CIVIL WORKS SCHEDULE 2006
SISECONDARY INPUT1Palesading (Item 186)0.0sft.2Bamboo driving
(Item 185)0.0rft325 mm thick patent stone (1:2:4) with brick/chips
for mosaic work0.0% sft425 mm thick patent stone (1:1.5:3) with
stone/chips for mosaic work0.0% sft.5Labour cost of mosaic with
glass strip0.0% sft.6Labour cost of mosaic without glass strip0.0%
sft.Cost for laying glazed tiles on wall (3:1)0.0% sft.Cost for
laying glazed tiles on floor (2:1)0.0% sft.Cost for laying glazed
tiles on floor (3:1)0.0% sft.71/2 " thick plaster (1:4)0.0sft.81/2
" thick plaster (1:4) with N.C.F.0.0sft.9One layer brick-flat
soling0.0% sft.10Polythene sheet laying0.0% sft.11Brick work (1:6)
in superstructure0.0% cft.12Brick work (1:6) in foundation0.0%
cft.Plain concrete (1:3:6) with brick chips0.0% cft.13Plain
concrete (1:2:4) with brick chips0.0% cft.Plain concrete (1:1.5:3)
with brick chips0.0% cft.Concrete for slab (1:2:4)0.0% cft.Concrete
for wall (1:2:4)0.0% cft.145" / 125 mm brickwork (1:4)0.0% sft.155"
/ 125 mm brickwork (1:6)0.0% sft.16Earthwork in excavation0.0% 0
cft.17Synthetic Enamel paint0.0% sft.18French polish0.0% sft.19Sand
fill (0.8)0.0% cft.2040 Grade rebar in concrete0.0IbsFORM-WORK
SHUTTERING WOODENWOODENSTEEL1Colum footing0.0Per sqm.0.02Raft /
mat0.0Per sqm.0.03Foundation beam0.0Per sqm.0.04Pedestal / column
etc.0.0Per sqm.0.05Tie-beam, lintels0.0Per sqm.0.06T-EL-R
beam0.0Per sqm.0.07Roof slab0.0Per sqm.0.08Waffel / ribbed
slab0.0Per sqm.0.09Railing-drop-walls, cornice, fins etc.0.0Per
sqm.0.010Sun-shade0.0Per sqm.0.011Stair-case slab0.0Per sqm.0.0COST
FOR LAYING CONCRETE1Laying concrete (1000 cft per day using one
mixture machine)0.0% cft.2Laying concrete (800 cft per day using
one mixture machine)0.0% cft.3Laying concrete (600 cft per day
using one mixture machine)0.0% cft.4Laying concrete (500 cft per
day using one mixture machine)0.0% cft.COST OF MATERIALS FOR
CONCRETE1(1:3:6) with BRICK CHIPS and sand of F.M. 1.20.0%
cft.2(1:2:4) with BRICK CHIPS and sand of F.M. 1.20.0% cft.3(1:2:4)
with BRICK CHIPS (sand of F.M. 1.2 and 2.2 in equal proportion)0.0%
cft.4(1:2:4) with CRUSHED STONE CHIPS and 100% sand of F.M. 2.20.0%
cft.5(1:1.5:3) with BRICK CHIPS (sand of F.M. 1.2 and 2.2 in equal
proportion)0.0% cft.6(1:1.5:3) with CRUSHED STONE CHIPS and 100%
sand of F.M. 2.20.0% cft.7(1:1.25:2.5) with CRUSHED STONE CHIPS and
100% sand of F.M. 2.20.0% cft.
Long ScheduleSCHEDULE OF RATES FOR CIVIL WORKSTWELFTH EDITION :
01 JUNE, 2008Item NoDescription of ItemUnitUnit RateDIVISION 01 :
GENERAL AND SITE FACILITIES01.101.1.1Engineers site office of
minimum 15 sqm plinth area with providing furniture, first aid-box,
safety helmet, level / theodolite, consumables, stationeries
etc.L.S.9091901.1.2Engineers site office of minimum 38 sqm plinth
area with providing security fencing, 5 Kva stand-bye generator,
furniture, first aid-box, safety helmet, level / theodolite,
consumables, stationeries etc.L.S.28127801.1.3Engineers site office
of minimum 38 sqm plinth area with providing security fencing, 5
Kva stand-bye generator, IBM compatible PC with monitor,
uninterruptible power supply (UPS), Laserjet printer (minimum 25
ppm), furniture, first aid-box, safety helmet,
level/theodolite/EDM, consumables, stationeries
etc.L.S.36447201.1.4Engineers site office of minimum 38 sqm plinth
area with providing security fencing, 5 Kva stand-bye generator,
IBM compatible PC with monitor, uninterruptible power supply (UPS),
Laserjet printer (minimum 25 ppm), photocopier, 6 cft. Freeze,
furniture, first aid-box, safety helmet, level/theodolite/EDM,
consumables, stationeries etc.L.S.38824101.1.5Engineers site office
of minimum 10 sqm plinth area with providing furniture, first
aid-box, safety helmet, consumables, stationeries etc for low value
simple work of short duration (not more than six
months).L.S.1570601.1.6Providing and maintenance window type 1800
BTU AC (Air-Cooler) for Engineers office and remove after
completion of contract.each2959301.1.7Providing and maintenance one
project profile signboards of the size not exceeding 1 m x 2 m, to
be placed at a suitable place of the site including submission of
proposals for the materials of the signboards and text layout to
the Engineer for approval which will be positioned as directed by
the Engineer and removing the same on completion of the Works or as
instructed by the Engineer.each380301.2.1Providing 3 sets as-built
Drawings subject to Engineers approval produced in AutoCAD software
in 23.38 x 16.54 (A-2 size) standard drawing paper, and operating
and maintenance manual of the equipment and plant incorporated in
the works, if any, in original by the date stated in the Particular
Conditions of Contract (PCC). If the Contractor does not supply the
as-built drawings and operating and maintenance manuals by the date
stated in the Particular Conditions of Contract (PCC), or they do
not receive the Engineers approval, the Engineer shall withhold the
amount stated in the PCC from the payments due to the
Contractor.The as-built drawings must show the permanent works as
actually constructed and reflect the revision of Tender Drawings
and Drawings supplied to the Contractor during the Contract as well
as revisions of drawings supplied by the Contractor during the
Contract. (One set of as-built drawings shall be considered for
measurement and payment)sqm.161201.2.2Providing additional copy of
as-built drawing produced in AutoCAD software in 23.38" x 16.54"
(A-2) standard drawing paper accepted by the
Engineer.sqm.52701.2.3Providing minimum ten (10) copies coloured
post-card size progress photograph of works under contract taken by
professional photographer which record the progress of the
Works.month60901.2.4Preparation & submission of implementation
schedule to the Engineer for approval prior ground breaking showing
the events (works) and successive sub-events of works including all
the management & control parameters like Earliest Start Time
(EST), Earliest Finish Time (EFT), float events on critical path,
resource allocation etc. with description of general method of
works, in orderly manner all in the form network diagram prepared
in computer software like MS project and presenting in Displayable
hard and soft copy minimum 3 (three) sets.(This is a time related
item. Proportionate payment for this item shall be made
distributing in each bill on the basis of percentage progress of
the whole works under contract)L.S.1818401.2.5Updating the
Implementation Schedule and submission to the Engineer at intervals
no longer than 28 days showing actual physical and financial
progress achieved, on each activity and the effect of the progress
on the timing of the remaining work, including any changes to the
sequence of the activities.However, Engineers approval of the
Programme shall not alter the Contractors obligations. The
Contractor may revise the Programme and submit it to the Engineer
again at any time. A revised programme shall show the Variations
and Events related to change of contract
price.month273401.2.6Providing all necessary logistic support to
frame monthly progress meeting between Contractor/Contractors
representatives and Employer / Employers representatives at the
Engineer's office at site.month202001.3Providing layout and carry
over PWD Bench-Mark (BM) at site from nearby BM pillar, Property
lines, existing ground level (EGL), formation ground level (FGL),
highest flood levels (HFL), plinth levels (PL), mean sea level
(MSL), setting and marking all pillars, marker, pegs etc. showing
and maintaining reduced levels (RLs) including locating,
establishing, protecting all public utilities within the premise of
work and finally all to be presented in black and
white.sqm.1701.4Mobilization and cleaning site before commencing
actual physical work and during contract period and demobilization
after completion of the Works under contract accepted by
Engineer.This work shall also covers clayey cleaning and clearing,
cutting or filling, dressing the project area on and in the ground
to an extent that all the events of works of the project can be
executed smoothly in a working environment with a particular
attention on safety and security in all respects, and to stockpile
the end outcome to a place for disposal agreed by the Engineer,
where, payments are to be based on ground area determined by the
Engineer and be proportionate to the percentage progress of work
under contract as a whole in all respects and approved by the
Engineer.sqm.128DIVISION 02 : EXCAVATION, FILLING AND SITE
DEVELOPMENT & PALISADING02.1Earth work in excavation in all
kinds of soil for foundation trenches including. layout, providing
center lines, local bench-mark pillars, leveling, ramming and
preparing the base, fixing bamboo spikes and marking layout with
chalk powder, providing necessary tools and plants, protecting and
maintaining the trench dry etc., stacking, cleaning the excavated
earth at a safe distance out of the area enclosed by the layout
etc. all complete and accepted by the Engineer, subject to submit
method statement of carrying out excavation work to the Engineer
for approval. However, Engineers approval shall not relieve the
contractor of his responsibilities and obligations under the
contract.02.1.1Layout and marking for earthwork in excavation in
foundation accepted by the Engineer. [Plinth area of the structure
shall be considered for measurement]sqm.702.1.2Earthwork in
excavation in foundation trenches up to 1.5 m depth and maximum 10
m lead: in soft clayey soil / loose sand / siltcum4102.1.3Earthwork
in excavation in foundation trenches up to 1.5 m depth and maximum
10 m lead: in medium stiff clayey soil.cum5902.1.4Earthwork in
excavation in foundation trenches up to 1.5 m depth and maximum 10
m lead: in very stiff (hard) clayey soil/ rubbish
etc.cum8902.1.5Earthwork in excavation in foundation trenches up to
1.5 m depth and maximum 10 m lead: in very soft / saturated /
