1 Scoping for Minnesota Department of Transportation Allied Radio Matrix for Emergency Response (MnDOT ARMER) Superior National Forest I. Introduction Minnesota Department of Transportation (MnDOT) Office of Electronic Communications has applied for a special-use permit to construct two new radio towers and replace two existing towers, for the operation and maintenance of the Allied Radio Matrix for Emergency Response (ARMER) system on National Forest System lands. One of the new towers is proposed to be constructed near a former fire lookout site (Pine Mountain). The second new tower is proposed to be located within a recently completed timber harvest tract (Forest Center). One replacement tower is the current Fernberg Tower site and the other replacement tower is Meander. These four towers fall within the Ranger Districts of Gunflint, Tofte, Kawishiwi, and LaCroix. II. Project Location The attached Vicinity Map displays the general location of the proposed tower locations. Detailed maps of each site can be viewed on the Superior National Forest webpage at www.fs.usda.gov/projects/superior/landmanagement/projects. III. Purpose and Need for the Proposed Action The towers’ purpose is to provide a public safety communications network managing the implementation of the 800 MHz (megahertz) digital trunked radio communication system. When implemented, the system provided emergency response personnel the means and ability to share information via voice and/or data systems on demand in real time. This includes every city, county, state agency, tribal government and non-government public safety entity operating in the state. The ARMER system was first conceived for the metropolitan area in the late 1980s due to aging radio systems and lack of additional frequencies. A commission was formed and a recommendation was presented to and approved by the Minnesota Legislature in 1995. In June 1995, the Metropolitan Radio Board formed and began to plan and implement a region-wide radio system for use by EMS, Fire, Law Enforcement, Public Service and Public Works. In 2001 a plan was developed to extend the metro system into a statewide system for the extension of the backbone into Greater Minnesota.
11

Scoping for Minnesota Department of Transportation Allied ...a123.g.akamai.net/7/123/11558/abc123/forestservic.download.akamai... · 1 Scoping for Minnesota Department of Transportation

Apr 10, 2018

Download

Documents

trannhi
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Scoping for Minnesota Department of Transportation Allied ...a123.g.akamai.net/7/123/11558/abc123/forestservic.download.akamai... · 1 Scoping for Minnesota Department of Transportation

1

Scoping for Minnesota Department of Transportation Allied Radio

Matrix for Emergency Response (MnDOT ARMER)

Superior National Forest

I. Introduction

Minnesota Department of Transportation (MnDOT) Office of Electronic Communications has

applied for a special-use permit to construct two new radio towers and replace two existing

towers, for the operation and maintenance of the Allied Radio Matrix for Emergency Response

(ARMER) system on National Forest System lands. One of the new towers is proposed to be

constructed near a former fire lookout site (Pine Mountain). The second new tower is proposed

to be located within a recently completed timber harvest tract (Forest Center). One replacement

tower is the current Fernberg Tower site and the other replacement tower is Meander. These

four towers fall within the Ranger Districts of Gunflint, Tofte, Kawishiwi, and LaCroix.

II. Project Location

The attached Vicinity Map displays the general location of the proposed tower locations.

Detailed maps of each site can be viewed on the Superior National Forest webpage at

www.fs.usda.gov/projects/superior/landmanagement/projects.

III. Purpose and Need for the Proposed Action

The towers’ purpose is to provide a public safety communications network managing the

implementation of the 800 MHz (megahertz) digital trunked radio communication system.

When implemented, the system provided emergency response personnel the means and ability to

share information via voice and/or data systems on demand in real time. This includes every

city, county, state agency, tribal government and non-government public safety entity operating

in the state.

The ARMER system was first conceived for the metropolitan area in the late 1980s due to aging

radio systems and lack of additional frequencies. A commission was formed and a

recommendation was presented to and approved by the Minnesota Legislature in 1995. In June

1995, the Metropolitan Radio Board formed and began to plan and implement a region-wide

radio system for use by EMS, Fire, Law Enforcement, Public Service and Public Works. In 2001

a plan was developed to extend the metro system into a statewide system for the extension of the

backbone into Greater Minnesota.

