GRID SUBSTATION AUTOMATION DUBAI UNITED ARAB EMIRATES 1 Reference TRNG-P102 Version DS-Agile Training Rev0 Distribution Limited to SEC, KSA GE SEC, KSA Line differential Protection Training
GRID SUBSTATION AUTOMATION DUBAI UNITED ARAB EMIRATES
1
Reference TRNG-P102
Version DS-Agile Training Rev0
Distribution Limited to SEC, KSA
GESEC, KSA
Line differential Protection Training
GRID SUBSTATION AUTOMATION DUBAI UNITED ARAB EMIRATES
2
Table of Contents
1. INTRODUCTION ............................................................................................................................. 3
2. TRAINING PROGRAM ..................................................................................................................... 4
3. ANNEX 1 MICOM-AGILE OPERATION, MAINTENANCE AND CONFIGURATION TRAINING PROGRAM 5
GRID SUBSTATION AUTOMATION DUBAI UNITED ARAB EMIRATES
3
1. INTRODUCTION
We are an international based company with a worldwide footprint in more than 100 countries. As
part of GE Grid, we have a solid reputation for designing, developing and producing a wide range of
equipment, product and services for power systems. Our division is leader in the fields of solution for
protection, control and monitoring of substations and electrical networks. As Training Center, each
year our Technical Institutes trains more than thousand people in the field of digital control system,
protection devices and power system protection philosophy.
Our training offer corresponds to your requirements for training Customers engineers in the field of
Protection-Agile
GRID SUBSTATION AUTOMATION DUBAI UNITED ARAB EMIRATES
4
2. TRAINING PROGRAM
Training objective:
Purpose of the proposed training program is to train SEC employees so that they can ensure
administration, testing, managing, maintaining & trouble shooting of MiCOM Protection Relays
delivered in project.
Training program: please refer to Annex 1.
Course duration: 5 working days (Training course cover rate 70% as practical portion and 30% as
theoretical portion)
Training days: Sunday to Thursday, 8 hours per day
Participant pre-requisite:
It is assumed that the Training program participants are from SEC technical department. They shall
be Electrical Engineers, with good knowledge of Protection Systems. It is also assumed they are
skilled and experienced in the following areas:
-HV/MV/LV substation Protection.
-MiCOME S1 AGILE SOFTWARE
environment
-English speaking.
Language:
The course will be conducted in English language. The training document will be printed in English
language
GRID SUBSTATION AUTOMATION DUBAI UNITED ARAB EMIRATES
5
3. ANNEX 1
PROTECTION, MAINTENANCE AND CONFIGURATION TRAINING PROGRAM
FOR SEC
1st Day 8.00am –10.00am
Welcome Speech - Introduction to the Course Program- Base Line evaluation & assessment for Trainees
10.15 am – 10.30 am TEA 10.30am –12.00pm An introduction to Digital & Numerical relays
Px40 Agile Relays .
Modules and Type MiCOM Range
12pm – 1.00pm LUNCH and PRAYER 1.00pm – 1.30pm Numerical Protection Relaying- The MiCOM Technology
The MiCOM Platform & Features Hardware & software
1.30pm – 3.30pm Introduction to MiCOM S1 software settings Tool The MiCOM
PSL (Programmable Scheme Logic Editor)
ata model manager
GRID SUBSTATION AUTOMATION DUBAI UNITED ARAB EMIRATES
6
2nd Day 8.00am –10.00am
MiCOM P54x – Line differential Protection Relay: Features, Functions & Applications
10.15 am – 10.30 am TEA 10.30am –12.00pm Line differential Protection Relay – Principles
Line Differential Protection – Schemes
12pm – 1.00pm LUNCH and PRAYER 1.00pm – 1.30pm Line Differential protection relay- Settings
1.30pm – 3.30pm Numerical Line Differential Protection Relay – Characteristics
3rd Day 8.00am –10.00am
MiCOM P546 & P591 Relay – Line differential Protection -Practical Session
Relay Familiarisation – Menu Browsing Front User Interface settings
Local Communication & Programming
10.15 am – 10.30 am TEA 10.30am –12.00pm MiCOM P591 Relay – Media convertor application
12pm – 1.00pm LUNCH and PRAYER 1.00pm – 1.30pm Relay setting File Creation, Uploading & Downloading 1.30pm – 3.30pm Relay Installation and wiring
GRID SUBSTATION AUTOMATION DUBAI UNITED ARAB EMIRATES
7
4th Day 8.00am –10.00am
Hands-On Functional Testing & Performance Analysis
10.15 am – 10.30 am TEA 10.30am –12.00pm Line Differential Protection – Test Mode
Loopback test Procedure
Line Differential Protection – End to end test Procedure
12pm – 1.00pm LUNCH and PRAYER 1.00pm – 1.30pm MiCOM P54x Relay – maintenance and troubleshooting
Maintenance check
Post modification test
Firmware updating
Problem identification
Repair and modification procedure 1.30pm – 3.30pm MiCOM P546 – Line differential Protection Relay Distance Functions
Application
Line Differential Protection – Distance Schemes
GRID SUBSTATION AUTOMATION DUBAI UNITED ARAB EMIRATES
8
5th Day 8.00am –10.00am
Capacitive charging current
10.15 am – 10.30 am TEA 10.30am –12.00pm Distance Protection- Distance Protection Single-ended Testing,
Distance Protection Operation
12pm – 1.00pm LUNCH and PRAYER 1.00pm – 1.30pm MiCOM P54x Relay – maintenance and troubleshooting
Maintenance check
Post modification test
Firmware updating
Problem identification Repair and modification procedure
1.30pm – 3.30pm GE Certificates Finish