organic clayey soil / soil of semi-liquid state.cum10202.1.6Extra
rate for each additional 0.5 meter depth exceeding 1.5
meter.cum1002.1.7Extra rate for each 1 m additional lead beyond 10
m.cum102.2Bailing out trapped water caused by inundation or rain,
by pump from foundation trenches.hour23702.3Supplying of straight
and strong borrak bamboo posts of having minimum 75 mm diameter
althrough and driving the same vertically in the ground up to
required depth by any means shaping the top of the post, all
complete and accepted by the Engineer.rm.3902.4Supplying wooden
ballah having an average diameter not less than 150 mm (without
barks) at one third distance from larger end with a minimum end
diameter of 100 mm for retaining purpose and driving to a depth as
per design and drawing by any method including all arrangement for
staging, hoisting, carrying etc. complete and accepted by the
Engineer.rm.34402.5Palisading work by supplying bitumen drum sheet
walling tied with 20 BWG G.I. wire fixing the same with already
driven borrak bamboo posts with half split borrak bamboo runners @
450mm c/c horizontally with iron nails, G.I wire etc. all complete
and accepted by the Engineer. (Rate is excluding the cost of bamboo
post).sqm.41702.6Supplying and fitting-fixing horizontal bracing in
Palisading with split wooden ballah having an average diameter not
less than 150 mm with a minimum end diameter of 100 mm @ 450 mm
including supply of iron nails, gazals etc. complete approved and
accepted by the Engineer.rm.12102.7.1Shore protection work during
excavation in foundation trenches up to 1.5 m depth, to protect
loss due to damage of property by Palisading accepted by the
Engineer. [the rate is including cost of vertical
post]sqm.46402.7.2Shore protection work during excavation in
foundation trenches to protect loss due to damage of property by
Palisading beyond 1.5 m depth accepted by the Engineer [the rate is
including cost of vertical post]sqm.67902.8Supply and laying 2 mm
thick Geo-textile of approved quality and origin/manufacturer as
per manufacturers instructions approved and accepted by the
Engineer.Before commencing laying of Geo-textile, the Contractor
must submit the method statement for carrying out this work
including sample with evidence of origin and compliance certificate
from independent testing laboratory for
approval.sqm.12302.9Removing sludge or semi-liquid clay/substances
etc not suitable for pumping out or carrying by head load from the
bottom of any marshy land, lake, ditch, pond by mixing fine local
sand of F.M. 0.8 or less to a proportion such that it can be
carried to an intermediate point of disposal and cutting the same
including stacking and spreading properly on a suitable place to
dry in the sun for a certain days and dispose the dried sludge or
clay to a safe distance etc. complete and accepted by the Engineer
subject to submit method statement to the Engineer for carrying out
the works including ultimate disposal of the sludge under this item
for approval. However Engineers approval shall not relieve the
Contractor of his responsibilities and obligations under the
contract.cum42002.10.1Sand filling in foundation trenches and
plinth with sand having F.M. 0.5 to 0.8 in 150mm layers including
leveling, watering and compaction to achieve minimum dry density of
90% with optimum moisture content (Modified proctor test) by
ramming each layer up to finished level as per design supplied by
the design office only etc. all complete and accepted by the
Engineer.cum47602.10.2Sand filling in foundation trenches and
plinth with coarse sand having min. F.M. 1.2 in 150mm in layers
including leveling, watering and compaction to achieve minimum dry
density of 90% with optimum moisture content (Modified proctor
test) by ramming each layer up to finished level as per design
supplied by the design office only etc. all complete and accepted
by the Engineer.cum77602.10.3Sand filling in foundation trenches
and plinth with coarse sand having min. F.M. 2.2 in 150mm layers
including leveling, watering and compaction to achieve minimum dry
density of 90% with optimum moisture content (Modified proctor
test) by ramming each layer up to finished level as per design
supplied by the design office only etc. all complete and accepted
by the Engineer.cum126702.1150 mm down graded picked jhama Khoa
consolidation in foundation trenches by mixing the same with best
quality local sand (F.M. 1.2) in (2:1) (khoa:sand) proportion to
achieve minimum dry density of 90% with optimum moisture content
(Modified proctor test) including breaking and screening
chips,laying and spreading in150mm layers uniformly etc. all
complete and accepted by the Engineer.cum243102.1250 mm down graded
picked jhama khoa consolidation in foundation trenches by mixing in
mixer machine in foundation with best quality local sand(F.M. 1.2)
and cement in (1:6:12) (cement : sand : khoa) proportion to achieve
minimum dry density of 90% with optimum moisture content (Modified
proctor test) including breaking and screening chips etc. all
complete and accepted by the Engineer.cum327402.13Earth filling in
foundation trenches and plinth in 150 mm layer with earth available
within 90 m of the building site to achive minimum dry density of
90% with optimum moisture content (Modified proctor test) including
carrying watering, leveling, dressing and compacting to a specified
percentage each layer up to finished level etc. all complete and
accepted by the Engineer.cum7002.14Clearing and disposing of
excavated earth from the construction site by truck or any other
means to a place within 30 km radius of the city or town area
including loading, unloading at both ends, leveling and dressing
the carried earth etc. complete accepted by the
Engineer.cum27902.15Earth filling in foundation trenches and plinth
in 150 mm layers with carted earth carried by truck or any other
means loading and unloading at both ends including leveling,
watering and compacting to achive minimum dry density of 90% with
optimum moisture content (modified proctor test) including local
carriage each layer up to finished level including cost of water
and test (carried from beyond 300 m) etc. all complete and accepted
by the Engineer.02.15.1For Dhaka Metropolitan Areacum26402.15.2For
Chittagong / Sylhet/ Narayanganj Areacum23902.15.3For Rajshahi /
Barishal / Khulna metropolitan areacum22602.15.4For other than
Dhaka, Ctg., Sylhet, Rajshahi, Barishal, Khulna metropolitan area
and N'ganj districtcum21402.16Site Development/Improvement by
carted/dredged earth or sand (free from any organic, foreign,
environmental hazard substances) carried by head or truck or any
other meansl in/c cost of cutting/dredging of earth/sand, carrying,
placing the earth/sand in the designated area, maintaining slopes,
breaking lumps, levelling and dressing in layers up to finished
level etc. all complete as per direction and accepted by the
engineer in charge.02.16.1For Dhaka Metropolitan
Areacum18702.16.2For Chittagong / Sylhet/ Narayanganj
Areacum15802.16.3For Rajshahi / Barishal / Khulna metropolitan
areacum14302.16.4For other than Dhaka, Ctg., Sylhet, Rajshahi,
Barishal, Khulna metropolitan area and N'ganj
districtcum11902.17Mechanical compaction of earth or sand in 150mm
layers including leveling, watering and consolidation each layer
with chain dozer, grader, roller etc. to achieve minimum dry
density of 90% with optimum moisture content (modified proctor
test) up to finished level all complete and accepted by the
engineer subject to submission of the method
statement.cum242DIVISION 03 : BRICK SOLING, CC, DPC ETC.03.1One
layer of brick flat soling in foundation or in floor with first
class or picked jhama bricks including preparation of bed and
filling the interstices with local sand, leveling etc. complete and
accepted by the Engineer.sqm.23403.2One layer of Herring bone bond
(HBB) brick soling in foundation or in floor with first class or
picked jhama bricks including preparation of bed and filling the
interstices with local sand, leveling including the supply of
water, electricity and other charges and costs of tools and plants
etc. all complete and accepted by the Engineer.sqm.37103.3Brick on
end edging including preparation of bed and filling the interstices
with local sand, leveling, maintaining alignment grid etc. all
complete and accepted by the Engineer.rm.5803.4Mass concrete
(1:3:6) in foundation or floor with cement, sand (F.M. 1.2) and
picked jhama chips including breaking chips, screening, mixing,
laying, compacting to levels and curing for at least 7 days
including the supply of water, electricity and other charges and
costs of tools and plants etc. all complete and accepted by the
Engineer.(Cement: CEM-II/A-M)03.4.1Mass concrete in foundation
(1:3:6) with cement, brick chips and sand of F.M.
1.2cum474903.4.2Mass concrete in floor (1:3:6) with cement brick
chips and sand of F.M. 1.2cum469303.5Mass concrete (1:2:4) in
foundation or floor with cement, sand (F.M. 1.2) and picked jhama
chips including breaking chips, screening, mixing, laying,
compacting to levels and curing for at least 7 days including the
supply of water, electricity and other charges and costs of tools
and plants etc. all complete and accepted by the Engineer.(Cement:
CEM-II/A-M)03.5.1Mass concrete in foundation (1:2:4) with brick
chips and local sand of F.M. 1.2cum552603.5.2Mass concrete in floor
(1:2:4) with brick chips and local sand of F.M. 1.2cum547003.6Damp
proof course (DPC) (1:1.5:3) in cement concrete with cement, sand
(F.M. 1.2) and picked jhama or stone chips including breaking
chips, screening, centering, shuttering, casting, curing and
finished with a coat of bitumen including the supply of water,
electricity and other charges and costs of tools and plants etc.
all complete and accepted by the Engineer. (Cement:
CEM-II/A-M)03.6.175 mm or 3" thick damp proof course (1:1.5:3) with
brick chips and 50% Sylhet sand (F.M. 2.2) and 50% local sand (F.M.