Page 2: Scoping for Minnesota Department of Transportation Allied ...a123.g.akamai.net/7/123/11558/abc123/forestservic.download.akamai... · 1 Scoping for Minnesota Department of Transportation

2

In 2007, ARMER proved to be a valuable asset when the I-35W bridge collapsed in the Twin

Cities. The shared regional tactical groups allowed various responding agencies with differing

jurisdictions (water vs. land) to easily communicate and coordinate search and rescue and

recovery operations. This system allowed State Patrol to easily speak to city, county, and federal

emergency agencies directly without having to relay information via telephone through

dispatchers or by swapping radios.

The ARMER radio system operates by line of sight, talking to other ARMER towers. In order

for the system to operate effectively, multiple towers are needed to produce a solid blanket of

coverage. A map showing the proposed towers, existing MnDOT ARMER towers, and all other

FCC towers within or near Superior National Forest can be located on the Superior National

Forest website. Some of the last areas in rural Minnesota lacking this coverage are near and

within the Boundary Waters Canoe Area Wilderness. The communication sites proposed would

nearly complete coverage in this area. Other agencies would have the opportunity to rent space

on the radio tower for communication equipment and systems. This includes Cook, Lake, and

St. Louis counties and the US Forest Service and possibly others. For additional information

regarding ARMER, view the website:

http://www.mn-mesb.org/MetroARMERSystem/RadioInteroperability.aspx

The project responds to Forest Plan Objectives for Special Uses: ‘Outside of the BWCAW,

generally provide for utility transmission corridors and communication sites. Emphasize the use

of common corridors and multiple use sites when granting appropriate right-of-ways.’ (O-SU-1)

IV. Proposed Action

The Proposed actions for each of the four communication facility sites, towers, electrical power

line routes, and access roads are detailed below. In addition to the Maps showing land

ownership, aerial views, and management area can be viewed on the Superior National Forest

webpage at www.fs.usda.gov/projects/superior/landmanagement/projects.

Pine Mountain Tower

The Pine Mountain Tower would contain approximately 1 acre of new construction located in

Cook County, T63N, R1E, Section 33 NWSE (Lat. 47°53’42.60”N Long. 90°19’37.50”W) on

the Gunflint Ranger District. This location is on top of Pine Mountain, elevation of 2190 feet.

There once was a Forest Service fire lookout located on this site which was removed decades

ago.

Tower Description

The proposed tower would be a 3-legged, self-sustaining steel structure, being dull grey

galvanized in color to minimize visual impacts. The height would be 180 feet and contain no

FCC markings, lights, or strobes. As a reference, a mature White Pine grows to a height of 80-

110 feet tall.

Page 3: Scoping for Minnesota Department of Transportation Allied ...a123.g.akamai.net/7/123/11558/abc123/forestservic.download.akamai... · 1 Scoping for Minnesota Department of Transportation

3

Other Facilities

In order to house the communication equipment and 34kV (kilovolt) back-up generator, a

concrete shelter measuring 12’ x 30’ x 10’ is proposed. This structure would be covered with

brown stone aggregate finish to minimize visual impacts. Next to the shelter would be a 1,000

gallon LP tank measuring 10’ x 4’ to fuel the generator.

Communication Site

The Communication Site that would contain all the facilities is proposed to be 50’ x 60’ with a 7-

foot link fence and an additional 3 strands of barbed wire extending 1 foot above the fence. The

fence includes a 4 foot pedestrian gate and a 16 foot drive-through gate. The entire ground area

would be covered a 4-ounce polyester filter fabric to retard growth of weeds yet porous enough

to allow water to pass to soil. Landscape rock of class 5 will cover the entire area within the

communication site.

Power Requirements

The closest power company operating in the area is Qwest. To access the tower site, new power

lines will need to be installed for approximately three miles. The power line would be buried,

adjacent to and following road rights-of-way.

In addition to electrical power lines, a vertical wind turbine is proposed to be installed. This will

assist in charging a back-up battery supply for power.

Access

The vehicle access to this proposed site would be using FR 154 (Pine Mountain Road) to an

existing unclassified road. A new road approximately 0.5 miles long and 15 feet wide is needed

to complete the access route to the site. This new construction will be designed in accordance

with typical Forest Service standards and stipulations, making it a low operational maintenance

level road. All or parts of this access may need initial reinforcing with class 5 gravel while the

tower is being constructed. An example of the road construction stipulations can be found on

our web site at www.fs.usda.gov/projects/superior/landmanagement/projects .

