Top Banner
SEE-GRID-SCI NA4 Progress http://www.see-grid-sci.eu PSC05, Dubrovnik, 9-11 September 2009 Cevat Şener Dept. of Computer Engineering, Middle East Technical University, Ankara [email protected]
16

SEE-GRID-SCI

Jan 19, 2016

Download

Documents

hollis

SEE-GRID-SCI. NA4 Progress http://www.see-grid-sci.eu PSC05, Dubrovnik, 9-11 September 2009 Cevat Ş ener Dept. of Computer Engineering, Middle East Technical University, Ankara [email protected]. Current NA4 Activities. NA4.2 Adapt Grid applications - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SEE-GRID-SCI

SEE-GRID-SCI

NA4 Progresshttp://www.see-grid-sci.eu

PSC05,Dubrovnik, 9-11 September 2009

Cevat Şener

Dept. of Computer Engineering,Middle East Technical University, Ankara

[email protected]

Page 2: SEE-GRID-SCI

PSC05, Dubrovnik, 9-11 September 2009 2

Current NA4 Activities

NA4.2 Adapt Grid applications NA4.3 Support the deployed applications

Page 3: SEE-GRID-SCI

PSC05, Dubrovnik, 9-11 September 2009 3

Review Recommendations

In the second year of the project, the partners will need to place more emphasis on dissemination of the scientific outputs from the project.

Deliverable NA4.4 due in M24, User Community Engagement and Applications Assessment, should signpost:

the new science / new capabilities developed by the project; how the scientific state of the art has been advanced by the

project; how the grid has helped advance the science base.

In addition, it will be important to point to scientific papers produced by the project that have appeared in refereed conferences/journals outside the grid community in the scientific field of interest.

Page 4: SEE-GRID-SCI

PSC05, Dubrovnik, 9-11 September 2009 4

Application Dissemination Application Web Pages:

To achieve AP#135, application developers are expected to prepare web pages with substantial content on their applications (also, continuing to keep the targeted content at the wiki might be an option if it is appropriate for that full content).

Wiki should hold the rich content for application descriptions or links to the actual web pages.

Still very limited content on the Web! One application with a web page and a link from wiki to it;

Some (ROMS, e.g.) with a web page but w/o link from wiki. Need immediate action by the developers. We may also consider having direct links from project web

to wiki page of VOs or to application web pages.

Page 5: SEE-GRID-SCI

PSC05, Dubrovnik, 9-11 September 2009 5

Application Dissemination

iSGTW Submissions: Coordinated by NA3. Developers should follow the submission schedule.

Focus: Should not limited to the Grid conferences etc. More emphasis should be given to the publications in our

scientific domains: Meteorology, Seismology, Environmental Protection.

Each VO can form (and keep updated) a list of conferences, workshops, journals etc. in the scientific domain for the members to submit their results – VO Leaders + Scientific Representatives can lead this process.

Page 6: SEE-GRID-SCI

PSC05, Dubrovnik, 9-11 September 2009 6

Application Dissemination

Deployment in production: Lets have some version deployed in production as

early as possible – November 2009, latest. Should be made available to the scientific community

to attract potential users. Generated results should be disseminated as well.

SEE-GRID-SEE User Forum: Every application is expected to submit an abstract.

Page 7: SEE-GRID-SCI

PSC05, Dubrovnik, 9-11 September 2009 7

Applications' Progress

Details are to be covered within the VO presentations. Critical: CHERS is still behind the schedule.

RO team declared that they are ready to help technically.

However, the problem is now more administrative. Update in the development timeline needed, and

must be strictly obeyed.

Page 8: SEE-GRID-SCI

PSC05, Dubrovnik, 9-11 September 2009 8

New Applications: ROMS and CCIAQ

NA4 Application Questionnaire was filled by both of them. Presentation uploaded to "Downloads > NA4 > Applications_August08"

by ROMS only – Expected from CCIAQ as well. ROMS has no regional collaboration yet! With AL, ME? Other possible operations:

Filling in JRA1 and SA1 surveys. Updating the timeline to create the iSGTW articles, e.g. appending

ROMS and CCIAQ to M23. Updating the lists, tables etc. of Envo VO – Wiki has already been

updated, but it might be needed to go over the VOMS groups. Suggestion for VO ASG teams to be formed:

CCIAQ → S.Ivanovska, E.Atanassov + A.Balasko ROMS → D.Davidovic + N.Frasheri

Page 9: SEE-GRID-SCI

PSC05, Dubrovnik, 9-11 September 2009 9

New Extension: EnviMon to GreenView

Proposed by MD team. Goals were clarified, and timeline provided:

Page 10: SEE-GRID-SCI

PSC05, Dubrovnik, 9-11 September 2009 10

Application Accounting

Here is the current status : The Seismo VOMS is ready. Three application groups on the Meteo VOMS:

/GR/App/REFS, /RS/App/REFS, /HR/App/WRF-ARW

Normally, one group per application is assumed – We should check if it creates any problem for accounting or not?