1.2)sqm.72903.6.275 mm or 3" thick damp proof course (1:1.5:3) with
Sylhet sand (F.M. 2.2) and stone chips.sqm.80103.6.3150 mm or 6"
thick damp proof course (1:1.5:3) with Sylhet sand (F.M. 2.2) stone
chips and water-proofing admixture/agent approved by the
Engineer.cum880303.7Supplying and laying of single layer polythene
sheet weighing one kilogram per 6.5 square meter in floor or any
where below cement concrete complete in all respect and accepted by
the Engineer.sqm.24DIVISION 04 : BRICK WORKS, PATENT STONE IN FLOOR
AND FANCY SCREEN BLOCK WORK04.1Brick works with first class bricks
in cement sand (F.M. of sand 1.2) mortar (1:6) in foundation and
plinth, filling the joints/interstices fully with mortar, racking
out the joints, cleaning and soaking the bricks at least for 24
hours before use and curing at least for 7 days etc. all complete
including cost of water, electricity and other charges and accepted
by the Engineer.(Cement: CEM-II/A-M)cum363604.2Brick works of width
one brick or one and a half brick length with first class bricks in
cement sand (F.M. 1.2) mortar (1:6) in superstructure including
raking out joints, filling the interstices with mortar, cleaning
and soaking the bricks at least for 24 hours before use and washing
of sand, necessary scaffolding, curing at least for 7 days etc. all
complete (measurement to given as 250 mm width for one brick length
and 375 mm for one brick and a half brick length) and accepted by
the Engineer.(Cement: CEM-II/A-M)In ground floorcum383104.3Brick
works with first class bricks in cement sand (F.M. 1.2) mortar
(1:4) in exterior walls including filling the interstices with
mortar, raking out joints, cleaning and socking the bricks at least
for 24 hours before use and washing of sand, necessary scaffolding,
curing at least for 7 days etc. all complete including cost of
water, electricity and other charges (measurement to given as 250
mm width for one brick length and 375 mm for one brick and a half
brick length) accepted by the Engineer.(Cement: CEM-II/A-M)In
ground floorcum414704.4Exposed brick works (for exterior wall
without outside plaster) with special quality sorted out first
class bricks, very carefully laid in cement sand (F.M. 1.2) mortar
(1:4)) in superstructure with uniform width and depth joints, true
to vertical and horizontal lines including raking out joints
scaffolding, soaking the bricks at least for 24 hours before use,
washing and screening of sand. Curing at least for 7 days and high
class flush pointing with cement sand (F.M. 1.2) mortar (1:1)
including cost of water, electricity and other charges etc all
complete and accepted by the Engineer.(Cement: CEM-II/A-M)In ground
floorcum480804.5Exposed brick works (for exterior wall without
outside plaster) with automatic machine made first class bricks,
very carefully laid in cement sand (F.M. 1.2) mortar (1:4)) in
superstructure with uniform width and depth joints, true to
vertical and horizontal lines including raking out joints
scaffolding, soaking the bricks at least for 24 hours before use,
washing and screening of sand. Curing at least for 7 days and high
class flush pointing with cement sand (F.M. 1.2) mortar (1:1)
including cost of water, electricity and other charges etc all
complete and accepted by the Engineer.(Cement: CEM-II/A-M)In ground
floorcum446204.6Brick works with 10 holes machine made bricks of
approved size (9.5" x 4.5" x 2.75") having uniform colour carefully
laid in cement sand (F.M. 1.2) mortar (1:4) in superstructure with
uniform width and depth joints, true to vertical and horizontal
lines including raking out joints, filling the interstices with
mortar, cleaning and soaking bricks at least for 24 hours before
use and washing and screening of sand, necessary scaffolding,
curing at least for 7 days and pointing with cement sand (F.M. 1.2)
mortar (1:2) including cost of water, electricity and other charges
etc. complete and accepted by the Engineer.(Cement: CEM-II/A-M)In
ground floorcum654004.7Brick work with 9.5" x 4.5" x 2.75" size
machine made solid klinker facing bricks having uniform colour
carefully laid in cement sand (F.M. 1.2) mortar (1:4) in
superstructure with uniform width and depth joints, true to
vertical and horizontal lines including raking out joints, filling
the interstices with mortar, cleaning and soaking bricks at least
for 24 hours before use and washing and screening of sand,
necessary scaffolding, curing at least for 7 days and pointing with
cement sand (F.M. 1.2) mortar (1:2) including cost of water,
electricity and other charges etc. complete and accepted by the
Engineer.(Cement: CEM-II/A-M)In ground floorcum617004.8Brick works
with 9.5" x 4.5" x 2.75" size 10 hole machine made Rock-face or
textured klinker facing bricks having uniform colour carefully laid
in cement sand (F.M. 1.2) mortar (1:4) in superstructure with
uniform width and depth joints, true to vertical and horizontal
lines including raking out joints, filling the interstices with
mortar, cleaning and soaking bricks at least for 24 hours before
use and washing and screening of sand, necessary scaffolding,
curing at least for 7 days and pointing with cement sand (F.M. 1.2)
mortar (1:2) including cost of water, electricity and other charges
etc. all complete and accepted by the Engineer.(Cement:
CEM-II/A-M)In ground floorcum685304.9Brick works with 9.5" x 4.5" x
2.75" size 3 hole machine made reinforced klinker facing bricks
having uniform colour carefully laid in cement sand (F.M.1.2)
mortar (1:4) in superstructure with uniform width and depth joints,
true to vertical and horizontal lines including raking out joints,
filling the interstices with mortar, cleaning and soaking bricks at
least for 24 hours before use and washing and screening of sand,
necessary scaffolding, curing at least for 7 days and pointing with
cement sand (F.M. 1.2) mortar (1:2) including cost of water,
electricity and other charges etc. all complete and accepted by the
Engineer.(Cement: CEM-II/A-M)In ground floorcum665904.10Extra cost
shall be incorporated in the estimate for each additional floor for
brick works (item No.- 4.2 to 4.9)04.10.1Add for each additional
floor up to 5th floorcum7904.10.2Add for each additional floor from
6th floor to 9th floorcum11004.10.3Add for each additional floor
for 10th floor and abovecum12604.11Extra cost for brick-work for
each additional meter (or part of meter) free height of brick wall
beyond 4 m from the respective floor in auditorium, go-down,
overhead water tank etc. as description of the item No. in 16, 17,
18 and 19 including cost of water, electricity and other charges
etc. all complete and accepted by the Engineer.(Extra cost shall be
incorporated in the estimate only when both sides of wall is
uninterruptedly free beyond 4.00 meter)cum8804.12Providing brick
works for 200 x 100 mm facing in superstructure with 200 x 100 x 50
mm machine made klinker hard pressed facing bricks of approved
quality in cement sand (F.M. 1.2) mortar (1:4), including racking
out joints, cutting the bricks to required size wherever necessary
including high class recessed pointing, cleaning and soaking the
bricks at least for 24 hours before use and washing and screening
of sand, necessary scaffolding, curing at least for 7 days for all
floors up to 4th floor including cost of water, electricity and
other charges etc. all complete and accepted by the Engineer.(100 x
200 mm face should be placed for facing).(Cement: CEM-II/A-M)In
ground floorsqm.96604.13Providing brick works in facing for 200 x
50 mm in superstructure with 200 x 50 x 50 mm machine made hard
pressed klinker facing bricks of approved quality pressed with 20
mm thick cement sand (F.M.1.2) mortar (1:4), 10 mm thick cement
mortar in adjacent sites including racking out joints and cutting
the bricks to required sizes wherever necessary with high class
recessed pointing, cleaning and soaking the bricks for at least 24
hours before use and washing of sand necessary scaffolding, curing
at least for 7 days for all floors up to 4th floor including cost
of water, electricity and other charges etc. all complete and
accepted by the Engineer.(Cement: CEM-II/A-M)In ground
floorsqm.114904.14Providing brick works for 200 x 62 mm facing in
superstructure with 200 x 62 x 25 mm machine made hard pressed
klinker facing strips of approved quality with 20 mm thick cement
sand (F.M.1.2) mortar (1:3) in adjacent side wall, column, drop
wall etc. and racking out joints, cutting the bricks to required
sizes wherever necessary with high class recessed pointing,
cleaning and soaking the bricks at least for 24 hours before use
washing and screening of sand and necessary scaffoldings, curing at
least 7 days including cost of water, electricity and other charges
etc. all complete and accepted by the Engineer.(Cement:
CEM-II/A-M)In ground floorsqm.107904.15125 mm brick work with first
class bricks in cement sand (F.M. 1.2) mortar (1:6) and making bond
with connected walls including necessary scaffolding, raking out
joints, cleaning and soaking the bricks for at least 24 hours
before use and washing of sand curing at least for 7 days in all
floors including cost of water, electricity and other charges etc.
all complete and accepted by the Engineer.(Cement: CEM-II/A-M)In
ground floorsqm.54204.16125 mm brick works with first class bricks
in cement sand (F.M. 1.2) mortar (1:4) and making bond with
connected walls including necessary scaffolding, raking out joints,
cleaning and soaking the bricks for at least 24 hours before use
and washing of sand curing at least for 7 days in all floors
including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer.(Cement: CEM-II/A-M)In ground
floorsqm.57604.17Exposed 125 mm thick pointing extra ordinary
ornamental brick work with sorted out first class bricks in cement
sand (F.M. 1.2) mortar (1:4) and making bond with connected walls
including necessary scaffolding, raking out joints, cleaning and
soaking the bricks for at least 24 hours before use and washing of
sand curing at least for 7 days in all floors including cost of
water, electricity and other charges etc. all complete and accepted
by the Engineer.(Cement: CEM-II/A-M)In ground
floorsqm.69704.18Exposed 125 mm thick pointing extra ordinary
ornamental brick work with automatic machine made first class
bricks in cement sand (F.M. 1.2) mortar (1:4) and making bond with
connected walls including necessary scaffolding, raking out joints,
cleaning and soaking the bricks for at least 24 hours before use
and washing of sand curing at least for 7 days in all floors
including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer. (Cement: CEM-II/A-M)In
ground floorsqm.65904.19Providing 125 mm thick (Partition walls)
brick work in superstructure brick work (1:4) in cement sand (F.M.
