Seismic Upgrades at La Colina and Hunter Substations Project Overview April 1, 2011
20

Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

Jun 25, 2018

Download

Documents

phungnguyet
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

Seismic Upgrades at La Colina

and Hunter Substations

Project Overview

April 1, 2011

Page 2: Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

Seismic Upgrades at

La Colina and Hunter Subs

Seismic analysis initiated to confirm structural

integrity due to past modifications and future

apparatus upgrades.

Seismic analysis resulted in recommended

upgrades of substation structures, foundations,

and anchor bolts.

Page 3: Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

Seismic Analysis

Methodology

Lattice Steel structures at La Colina and Hunter

Substations were modeled using a structural

computer program (STAAD Pro - V8i)

2008 U.S. Geological Survey’s Seismic Hazard

Maps

Provides levels of horizontal shaking that have a 2-in-

100 chance of being exceeded in a 50-year period.

Calculation Standards and Practices

ASCE Std. 7-05, “Minimum Design Loads for Buildings

and Other Structures”

ASCE Engineering Practice No. 113-2008, “Substation

Structure Design Guide”

IEEE Std. 693-2005, “Recommended Practice for

Seismic Design of Substations”

Page 4: Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

La Colina Substation

La Colina built in 1960’s

Steel Box-type Overhead Frame

Assembly (Lattice Structure)

Eight bays with an overall footprint of 50

ft. x 102 ft. laid out in a 4x2 pattern

Some structural modifications done

since 1960, but documentation is not

sufficient to confirm structural integrity

Future planned apparatus upgrades may

add weight to the existing structures

Page 5: Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

La Colina Substation

Page 6: Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

Original cross arms were relocated

to this position from adjacent bay at

left (just off slide to left)

La Colina - Example of Modification with Insufficient Documentation

Page 7: Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

overstressed

members in

red (typ.)

La Colina Seismic Analysis - Model

Page 8: Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

La Colina Analysis Results

Outside bay structures: analysis concluded

some structural members were overstressed

when placed under design loading conditions

Foundations and anchor bolts throughout the

structure were determined to be overstressed

under similar conditions (pull out failure)

Page 9: Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

La Colina Seismic

Recommended Upgrades

Outside bay structures: upgrade overstressed

structural cross members and add some new

cross members

Foundations and anchor bolts: reinforce

foundations to strengthen concrete around

anchor bolts (addresses pull out failure)

No anticipated customer outages, but requires

some high voltage bus outages and significant

coordination by RPU

Significant construction labor since limited

access and electrical clearances require hand

digging by construction crews

Page 10: Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

Upgraded steel

members.

New member.

La Colina Seismic Upgrades

Page 11: Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

Concrete collars will be added

to reinforce existing

structure foundations.

La Colina Seismic Upgrades

Page 12: Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

Hunter Substation

Hunter built in early 1960’s

Three bays added in late 1980’s

Some structural modifications done, but

documentation is not sufficient to confirm

structural integrity of entire structure (both

original bays and added bays)

Future planned apparatus upgrades may add

weight to the existing structures

Page 13: Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

Hunter Substation

Added 1986

Original 1960

Page 14: Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

Original location of

cross member

connection

Current location of

cross member

connection

Hunter - Example of Modification with Insufficient Documentation

Page 15: Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

Original cross

member used to be

one piece, but was

modified as shown.

Hunter - Example of Modification with Insufficient Documentation

Page 16: Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

Hunter Analysis Results

Multiple overstressed structural members in

original three bay section designed and

originally constructed in 1960s

Foundations and anchor bolts: overstressed in

both the older and newer sections of the overall

structure

Page 17: Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

Hunter Seismic Analysis Results

overstressed

members

bolded (typ.)

Page 18: Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

Hunter Seismic Upgrades

Further evaluation required to determine

appropriate modifications and the method by

which those modifications are implemented

Further evaluation will help determine cost,

schedule, and electric system impacts due to

the extent of the complex modifications at an

essential substation

Page 19: Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

Summary – La Colina Sub

La Colina Substation

Board requested to approve work order in the

amount of $266,240 for seismic upgrades at

La Colina substation

• Seismic upgrades include

– Modifications to lattice structure

– Reinforcement of foundations

Construction to begin in Summer 2011 and

complete in Fall 2011

Page 20: Seismic Upgrades at La Colina and Hunter Substations ... · and Hunter Substations Project Overview April 1, 2011 . ... and anchor bolts. ... (STAAD Pro - V8i)

Summary – Hunter Sub

Hunter Substation

Further evaluation is required to determine

appropriate modifications.

• To be approved separately from today’s

action and will come back to Board, if

required