    SECTION 3

    SCOPE OF WORK

    TRUNK LINE PHASE 2 STEEL PIPE

    Bid No.CMIT-PRT-10.30-150044

    June, 2015

    Dubai, U.A.E.

  • 7/24/2019 Section 3 Technical Package

    2/19

    SECTION 3TECHNICAL PACKAGE

    DESCRIPTION OF MATERIALS

    SEAMLESS& SAWLMATERIALS

    Steel Pipe and bend for Trunk line:

    (1)The supplier must provide ITP and MPS to Company,and Supplier can execute implementation after getting approval from

    Company.

    (2)The Internal and External anticorrosiveexecuting, supplier must report technical specificationsto Company to review, and get

    approvalfrom Company before executing.

    (3)The amount of bidding materials in the ITT files may have relative modifications during the contract period which are required by

    Company according to the actual site situation, and the modification parts would be calculated according to the actual quantity and

    contract price in the contract.

    (4)The supplier shall submit completion and handover documents according to Companys request instruction. And the follow

    document list is for your information.

    Completion document contents

    Item Description Document No

    3.1 Technical specification of the project -

    3.1.1 Technical specification of bare pipe3.1.2 Technical specification of 3PP

    3.2 Production process specification -

    3.2.1 Production process specification of bare pipe

    3.2.2 Production process specification of 3PP

    3.3 Quality control plan -

  • 7/24/2019 Section 3 Technical Package

    3/19

    3.3.1 Quality control plan of bare pipe

    3.3.2 Quality control plan of 3PP

    3.4 Technological change record -

    3.4.1 Technological change record of bare record

    .... .... According to the actual

    3.5 The third party release permit3.5.1 First vessel

    3.5.2 Second vessel

    3.5.3 Third vessel

    .... .... According to the actual

    3.6 Bill of material

    3.6.1 First vessel

    3.6.2 Second vessel

    3.6.3 Third vessel

    .... .... According to the actual

    3.7 Factory quality inspection certificateIncluding but not limited the following content

    A)Chemical component analysis

    B)Mechanical property test:

    Tensile test

    Bend test

    Impact testing

    Drop hammer test

    Hardness measurement

    C) Hydrostatic testing pressure

    D) Nondestructive testing results

    3.8 Macro metallographic report

    3.9 Welding process

    3.10 pair weldingprocess

    http://../Documents/Documents%20and%20SettingsAdministratorLocal%20SettingsApplication%20DataYodaoDeskDictframe20150401141735javascript:void(0);http://../Documents/Documents%20and%20SettingsAdministratorLocal%20SettingsApplication%20DataYodaoDeskDictframe20150401141735javascript:void(0);http://../Documents/Documents%20and%20SettingsAdministratorLocal%20SettingsApplication%20DataYodaoDeskDictframe20150401141735javascript:void(0);http://../Documents/Documents%20and%20SettingsAdministratorLocal%20SettingsApplication%20DataYodaoDeskDictframe20150401141735javascript:void(0);http://../Documents/Documents%20and%20SettingsAdministratorLocal%20SettingsApplication%20DataYodaoDeskDictframe20150401141735javascript:void(0);http://../Documents/Documents%20and%20SettingsAdministratorLocal%20SettingsApplication%20DataYodaoDeskDictframe20150401141735javascript:void(0);http://../Documents/Documents%20and%20SettingsAdministratorLocal%20SettingsApplication%20DataYodaoDeskDictframe20150401141735javascript:void(0);http://../Documents/Documents%20and%20SettingsAdministratorLocal%20SettingsApplication%20DataYodaoDeskDictframe20150401141735javascript:void(0);http://../Documents/Documents%20and%20SettingsAdministratorLocal%20SettingsApplication%20DataYodaoDeskDictframe20150401141735javascript:void(0);http://../Documents/Documents%20and%20SettingsAdministratorLocal%20SettingsApplication%20DataYodaoDeskDictframe20150401141735javascript:void(0);http://../Documents/Documents%20and%20SettingsAdministratorLocal%20SettingsApplication%20DataYodaoDeskDictframe20150401141735javascript:void(0);http://../Documents/Documents%20and%20SettingsAdministratorLocal%20SettingsApplication%20DataYodaoDeskDictframe20150401141735javascript:void(0);http://../Documents/Documents%20and%20SettingsAdministratorLocal%20SettingsApplication%20DataYodaoDeskDictframe20150401141735javascript:void(0);http://../Documents/Documents%20and%20SettingsAdministratorLocal%20SettingsApplication%20DataYodaoDeskDictframe20150401141735javascript:void(0);http://../Documents/Documents%20and%20SettingsAdministratorLocal%20SettingsApplication%20DataYodaoDeskDictframe20150401141735javascript:void(0);http://../Documents/Documents%20and%20SettingsAdministratorLocal%20SettingsApplication%20DataYodaoDeskDictframe20150401141735javascript:void(0);http://../Documents/Documents%20and%20SettingsAdministratorLocal%20SettingsApplication%20DataYodaoDeskDictframe20150401141735javascript:void(0);http://../Documents/Documents%20and%20SettingsAdministratorLocal%20SettingsApplication%20DataYodaoDeskDictframe20150401141735javascript:void(0);http://../Documents/Documents%20and%20SettingsAdministratorLocal%20SettingsApplication%20DataYodaoDeskDictframe20150401141735javascript:void(0);http://../Documents/Documents%20and%20SettingsAdministratorLocal%20SettingsApplication%20DataYodaoDeskDictframe20150401141735javascript:void(0);
  • 7/24/2019 Section 3 Technical Package

