NORTHSIDE INDEPENDENT SCHOOL DISTRICT Photo Album Index: Construction Projects In Progress • Brennan High School • Briscoe Middle School (Alamo Ranch MS) • Behlau (Laurel Mountain Ranch) Elementary • Martin (Canterbury Farm) Elementary • Henderson (Kallison Ranch) Elementary • Westwinds Elementary • Lieck Elementary Facilities Construction Vernon Dunagin, AIA Assist. Superintendent of Facilities & Operations Leroy San Miguel Executive Director of Construction & Engineering Ceasar Ponce, AIA Director of Facilities Construction Schools Under Construction for N.I.S.D. Martin Elementary - Front Entrance Henderson Elementary - Front Entrance • Meadow Village Elementary Addition • Marshall High School Addition • Clark High School • Holmes High School Renovation • Pease Middle School Addition • John Glenn Elementary Addition Additions & Renovations Projects • Warren High School Addition • Oak Hills Terrace ES Addition • Bandera North Elementary February 2010
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Photo Album Index: Construction Projects In Progress
• Brennan High School
• Briscoe Middle School (Alamo Ranch MS)
• Behlau (Laurel Mountain Ranch) Elementary
• Martin (Canterbury Farm) Elementary
• Henderson (Kallison Ranch) Elementary
• Westwinds Elementary
• Lieck Elementary
Facilities Construction Vernon Dunagin, AIA
Assist. Superintendent of Facilities & Operations
Leroy San Miguel Executive Director of Construction & Engineering
Ceasar Ponce, AIA
Director of Facilities Construction
Schools Under Construction for
N.I.S.D.
Martin Elementary - Front Entrance Henderson Elementary - Front Entrance
• Meadow Village Elementary Addition
• Marshall High School Addition
• Clark High School
• Holmes High School Renovation
• Pease Middle School Addition
• John Glenn Elementary Addition
Additions & Renovations Projects
• Warren High School Addition
• Oak Hills Terrace ES Addition
• Bandera North Elementary
February 2010
Briscoe MS
Henderson ES
Brennan HSMartin ES
Behlau ES
New Schools from Bond 2007
Schools to Open in Summer 2010
Lieck ES
Westwinds Area ES
Schools to Open in Summer 2011 Bandera North ES
Schools to Open in Summer 2012
Pease MS
Clark HS
Warren HS
Holmes HS
Marshall HS
John Glenn ES
Additions & Renovations from Bond 2007
Schools to Open in Summer 2010
Oak Hills ES
Meadow Village ES
BRENNAN HIGH SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
a. Name and Location of Building:
Brennan High School
Potranco West
San Antonio, TX
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
San Antonio, TX 78238-2220
(210) 397-1200
c. Contractor:
Bartlett-Cocke, Inc.
d. Construction Cost:
$88,146,618.00
e. Construction Completion:
January, 2008 thru May, 2010
f. Managing Principal:
Bill Reeves, AIA
Marmon Mok Architects
g. Project Architect:
Monty Howard, AIA
h. Scope of Services Performed:
2800 Student High School (96% complete – Site & Building)
Rendering of Front Entrance at Brennan High School
BRENNAN HIGH SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Location Aerial of Brennan High School
School Site Location for Brennan High School
Wiseman Blvd.Lone Star Pkwy
LOO
P 1604
BRENNAN HIGH SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Brennan High School (November 17, 2009)
BRENNAN HIGH SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Brennan High School (November 17, 2009)
BRENNAN HIGH SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Brennan High School (February 12, 2010)
BRENNAN HIGH SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Brennan High School (February 12, 2010)
BRENNAN HIGH SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
a. Name and Location of Building:
Briscoe Middle School
4265 Lone Star Parkway
San Antonio, TX 78253
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
Ms. Marilyn Sevedge, Senior Project Manager
5900 Evers Road
San Antonio, TX 78238-2220
(210) 397-1200
c. Contractor:
CM@Risk: Bartlett-Cocke, Inc.
d. Construction Cost:
$39,931,870.00
e. Construction Completion:
August, 2008 thru May, 2010
f. Managing Principal:
Joel Hernandez, AIA
PBK Architects
g. Project Architect:
Raul Llanas, Assoc. AIA
h. Scope of Services Performed:
1200 Student Middle School (93% complete)
BRISCOE MIDDLE SCHOOL
Rendering of Front Entry at Briscoe Middle School
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
BRISCOE MIDDLE SCHOOL
Location Aerial of Briscoe Middle School
School Site Location for Briscoe Middle School
Wiseman Rd.