1.2) mortar with 10 hole machine made ceramic bricks of approved
size having uniform colour, carefully laid in cement mortar and
depth joints true to vertical and horizontal lines including.
racking out joints, filling the interstices with same mortar,
making bond with connected walls, cleaning, soaking brick at least
24 hours and washing of sand, curing 7 days in all floors,
including cost of water, electricity and other charges accepted by
the Engineer.(Cement: CEM-II/A-M)In ground floorsqm.89604.20Fancy
screen work with different size hollow machine made design blocks
with uniform colour, carefully laid in coloured cement sand (F.M.
1.2) mortar (1:3) in all floors in wall with uniform mortar joints,
true to vertical and horizontal line including racking out joints,
cleaning and soaking the blocks for minimum 24 hours before use
including washing and screening of sand, scaffolding, curing etc.
complete in all respect including supply of all necessary materials
including cost of water, electricity and other charges accepted by
the Engineer. (Cement: CEM-II/A-M)04.20.1With design block No. 3
(MCW) size: 4" x 4" x 4"In ground floorsqm.199304.20.2With design
block No. 2 (MCW) size: 6.5" x 4.75" x 4"In ground
floorsqm.139904.20.3With design block No. 20 (MCW) size: 6" x 6" x
4"In ground floorsqm.149504.21Extra cost shall be incorporated in
the estimate for each additional floor for brick and screen block
works (item No.- 4.12 to 4.20)04.21.1Add for each additional floor
up to 5th floorsqm.1404.21.2Add for each additional floor from 6th
floor to 9th floorsqm.1904.21.3Add for each additional floor for
10th floor and abovesqm.2404.22Klinker paving brick works in floor
or pavement with machine made pressed bricks of approved quality in
cement sand (F.M. 1.2) mortar (1:4) on minimum 12 mm thick cement
sand (F.M. 1.2) mortar (1:4) including raking out joints, cutting
the bricks to required size soaking the same 24 hours before use
wherever necessary including high class flush pointing in cement
mortar (1:2), cleaning, curing at least for 7 days etc. including
washing and screening of sand, cost of water, electricity and other
charges complete and standard practice accepted by the
Engineer.(Cement: CEM-II/A-M)04.22.1100 mm thick brick on edge
pavement with 200 x 100 x 50 mm size klinker facing
bricks.sqm.155404.22.250 mm thick flat brick pavement with 200 x
100 x 50 mm klinker paving bricks in 1:4 cement sand mortar having
200 x 100 mm face at top.sqm.92604.22.350 mm thick brick pavement
with 200 x 50 x 50 mm klinker facing bricks.sqm.109104.23125 mm
thick brick pavement or flooring with first class brick on edge in
cement sand (F.M. 1.2) mortar (1:4) on minimum 12 mm thick cement
sand (F.M. 1.2) mortar (1:4) including cutting the bricks as per
requirement, cleaning and racking out joints, finishing with flush
pointing with cement sand (F.M. 1.2) mortar (1:2) and curing for at
least 7 days etc. including cost of water, washing and screening of
sand (F.M. 1.2), electricity and other charges complete and
standard practice accepted by the Engineer.(Cement:
CEM-II/A-M)sqm.64704.24125 mm thick brick pavement/flooring with 10
hole machine made ceramic bricks in cement sand (F.M. 1.2) mortar
(1:4) on minimum 12 mm thick cement sand (F.M. 1.2) mortar (1:4)
including cutting the bricks as per requirement, cleaning and
racking out joints, finishing with flush pointing with cement sand
(F.M. 1.2) mortar (1:2) and curing for at least 7 days etc.
including cost of water, washing and screening of sand (F.M. 1.2),
electricity and other charges etc. all complete and accepted by the
Engineer.(Cement: CEM-II/A-M)sqm.95104.2575 mm thick cement
concrete (1:3:6) with cement in flooring best quality coarse sand
and 19 mm down graded picked chips including breaking chips,
screening, mixing, laying, compacting, washing and screening of
sand of F.M 1.2 and curing at least for 7 days etc. including cost
of water, electricity and other charges etc. all complete and
accepted by the Engineer. Cement: CEM-II/A-M)sqm.39004.2625 mm
thick artificial patent stone (1:2:4) flooring with cement, best
quality coarse sand (50% quantity of Sylhet sand or coarse sand of
equivalent F.M. 2.2 and 50% best local sand of FM 1.2) and 12 mm
down well graded brick chips including breaking chips, screening,
laying the concrete in alternate panels, compacting and finishing
the top with neat cement and curing at least 7 days in all floors
including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer.(Cement: CEM-II/A-M)In ground
floorsqm.23704.2738 mm thick artificial patent stone (1:2:4)
flooring with cement, best quality coarse sand (50% quantity of
Sylhet sand or coarse sand of equivalent F.M. 2.2 and 50% best
local sand of FM 1.2) and 12 mm down well graded brick chips
including breaking chips, screening, laying the concrete in
alternate panels, compacting and finishing the top with neat cement
and curing at least 7 days in all floors including cost of water,
electricity and other charges etc. all complete and accepted by the
Engineer.(Cement: CEM-II/A-M)In ground floorsqm.30504.2825 mm thick
artificial patent stone (1:2:4) flooring with cement, best quality
coarse sand (50% quantity of Sylhet sand or coarse sand of
equivalent F.M. 2.2 and 50% best local sand of FM 1.2) and 12 mm
down well graded stone chips, laying the concrete in alternate
panels, compacting and finishing the top with neat cement and
curing at least 7 days in all floors including cost of water,
electricity and other charges etc. all complete and accepted by the
Engineer. (Cement: CEM-II/A-M)In ground floorsqm.26104.2938 mm
thick artificial patent stone (1:2:4) flooring with cement, best
quality coarse sand (50% quantity of Sylhet sand or coarse sand of
equivalent F.M. 2.2 and 50% best local sand of FM 1.2) and 12 mm
down well graded stone chips, laying the concrete in alternate
panels, compacting and finishing the top with neat cement and
curing at least 7 days in all floors including cost of water,
electricity and other charges etc. all complete and accepted by the
Engineer. Cement: (CEM-II/A-M)In ground floorsqm.34004.3025 mm
thick artificial patent stone (1:1.5:3) flooring with cement, best
quality coarse sand (50% quantity of Sylhet sand or coarse sand of
equivalent F.M. 2.2 and 50% best local sand of FM 1.2) and 12 mm
down well graded stone chips, laying the concrete in alternate
panels, compacting and finishing the top with neat cement and
curing at least 7 days in all floors including cost of water,
electricity and other charges etc. all complete and accepted by the
Engineer. (Cement: CEM-II/A-M)In ground floorsqm.27604.3138 mm
thick artificial patent stone (1:1.5:3) flooring with cement, best
quality coarse sand (50% quantity of Sylhet sand or coarse sand of
equivalent F.M. 2.2 and 50% best local sand of FM 1.2) and 12 mm
down well graded stone chips, laying the concrete in alternate
panels, compacting and finishing the top with neat cement and
curing at least 7 days in all floors including cost of water,
electricity and other charges etc. all complete and accepted by the
Engineer.(Cement: CEM-II/A-M)In ground floorsqm.36404.32Extra cost
shall be incorporated in the estimate for each additional floor for
patent stone works.04.32.1Add for each additional floor up to 5th
floorsqm.1404.32.2Add for each additional floor from 6th floor to
9th floorsqm.1904.32.3Add for each additional floor for 10th floor
and abovesqm.24DIVISION 05 : MOSAIC WORKS05.110 mm thick finished
and 12 mm laying thickness situ mosaic work on floor with one part
of 10 mm machine crushed well graded dust free and properly washed
marble chips and one part of mixture containing white cement / grey
cement including preparation of mix. and laying the same over
minimum 25 mm thick artificial patent stone flooring with brick
chips (1:2:4) including making suitable panel, compacting, curing
at least for 7 days, cutting with pumic stone (No. 40, No. 80,
No.120)/cutting with mosaic machine and finishing with Minar stone
and spreading oxalic acid including breaking brick chips,
screening, washing mosaic chips and supply of all necessary
materials and water, electricity and other charges in all respect
accepted by the Engineer. (Cement: CEM-II/A-M)05.1.1With Indian
chips and glass strip using 100% white cement.In Ground
Floorsqm.100205.1.2With Indian chips and glass strip using 100%
grey cement.In ground floorsqm.82805.1.3With Pakistani chips and
glass strip using 100% white cement.In ground
floorsqm.108205.1.4With Indian chips and without glass strip using
100% white cement.In ground floorsqm.88705.1.5With Indian chips and
without glass strip using 100% grey cement.In ground
floorsqm.75105.1.6With Pakistani chips and without glass strip
using 100% white cement.In ground floorsqm.96705.212 mm thick
finished and laying thickness 14.5 mm cast in situ mosaic work on
floor with one part of 10 mm machine crushed well graded dust free
and properly washed marble chips and one part of mixture containing
100% white cement including preparation of mix and laying the same
over minimum 25 mm thick artificial patent stone flooring with
brick-chips (1:2:4) including making suitable panel, compacting,
curing at least for 7 days, cutting with pumic stone (No. 40, No.