Management Area

The Forest Plan puts this proposed location within the General Forest Management Area (MA).

Under facilities, this MA allows buildings and structures that provide support of resource

management and allows occasional resorts, utility corridors, towers, dams, and similar structures

(D-GF-12). Under special uses, this MA allows accommodation of most special uses (G-GF-3).

Special Notes of this Location

The proposed site location once held a FS fire lookout. The structure has been removed but the

concrete footings remain. This proposed location may require mitigation measure to prevent

historical/cultural damage during and after construction.

This proposed location is one parcel identified as being part of a possible land exchange with

Cook County in the near future.

Page 4: Scoping for Minnesota Department of Transportation Allied ...a123.g.akamai.net/7/123/11558/abc123/forestservic.download.akamai... · 1 Scoping for Minnesota Department of Transportation

4

Forest Center Tower The Forest Center Tower would contain approximately 1 acre of new construction located in

Lake County, T61N, R8W, Section 20 NENW (Lat. 47°45’19.92”N Long. 91°22’28.81”W) on

the Tofte Ranger District. This area was recently logged.

Tower Description

The proposed tower would be a 3-legged, self-sustaining steel structure, being dull grey

galvanized in color to minimize visual impacts. The height would be 180 feet and contain no

FCC markings, lights or strobes. As a reference, a mature White Pine grows to a height of 80-

110 feet tall.

Other Facilities

In order to house the communication equipment and 34kV back-up generator, a concrete shelter

measuring 12’ x 30’ x 10’ is proposed. This structure would be covered with brown stone

aggregate finish to minimize visual impacts. Next to the shelter would be a 1,000 gallon LP tank

measuring 10’ x 4’ to fuel the generator.

Communication Site

The Communication Site that would contain all the facilities is proposed to be 50’ x 60’ with a 7-

foot link fence and an additional 3 strands of barbed wire extending 1 foot above the fence. The

fence includes a 4 foot pedestrian gate and a 16 foot drive-through gate. The entire ground area

would be covered a 4-ounce polyester filter fabric to retard growth of weeds yet porous enough

to allow water to pass to soil. Landscape rock of class 5 will cover the entire area within the

communication site.

Power Requirements

The closest power company operating in the area is Cooperative Light and Power. To access the

tower site, new power lines will need to be installed for approximately six miles. The power line

would be buried, adjacent to and following road rights of ways.

In addition to electrical power lines, a vertical wind turbine is proposed to be installed. This will

assist in charging a back-up battery supply for power.

Access

The vehicle access to this proposed site would be FR 377 (Tomahawk Road), to a newly

constructed access used for timber harvest. This newly constructed access may need initial

reinforcing while the tower is being installed. All or parts of this access may need initial

reinforcing with class 5 gravel while the tower is being constructed.

Management Area

The Forest Plan puts this proposed location within the General Forest Management Area (MA).

Under facilities, this MA allows buildings and structures that provide support of resource

management and allows occasional resorts, utility corridors, towers, dams, and similar structures

(D-GF-12). Under special uses, this MA allows accommodation of most special uses (G-GF-3).

Special Notes of this Location

The Boundary Waters Canoe Area Wilderness is approximately 0.5 miles away from the

proposed location.

Page 5: Scoping for Minnesota Department of Transportation Allied ...a123.g.akamai.net/7/123/11558/abc123/forestservic.download.akamai... · 1 Scoping for Minnesota Department of Transportation

5

State land is 0.75 miles away from this location. This State land was considered for the tower

site but with a recently disturbed area from a timber harvest in such close proximity, the

proposed site was chosen.

Fernberg Tower The Fernberg Tower would be replacement of an existing radio tower located in Lake County,

T63N, R9W, Section 8 SESE (Lat. 47°56’49”.10N Long. 91°29’42.10”W) on the Kawishiwi

Ranger District. The current tower is showing age and has limited structural capabilities to hold

the weight of any additional radio equipment.

Tower Description

The proposed tower would be a 3-legged, self-sustaining steel structure, being dull grey

galvanized in color to minimize visual impacts. The height would be 200 feet and contain a dual

mode lighting system at the top of the tower in accordance with FCC requirements. This lighting

system consists of a medium intensity white strobe light for daytime illumination and a red

flashing beacon for nighttime illumination.