/GR/App/REFS has two members, but the others have none. The Envo VOMS not responding: When checked before, there were

some –but not all– of the application groups defined on it with the registered users.

A user should declare his/her role using the "voms-proxy-init" command before submitting an application (may not be required if s/he is registered to only one application group).

Page 11: SEE-GRID-SCI

PSC05, Dubrovnik, 9-11 September 2009 11

Application Accounting

“Elapsed Time” figures taken from the new interface:

MPI jobsMPI jobs Q1Q1 Q2Q2 Q3Q3 Q4Q4 Q5Q5

EnvoEnvo 00 00 30083008 24822482 00

MeteoMeteo 523523 1690216902 1157811578 24352435 00

SeismoSeismo 00 00 00 00 11

Single jobsSingle jobs Q1Q1 Q2Q2 Q3Q3 Q4Q4 Q5Q5

EnvoEnvo 00 00 1111 36563656 31173117

MeteoMeteo 00 420420 12691269 859859 13771377

SeismoSeismo 00 00 00 278278 5858

Page 12: SEE-GRID-SCI

PSC05, Dubrovnik, 9-11 September 2009 12

VO Meetings

VO meetings (incl. EVO) expected to be held regularly – once bimonthly.

Also, their minutes need to be uploaded to the project web in the SEE-GRID-SCI format.

On the web only the following minutes are available: Minutes of the EVO-1 Meteorology Minutes of the EVO-1 Seismology Minutes of the EVO-2 Meteorology

Others: Not held or Held but their minutes not uploaded?

Page 13: SEE-GRID-SCI

PSC05, Dubrovnik, 9-11 September 2009 13

DNA4.3 – Gridification Guideline

Draft ToC has been announced by Davor. It needs to be finalized first.

Contributions expected from Activity / VO Leaders. By circulating through the e-mails very quickly or

by F2F communication during PSC05. Next, we can create the wiki sections accordingly and

assign the responsibilities. There we can also make use of the "Contribution Policy",

"Instructions for Contributions" and the other content left from SEE-GRID2.

Page 14: SEE-GRID-SCI

PSC05, Dubrovnik, 9-11 September 2009 14

Collaboration with GENESI-DR

Latest status: They are checking the data access techniques for

different data types, formats etc. The main problem is the certification and the access

rights. For each data source two certificates are needed: One certification is given by GENESI-DR portal (ESA), and another one is given by the data owner (the particular data repository). That means for each data source one need different certification.

The GENESI-DR project is on the development as well, and all the problems, and our requirements are resolved on the way.

Page 15: SEE-GRID-SCI

PSC05, Dubrovnik, 9-11 September 2009 15

Action Points

Application web pages should be completed as described [Developers, October'09]

The iSGTW submissions schedule should be obeyed by the developers.

VO Leaders and Scientific Representatives guide the members for scientific publications by providing a list of scientific events + journals to be targeted [VO Leaders + Scientific Rep., October'09].

Some version of the applications should be deployed in production and made accessible to the scientific community to attract potential users [Developers, November'09].

Applications should submit abstract to the User Forum [Developers, September'09].

The development timeline of CHERS needs to be updated and followed [Neki Frasheri, October'09].

Page 16: SEE-GRID-SCI

PSC05, Dubrovnik, 9-11 September 2009 16

Action Points

Regarding our new applications: The application presentation for CCIAQ should be uploaded [Dimiter

Syrakov, September'09]. Regional collaborations for ROMS [Davor Davidovic, October'09]. VO ASG teams for ROMS and CCIAQ [Cevat Sener and Alex

Stanciu, September'09]. VOs should make sure that application groups are ready on

VOMS, and users declare roles [Technical Rep., September'09]. VO meetings should be held, and minutes should be uploaded

regularly [VO Leaders]. Members of the collaborating institutes should register to VOMS. ToC for DNA4.3 should be finalized; corresponding wiki sections

should be created and assigned to the relevant teams [Davor Davidovic and Cevat Sener, September'09].