    4/19

    3.11 PQR

    3.12 pair welding procedure qualification

    3.13 Weld material information

    3.14 Anticorrosion material information

    3.15 Steel pipe retrieve listing

    (5)The third party inspection unit, supplier must choose the Iraqi government approved list provided by Company; the information as

    below:

    S/N TPI Companies

    1 LIoyds Register EMA

    2 Bureau Veritas of France

    3 Intertek Group PLC

    4 TUV Rheinland Middle East FZE

    5 DNV

    Ender user department proposed the Key technical indicators are as follows:

    (1) Rules of origin for pipes: Steel plates used in Steel pipes must be labeled of the original country.(2) Company do not accept agent bidding.

    (3) Supplier qualification: In accordance with America Petroleum Institute (API) certification of authorization to the supplier.

    (4)The Supplier has its own whole process of iron smelting, steelmaking, and steel pipe manufacture factory.

  • 7/24/2019 Section 3 Technical Package

    5/19

    (5) The Supplier must have its own anti-sulfur laboratory, and the laboratory needs to have ISO 17025 Certificate.

    (6) The Supplier shall ensure 90% of the iron ore are from Australia or Brazil at least.

    (7) Either the Supplier has the steel pipes supplying performance in IRAQ, or the Supplier has the Market Access Approval from

    Ministry of Oil (MoO) of IRAQ

    PART I: Pipe Related Specifications as follows:

    1.CILBCFQ-710-COM-15.03-10005_0_QUALITY ASSURANCE SPECIFICATION

    2.CILBCFQ-710-COM-15.03-10010_0_CRITICALITY RATING PROCEDURE

    3.CILBCFQ-710-PAI-15.03-10001_0_PAINTING SPECIFICATION FOR VENDORS

    4.CILBCFQ-710-PIP-15.03-10011_0A_SPECIFICATION FOR PIPING GENERAL DESIGN

    5.CILBCFQ-710-PIP-15.03-10012_0_SPECIFICATION FOR PRESSURE TESTING OF PIPING SYSTEM

    6.CILBCFQ-710-PIP-15.03-10013_0_SPECIFICATION FOR PIPING FABRICATION

    7.CILBCFQ-710-PIP-15.03-10016_0_SPECIFICATION FOR PIPING MATERIALS

    8.CILBCFQ-710-PIP-15.03-10022_0_SPECIFICATION FOR BNS FITTINGS

    9.CILBCFQ-710-PIP-15.03-10030-B_SPECIFICATION FOR PAINTING10.CILBCFQ-710-PIP-15.03-10105_0_SPECIFICATION FOR FUSION BONDED EPOXY COATING FOR GIRTH WELDS _FIELD

