    SEEMP Webinar

    The Ship Energy Efficiency

    Management Plan (SEEMP)

    11 March 2013

  • 8/10/2019 SEEMP-forBIMCOweb

    2/21

    Introduction

    The Ship Energy Efficiency Management Plan(SEEMP) is an operational measure thatestablishes a mechanism to improve theenergy efficiency of a ship in a cost-effectivemanner.

    As per the IMO regulation, a SEEMP must beprepared for each ship.

    The SEEMP is not just another paper on

    board but a tool, for ship energyoptimisation, and therefore becomes an idealopportunity for the operator to cut fuel costsby increasing the energy efficiency of theship.

  • 8/10/2019 SEEMP-forBIMCOweb

    3/21

    Introduction

    The SEEMP urges the shipowner andoperator at each stage of the plan toconsider new technologies and practiceswhen seeking to optimize the performance ofa ship.

    Done properly it should significantly reducefuel consumption.

    The SEEMP also provides an approach for

    shipping companies to manage ship and fleetefficiency performance over time using, forexample, the Energy Efficiency OperationalIndicator (EEOI) as a monitoring tool.

  • 8/10/2019 SEEMP-forBIMCOweb

    4/21

    Application

    The SEEMP was made mandatory by theInternational Maritime Organization (IMO)for all ships over 400GT on internationalvoyages from 1 January 2013 at the firstrenewal or intermediate survey after this

    date.

    SEEMP will not be subject to approval byFlag States or Recognized Organizations, butwill be part of chapter 4 of MARPOL Annex VIregulations and be required under theInternational Energy Efficiency Certificate(IEEC).

  • 8/10/2019 SEEMP-forBIMCOweb

    5/21

    Application

    The SEEMP is a softregulation and there isno mechanism to force or even incentiviseship operators to implement the measureslisted in their SEEMPs.

    Monitoring and enforcement is limited tosimply verifying that the SEEMP exists onboard, as a part of the official shipsdocument.

    Thus the SEEMP may be required to bepresented to Port State Control.

  • 8/10/2019 SEEMP-forBIMCOweb

    6/21

    A plan is essential

    The way in which an SEEMP is implementeddetermines whether it is successful or not.

    Planning is identified by the IMO Guidelines

    as the most crucial stage of the SEEMPprocess.

    Each ship specific plan should bemonitored, updated and improved upon

    frequently throughout the life of the vessel.

  • 8/10/2019 SEEMP-forBIMCOweb

    7/21

    SEEMP - four steps

  • 8/10/2019 SEEMP-forBIMCOweb

    8/21

    Energy Efficiency OperationalIndicator (EEOI)

    The EEOI enables operators to measure thefuel efficiency of a ship in operation and togauge the effect of any changes in operation

    Like improved voyage planning or morefrequent propeller cleaning, or introductionof technical measures such as waste heatrecovery systems or a new propeller.

    The Ship Energy Efficiency OperationalIndicator, set out in IMO MEPC.1/Circ.684

  • 8/10/2019 SEEMP-forBIMCOweb

    9/21

    SEEMP in conjunction withISO standards

    The mandatory SEEMP must be preparedand tailored for each ship.

    Many Classification Societies offer such

    services as turn-key solution, oftendeveloped in conjunction withimplementation of ISO 14001 or ISO50001.

    ISO 50001 - Energy Management Systems ISO 14001 - Environmental Management

    Systems

  • 8/10/2019 SEEMP-forBIMCOweb

    10/21

    The Step-by-Step SEEMPManual

    BIMCO in association with Fathom has issuedtheStep-by-Step SEEMP Manual.

    The regulation is so open-ended, and the

    spectrum of potential measures to improveenergy efficiency is so broad that it can bedifficult to know where to begin.

    Provides the ship-owners and operators a

    one-stop solution that allows them to easilycreate ship specific plans in-house at lowcost.

  • 8/10/2019 SEEMP-forBIMCOweb

    11/21

    The Step-by-Step SEEMPManual

  • 8/10/2019 SEEMP-forBIMCOweb

    12/21

    The Step-by-Step SEEMPManual

    BIMCO finds that a simple SEEMPimplemented effectively is better than acomplicated document that may not befollowed.

