January 22, 2011 - Design Workshop Green Team Broadway E. John St. Cal Anderson Park Notes: The Green Team considered the hierarchy of places on the sites. The team identified an important diagonal ‘desire line’ for pedestrians between the most prominent north station entry (Blue Circle) at the corner of busy Broadway and E. John St. through the Station Plaza to Cal Anderson Park. Desire Line
7

Seattle DPD - Capitol Hill UDF Design Workshop Sketches...the station plaza and E. Denny Way to preserve light views and air onto the plaza and Cal Anderson Park. The team also proposed

Oct 24, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • January 22, 2011 - Design WorkshopGreen Team

    Broadway

    E. John St.

    Cal Anderson Park

    Notes: The Green Team considered the hierarchy of places on the sites. The team identified an important diagonal ‘desire line’ for pedestrians between the most prominent north station entry (Blue Circle) at the corner of busy Broadway and E. John St. through the Station Plaza to Cal Anderson Park.

    Desire

    Line

  • Urban Design Framework for the Capitol Hill light rail station area sitesJanuary 22, 2011 - Design WorkshopGreen Team

    Notes: The Green Team discussed elements of the four sites and made notations on the plan. The team explored potential alternate entries to below grade parking. The team discussed how to make the north end of the Nagle Place extension a successful pedestrian place.

  • Urban Design Framework for the Capitol Hill light rail station area sitesJanuary 22, 2011 - Design WorkshopRed Team

    Notes: The red team explored massing on the sites. The team considered stepping down building mass adjacent to and around the station plaza and E. Denny Way to preserve light views and air onto the plaza and Cal Anderson Park. The team considered allowing increased mass and development capacity on the north end (sites A1 adn B1), and potentially on a portion of site C.

    Broa

    dway

    Cal Anderson Park

    B1

    B2

    C

    A2

    E. John St.

  • Urban Design Framework for the Capitol Hill light rail station area sitesJanuary 22, 2011 - Design WorkshopRed Team

    Notes: The red team further explored massing, emphasizing stepping down building mass adjacent to and around the station plaza and E. Denny Way to preserve light views and air onto the plaza and Cal Anderson Park. The team also proposed an upper level public space, and building design on sites A2 and B2 to ensure good oversight of the station plaza.

    B2

    A2

    A1

    B1

    E. Denny Way 10th

    Ave.

    Cal Anderson Park

  • Urban Design Framework for the Capitol Hill light rail station area sitesJanuary 22, 2011 - Design WorkshopOrange Team

    Notes: The orange team explored the concept of the strong pedestrian desire line betwen the main station entry at the corner of Broadway and East John St. through the sation plaza to Cal Anderson Park. The team considered how the through-block crossing on the A sites could be modified to accommodate the pedestrian desire line. The team began to explore how site A1 could be modified and still allow for a feasible development on the site.

    Broadway

    E. John St.

    Cal Anderson Park

    Desire

    Line

    E. Denny W

    ay

    B2

    A2A1

    B1

    C

    North Station Entry

    Nagle Place

  • Urban Design Framework for the Capitol Hill light rail station area sitesJanuary 22, 2011 - Design WorkshopOrange Team

    Notes: The orange team explored how the station plaza could be better integrated with the edge of Cal Anderson Park. The team considered reconfiguration of E. Denny Way and adjustment of the A2 site. The team explored the idea of a stand alone ‘jewel box’ building on site B2 that could have a strong presence on the plaza and from the park.

    Broadway

    Cal Anderson ParkE. D

    enny Way

    B2

    A2

    B1

    C

    Station PlazaNagle Place

  • Urban Design Framework for the Capitol Hill light rail station area sitesJanuary 22, 2011 - Design WorkshopOrange Team

    Notes: The orange team discussed streetscape improvements including green street type treatments. The team suggested incorporation of green stormwater infrastructure, sidewalk cafes and abundant streetscape planting areas. These type of improvements were suggested for E. Denny Way as well as Broadway.

    Sidewalk

    Sidewalk Cafe Area

    SwaleStreet / Parking

    Planting / SwaleAreas