    COATING

    11..CILBCFQ-710-PIP-15.03-10106_0_SPECIFICATION FOR MULTI-COMPONENT EPOXY COATING

    12.CILBCFQ-710-PIP-15.03-10107_0_SPECIFICATION FOR TRANSPORTATION AND HANDLING OF STEEL LINE PIPE

    13.CILBCFQ-710-PIP-15.03-10111_0_SPECIFICATION FOR HOT INDUCTION BENDS

    14.CILBCFQ-710-PIP-15.03-10115_0_SPECIFICATION FOR HYDROSTATIC TESTING

    15.CILBCFQ-710-PIP-15.03-10116_0_SPECIFICATION FOR PIPELINE STRESS ANALYSIS AND FLEXIBILITY CHECK

    16.CILBCFQ-710-PIP-15.03-10120_0_SPECIFICATION FOR PIPELINE MATERIALS

    17.CILBCFQ-710-PIP-15.03-10205_1_Specification For BNS SAWL Piping Material

    18.CILBCFQ-710-PIP-15.03-10208_1_Specification for X52NS Pipeline Material in Sour Service19.CILBCFQ-710-PRT-15.91-10010_0_SPECIFICATION FOR SHIPPING, PACKING & MARKING INSTRUCTIONS

    20.CMIT-710-COM-15.69-1010-A_MATERIAL SELECTION REPORT

    21.CMIT-710-PAI-15.03-1002 SPECIFICATION FOR 3-LAYER PP COATING OF BURIED PIPEINE

    22.CMIT-710-PIP-15.03-1001-B_SPECIFICATION FOR PIPING MATERIALS

    23.CMIT-710-PIP-15.03-1010-B_SPECIFICATION FOR X52NS SAWL PIPELINE MATERIAL IN SOUR SERVICE

  • 7/24/2019 Section 3 Technical Package

    6/19

    24.CMIT-710-PIP-15.03-1011_A_SPECIFICATION FOR PIPING AND PIPELINE WELDING IN SOUR SERVICE25.CMIT-710-PIP-15.69-1001-B_PIPE WALL THICKNESS CALCULATION REPORT

    26.CILBCFQ-710-PIP-15.03-10121 SPECIFICATION OF FREE-SOLVENT LIQUID PHENOLIC EPOXY INTERNAL COATING FOR

    STEEL PIPELINE

    EXHIBIT 2 for more detailed information.

    PIPE and HOT BEND list:

    STEEL PIPE for Trunk line

    Item Quantity(km)

    Size(inch)

    Description Material Note(internal+external)

    1 12 16PIPE,C.S.SEAMLESS

    406X8.7mm

    API 5L

    PSL2 X52NSSour ServiceLPE +3PP

    2 36 18PIPE,C.S.SEAMLESS

    457X8.7mm

    API 5L

    PSL2 X52NSSour Service)LPE +3PP

    3 32 18PIPE,C.S.SAWL

    457X7.9mm

    API 5L

    PSL2 X52NSSour ServiceLPE+3PP

    4 13.5 20PIPE,C.S.SAWL

    508X9.5mm

    API 5L

    PSL2 X52NSSour Service)LPE+3PP

  • 7/24/2019 Section 3 Technical Package

    7/19

    5 0.6 24PIPE,C.S.SAWL

    610X9.5mm

    API 5L

    PSL2 X52NSSour ServiceLPE+3PP

    BEND for Trunk line

    Item Quantity Size(inch) Description MaterialNote

    internal

    external

    1 7 12

    RADIUS OFCURVATUR 5D , C.S.

    SEAMLESS ,20

    323X7.9mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

    7 12

    RADIUS OF

    CURVATUR 5D , C.S.

    SEAMLESS ,30

    323X7.9mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

    7 12

    RADIUS OFCURVATUR 5D , C.S.

    SEAMLESS ,45

    323X7.9mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

  • 7/24/2019 Section 3 Technical Package

    8/19

    7 12

    RADIUS OF

    CURVATUR 5D , C.S.

    SEAMLESS ,60

    D323X7.9mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

    4 12

    RADIUS OF

    CURVATUR 5D , C.S.

    SEAMLESS ,90

    323X7.9mm

    API 5L

    PSL2 X52NSSour Service LPE + dual-layer FBE

    2 40 16

    RADIUS OFCURVATUR 5D , C.S.