80, No. 120)/ mosaic cutting machine and finishing with Minar stone
including breaking brick chips screening, spreading oxalic acid,
washing mosaic chips and supply of all necessary materials and
water, electricity and other charges in all respect accepted by the
Engineer.(Cement: CEM-II/A-M)05.2.1With Indian chips and glass
strip.In ground floorsqm.105605.2.2With Pakistani chips and glass
strip.In ground floorsqm.114505.2.3With Indian chips and without
glass strip.In ground floorsqm.94005.2.4With Pakistani chips and
without glass strip.In ground floorsqm.103005.310 mm thick finished
and laying thickness 12.5 mm silver grey situ mosaic work on floor
with one part of 10 mm machine crushed well graded, dust free and
properly washed marble chips and one part of mixture containing
white cement and grey cement in proportion (1:1) including
preparation of mix and laying the same over minimum 25 mm thick
artificial patent stone flooring with brick-chips (1:2:4) including
making suitable panel, compacting, curing at least for 7 days,
cutting with pumic stone (No. 40, No. 80, No. 120) and finishing
with Minar stone including breaking brick chips, screening, washing
mosaic chips and supply of all necessary materials including and
water, electricity and other charges in all respect accepted by the
Engineer. (Cement: CEM-II/A-M)05.3.1With Indian chips and with
glass strip.In ground floorsqm.91705.3.2With Pakistani chips and
with glass strip.In ground floorsqm.99705.3.3With Indian chips and
without glass strip.In ground floorsqm.80205.3.4With Pakistani
chips and without glass strip.In ground floorsqm.88205.412 mm thick
finished and laying thickness 14.5 mm silver grey cast in situ
mosaic work on floor with one part of 10 mm machine crushed well
graded dust free and properly washed marble chips and one part of
mixture containing white cement dust free and properly washed
marble chips and one part of mixture containing white cement and
grey with cement in proportion (1:1) including. preparation of mix
and laying the same over minimum 25 mm thick artificial patent
stone flooring with brick-chips (1:2:4) including making suitable
panels, compacting, curing at least for 7 days, cutting with pumic
stone (No. 40. No. 80, No. 120) and finishing with Minar stone
including breaking brick chips, screening, washing mosaic chips and
supply of all necessary materials and water, electricity and other
charges in all respect accepted by the Engineer.(Cement:
CEM-II/A-M)05.4.1With Indian chips and with glass strip.In ground
floorsqm.96105.4.2With Pakistani chips and with glass strip.In
ground floorsqm.105005.4.3With Indian chips and without glass
strip.In ground floorsqm.84605.4.4With Pakistani chips and without
glass strip.In ground floorsqm.93505.510 mm thick finished and
laying thickness 12.5 mm situ mosaic work on wall with one part of
10 mm machine crushed well graded dust free and properly washed
marble chips and one part of mixture containing 100% white cement
including preparation of mix and laying the same on 12 mm thick
cement plaster (1:4) to wall, compacting, curing at least for 7
days, cutting with pumic stone (No. 40, No. 80, No. 120) including
finishing the corners and edges and also finishing with Minar stone
and supplying all necessary materials in and water, electricity and
other charges in all respect accepted by the Engineer. (Cement:
CEM-II/A-M)05.5.1With Indian chips.In ground floorsqm.96305.5.2With
Pakistani chips.In ground floorsqm.104305.610 mm thick finished and
laying thickness silver grey situ mosaic work on wall with one part
of 10 mm machine crushed well graded, dust free and properly washed
marble chips and one part of mixture containing white cement and
grey cement in proportion (1:1) including preparation of mix. and
laying the same on 12 mm thick cement plaster (1:4) to wall,
compacting, curing at least for 7 days, cutting with pumic stone
(No. 40, No. 80, No 120) including finishing the corners and edges
and also finishing with Minar stone and supplying all necessary
materials in and water, electricity and other charges in all
respect accepted by the Engineer. (Cement: CEM-II/A-M)05.6.1With
Indian chips.In ground floorsqm.87805.6.2With Pakistani chips.In
ground floorsqm.95805.6.3With Indian chips using 100% grey
cement.In ground floorsqm.79305.710 mm thick finished laid in 12.5
mm thickness coloured situ mosaic work in floor with one part of 10
mm machine crushed well graded, dust free and properly washed
marble chips and one part of mixture containing white and grey
cement in proportion (1:9) and necessary quantity of approved
colouring materials including preparation of mix and laying the
same over min 25 mm thick artificial patent stone flooring with
brick-chips (1:2:4) including making suitable panel, compacting,
curing at least for 7 days, cutting with pumic stone (No. 40, No.
80, No. 120) and finishing with Minar stone including breaking
brick chips, screening, washing mosaic chips and supply of all
necessary materials in all respects and water, electricity and
other charges in all respect accepted by the Engineer. (Cement:
CEM-II/A-M)05.7.1With Indian chips and with glass strip.In ground
floorsqm.104805.7.2With Pakistani chips and with glass strip.In
ground floorsqm.112805.7.3With Indian chips and without glass
strip.In ground floorsqm.93305.7.4With Pakistani chips and without
glass strip.In ground floorsqm.92805.812 mm thick finished and
laying thickness 14 mm coloured situ mosaic on floor with one part
of 10 mm machine crushed well graded, dust free and properly washed
marble chips and one part of mixture containing white cement and
grey cement in proportion (9:1) and necessary quantity of approved
colourings materials including preparation of mix and laying the
same over minimum 25 mm thick artificial patent stone flooring with
brick-chips (1:2:4) including making suitable panel, compacting,
curing at least for 7 days, cutting with pumic stone (No. 40, No.
80, No. 120) and finishing with Minar stone including breaking
brick chips, screening, washing mosaic chips and supply of all
necessary materials in all respects and water, electricity and
other charges in all respect accepted by the Engineer. (Cement:
CEM-II/A-M)05.8.1With Indian chips and with glass strip.In ground
floorsqm.110205.8.2With Pakistani chips and with glass strip.In
ground floorsqm.119105.8.3With Indian chips and without glass
strip.In ground floorsqm.98705.8.4With Pakistani chips and without
glass strip.In ground floorsqm.107605.910 mm thick finished and
laying thickness 12.5 mm coloured situ mosaic on walls with one
part of 10 mm machine crushed well graded, dust free and properly
washed marble chips and one part of mixture containing white cement
and grey cement in proportion (9:1) and necessary quantity of
approved colouring materials including preparation of mix and
laying the same on 12 mm thick cement sand (F.M. 1.2) plaster (1:4)
to walks including compacting, curing at least for 7 days, cutting
with pumic stone (No. 40, No. 80, No. 120) including finishing the
corners and edges and also finishing with Minar stone and supply of
all necessary materials etc. and water, electricity and other
charges complete in all respect accepted by the Engineer. (Cement:
CEM-II/A-M)05.9.1With Indian chips.In ground
floorsqm.100905.9.2With Pakistani chips.In ground
floorsqm.108905.10200 x 200 x 20 mm mosaic terrazzo tiles flooring
having 10 mm thick finished mosaic top with one part of 10 mm
machine crushed well graded dust free and properly washed marble
chips and one part of mixture containing white cement and grey
cement and supply of all necessary materials etc. and water,
electricity and other charges complete in all respect accepted by
the Engineer in proportion (9:1) including preparation of mix
machine pressed on 12 mm thick cement sand (F.M. 1.2) mortar base
(1:2) including preparing the base, setting the tiles on 40 mm
thick cement sand (F.M.1.2) mortar/slurry (lime and surki) base in
proportion of (1:3) compacting, cutting with pumic stone (No. 40,
No. 80, No. 120) and finishing the corners and edges and also
finishing with minar stone including screening, washing mosaic
chips and supply of all necessary materials etc. and water,
electricity and other charges complete in all respect accepted by
the Engineer.(Cement: CEM-II/A-M)05.10.1200 x 200 x 20 mm
(finished) mosaic terrazzo tiles flooring with Indian chips.In
ground floorsqm.103905.10.2200 x 200 x 20 mm (finished) mosaic
terrazzo tiles flooring with Pakistani chips.In ground
floorsqm.111605.11Extra cost shall be incorporated in the estimate
for mosaic and terrazzo tiles work above ground floor (item No.-
5.1 to 5.10).05.11.1Add for each additional floor up to 5 th
floorsqm.505.11.2Add for each additional floor for 6th to 9th
floorsqm.1005.11.3Add for each additional floor for 10th floor and
abovesqm.14DIVISION 06 : GLAZED TILES AND MARBLE STONE
WORK06.1Marble stone flooring with Indian black/ white marble stone
of approved quality, texture and size over 25 mm thick cement sand
(F.M. 1.2) mortar (1:2) including. placing cement slurry below the
stone, cutting the marble stone to desired size, grinding and
finishing the edges, setting in position in proper level filling
the gaps with white cement and colouring pigments including
supplying all necessary equipments/materials and finishing the top
by pumic stone and necessary auxiliary materials and water,
electricity and other charges complete in all respect accepted by
the Engineer.(Cement: CEM-II/A-M)06.1.118 mm thick Marble stone
flooringIn ground floorsqm.475806.1.216 mm thick Marble stone
flooringIn ground floorsqm.437406.2Marble stone flooring with
Indian coloured/ grey marble stone of approved quality, texture and
size over 25 mm thick cement sand (F.M. 1.2) mortar (1:2)
including. placing cement slurry below the stone, cutting the
marble stone to desired size, grinding and finishing the edges,
setting in position in proper level filling the gaps with white
cement and colouring pigments including supplying all necessary
equipments/materials and finishing the top by pumic stone and
necessary auxiliary materials and water, electricity and other
charges complete in all respect accepted by the Engineer.(Cement:
CEM-II/A-M)06.2.118 mm thick Marble stone flooringIn ground
floorsqm.488506.2.216 mm thick Marble stone flooringIn ground
floorsqm.450206.3Supplying and setting Indian marble stone of
approved quality, textured and size on walls over 12 mm thick
cement sand (F.M. 1.2) mortar (1:2) including cutting and grinding
the marble stone slab/tile setting in position keeping horizontal
and vertical alignment correct, filling the joints with white
cement, cutting and grinding the top surface, finishing etc
including water, electricity and other charges complete in all
respect accepted by the Engineer.(Cement: CEM-II/A-M)06.3.112 mm
thick white/ black Marble stone wallingIn ground
floorsqm.406206.3.212 mm thick grey or coloured Marble stone
wallingIn ground floorsqm.418906.4Marble stone flooring with 18mm
thick Italian coloured/ grey marble stone of approved quality,
texture and size over 25 mm thick cement sand (F.M. 1.2) mortar
(1:2) including. placing cement slurry below the stone, cutting the
marble stone to desired size, grinding and finishing the edges,
setting in position in proper level filling the gaps with white
cement and colouring pigments including supplying all necessary
equipments/materials and finishing the top by pumic stone and
necessary auxiliary materials and water, electricity and other
charges complete in all respect accepted by the Engineer.(Cement:
CEM-II/A-M)In ground floorsqm.693206.5Labour Cost for making
moulding in marble stone as per Architectural drawing including
cutting, grinding, finishing, supplying necessary equipment etc.
