Seismic hazard analysisin

Santo Domingo City

Team 4Report

Page 2: Seismic hazard analysis in Santo Domingo City Team 4 Report.

• Study area• Geological setting• HVSR technique• ReMi, Masw and Spac techniques• Final discussion

Outline

Page 3: Seismic hazard analysis in Santo Domingo City Team 4 Report.

Team Members

Pablo Rocio Fernando

VenezuelaHondurasDominican Rep.

Page 4: Seismic hazard analysis in Santo Domingo City Team 4 Report.

Team Members

Junior

Haiti

Lidia

Honduras

Norberto

Puerto Rico

Heriberto

Dominican Rep.

Page 5: Seismic hazard analysis in Santo Domingo City Team 4 Report.

Study Area

Profile 1Profile 2

Profile 3

Profile 4Profile 5

Profile 6

Page 6: Seismic hazard analysis in Santo Domingo City Team 4 Report.

Geological setting of Santo Domingo

Stratigraphic column

Page 7: Seismic hazard analysis in Santo Domingo City Team 4 Report.

HVSR technique

Page 8: Seismic hazard analysis in Santo Domingo City Team 4 Report.

H/V data acquisition

Page 9: Seismic hazard analysis in Santo Domingo City Team 4 Report.

Geology (Team 4 HVSR study area)

Page 10: Seismic hazard analysis in Santo Domingo City Team 4 Report.

H/V station deployments

Page 11: Seismic hazard analysis in Santo Domingo City Team 4 Report.

H/V Results:

2.60 s

Station SD03_p2-p3(1508_9282_202)

4.02 s

Station SD06_p3-p4(1526_92F1_202)

?? ?

Page 12: Seismic hazard analysis in Santo Domingo City Team 4 Report.

H/V Results:

Station SD02_p3-p4(1349_92F1_202)

Station SD03_p3-p4S

(1410_949A_202)

4.32 Secs

3.70 Secs

?

?

Page 13: Seismic hazard analysis in Santo Domingo City Team 4 Report.

H/V Results:

Station SD07_p3-p4 (1550_949A_202)

Station SD04_p2-p3(1532_950C_202)

3.71 Secs 2.38 Secs

?? ?

Page 14: Seismic hazard analysis in Santo Domingo City Team 4 Report.

H/V Results:

Station SD01A_p3-p4 (1300_92F1_202)

Station SD01B_p3-p4 (1308_949A_202)

0.28 Hz 3.58 Secs

0.27 Hz 3.70 Secs

??

Page 15: Seismic hazard analysis in Santo Domingo City Team 4 Report.

Isoperiods Map (seconds)

Page 16: Seismic hazard analysis in Santo Domingo City Team 4 Report.

ReMi and Masw techniques

Page 17: Seismic hazard analysis in Santo Domingo City Team 4 Report.

ReMi and Masw data acquisition

Page 18: Seismic hazard analysis in Santo Domingo City Team 4 Report.

Location for ReMi, Spac and Masw surveys

Mirador sur Av.

Mirador del Sur park

Remi and Masw Line 1Remi Line 2

Spac 1Spac 2

Remi Line 3

Page 19: Seismic hazard analysis in Santo Domingo City Team 4 Report.

Remi velocity model Line 2

Page 20: Seismic hazard analysis in Santo Domingo City Team 4 Report.

Dispersion model Line 2

Page 21: Seismic hazard analysis in Santo Domingo City Team 4 Report.

Soil Characterization near to ReMi 2

Page 22: Seismic hazard analysis in Santo Domingo City Team 4 Report.

Soil Classification DR Seismic Code

Page 23: Seismic hazard analysis in Santo Domingo City Team 4 Report.

727 m

Remi Model Line 3

Page 24: Seismic hazard analysis in Santo Domingo City Team 4 Report.

Dispersion curve for Line 3

Page 25: Seismic hazard analysis in Santo Domingo City Team 4 Report.

65.5

m

Last

13.

5 m

Limestone!

Borehole S-4

Vs = 2083 m/s

Vs = 1261 m/s

Vs = 978 m/s

Vs = 795 m/s

Dispersion curveRMS error: 26.623 m/sVs = 909.136 m/sIBC class site B

Line 3 Remi Model

Page 26: Seismic hazard analysis in Santo Domingo City Team 4 Report.

MASW Line 1 results

Page 27: Seismic hazard analysis in Santo Domingo City Team 4 Report.

MASW Line 1 results

Page 28: Seismic hazard analysis in Santo Domingo City Team 4 Report.

Spac technique

Page 29: Seismic hazard analysis in Santo Domingo City Team 4 Report.

Location for Spac survey No. 2

Mirador sur Av.

Mirador del Sur park

Remi and Masw Line 1Remi Line 2

Spac 1Spac 2

Remi Line 3

Page 30: Seismic hazard analysis in Santo Domingo City Team 4 Report.

Spac survey No. 2 ground model

Page 31: Seismic hazard analysis in Santo Domingo City Team 4 Report.

• HVSR results have a good relationship with the geological environment of deposition (alluvial fal, prodelta), that is the reason because we got high predominant period peaks.

• Remi, Masw and Spac techniques revealed a high velocity layering structure, validated by 8 boreholes drilled near from the team’s study site.

• Remi line 2 could be defined as a Class C site (360-760 m/s, Stiff Soil- standard designs - NERHP).

• Remi lines 3 could be defined as a Class B site (760-1500 m/s, Soft Rock- low-hazard design - NERHP).

Conclusions