    SEAMLESS ,20

    406X8.7mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

    40 16

    RADIUS OF

    CURVATUR 5D , C.S.

    SEAMLESS ,30

    406X8.7mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

    40 16

    RADIUS OF

    CURVATUR 5D , C.S.SEAMLESS ,45

    406X8.7mm

    API 5LPSL2 X52NSSour Service

    LPE + dual-layer FBE

    40 16

    RADIUS OF

    CURVATUR 5D , C.S.

    SEAMLESS ,60

    406.4X8.7mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

    20 16

    RADIUS OF

    CURVATUR 5D , C.S.

    SEAMLESS ,90

    406X8.7mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

    3 30 18

    RADIUS OFCURVATUR 5D , C.S.

    SEAMLESS,20

    457X8.7mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

  • 7/24/2019 Section 3 Technical Package

    9/19

    30 18

    RADIUS OF

    CURVATUR 5D , C.S.

    SEAMLESS,30

    457X8.7mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

    30 18

    RADIUS OF

    CURVATUR 5D , C.S.

    SEAMLESS,45

    457X8.7mm

    API 5L

    PSL2 X52NSSour Service LPE + dual-layer FBE

    30 18

    RADIUS OFCURVATUR 5D , C.S.

    SEAMLESS ,60

    457X8.7mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

    18 18

    RADIUS OF

    CURVATUR 5D , C.S.

    SEAMLESS,90

    457X8.7mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

    4 28 18

    RADIUS OF

    CURVATUR 5D , C.S.SEAMLESS,20

    457X7.9mm

    API 5LPSL2 X52NSSour Service

    LPE + dual-layer FBE

    28 18

    RADIUS OFCURVATUR 5D , C.S.

    SEAMLESS,30

    457X7.9mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

    28 18

    RADIUS OF

    CURVATUR 5D , C.S.

    SEAMLESS,45

    457X7.9mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

    28 18RADIUS OFCURVATUR 5D , C.S.

    SEAMLESS ,60

    457X7.9mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

  • 7/24/2019 Section 3 Technical Package

    10/19

    14 18

    RADIUS OF

    CURVATUR 5D , C.S.

    SEAMLESS,90

    457X7.9mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

    5 12 20

    RADIUS OF

    CURVATUR 5D , C.S.

    SEAMLESS,20

    508X9.5mm

    API 5L

    PSL2 X52NSSour Service LPE + dual-layer FBE

    12 20

    RADIUS OFCURVATUR 5D , C.S.

    SEAMLESS,30

    508X9.5mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

    12 20

    RADIUS OF

    CURVATUR 5D , C.S.

    SEAMLESS,45

    508X9.5mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

    12 20

    RADIUS OF

    CURVATUR 5D , C.S.SEAMLESS ,60

    508X9.5mm

    API 5LPSL2 X52NSSour Service

    LPE + dual-layer FBE

    7 20

    RADIUS OFCURVATUR 5D , C.S.

    SEAMLESS,90

    508X9.5mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

    6 3 24

    RADIUS OF

    CURVATUR 5D ,

    C.S.SEAMLESS,20

    610X9.5mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

    3 24RADIUS OFCURVATUR 5D ,

    C.S.SEAMLESS,30

    610X9.5mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

  • 7/24/2019 Section 3 Technical Package

    11/19

    3 24

    RADIUS OF

    CURVATUR 5D ,

    C.S.SEAMLESS,45

    610X9.5mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

    3 24

    RADIUS OFCURVATUR 5D ,

    C.S.SEAMLESS,60

    610X9.5mm

    API 5L

    PSL2 X52NSSour Service LPE + dual-layer FBE

    2 24

    RADIUS OFCURVATUR 5D ,

    C.S.SEAMLESS,90

    610X9.5mm

    API 5L

    PSL2 X52NSSour ServiceLPE + dual-layer FBE

    APPENDIXC

    MILESTONE PAYMENT SCHEDULE

    1.NO. Item Subtotal Price

    (CIFUmmQasr Port, Iraq)

    1 First Lot

    2 Second Lot

    Note: The amount of bidding materials in the ITT files mayhaverelative

    modifications during the contract period which are required by Company

    according to the actual site situation, and the modification parts would be

    calculated according to the actual quantity and contract price in the contract.

