seabed-to-surface SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT JUNE 2006
16

Seabed-to-surface SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT JUNE 2006.

Jan 05, 2016

Download

Documents

Jasmine Adams
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Seabed-to-surface SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT JUNE 2006.

seabed-to-surface

SCM ISSUES IN WEST AFRICALOCAL CONTENT DEVELOPMENT

JUNE 2006

Page 2: Seabed-to-surface SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT JUNE 2006.

slide 2

seabed-to-surfaceSubsea UK June 1st 2006

What we doSURF Conventional Trunklines IMR

Page 3: Seabed-to-surface SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT JUNE 2006.

slide 3

seabed-to-surfaceSubsea UK June 1st 2006

Africa & Mediterranean : Countries of operation

40% of ACERGY worldwide activity : circa 750 MUSD in 2005.

45% of which is related to procurement of Projects : 350 MUSD

450 MUSD foreseen in 2006 & 2007.

Projects in the Gulf of Guinea Nigeria Angola Equatorial Guinea Congo

Regional permanent implantation in

Angola, Nigeria and Gabon.

Page 4: Seabed-to-surface SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT JUNE 2006.

slide 4

seabed-to-surfaceSubsea UK June 1st 2006

SCM Issues 1/2

Weak and critical point :• Risky

• Remote environment

• Uncontrolled planning

InstallationDelivery on site

Logistic

Fabrication Transport CustomsEngineering

Page 5: Seabed-to-surface SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT JUNE 2006.

slide 5

seabed-to-surfaceSubsea UK June 1st 2006

SCM Issues 2/2

How to succeed the installation ?

Engineering : - over design => secure installation and in service lifeFabrication : - zero default => high QA/QC capabilities

How to succeed the delivery on site ?

Ensure good structure for logistics : - Availability of transport (flexible planning)- Very good knowledge of local regulations which are constantly

changing- Strong set up and full control of local logistics from shore to site.

Page 6: Seabed-to-surface SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT JUNE 2006.

slide 6

seabed-to-surfaceSubsea UK June 1st 2006

West African Top Priority : Local Content = Constraint but also an Opportunity

1. Constraint : • Access to local Human Resources

- Engineers (Engineering)

- Workers (Fabrication)

• Control of Quality

2. Opportunity : • Transport and Customs are cleared Upstream

- Improve Float on planning

- Less complex nature of goods to import.

Installation

Engineering

Transport Customs

FabricationDelivery on site

Page 7: Seabed-to-surface SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT JUNE 2006.

slide 7

seabed-to-surfaceSubsea UK June 1st 2006

West Africa : A region with high “Country Specifics”C

APE

X \

In

vest

men

t

Technology / Complexity

Pipe fabrication

(Steel mill)

Flexible

Umbilicals

Forging

Engineering

Local logistic

Coating

Yard

long-product base

(Jacket-piles

/double joint)

low high

high

low

Page 8: Seabed-to-surface SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT JUNE 2006.

slide 8

seabed-to-surfaceSubsea UK June 1st 2006

SOME LOCAL REALISATIONS

Page 9: Seabed-to-surface SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT JUNE 2006.

slide 9

seabed-to-surfaceSubsea UK June 1st 2006

Nigeria : Warri Yard & Angola : Lobito Yard

Page 10: Seabed-to-surface SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT JUNE 2006.

slide 10

seabed-to-surfaceSubsea UK June 1st 2006

HRT in Lobito

Page 11: Seabed-to-surface SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT JUNE 2006.

slide 11

seabed-to-surfaceSubsea UK June 1st 2006

Manifolds in Lobito

Page 12: Seabed-to-surface SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT JUNE 2006.

slide 12

seabed-to-surfaceSubsea UK June 1st 2006

APL offloading Buoy

Page 13: Seabed-to-surface SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT JUNE 2006.

slide 13

seabed-to-surfaceSubsea UK June 1st 2006

YOKRI Deck fabrication in Warri

Page 14: Seabed-to-surface SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT JUNE 2006.

slide 14

seabed-to-surfaceSubsea UK June 1st 2006

Warri Fabrication Yard: Jacket - Suction Piles

Page 15: Seabed-to-surface SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT JUNE 2006.

slide 15

seabed-to-surfaceSubsea UK June 1st 2006

Warri Fabrication Yard: Jacket - Suction Piles

Page 16: Seabed-to-surface SCM ISSUES IN WEST AFRICA LOCAL CONTENT DEVELOPMENT JUNE 2006.

slide 16

seabed-to-surfaceSubsea UK June 1st 2006

Common objective for main Contractors and Suppliers :

- Localisation in country with guaranteed quality and delivery

Strong and relationship / partnership required

Conclusion