ENERGYSEC 10 TH ANNIVERSARY SUMMIT August 12-22, 2014 Austin, Texas Feldman comments – a view from 50K ft.
Nov 28, 2014
ENERGYSEC 10TH ANNIVERSARY SUMMITAugust 12-22, 2014
Austin, Texas
Feldman comments – a view from 50K ft.
Distribution Reliability
Berkeley Lab Study Estimates $80 Billion Annual Cost of Power Interruptions - 70 page study. http://www.EnergyCollection.us/Energy-Reliability/The-Cost-Of-Power-Interruptions-2004-09-01-70.pdf
Energy Sources and Sinks
RTOs/ ISOs
Secondary Decisions
Wind / Cost / Reliability
Duck Curve
Today
Tomorrow
Incentives
Additional Information• [email protected]• Board of Directors – Governance – Cybersecurity Paper –
http://www.EnergyCollection.us/456.pdf• Collected Resources – http://EnergyCollection.us/457.pdf
• Industry Strategy Paper – http://www.EnergyCollection.us/211.pdf
• This presentation in PDF – http://www.EnergyCollection.us/0334.pdf