    Total Price

    1.1 Table: Contract Price for First Lot

    STEEL PIPE for First Lot

  • 7/24/2019 Section 3 Technical Package

    12/19

    ItemQuantity

    (km)

    Size

    (inch)

    Description MaterialNote

    (internal+external)

    Country of

    Origin and

    Name of

    manufacturer

    Unit Price

    (USD/KM)

    CIF Umm

    Qasr Port,

    Iraq

    Subtotal

    Price

    (USD)

    CIF Umm

    Qasr Port,

    Iraq

    1 12 16PIPE,C.S.

    SEAMLESS

    406X8.7mm

    API 5LPSL2 X52NSSour

    Service

    LPE+3PP

    2 36 18

    PIPE,C.S.

    SEAMLESS

    457X8.7mm

    API 5L

    PSL2 X52NSSour

    Service

    LPE+3PP

    Total price of First Lot

    1.2 Table: Contract Price for Second Lot

    STEEL PIPEforSecond Lot

    ItemQuantity

    (km)

    Size

    (inch)Description Material

    Note

    (internal+external)

    Country of

    Origin and

    Name of

    manufacturer

    Unit Price

    (USD/KM)

    CIF Umm Qasr

    Port, Iraq

    Subtotal Price

    (USD)

    CIF Umm Qasr

    Port, Iraq

    1 32 18

    PIPE,C.S.

    SAWL

    457X7.9mm

    API 5L

    PSL2 X52NSSour

    Service

    LPE+3PP

    2 13.5 20

    PIPE,C.S.

    SAWL508X9.5mm

    API 5L

    PSL2 X52NSSourService

    LPE+3PP

    3 0.6 24

    PIPE,C.S.SAW

    L

    610X9.5mm

    API 5L

    PSL2 X52NSSour

    Service

    LPE+3PP

  • 7/24/2019 Section 3 Technical Package

    13/19

    Total Price of Steel pipe:

    HOT BEND for Second Lot

    Item Quantity(Pcs)