complete in all respect as per direction of the Engineer in
Charge.(Cement: CEM-II/A-M)06.5.118 mm thick marble
stonerm.25306.5.216 mm thick marble stonerm.24906.5.312 mm thick
marble stonerm.22406.6Supplying, fitting and fixing glazed wall
tiles (local made) with on 20 mm thick cement sand (F.M. 1.2)
mortar (1:3) base and raking out the joints with white cement
including cutting, laying and hire charge of machine and finishing
with care etc. including water, electricity and other charges
complete all respect accepted by the Engineer.(Cement:
CEM-II/A-M)In ground floor06.6.1White glazed tiles of different
sizessqm.98006.6.2Coloured glazed wall tiles of different
sizessqm.100706.6.3Special design glazed coloured wall
tilessqm.103306.7Supplying, fitting and fixing glazed homogeneous
floor tiles (local made) with cement sand (F.M. 1.2) mortar (1:4)
base and raking out the joints with white cement including cutting
and laying the tiles in proper way and finishing with care etc. all
complete and accepted by the Engineer.(Cement: CEM-II/A-M)In ground
floor06.7.1GP (homogeneous) 300 x 300 mm floor
tilessqm.104406.7.2GP (homogeneous) 400 x 400 mm floor
tilessqm.109706.8Supplying, fitting and fixing unglazed homogeneous
floor tiles (local made) with cement sand (F.M. 1.2) mortar (1:4)
base and raking out the joints with white cement including cutting
and laying the tiles in proper way and finishing with care etc. all
complete and accepted by the Engineer.(Cement: CEM-II/A-M)In ground
floor06.8.1GP (homogeneous) 300 x 300 mm floor
tilessqm.108406.8.2GP (homogeneous) 400 x 400 mm floor
tilessqm.115106.9Supplying, fitting and fixing mirror polished
homogeneous floor tiles (local made) with cement sand (F.M. 1.2)
mortar (1:4) base and raking out the joints with white cement
including cutting and laying the tiles in proper way and finishing
with care etc. all complete and accepted by the Engineer.(Cement:
CEM-II/A-M)In ground floor06.9.1GP (mirror polished) 300 x 300 mm
floor tilessqm.174206.9.2GP (mirror polished) 400 x 400 mm floor
tilessqm.189006.9.3GP (mirror polished) 300 x 600 mm / 600 x 600 mm
floor tilessqm.214506.10Supplying, fitting and fixing GP
homogeneous stair tiles (local made) with cement sand (F.M. 1.2)
mortar (1:4) base and raking out the joints with white cement
including cutting and laying the tiles in proper way and finishing
with care etc. all complete and accepted by the Engineer.(Cement:
CEM-II/A-M)In ground floorsqm.109706.11Supplying, fitting and
fixing floor tiles with adhesives (5mm to 7mm thick) and Joint
filler/tiles grout in/c cutting, shaping, placing in proper level
etc. all complete as direction of the Engineer in charge.In ground
floor06.11.1GP glazed homogenous floor tiles (400 x 400
mm)sqm.96006.11.2GP glazed homogenous floor tiles (300 x 300
mm)sqm.90606.11.3GP un-glazed homogenous floor tiles (400 x 400
mm)sqm.101406.11.4GP un-glazed homogenous floor tiles (300 x 300
mm)sqm.94606.11.5GP Mirror Polished floor tiles (300 x 300
mm)sqm.160506.11.6GP Mirror Polished floor tiles (400 x 400
mm)sqm.175206.11.7GP Mirror Polished floor tiles (600 x 600
mm)sqm.200706.12Extra Rate for each additional floor for Tiles and
Marble Stone Works06.12.1Add for each addl. floor up to 5th
floorsqm.506.12.2Add for each addl. floor for 6th floor to 9th
floorsqm.1006.12.3Add for each addl. floor for 10th floor and
abovesqm.14DIVISION 07 : REINFORCED CEMENT CONCRETE WORKRCC WORKS
(f'c = 19 MPa, minimum f'cr = 24 MPa in nominal mix 1 : 2 : 4)
Brick-Chips using Wooden Shutter (Sand of F.M. 1.2 and F.M. 2.2 in
equal proportion)07.1Reinforced cement concrete works using wooden
shutter, with minimum cement content relates to mix ratio 1:2:4
having minimum f'cr = 24 Mpa, and satisfying a specified
compressive strength fc= 19 Mpa at 28 days on standard cylinders as
per standard practice of Code ACI/BNBC/ASTM & cement conforming
to BDS EN-197-1- CEM 1 (32.5 to 52.5 N) / ASTM-C 150 Type I, best
quality sand [50% quantity of best local sand (F.M. 1.2) and 50%
quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and
20 mm down well graded picked jhama brick chips conforming ASTM
C-33 including breaking chips and screening, making, placing
shutter in position and maintaining true to plumb, making shutter
water-tight properly, placing reinforcement in position; mixing in
standard mixer machine with hoper fed by standard measuring boxes,
casting in forms, compacting by vibrator machine and curing at
least for 28 days, removing centering-shuttering including cost of
water, electricity, testing and other charges etc. all complete
approved and accepted by the Engineer. (Rate is excluding the cost
of reinforcement and its fabrication, placing and
binding)07.1.1Individual and continuous footings of column at
plinth level07.1.1.1Concretecum562007.1.1.2Formwork/shuttering,
prop and necessary supports etc. (wooden)sqm.23907.1.2In raft/ mat/
floor slab at plinth
level07.1.2.1Concretecum562007.1.2.2Formwork/shuttering, prop and
necessary supports etc. (wooden)sqm.27907.1.3In foundation
beam07.1.3.1Concretecum562007.1.3.2Formwork/shuttering, prop and
necessary supports etc. (wooden)sqm.23107.1.4Padestals, column
capitals, lift walls and walls07.1.4.1ConcreteGround floor and
below plinth levelcum570807.1.4.2Formwork/shuttering, prop and
necessary supports etc. (wooden)Ground floor and below plinth
levelsqm.27907.1.5Tie beam and lintels07.1.5.1ConcreteGround floor
and below plinth levelcum597307.1.5.2Formwork/shuttering, prop and
necessary supports etc. (wooden)Ground floor and below plinth
levelsqm.27507.1.6Tee beams, Ell beams and Rectangular beams
etc07.1.6.1ConcreteGround floor and below plinth
levelcum562007.1.6.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floor and below plinth
levelsqm.32207.1.7Floor and roof slab07.1.7.1ConcreteGround
floorcum562007.1.7.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floorsqm.31507.1.8Cornice, railing,
drop walls, louver, fins etc.07.1.8.1ConcreteGround
floorcum585507.1.8.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floorsqm.23107.1.9Sunshade, false
ceiling07.1.9.1ConcreteGround
floorcum585507.1.9.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floorsqm.28307.1.10Stair case slab and
steps07.1.10.1ConcreteGround
floorcum585507.1.10.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floorsqm.25607.1.11Waffle or Ribbed
floor/roof slab07.1.11.1ConcreteGround
floorcum585507.1.11.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floorsqm.420RCC WORKS (f'c = 19 MPa,
minimum f'cr = 24 MPa in nominal mix 1 : 2 : 4) Brick-Chips using
Steel Shutter (Sand of F.M. 1.2 and F.M. 2.2 in equal
proportion)07.2Reinforced cement concrete works using steel
shutter, with minimum cement content relates to mix ratio 1:2:4
having minimum f'cr = 24 Mpa, and satisfying a specified
compressive strength fc= 19 Mpa at 28 days on standard cylinders as
per standard practice of Code ACI/BNBC/ASTM & cement conforming
to BDS EN-197-1- CEM 1 (32.5 to 52.5 N) / ASTM-C 150 Type I, best
quality sand [50% quantity of best local sand (F.M. 1.2) and 50%
quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and
20 mm down well graded picked jhama brick chips conforming ASTM
C-33 including breaking chips and screening, making, placing
shutter in position and maintaining true to plumb, making shutter
water-tight properly, placing reinforcement in position; mixing in
standard mixer machine with hoper fed by standard measuring boxes,
casting in forms, compacting by vibrator machine and curing at
least for 28 days, removing centering-shuttering including cost of
water, electricity, testing and other charges etc. all complete
approved and accepted by the Engineer. (Rate is excluding the cost
of reinforcement and its fabrication, binding, welding and
placing)07.2.1Individual and continuous footings of column at
plinth level07.2.1.1Concretecum562007.2.1.2Formwork/shuttering,
prop and necessary supports etc. (steel)sqm.27207.2.2In raft/ mat/
floor slab at plinth
level07.2.2.1Concretecum562007.2.2.2Formwork/shuttering, prop and
necessary supports etc. (steel)sqm.27707.2.3Foundation
beam07.2.3.1Concretecum562007.2.3.2Formwork/shuttering, prop and
necessary supports etc. (steel)sqm.22607.2.4Padestals, column,
column capitals, lift walla and walls07.2.4.1ConcreteGround floor