LOO
P 1604Lo
nest
arPk
wy
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
BRISCOE MIDDLE SCHOOL
Aerial of Briscoe Middle School (February 12, 2010)
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
BRISCOE MIDDLE SCHOOL
Aerial of Briscoe Middle School (February 12, 2010)
BRISCOE MIDDLE SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
a. Name and Location of Building:
Behlau Elementary
San Antonio, TX
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
Ms. Marilyn Sevedge, Senior Project Manager
5900 Evers Road
San Antonio, TX 78238-2220
(210) 397-1200
c. Contractor:
Kunz Construction
d. Construction Cost:
$19,552,691.00
e. Construction Completion:November, 2008 thru May, 2010
f. Managing Principal:
Craig Noonan, AIA
Noonan Rittimann
g. Project Architect:
Craig Noonan, AIA
h. Scope of Services Performed:
800 Student Elementary School (89% complete)
BEHLAU ELEMENTARY
Rendering of Front Entry at Behlau Elementary School
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
BEHLAU ELEMENTARY
Location Aerial of Behlau Elementary
School Site Location for Behlau Elementary
Emory Peak
GrosenbacherR
oad
Loop 1604
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Behlau E.S. (February 26, 2010)
BEHLAU ELEMENTARY
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Behlau E.S. (February 26, 2010)
BEHLAU ELEMENTARY
BEHLAU ELEMENTARY
MARTIN ELEMENTARY
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
a. Name and Location of Building:
Martin Elementary
San Antonio, TX
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
Mr. Leroy San Miguel, AIA Project Manager
5900 Evers Road
San Antonio, TX 78238-2220
(210) 397-1200
c. Contractor:
Joeris General Contractors
d. Construction Cost:
$19,264,223.00
e. Construction Period:
December, 2008 thru May, 2010
f. Managing Principal:
Jerry Lammers, AIA
Alamo Architects
g. Project Architect:
Jerry Lammers, AIA
h. Scope of Services Performed:
New Elementary School - 660 Students (80% complete)
Rendering of Martin Elementary
MARTIN ELEMENTARY
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
School Site Location for Martin Elementary
Canterbury
Callaghan R
oadLocation Aerial of Martin Elementary
New Callaghan Road
Culebra Road
MARTIN ELEMENTARY
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Martin Elementary (November 18, 2009)
MARTIN ELEMENTARY
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Martin Elementary (February 22, 2010)
MARTIN ELEMENTARY
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Martin Elementary (February 22, 2010)
MARTIN ELEMENTARY
HENDERSON ELEMENTARY
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
a. Name and Location of Building:
Henderson Elementary
14605 Kallison Bend
San Antonio, TX 78254
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
Mr. Thomas Curiel, Project Manager
5900 Evers Road
San Antonio, TX 78238-2220
(210) 397-1200
c. Contractor:
Bartlett-Cocke, Inc.
d. Construction Cost:
$19,773,497.00
e. Construction Period:
Janurary, 2009 thru May, 2010
f. Managing Principal:
Monty Howard, AIA
Marmon Mok
g. Project Architect:
Monty Howard, AIA
h. Scope of Services Performed:
800 Student Elementary School (89% complete)
Elevation Rendering of Front Entrance at Henderson Elementary
Elevation Rendering of Bus Drop and Cafeteria Entrance at Henderson Elementary
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Location Aerial of Henderson Elementary
HENDERSON ELEMENTARY
School Site Location for Henderson Elementary
Kalli
son
Bend
Win
dgat
ePk
wy
FM 471
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Henderson Elementary - February 22, 2010
HENDERSON ELEMENTARY
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Henderson Elementary - February 22, 2010
HENDERSON ELEMENTARY
HENDERSON ELEMENTARY
MIRELES ELEMENTARY SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Rendering of Entrance at Westwinds Elementary
a. Name and Location of Building:
Westwinds Elementary School
San Antonio, TX
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
Ms. Marilyn Sevedge, Senior Project Manager
5900 Evers Road
San Antonio, TX 78238-2220
(210) 257-1200
c. Contractor:
Bartlett Cocke
d. Construction Cost Estimate:
$19,324,998.00
e. Construction Period:
December, 2009 thru May 2011
f. Managing Principal:
Joel Henandez, AIA
PBK Architects
g. Project Architect:
Joel Hernandez, AIA
h. Scope of Services Performed:
800 Elementary School (12% complete)
MIRELES ELEMENTARY SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Rendering of Westwinds Elementary Site Plan
MIRELES ELEMENTARY SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Location Aerial of Mireles Elementary
School Site Location for Mireles ElementaryRockwall Mill
Palmetto W