    Size(inch) Description Material Noteinternal

    external

    Country of

    Origin andName of

    manufacturer

    Unit Price

    (USD/pcs)CIFUmmQasrP

    ort, Iraq

    Subtotal Price

    (USD)CIF Umm Qasr

    Port, Iraq

    1 7 12

    RADIUS OF

    CURVATUR 5D ,

    C.S. SEAMLESS

    ,20

    323X7.9mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    7 12

    RADIUS OF

    CURVATUR 5D ,

    C.S. SEAMLESS

    ,30

    323X7.9mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    7 12

    RADIUS OF

    CURVATUR 5D ,

    C.S. SEAMLESS

    ,45

    323X7.9mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    7 12

    RADIUS OFCURVATUR 5D ,

    C.S. SEAMLESS

    ,60D323X7.9mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    4 12

    RADIUS OF

    CURVATUR 5D ,

    C.S. SEAMLESS

    ,90

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

  • 7/24/2019 Section 3 Technical Package

    14/19

    323X7.9mm

    2 40 16

    RADIUS OF

    CURVATUR 5D ,

    C.S. SEAMLESS,20

    406X8.7mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    40 16

    RADIUS OF

    CURVATUR 5D ,

    C.S. SEAMLESS

    ,30

    406X8.7mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    40 16

    RADIUS OF

    CURVATUR 5D ,

    C.S. SEAMLESS

    ,45

    406X8.7mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE+ dual-layer FBE

    40 16

    RADIUS OF

    CURVATUR 5D ,

    C.S. SEAMLESS

    ,60

    D406.4X8.7mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    20 16

    RADIUS OF

    CURVATUR 5D ,C.S. SEAMLESS

    ,90

    406X8.7mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    3 30 18

    RADIUS OF

    CURVATUR 5D ,

    C.S. SEAMLESS

    API 5LPSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

  • 7/24/2019 Section 3 Technical Package

    15/19

    ,20

    457X8.7mm

    30 18

    RADIUS OF

    CURVATUR 5D ,

    C.S. SEAMLESS,30

    457X8.7mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    30 18

    RADIUS OFCURVATUR 5D ,

    C.S. SEAMLESS

    ,45

    457X8.7mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    30 18

    RADIUS OF

    CURVATUR 5D ,

    C.S. SEAMLESS

    ,60

    457X8.7mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    18 18

    RADIUS OF

    CURVATUR 5D ,

    C.S. SEAMLESS

    ,90

    457X8.7mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    4 28 18

    RADIUS OF

    CURVATUR 5D ,

    C.S. SEAMLESS

    ,20

    457X7.9mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE+ dual-layer FBE

    28 18

    RADIUS OF

    CURVATUR 5D ,

    C.S. SEAMLESS

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

  • 7/24/2019 Section 3 Technical Package

    16/19

    ,30

    457X7.9mm

    28 18

    RADIUS OF

    CURVATUR 5D ,

    C.S. SEAMLESS,45

    457X7.9mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    28 18

    RADIUS OFCURVATUR 5D ,

    C.S. SEAMLESS

    ,60

    457X7.9mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    14 18

    RADIUS OF

    CURVATUR 5D ,

    C.S. SEAMLESS

    ,90

    457X7.9mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layerFBE

    5 12 20

    RADIUS OF

    CURVATUR 5D,

    C.S.

    SEAMLESS,20

    508X9.5mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    12 20

    RADIUS OF

    CURVATUR 5D ,

    C.S.

    SEAMLESS,30

    508X9.5mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    12 20

    RADIUS OF

    CURVATUR 5D ,

    C.S.

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

  • 7/24/2019 Section 3 Technical Package

    17/19

    SEAMLESS,45

    508X9.5mm

    12 20

    RADIUS OF

    CURVATUR 5D ,

    C.S.SEAMLESS,60

    508X9.5mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    7 20

    RADIUS OF

    CURVATUR 5D ,

    C.S.

    SEAMLESS,90

    508X9.5mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    6 3 24

    RADIUS OF

    CURVATUR 5D ,

    C.S.

    SEAMLESS,20

    610X9.5mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layerFBE

    3 24

    RADIUS OF

    CURVATUR 5D ,

    C.S.

    SEAMLESS,30

    610X9.5mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    3 24

    RADIUS OF

    CURVATUR 5D ,

    C.S.

    SEAMLESS,45

    610X9.5mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    3 24

    RADIUS OF

    CURVATUR 5D ,

    C.S.

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

  • 7/24/2019 Section 3 Technical Package

    18/19

    SEAMLESS,60

    610X9.5mm

    2 24

    RADIUS OF

    CURVATUR 5D ,

    C.S.

    SEAMLESS,90

    610X9.5mm

    API 5L

    PSL2 X52NS

    Sour Service

    LPE + dual-layer FBE

    Total Price of HOT BEND:

    2. Milestone Payment Schedule of each lot

    Payment Item Amount Due upon

    The First

    Payment

    10% of Contract

    Price

    Original of B/L, Commercial Invoices, Certificates of

    Origin, Packing List and Insurance Certificate, Certificate

    of Thirty Party Inspection correctly submitted to Company

    and shipment has started.

    The Second

    Payment

    40% of

    Contract Price

    Submission of invoice when the Material has delivered to

    Umm Qasr Port, Iraq.

    The Third

    Payment

    45% of Contract

    Price

    After The Materialdelivered to the Buzurgan Terminal, Iraq,

    and submission of invoice.

    The Fourth

    Payment

    5% of Contract

    Price27 months after Company receives the material.

    Total price of Second Lot:

  • 7/24/2019 Section 3 Technical Package

    19/19

    APPENDIXD

    CONTRACT SCHEDULE AND GUARANTEED DELIVERY DATE

    1. DELIVERY SCHEDULE

    To improve the delivery Schedule, Both party agree that the following delivery is without HIC and/or SSC Test Report which could be

    submitted later after delivery.

    Supplier shall deliver each component of the Material at the Umm Qasr Port (Delivery Point), Iraq with the following Schedule.

    First Lot:

    For 16 inch and 18 inch Line Pipe:

    1.1 Table: Item 1 and Item 2 on or before five months after the contract signed.

    Second Lot:

    For 18 inch, 20 inch, 24 inch Line Pipe and All Hot Bends:

    1.2 Table: Item 1, Item 2, Item 3 and All Hot bends on or before six months after the contract signed.