The existing tower is a 220 foot guy wire supported structure with orange and white alternating

bands painted for color and a red flashing light for nighttime illumination in accordance with

FCC regulations. As a reference, a mature White Pine grows to a height of 80-110 feet tall.

The FCC regulations for a tower of this height requires it to be marked during the daytime by

either a medium intensity white strobe or alternating orange and white painted markings.

MnDOT has proposed the daytime whit strobe light for the reasons of:

1. Orange and white painted markings are more visible from the ground than a white

strobe light over a greater ground distance. Dull grey galvanized color has less visual

impact to the human eye.

2. The medium intensity white light strobe is encased so it deflects light towards the sky

for an airplane/helicopter pilot to view and minimally towards the ground.

3. Orange and white painted markings require 5-6 year annual maintenance at a high

cost.

Other Facilities

In order to house the communication equipment and 34kV back-up generator, a concrete shelter

measuring 12’ x 30’ x 10’ is proposed. This structure would be covered with brown stone

aggregate finish to minimize visual impacts. Next to the shelter would be a 1,000 gallon LP tank

measuring 10’ x 4’ to fuel the generator.

Communication Site

The Communication Site that would contain all the facilities is proposed to be 50’ x 60’ with a 7-

foot link fence and an additional 3 strands of barbed wire extending 1 foot above the fence. The

fence includes a 4 foot pedestrian gate and a 16 foot drive-through gate. The entire ground area

would be covered a 4-ounce polyester filter fabric to retard growth of weeds yet porous enough

Page 6: Scoping for Minnesota Department of Transportation Allied ...a123.g.akamai.net/7/123/11558/abc123/forestservic.download.akamai... · 1 Scoping for Minnesota Department of Transportation

6

to allow water to pass to soil. Landscape rock of class 5 will cover the entire area within the

communication site.

Power Requirements

Since this is an existing Communication Site and power is already installed to the site, no

additional authorization would be required.

In addition to electrical power lines, a vertical wind turbine is proposed to be installed. This will

assist in charging a back-up battery supply for power.

Access

The vehicle access to the existing site is C.S.A.H. 18 (Fernberg Road), to County 181 (FH6

Fernberg Tower), to FR 194, to FR194A. No additional road construction would be required.

Management Area

The Forest Plan puts this proposed location within the Semi-primitive Motorized Recreation

Management Area (MA). This MA generally does not permit special uses except those uses that

do not detract from the semi-primitive environment or uses needed to access or supply utilities to

private land, recreational facilities, or administrative sites (G-SPM-3).

Special Notes of this Location If proposal is accepted, MnDOT will dismantle and remove the existing “old” tower and guy

wires. The concrete footings will be broken off 4-6 feet below grade and soil added.

Other communication facilities are on this site location include Lake County Emergency

dispatch, USFS radio, USFS air monitoring, and USGS earthquake monitoring equipment.

The Fernberg Tower has an approved Communication Site Plan, signed on 1987 by Clay Beal,

Forest Supervisor. If this proposal is accepted, a new Communication Site Plan will be written

and approved with this proposal added.

The Boundary Waters Canoe Area Wilderness is one mile away from the existing location.

Meander Lake Tower The Meander Lake Tower would be replacement of an existing radio tower located in St. Louis

County, T65N, R14W, Section 17 NWNE (Lat. 48°07’12.6”N Long. 92°9’33.0”W) on the

LaCroix Ranger District. The existing radio tower is owned and operated by the National Forest

Service.

Tower Description

The proposed tower would be a 3-legged, self-sustaining steel structure, being dull grey

galvanized in color to minimize visual impacts. The height would be 180 feet and contain no

FCC markings, lights or strobes.

The existing tower is a 60 foot, single-legged, self-supported structure, being dull grey

galvanized in color to minimize visual impacts. The existing tower does not contain FCC

markings, lights or strobes. As a reference, a mature Jack Pine grows to a height of 55-65 feet

tall.