ay
Alam
o Pkwy
MIRELES ELEMENTARY SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Westwinds Elementary (February 12, 2010)
MIRELES ELEMENTARY SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Westwinds Elementary (February 12, 2010)
MIRELES ELEMENTARY SCHOOL
LIECK ELEMENTARY SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial Rendering of Lieck Elementary
a. Name and Location of Building:
Lieck Elementary School
San Antonio, TX
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
Mr. Thomas Curiel, Project Manager
5900 Evers Road
San Antonio, TX 78238-2220
(210) 257-1200
c. Contractor:
Bartlett Cocke
d. Construction Cost Estimate:
$19,578,860.00
e. Construction Period:
January, 2010 thru May 2011
f. Managing Principal:
Craig Noonan, AIA
Noonan Rittimann
g. Project Architect:
John Rittimann, AIA
h. Scope of Services Performed:
800 Elementary School (6% complete)
LIECK ELEMENTARY SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
School Site Location for Lieck Elementary
Potranco Rd.
Location Aerial of Lieck Elementary
Grosenbacher R
d.
Talley Road
LIECK ELEMENTARY SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Lieck Elementary - January 30, 2010
LIECK ELEMENTARY SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Lieck Elementary - February 26, 2010
LIECK ELEMENTARY SCHOOL
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Lieck Elementary - February 26, 2010
LIECK ELEMENTARY SCHOOL
Floor Plan - Rendering
PLANNORTH
MEADOW VILLAGE ELEMENTARY ADDITIONS AND RENOVATIONS
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
f. Managing Principal:
Chris Kim, AIA
West East Design Group
g. Project Architect:
Jeffrey Rodriquez, AIA
h. Scope of Services Performed:
Ten Classroom Addititon, Mechanical Upgrades and New Student Restrooms (69% complete)
a. Name and Location of Building:
Meadow Village Elementary
Additions & Renovations
1406 Meadow Way
San Antonio, TX 78227
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
Ms. Marilyn Sevedge, Senior Project Manager
5900 Evers Road
San Antonio, TX 78238-2220
(210) 397-1200
c. Contractor:
Galaxy Builders
d. Construction Cost:
$3,146,000.00
e. Construction Period:
May, 2009 thru August, 2010
MEADOW VILLAGE ELEMENTARY ADDITIONS AND RENOVATIONS
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Axonmetric View of Meadow Village ES - Addition
MEADOW VILLAGE ELEMENTARY
MARSHALL HIGH SCHOOLADDITION & RENOVATIONS
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Rendering of Entry Elevation of New Auditorium
a. Name and Location of Building:
Marshall High School
8000 Lobo Lane
San Antonio, TX 78240
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
San Antonio, TX 78238-2220
(210) 397-1200
c. CM @ Risk Contractor:
Satterfield & Pontikes
d. Construction Budget:
Package I thru VI
$12,246,916.00
e. Construction Completion:
May, 2009 thru August, 2010
f. Managing Principal:
Joel Hernandez, AIA
PBK Architects
g. Project Architect:
Joel Hernandez, AIA
h. Scope of Services Performed: (35% complete)
New Auditorium with Scene Shop, Drama Classroom, Choir Room and Practice Rooms, Gym AC, Roof Replacement, Campus Central Plant and Electrical Service Upgrades
Package I (Mech./Elect. Upgrades) - $1,943,050.00 (NTP Issued 4-29-09)
Package II (Demolition) - $192,527.00 (NTP Issued 5-19-2009)
Package III (Roofing) – $1,169,000.00(NTP Issued 5-19-2009)
Package IV (Foundation) – BIDS 6-2-09 $250,363.00
Package V (Building Package) – BIDS $7,441,409.00
Package VI (Stage Equipment) -- $1,250,567.00
Total - $12,246,916.00
MARSHALL HIGH SCHOOLADDITION & RENOVATIONS
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Marshall High School (January 25, 2010)
MARSHALL HIGH SCHOOLADDITION & RENOVATIONS
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of Marshall High School (January 25, 2010)
MARSHALL HIGH SCHOOLADDITION & RENOVATIONS
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Rendered Floor Plan of “New Auditorium” at Marshall High School
MARSHALL HIGH SCHOOL
CLARK HIGH SCHOOL ADDITIONS & RENOVATION
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
a. Name and Location of Building:
Clark High School
5150 DeZavala
San Antonio, TX 78249
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
Mr. Jim Berg, AIA Project Manager
5900 Evers Road
San Antonio, TX 78238-2220
(210) 257-1200
c. CM@ Risk Contractor:
Bartlett Cocke
d. Construction Budget:
$12,230,347.38
e. Construction Completion:June, 2009 - August, 2010
f. Managing Principal:
Craig Noonan, AIA
Noonan Rittimann, LLC
g. Project Architect:
Craig Noonan, AIA
h. Scope of Services Performed:
(59% complete)
Ten Room Science Lab Addition, Gym AC, Central Plant Upgrade, Dressing Rooms and Infrastructure Upgrades.
