Page 1: see slide show (Femern A/S)

Henrik Christensen, Technical Director

Status on the Fehmarnbelt project

Femern A/S

Page 2: see slide show (Femern A/S)

Three mega projects in one generation

Henrik Christensen08 June 2016

Page 3: see slide show (Femern A/S)

A European – and regional - connection

08 June 2016Henrik Christensen

Page 4: see slide show (Femern A/S)

08 June 2016Henrik Christensen

Page 5: see slide show (Femern A/S)

The Fehmarnbelt Tunnel – a world record

08 June 2016Henrik Christensen

Project features:Tunnel length: 18km Tunnel type: immersed tunnel (tube)Modes: 4 lane motorway with emergency lanesTwin track railway in separate tubes

Economy:Estimated tunnel cost: €7.1 billionLoans are state guaranteed and payedback via user tolls Total repayment period: 36 years

Page 6: see slide show (Femern A/S)

Standard and special elements

08 June 2016Henrik Christensen

Page 7: see slide show (Femern A/S)

Work Sites on Lolland and Fehmarn

08 June 2016Henrik Christensen

Page 8: see slide show (Femern A/S)

Regional interaction on jobs and business

§ The direct employment estimated to 25,000 man years

§ One job on site is followed by one job in supply chain

§ Strong regional business backup to our contractors

08 June 2016Henrik Christensen

Page 9: see slide show (Femern A/S)

The four main construction contracts

08 June 2016Henrik Christensen

Page 10: see slide show (Femern A/S)

Contractor – Dredging & reclamation

§ Fehmarn Belt Contractors:

Company CountryBoskalis International B.V. NetherlandsVan Oord Dredging and Marine Contractors b.v.

Netherlands

Consultants: SWECO Danmark A/S Denmark

08 June 2016Henrik Christensen

Page 11: see slide show (Femern A/S)

Contractor – Tunnel (North and South)

§ Fehmarn Link Contractors:Company CountryVinci Construction Grand Projets s.a.s FrancePer Aarsleff Holding A/S DenmarkWayss und Freytag Ingenieurbau AG GermanyMax Bögl Stiftung & Co KG GmbH GermanyCFE SA BelgiumSolétance-Bachy International FranceBAM Infra BV NetherlandsBAM International BV NetherlandsConsultants: COWI A/S Denmark

08 June 2016Henrik Christensen

Page 12: see slide show (Femern A/S)

Contractor – Portals & Ramps

§ Fehmarn Link Contractors:Company CountryPer Aarsleff Holding A/S DenmarkVinci Construction Grand Projets s.a.s FranceWayss und Freytag Ingenieurbau AG GermanyMax Bögl Stiftung & Co KG GmbH GermanyCFE SA BelgiumSolétance-Bachy International FranceBAM Infra BV NetherlandsBAM International BV NetherlandsConsultants: COWI A/S Denmark

08 June 2016Henrik Christensen

Page 13: see slide show (Femern A/S)
Page 14: see slide show (Femern A/S)
Page 15: see slide show (Femern A/S)

Henrik Christensen

Page 16: see slide show (Femern A/S)

Henrik Christensen

Page 17: see slide show (Femern A/S)

Tunnel element factory, ØresundNordhavn, Copenhagen

08 June 2016

Page 18: see slide show (Femern A/S)

Henrik Christensen

Page 19: see slide show (Femern A/S)

Henrik Christensen

Page 20: see slide show (Femern A/S)
Page 21: see slide show (Femern A/S)

More information:

Internet: www.femern.com Facebook: www.facebook.com/femernTwitter: www.twitter.com/femernas

08 June 2016Henrik Christensen