Page 7: Scoping for Minnesota Department of Transportation Allied ...a123.g.akamai.net/7/123/11558/abc123/forestservic.download.akamai... · 1 Scoping for Minnesota Department of Transportation

7

Other Facilities

In order to house the communication equipment and 34kV back-up generator, a concrete shelter

measuring 12’ x 30’ x 10’ is proposed. This structure would be covered with brown stone

aggregate finish to minimize visual impacts. The location of the generator building is proposed

to be located approximately 30 feet off of the road, tucked into the woods and underbrush.

Communication Site

The Communication Site that would contain all the facilities is proposed to be 50’ x 60’ with a 7-

foot link fence and an additional 3 strands of barbed wire extending 1 foot above the fence. The

fence includes a 4 foot pedestrian gate and a 16 foot drive-through gate. The entire ground area

would be covered a 4-ounce polyester filter fabric to retard growth of weeds yet porous enough

to allow water to pass to soil. Landscape rock of class 5 will cover the entire area within the

communication site.

Power Requirements

The closest power company operating in the area is Lake Country Power. To access the tower

site, new power lines will need to be installed for approximately 16 miles. The power line would

be buried, adjacent to and following road rights of ways.

An alternative to supply power to this proposed location is to operate the 34kV back-up

generator a constant 24 hours. The LP gas tank and generator would not be located next to the

tower but closer to the road. This would allow the LP tank to be filled on a regular basis. The

generator is reported to be as loud as a homeowner’s lawnmower, therefore it would be housed

in a small shed designed to reduce the noise. The manufacture could be asked to design a special

muffler, decreasing the noise level to an even lesser degree. The LP tank and generator shed

would be colored to blend in with the surrounding woods (see Other Facilities for design and

location). Electric power lines would be run slightly underground from the generator building to

the to the tower site.

In addition to electrical power lines, a vertical wind turbine is proposed to be installed. This will

assist in charging a back-up battery supply for power.

Access

The vehicle access to the existing site is C.S.A.H. 116 (Echo Trail) to a reclaimed unclassified

road numbered U6977. The overgrown road would be reconstructed for the initial installation.

The reconstruction will be designed in accordance with typical Forest Service standards and

stipulations, not to exceed an operational maintenance level 2 road. This road is steep in certain

areas and would require brush/timber removal.

A possible alternative MnDOT has proposed for the initial installation is contract the National

Guard to aerial crane/lift the construction supplies to the site with a helicopter where workers

would hike in and complete construction.

Management Area

The Forest Plan puts this proposed location within the General Forest – Longer Rotation

Management Area (MA). Under facilities, this MA allows buildings and structures that provide

support of resource management and allows occasional resorts, utility corridors, towers, dams,

Page 8: Scoping for Minnesota Department of Transportation Allied ...a123.g.akamai.net/7/123/11558/abc123/forestservic.download.akamai... · 1 Scoping for Minnesota Department of Transportation

8

and similar structures (D-LR-12). Under special uses, this MA allows accommodation of most

special uses (G-LR-3).

Special Notes of this Location

The Boundary Waters Canoe Area Wilderness is a half mile away from the existing location.

MNDOT will remove and replace the existing 60 foot National Forest Service tower, giving the

FS better communication reach with its radios. This is desired by FS Communication personnel.

V. Decision to be Made

Tim Dabney, Acting Forest Supervisor, Superior National Forest, is the Responsible Officer for

the Minnesota Department of Transportation Allied Radio Matrix for Emergency Response

(MnDOT ARMER) Project. The decisions to be made include:

� Which sites, if any, will be authorized under a Special-Use Permit.

� Will any of the proposed sites have a significant impact that would lead to preparation of

an Environmental Impact Statement

� Will any of the sites require alterations to the proposed plan

� Will electric power lines be authorized at the new construction location

A decision is expected by August 15, 2012. Implementation would begin October of 2012.

VI. Background Information

In 2010, the MnDOT Office of Electronic Communications approached the Superior National

Forest with a proposal to install radio towers throughout the Forest. These radio towers would

become part of the ARMER system which is the fundamental infrastructure for emergency

responders to achieve seamless interoperable communications. In Spring 2011, MnDOT and

Forest Service personnel visited each initial proposed site and alternative sites. Proposals that

were denied included:

Cascade Lake Tower, located in Cook County at T62N, R2W, Section 18 NESW. This was

denied due to the visual impacts associated with being located a few hundred feet from C.S.A.H.