    Link to the BIMCO Step-by-Step SEEMPmanual:

    https://www.bimco.org/Home/Products/Manuals-Pamphlets/SEEMP_Guide.aspx

    Or contact [email protected]

    https://www.bimco.org/Home/Products/Manuals-Pamphlets/SEEMP_Guide.aspxhttps://www.bimco.org/Home/Products/Manuals-Pamphlets/SEEMP_Guide.aspxhttps://www.bimco.org/Home/Products/Manuals-Pamphlets/SEEMP_Guide.aspxhttps://www.bimco.org/Home/Products/Manuals-Pamphlets/SEEMP_Guide.aspxhttps://www.bimco.org/Home/Products/Manuals-Pamphlets/SEEMP_Guide.aspxhttps://www.bimco.org/Home/Products/Manuals-Pamphlets/SEEMP_Guide.aspxhttps://www.bimco.org/Home/Products/Manuals-Pamphlets/SEEMP_Guide.aspx
  • 8/10/2019 SEEMP-forBIMCOweb

    13/21

    HANZEVAST

    Step-by-Step SEEMP Implementation

    06 March, 2013

    Hielke Lok

    [email protected]

    +31 (0) 6 411 80 858

    mailto:[email protected]:[email protected]
  • 8/10/2019 SEEMP-forBIMCOweb

    14/21

    1. Send the Bimco Step-by-Step SEEMP manual to theCaptains of our vessels

    2. Making of a separate SEEMP manual for our fleet (based

    on a combination of Bimco Step-by-Step manual and IMOcirculars)

    3. Reference made in our ISM system and in our companypolicy

    Start SEEMP

  • 8/10/2019 SEEMP-forBIMCOweb

    15/21

    1. Document distribution list

    2. Revision record

    3. Review record

    4. Introduction

    5. Application

    6. Best Management practices for improving Energy

    Efficiency

    7. Appendix

    Structure of our Fleet based SEEMP Manual

  • 8/10/2019 SEEMP-forBIMCOweb

    16/21

    7 Appendix

    1. Ship specific measures

    2. EEOI calculator

    3. Evaluation of the SEEMP

    4. EEOI Calculator (excel sheet)

    5. Measures checklist

    6. Heating plan and extract for tankers

    7. IMO circulars

    Structure of our Fleet based SEEMP Manual 2

  • 8/10/2019 SEEMP-forBIMCOweb

    17/21

    1. Planning- ship specific measures

    - in appendix of manual

    - based on the general best practices

    - familiarization and training

    - goal setting (EEOI)

    2. Implementation

    3. Monitoring

    4. Self-evaluation / improvement

    - in appendix of manual

    Application

  • 8/10/2019 SEEMP-forBIMCOweb

    18/21

    1. Routing procedures

    2. Accomodation energy optimization

    3. Communication between departments

    Best Management Practices for improvement

  • 8/10/2019 SEEMP-forBIMCOweb

    19/21

    1. Routing procedures

    - WNI & SPOS

    2. Accomodation energy optimization

    - closing of doors

    - lighting

    - galley

    - laundry

    3. Communication between departments

    - communication running of machinery

    Ship Specific Energy Measures

    Based on the best management practices

  • 8/10/2019 SEEMP-forBIMCOweb

    20/21

    1. Use existing software on board

    2. Use existing procedures

    3. Use existing forms/checklists of your ISM system for

    record keeping

    4. Mention for every specific energy saving measure

    1. Implementation actions

    2. Recordkeeping method

    3. Monitoring

    4. Who is responsible

    Ship Specific Energy Measures 2

  • 8/10/2019 SEEMP-forBIMCOweb

    21/21

    MR SEEMP SAYS: SAVE ENERGY

    - Switch off the lights when leaving your cabin

    - Switch of lights when leaving the toilet- Wash hands after use max 20 seconds

    - Send clean emails without old attachments to save energy

    and be environmental conscious

    MR SEEMP SAYS: THANK YOU

    Implementation on board