Soaring 175 feet above the water and at over 21,000 feet in length, the Sunshine Skyway Bridge.
9
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Screencast pp

Soaring 175 feet above the water and at over 21,000 feet in length, the Sunshine Skyway Bridge.

Page 2: Screencast pp

Construction of the current bridge began in 1982, and the completed bridge was dedicated on February 7, 1987

Page 3: Screencast pp

Summit Venture disaster of 1980

Page 4: Screencast pp

• regular inspection• drainage system maintenance• miscellaneous structural repairs• Aviation• Navigation• decorative lighting maintenance• debris removal• mechanical and electrical maintenance for elevators, generators, lightning suppression, motorist aid communications, and facility lighting• assistance with bridge security and emergency response.

Page 5: Screencast pp

Collapsing support beams

Page 6: Screencast pp

Inefficient Safety rails

Page 7: Screencast pp

2013: 5 suicides, 10 possible, 2 survivors, 4 saves2012: 12 suicides, 12 possible, 2 survivors, 6 saves2011: 9 suicides, 14 possible, 1 survivor, 3 saves

2010: 5 suicides, 19 possible, 5 saves2009: 8 suicides, 15 possible, 1 survivor, 8 saves2008: 11 suicides, 10 possible, 2 survivors, 5 saves2007: 10 suicides, 7 possible, 2 survivors, 1 save2006: 5 suicides, 17 possible, 1 survivor, 1 save

2005: 10 suicides, 13 possible, 2 saves2004: 4 suicides, 2 possible, 4 saves

2003: 13 suicides, 4 saves 2002: 9 suicides, 1 survivor, 1 save2001: 5 suicides, 3 survivors, 1 save2000: 5 suicides, 1 survivor, 1 save1999: 10 suicides, 2 survivors, 1 save

1998: 12 suicides, 1 survivor1997-1987: 36 suicides, 3 survivors

1986-1977: 15 suicides, 1 forced, 7 survivors1976-1967: 15 suicides, 4 survivors1966-1954: 20 suicides, 3 survivors

Page 8: Screencast pp

Damaged Stay-Cables

Page 9: Screencast pp