4, a scenic drive.

Cascade Lake Tower Alternative, located in Cook County at T62N, R2W, Section 24 NWNE.

This was denied due to the availability of suitable State land near the area.

Sawbill Tower, located in Cook County at T62N, R4W, Section 19 NWSW. This was denied

due to the location being in a Roadless Area Review and Evaluation (RARE II) area.

Sawbill Tower Alternative, located in Cook County at T61N, R5W, Section 12 SWNW. This

was denied due to the availability of suitable State land near the area.

Page 9: Scoping for Minnesota Department of Transportation Allied ...a123.g.akamai.net/7/123/11558/abc123/forestservic.download.akamai... · 1 Scoping for Minnesota Department of Transportation

9

Forest Center (Original), located in Lake County at T61N, R8W, Sec. 22 SENW. This was

denied due to the close proximity of a heavily used Boundary Waters Canoe Area Wilderness

entry point.

VII. Summary of the Environmental Assessment Process

The MnDOT ARMER interdisciplinary team of resource specialists will prepare an

Environmental Assessment (EA) using the following steps. The team includes a wildlife

biologist, recreation specialist, archeologist, wilderness specialist, and others as needed.

Step 1: The information in this scoping package explaining the Purpose and Need and Proposed

Action is sent to the public, adjacent landowners, and others who have an interest in how the

lands are managed. The purpose of the scoping package is to inform the public and to provide

people with an opportunity to submit comments on the proposal.

Step 2: The interdisciplinary team will evaluate the comments received on the scoping package

and identify environmental issues to help them develop the EA. The issues will be used to

develop management alternatives to the Proposed Action and to disclose any effects of the

actions of each proposed alternative. This analysis will be compiled in an EA that will be

available for public review on the Superior National Forest website. This review will include the

official comment period.

Step 3: Comments received during the official comment period will be considered by the

Responsible Official. He will document his decision in a formal decision document. The

decision document and response to comments will be made available to parties who submit

comments during the official comment period and will be posted on the Superior National Forest

website.

Step 4: Interested parties who submitted comments during the official comment period will have

opportunity to appeal the project. Details on appeal rights will be displayed in the decision

documentation.

VIII. How to Comment on the MnDOT ARMER Proposed Action

Comments will be used to determine issues associated with the special-use permit, to develop

alternatives to the Proposed Action, and to refine the analysis of effects.

Comments are most useful if they refer to a specific action or activity rather than general

management direction of the Superior National Forest. Please consider the following question

when reviewing proposed activities and submitting comments: Is there anything about the areas

involved in the tower locations project that I believe the Forest Service should consider in the

environmental assessment?

Page 10: Scoping for Minnesota Department of Transportation Allied ...a123.g.akamai.net/7/123/11558/abc123/forestservic.download.akamai... · 1 Scoping for Minnesota Department of Transportation

10

Scoping comments are most useful if received by April 20, 2012 (30 days after date of letter), in

a timely and legible fashion. Please note that if you do not submit any response for this Special-

Use Permit project, your name will be removed from this project’s mailing list. The next step in

the public involvement process is to release an environmental assessment (EA) document. To

save resources, we will inform those who respond to the scoping document when the EA is

available on the Superior National Forest webpage

(www.fs.usda.gov/projects/superior/landmanagement/project). Please let us know if you prefer a

hard copy. All comments received (including names and addresses) will become part of the

project file and will be available for public review, if requested. Comments submitted

anonymously will not be accepted or considered. Submit comments by e-mailing, faxing,

calling, or writing to:

Tim Dabney, Acting Forest Supervisor

ATTN: MnDOT ARMER

• Electronic comments must be submitted in a format such as text or html e-mail, Adobe

portable document format or formats viewable in Microsoft Office applications. Send

electronic comments to: [email protected]

• FAX comments to: 218-626-4398 with “MnDOT ARMER Project” as the subject.

• Oral comments may be provided in person at the Superior National Forest Headquarters,

8:00 a.m. to 4:30 p.m., Monday through Friday or by calling 218-626-4371.

• Written comments to: Tim Dabney, Acting Forest Supervisor, Attn: MnDOT ARMER

Project, 8901 Grand Avenue Place, Duluth, MN 55808.