Package I (Equipment) - $356,823.00 (NTP Issued March 26, 2009)
Package II (Athletics, Gym AC & Central Plant) - $3,618,638.00
Package III (Building Package) - $8,216,227.00
Total = $12,230,347.38
CLARK HIGH SCHOOL ADDITIONS & RENOVATION
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of “New Classroom Addition February 21, 2010
CLARK HIGH SCHOOL ADDITIONS & RENOVATION
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Site Plan of Additions/Renovations
CLARK HIGH SCHOOL
f. Managing Principal:
Craig Noonan, AIA
Noonan, Rittimann, LLC
g. Project Architect:
Craig Noonan, AIA
h. Scope of Services Performed:
(51% complete)
Fourteen Room Science Lab Addition, Gym A/C, Central Plant Upgrade, Dressing Rooms and Infrastructure Upgrades.
Package I (Equipment) - $457,211.00 (NTP Issued March 26, 2009)
Package II (Athletics, Gym AC & Central Plant) - $2,959,392.00
Package III (Building Package) - $8,430,598.00 (Pending Board Approval)
Total - $11,847,201.00
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
OLIVER W. HOLMES HIGH SCHOOL ADDITIONS AND RENOVATIONS
a. Name and Location of Building:
Oliver Wendell Holmes High School
Additions & Renovations
6500 Ingram Road
San Antonio, TX 78238
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
Mr. Jim Berg, AIA Project Manager
5900 Evers Road
San Antonio, TX 78238-2220
(210) 257-1200
c. CM@ Risk Contractor:
Bartlett Cocke
d. Construction Budget:
$11,847,201.00
e. Construction Period:
June, 2009 - August, 2010
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
OLIVER W. HOLMES HIGH SCHOOL ADDITIONS AND RENOVATIONS
Aerial of “New Classroom Addition - February 21, 2010
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
OLIVER W. HOLMES HIGH SCHOOL ADDITIONS AND RENOVATIONS
Site Plan of Holmes High School
OLIVER W. HOLMES HIGH SCHOOL
PEASE MIDDLE SCHOOL ADDITIONS AND RENOVATIONS
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
a. Name and Location of Building:
Pease Middle School
201 Hunt Lane
San Antonio, TX 78245
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
Mr. Thomas Curiel, Project Manager
5900 Evers Road
San Antonio, TX 78238-2220
(210) 397-1200
c. Contractor:
Joeris General Contractors
d. Construction Budget:
$11,647,505.00
e. Construction Period:
April, 2009 thru August, 2010
f. Managing Principal:
Jesse Garza, AIA
Garza Architecture, Inc.
g. Project Architect:
Jesse Garza, AIA
h. Scope of Services Performed:
Nineteen Classroom Addition (69% complete)
Package I (Site) - $2,014,895.00 (NTP Issued May 15, 2009)
Package II (Bldg. Package) - $9,632,610.00
Total = $11,647,505.00
Project Scope – 2 Story, Nineteen Classroom Addition with 9 Science Labs, 3 Computer Labs, 2 Art Labs and 5 General Classrooms, Gym AC, Site Parking, Admin. and Library Renovations.
