Top Banner
Scheduling a Report to Run on a Regular Basis
18

Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.

Jan 05, 2016

Download

Documents

Myrtle Walker
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.

Scheduling a Report to Run on a Regular

Basis

Page 2: Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.

Any Scheduled Report must indicate the school and report name

Rename the Report and enter all Selection Criteria for the Report

When you have finished click the Schedule Button on the bottom left

Page 3: Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.

You may schedule the report to run as soon as possible,

One time in the future

Daily, Weekly or Monthly on a regular basis

or

Page 4: Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.

To run the report once in the future you should choose the Once selection. This will open the calendar gadget.

Using the calendar gadget enter a date and time and then click the Schedule button

Page 5: Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.

To run the report Daily choose the Daily selection. This will open the calendar gadget

Using the calendar gadget enter a date and time

Select the number of Interval Days Every # days: 1 would be every day, 2 would be every other day…

Then click the Schedule button

Page 6: Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.

Choose Weekly to run the report once or more during the week, this will open the calendar gadget

Choose the day(s) of the week the report should be run on. When finished click the schedule button

Using the calendar gadget enter a date and time

Page 7: Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.

Choose Monthly to run the report once or more during the month, this will open the calendar gadget

Enter date selections in the Days of month section. Choosing the day's of the month the report should be run on

Click the schedule button when finished

Using the calendar gadget enter a date and time

Page 8: Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.

Let’s look at the Printing/Distribution section

Page 9: Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.

Send to printer: should not be used as it is for a system-wide printer

Save to Finished Reports Wizard: is the default and will send the report to the Finished Reports list. Unless another choice is made this selection can not be removed.

Email to Individual(s): this selection sends the entire report log and/or results directly to an email address or list of addresses.

Reply to: enter a valid email address, the user entered in the Reply to field will receive any reply from the receivers.Format: [ √ ] will apply the default formatting option such as report headers, spacing, and page breaks when sending to a printer or emailing to individuals.

Page 10: Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.

When you are ready to add the report to the list of scheduled reports click the Schedule button

Choose Cancel If you need to make more changes to the selection criteria or decide not to run the report

Page 11: Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.

The above confirmation box should appear showing the name, frequency,

dates and times of the report

You can now Schedule a new report, display a list of scheduled or finished reports or close the reports window

Page 12: Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.

To see a list of scheduled reports click the Scheduled Reports wizard

Since I am logged in as Reporter5, I see a list of all the scheduled reports created under this login

ABC Count Item Titles is listed and scheduled to next run on 7/31/2009 at 9:53

Reports that appear in bold-type are currently suspended

Page 13: Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.

Remember you are just seeing those reports which were scheduled under Reporter5, there are many other scheduled reports under the administrator and the other logins.

Before selecting a time please check with the System Administrator to make sure it is not in conflict with another report

To the left is a sample of the 125 scheduled reports throughout the district

Page 14: Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.

Copy allows you to create a copy of the report, choose any new selection criteria and enter time and dates to run

Remove allows you to delete your scheduled report

Advanced allows you to suspend or reschedule the report

Let’s look at Reschedule and Suspend

Page 15: Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.

Reschedule brings up the Date and Time to run selection used when creating the report. Make any changes and click the schedule button.

Page 16: Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.

Suspend will bring up a confirmation box. To suspend the report click Yes, otherwise Cancel

Ownership: assigns who is able to run or see this report. Trying to change ownership under a Reporter login will result in an error message.

Page 17: Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.

A suspended report will appear in bold letters and will not run until unsuspended

Clicking the Advanced button on a suspended report gives you the option to Unsuspend the report

Choose the Start date Specific option and use the calendar gadget to choose a date you wish the report to start on.

Choose Never If you want to remove the schedule altogether, but retain the report in the scheduled list

Page 18: Scheduling a Report to Run on a Regular Basis. Any Scheduled Report must indicate the school and report name Rename the Report and enter all Selection.

The report is now unscheduled and ready to run