and below plinth levelcum570807.2.4.2Formwork/shuttering, prop and
necessary supports etc. (steel)Ground floor and below plinth
levelsqm.27507.2.5Tie beam and lintels07.2.5.1ConcreteGround floor
and below plinth levelcum597307.2.5.2Formwork/shuttering, prop and
necessary supports etc. (steel)Ground floor and below plinth
levelsqm.28207.2.6Tee beams, Ell beams and Rectangular beams
etc07.2.6.1ConcreteGround floor and below plinth
levelcum562007.2.6.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floor and below plinth
levelsqm.31907.2.7Floor and roof slab07.2.7.1ConcreteGround
floorcum562007.2.7.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floorsqm.40707.2.8Cornice, railing,
drop walls, louver, fins etc.07.2.8.1ConcreteGround
floorcum585507.2.8.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floorsqm.25207.2.9Sunshade, false
ceiling07.2.9.1ConcreteGround
floorcum585507.2.9.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floorsqm.29007.2.10Stair case slab and
steps07.2.10.1ConcreteGround floor and below plinth
levelcum585507.2.10.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floor and below plinth
levelsqm.32607.2.11Waffle or Ribbed floor/roof
slab07.2.11.1ConcreteGround
floorcum585507.2.11.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floorsqm.420RCC WORKS (f'c = 22 MPa,
minimum f'cr = 27 MPa in nominal mix 1 : 2 : 4) Stone-Chips using
Wooden Shutter (100% Sand of F.M. 2.2 )07.3Reinforced cement
concrete works using wooden shutter with minimum cement content
relates to mix ratio 1:2:4 having minimum f'cr = 27 Mpa, and
satisfying a specified compressive strength fc = 22 Mpa at 28 days
on standard cylinders as per standard practice of Code
ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1- CEM 1 (32.5
to 52.5 N) / ASTM-C 150 Type I, best quality Sylhet sand or coarse
sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips
conforming to ASTM C-33, making, placing shutter in position and
maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position; mixing in standard mixer machine
with hoper fed by standard measuring boxes, casting in forms,
compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering including cost of water, electricity,
testing and other charges etc. all complete approved and accepted
by the Engineer. (Rate is excluding the cost of reinforcement and
its fabrication, binding, welding and placing)07.3.1Individual and
continuous footings of column at plinth
level07.3.1.1Concretecum668707.3.1.2Formwork/shuttering, prop and
necessary supports etc. (wooden)sqm.23907.3.2In raft/ mat/ floor
slab at plinth
level07.3.2.1Concretecum668707.3.2.2Formwork/shuttering, prop and
necessary supports etc. (wooden)sqm.27907.3.3Foundation
beam07.3.3.1Concretecum668707.3.3.2Formwork/shuttering, prop and
necessary supports etc. (wooden)sqm.23107.3.4Padestals, column,
column capitals, lift walls and walls07.3.4.1ConcreteGround floor
and below plinth levelcum677607.3.4.2Formwork/shuttering, prop and
necessary supports etc. (wooden)Ground floor and below plinth
levelsqm.27907.3.5Tie beam and lintels07.3.5.1ConcreteGround floor
and below plinth levelcum704007.3.5.2Formwork/shuttering, prop and
necessary supports etc. (wooden)Ground floor and below plinth
levelsqm.27507.3.6Tee beams, Ell beams and Rectangular beams
etc07.3.6.1ConcreteGround floor and below plinth
levelcum668707.3.6.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floor and below plinth
levelsqm.32207.3.7Floor and roof slab07.3.7.1ConcreteGround
floorcum668707.3.7.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floorsqm.31507.3.8Cornice, railing,
drop walls, louver, fins etc.07.3.8.1ConcreteGround
floorcum692207.3.8.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floorsqm.23107.3.9Sunshade, false
ceiling07.3.9.1ConcreteGround
floorcum692207.3.9.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floorsqm.28307.3.10Stair case slab and
steps07.3.10.1ConcreteGround
floorcum692207.3.10.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floorsqm.25607.3.11Waffle or Ribbed
floor/roof slab07.3.1.1Cost of concreteGround
floorcum692207.3.11.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floorsqm.420RCC WORKS (f'c = 22 MPa,
minimum f'cr = 27 MPa in nominal mix 1 : 2 : 4) Stone-Chips using
Steel Shutter (100% Sand of F.M. 2.2 )07.4Reinforced cement
concrete works using steel shutter with minimum cement content
relates to mix ratio 1:2:4 having minimum f'cr = 27 Mpa, and
satisfying a specified compressive strength fc = 22 Mpa at 28 days
on standard cylinders as per standard practice of Code
ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1- CEM 1 (32.5
to 52.5 N) / ASTM-C 150 Type I, best quality Sylhet sand or coarse
sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips
conforming to ASTM C-33, making, placing shutter in position and
maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position; mixing in standard mixer machine
with hoper fed by standard measuring boxes, casting in forms,
compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering including cost of water, electricity,
testing and other charges etc. all complete approved and accepted
by the Engineer. (Rate is excluding the cost of reinforcement and
its fabrication, binding, welding and placing)07.4.1Individual and
continuous footings of column at plinth
level07.4.1.1Concretecum668707.4.1.2Formwork/shuttering, prop and
necessary supports etc. (steel)sqm.27207.4.2In raft/ mat/ floor
slab at plinth
level07.4.2.1Concretecum668707.4.2.2Formwork/shuttering, prop and
necessary supports etc. (steel)sqm.27707.4.3Foundation
beam07.4.3.1ConcreteGround floorcum668707.4.3.2Formwork/shuttering,
prop and necessary supports etc. (steel)Ground
floorsqm.22607.4.4Padestals, column, column capitals, lift walls
and walls07.4.4.1ConcreteGround floor and below plinth
levelcum677607.4.4.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floor and below plinth
levelsqm.27507.4.5Tie beam and lintels07.4.5.1ConcreteGround floor
and below plinth levelcum704007.4.5.2Formwork/shuttering, prop and
necessary supports etc. (steel)Ground floor and below plinth
levelsqm.28207.4.6Tee beams, Ell beams and Rectangular beams
etc07.4.6.1ConcreteGround floor and below plinth
levelcum668707.4.6.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floor and below plinth
levelsqm.31907.4.7Floor and roof slab07.4.7.1ConcreteGround
floorcum668707.4.7.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floorsqm.40707.4.8Cornice, railing,
drop walls, louver, fins etc.07.4.8.1ConcreteGround
floorcum692207.4.8.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floorsqm.25207.4.9Sunshade, false
ceiling07.4.9.1ConcreteGround
floorcum692207.4.9.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floorsqm.29007.4.10Stair case slab and
steps07.4.10.1ConcreteGround
floorcum692207.4.10.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floorsqm.32607.4.11Waffle or Ribbed
floor/roof slab07.4.11.1ConcreteGround
floorcum692207.4.11.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floorsqm.420RCC WORKS (f'c = 21MPa,
minimum f'cr = 26 MPa in nominal mix 1 : 1.5 : 3) Brick-Chips using
Wooden Shutter (Sand of F.M. 2.2 )07.5Reinforced cement concrete
works using wooden shutter with minimum cement content relates to
mix ratio 1:1.5:3 having minimum f'cr = 26 Mpa, and satisfying a
specified compressive strength fc = 21 Mpa at 28 days on standard
cylinders as per standard practice of Code ACI/BNBC/ASTM &
Cement conforming to BDS EN-197-1- CEM 1 (32.5 to 52.5 N) / ASTM-C
150 Type I, best quality Sylhet sand or coarse sand [F.M. 2.2] and
20 mm down well graded picked jhama brick chips conforming to ASTM
C-33, including breaking chips and screening, making, placing
shutter in position and maintaining true to plumb, making shutter
water-tight properly, placing reinforcement in position; mixing in
standard mixer machine with hoper and fed by standard measuring
boxes, casting in forms, compacting by vibrator machine and curing
at least for 28 days, removing centering-shuttering including cost
of water, electricity, testing and other charges etc. all complete
approved and accepted by the Engineer. (Rate is excluding the cost
of reinforcement and its fabrication, binding, welding and
placing)07.5.1Individual and continuous footings of column at