Rendering of Northwest Elevation at Pease Middle School
PEASE MIDDLE SCHOOL ADDITIONS AND RENOVATIONS
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of “New Classroom Addition - March 2, 2010
PEASE MIDDLE SCHOOL ADDITIONS AND RENOVATIONS
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial of “New Classroom Addition - March 2, 2010
PEASE MIDDLE SCHOOL
JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
a. Name and Location of Building:
John Glenn Elementary
2385 Horal
San Antonio, TX 78227
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
Mr. Jim Berg, Project Manager
5900 Evers Road
San Antonio, TX 78238-2220
(210) 397-1200
c. CM@ Risk Contractor:
Guido Brothers Construction
d. Construction Cost:
$8,079,000.00
e. Construction Completion:June, 2009 - August, 2010
f. Managing Principal:
Mark Oppelt, AIA
O’Neil Conrad Oppelt
g. Project Architect:
Lowell Tacker, AIA
h. Scope of Services Performed:
(67% complete)
Classroom Replacement (20 General Classroom’s, 2 Computer Labs and 4 Small Classroom’s)
Package I (Site & Central Plant) - $2,251,000.00 (NTP Issued April 20, 2009)
Package II (Building Package) - $5,828,000.00
Total - $8,079,000.00
JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial at John Glenn ES - February 2010
JOHN GLENN ELEMENTARY ADDITIONS & RENOVATION
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Aerial at John Glenn ES - February 2010
JOHN GLENN ELEMENTARY
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Front Elevation - New Construction Careers Academy at Warren HS
WARREN HIGH SCHOOL ADDITIONS AND RENOVATIONS
a. Name and Location of Building:
Warren High School
Additions & Renovations
9411 Military Drive West
San Antonio, TX 78251
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
Mr. Jim Berg, AIA Project Manager
5900 Evers Road
San Antonio, TX 78238-2220
(210) 397-1200
c. Contractor:
Joeris General Contractor
d. Construction Budget:
$7,167,464.00
e. Construction Period:June, 2009 - July, 2010
f. Managing Principal:
Roy Lewis, AIA
Garza Bomberger
g. Project Architect:
Roy Lewis, AIA
h. Scope of Services Performed:
New Construction Careers Academy that will include a Building Trades Shop, Plumbing/Pipefitting Trades Shop, HVAC Trades Shop, Electrical Trades Shop, Director’s Office, Boys and Girls Locker Rooms, 10 Classrooms, One Computer Lab, and a Large Instructional Room.
(53% complete)
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
WARREN HIGH SCHOOL ADDITIONS AND RENOVATIONS
Aerial of New Careers Academy at Warren HS – February 5, 2010
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
WARREN HIGH SCHOOL ADDITIONS AND RENOVATIONS
Aerial of New Careers Academy at Warren HS – February 5, 2010
WARREN HIGH SCHOOL
OAK HILLS TERRACE ELEMENTARY SCHOOLADDITIONS & RENOVATIONS
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
Rendering of “New Entrance” at Oak Hills Terrace Elementary
a. Name and Location of Building:
Oak Hills Terrace Elementary School
5710 Cary Grant Dr.
San Antonio, TX 78240
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
Ms. Marilyn Sevedge, Senior Project Manager
5900 Evers Road
San Antonio, TX 78238-2220
(210) 257-1200
c. Contractor:
Kopplow Construction
d. Construction Cost Estimate:
$3,396,593.00
e. Construction Period:
August, 2009 thru August 14, 2010
f. Managing Principal:
Kent Nieman, AIA
Pfluger & Associates
g. Project Architect:
Kent Nieman, AIA
h. Scope of Services Performed:
(19% complete)
Library and New Admin. Addition, Playground Upgrades and ADA Access
OAK HILLS TERRACE ELEMENTARY SCHOOL
BANDERA ROAD NORTH ELEMENTARY
NORTHSIDE INDEPENDENT SCHOOL DISTRICT
a. Name and Location of Building:
Bandera Road North Elementary
San Antonio, TX
b. Client/ Contact Person:
Northside Independent School District
Mr. Ceasar Ponce, AIA Director of Facilities Construction
Mr. Thomas Curiel, Project Manager
5900 Evers Road
San Antonio, TX 78238-2220
(210) 397-1200
c. Contractor:
TBD
d. Construction Cost Estimate:
$20,500,000.00
c. Construction Period:
January, 2010 thru May, 2012
f. Managing Principal:
Mark Oppelt, AIA
OCO Architects
g. Project Architect:
Lowell Tacker, AIA
h. Scope of Services Performed:
800 Student Elementary School
(0% complete)
Rendering of Front Entrance at Bandera Road North E.S.