plinth level.07.5.1.1Concretecum619507.5.1.2Formwork/shuttering,
prop and necessary supports etc. (wooden)sqm.23907.5.2In raft/ mat/
floor slab at plinth
level07.5.2.1Concretecum619507.5.2.2Formwork/shuttering, prop and
necessary supports etc. (wooden)sqm.27907.5.3Foundation
beam07.5.3.1Concretecum619507.5.3.2Formwork/shuttering, prop and
necessary supports etc. (wooden)sqm.23107.5.4Padestals, column,
column capitals, lift walls and walls07.5.4.1ConcreteGround floor
and below plinth levelcum628307.5.4.2Formwork/shuttering, prop and
necessary supports etc. (wooden)Ground floor and below plinth
levelsqm.27907.5.5Tie beam and lintels07.5.5.1ConcreteGround floor
and below plinth levelcum654707.5.5.2Formwork/shuttering, prop and
necessary supports etc. (wooden)Ground floor and below plinth
levelsqm.27507.5.6Tee beams, Ell beams and Rectangular beams
etc07.5.6.1ConcreteGround floor and below plinth
levelcum619507.5.6.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floor and below plinth
levelcum32207.5.7Floor and roof slab07.5.7.1ConcreteGround
floorcum619507.5.7.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floorsqm.31507.5.8Cornice, railing,
drop walls, louver, fins etc.07.5.8.1ConcreteGround
floorcum643007.5.8.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floorsqm.23107.5.9Sunshade, false
ceiling07.5.9.1ConcreteGround
floorcum643007.5.9.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floorsqm.28307.5.10Stair case slab and
steps07.5.10.1ConcreteGround floor and below plinth
levelcum643007.5.10.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floor and below plinth
levelsqm.25607.5.11Waffle or Ribbed floor/roof
slab07.5.11.1ConcreteGround
floorcum643007.5.11.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floorsqm.420RCC WORKS (f'c = 25MPa,
minimum f'cr = 30 MPa in nominal mix 1 : 1.5 : 3) Stone Chips using
Steel Shutter (100% Sand of F.M. 2.2)07.6Reinforced cement concrete
works using steel shutter with minimum cement content relates to
mix ratio 1:1.5:3 having minimum f'cr = 30 Mpa, and satisfying a
specified compressive strength fc = 25 Mpa at 28 days on standard
cylinders as per standard practice of Code ACI/BNBC/ASTM &
Cement conforming to BDS EN-197-1-CEM 1 (32.5 to 52.5 N) / ASTM-C
150 Type I, best quality Sylhet sand or coarse sand of equivalent
F.M. 2.2 and 20 mm down well graded stone chips conforming to ASTM
C-33, making, placing shutter in position and maintaining true to
plumb, making shutter water-tight properly, placing reinforcement
in position; mixing with standard mixer machine with hopper, fed by
standard measuring boxes, casting in forms, compacting by vibrator
machine and curing at least for 28 days, removing
centering-shuttering including cost of water, electricity, testing
and other charges etc. all complete approved and accepted by the
Engineer.(Rate is excluding the cost of reinforcement and its
fabrication, binding, welding and placing)07.6.1Individual and
continuous footings of column at plinth
level.07.6.1.1Concretecum709907.6.1.2Formwork/shuttering, prop and
necessary supports etc. (steel)sqm.27207.6.2In raft/ mat/ floor
slab at plinth
level07.6.2.1Concretecum709907.6.2.2Formwork/shuttering, prop and
necessary supports etc. (steel)sqm.27707.6.3Foundation
beam07.6.3.1Concretecum709907.6.3.2Formwork/shuttering, prop and
necessary supports etc. (steel)sqm.22607.6.4Padestals, column,
column capitals, lift walls and walls07.6.4.1ConcreteGround floor
and below plinth levelcum718807.6.4.2Formwork/shuttering, prop and
necessary supports etc. (steel)Ground floor and below plinth
levelsqm.27507.6.5Tie beam and lintels07.6.5.1ConcreteGround floor
and below plinth levelcum745207.6.5.2Formwork/shuttering, prop and
necessary supports etc. (steel)Ground floor and below plinth
levelsqm.28207.6.6Tee beams, Ell beams and Rectangular beams
etc07.6.6.1ConcreteGround floor and below plinth
levelcum709907.6.6.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floor and below plinth
levelsqm.31907.6.7Floor and roof slab07.6.7.1ConcreteGround
floorcum709907.6.7.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floorsqm.40707.6.8Cornice, railing,
drop walls, louver, fins etc.07.6.8.1ConcreteGround
floorcum733507.6.8.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floorsqm.25207.6.9Sunshade, false
ceiling07.6.9.1ConcreteGround
floorcum733507.6.9.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floorsqm.29007.6.10Stair case slab and
steps07.6.10.1ConcreteGround
floorcum733507.6.10.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floorsqm.32607.6.11Waffle or Ribbed
floor/roof slab07.6.11.1ConcreteGround
floorcum733507.6.11.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floorsqm.420RCC WORKS (f'c = 25MPa,
minimum f'cr = 30 MPa in nominal mix 1 : 1.5 : 3) Stone Chips using
Wooden Shutter (100% Sand of F.M. 2.2)07.7Reinforced cement
concrete works using wooden shutter with minimum cement content
relates to mix ratio 1:1.5:3 having minimum f'cr = 30 Mpa, and
satisfying a specified compressive strength fc = 25 Mpa at 28 days
on standard cylinders as per standard practice of Code
ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1-CEM 1 (32.5
to 52.5 N) / ASTM-C 150 Type I, best quality Sylhet sand or coarse
sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips
conforming to ASTM C-33, making, placing shutter in position and
maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position; mixing with standard mixer
machine with hopper, fed by standard measuring boxes, casting in
forms, compacting by vibrator machine and curing at least for 28
days, removing centering-shuttering including cost of water,
electricity, testing and other charges etc. all complete approved
and accepted by the Engineer. (Rate is excluding the cost of
reinforcement and its fabrication, binding, welding and
placing)07.7.1Individual and continuous footings of column at
plinth level.07.7.1.1Concretecum709907.7.1.2Formwork/shuttering,
prop and necessary supports etc. (wooden)sqm.23907.7.2In raft/ mat/
floor slab at plinth
level07.7.2.1Concretecum709907.7.2.2Formwork/shuttering, prop and
necessary supports etc. (wooden)sqm.27907.7.3Foundation
beam07.7.3.1Concretecum709907.7.3.2Formwork/shuttering, prop and
necessary supports etc. (wooden)sqm.23107.7.4Padestals, column,
column capitals, lift walls and walls07.7.4.1Cost of concreteGround
floor and below plinth levelcum718807.7.4.2Formwork/shuttering,
prop and necessary supports etc. (wooden)Ground floor and below
plinth levelsqm.27907.7.5Tie beam and lintels07.7.5.1ConcreteGround
floor and below plinth levelcum745207.7.5.2Formwork/shuttering,
prop and necessary supports etc. (wooden)Ground floor and below
plinth levelsqm.27507.7.6Tee beams, Ell beams and Rectangular beams
etc07.7.6.1Cost of concreteGround
floorcum709907.7.6.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floorsqm.32207.7.7Floor and roof
slab07.7.7.1ConcreteGround floor and below plinth
levelcum709907.7.7.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floor and below plinth
levelsqm.31507.7.8Cornice, railing, drop walls, louver, fins
etc.07.7.8.1ConcreteGround floorcum733507.7.8.2Formwork/shuttering,
prop and necessary supports etc. (wooden)Ground
floorsqm.23107.7.9Sunshade, false ceiling07.7.9.1ConcreteGround
floorcum733507.7.9.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floorsqm.28307.7.10Stair case slab and
steps07.7.10.1ConcreteGround
floorcum733507.7.10.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floorsqm.25607.7.11Waffle or Ribbed
floor/roof slab07.7.11.1ConcreteGround
floorcum733507.7.11.2Formwork/shuttering, prop and necessary
supports etc. (wooden)Ground floorsqm.420RCC WORKS (f'c = 32 MPa,
minimum f'cr = 40 MPa in nominal mix 1 : 1.25 : 2.5) With Stone
Chips and Admixture (high strength concrete) using Steel
Shutter07.8Reinforced cement concrete works using steel shutter
with minimum cement content relates to mix ratio 1:1.25:2.5 having
minimum f'cr = 40 Mpa, and satisfying a specified compressive
strength fc = 32 Mpa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM & Cement conforming to
BDS EN-197-1-CEM 1 (32.5 to 52.5 N) / ASTM-C 150 Type I, with
approved high range admixture, best quality coarse sand [Sylhet
sand or coarse sand of equivalent F.M. 2.2], 20 mm down well graded
crushed stone chips conforming to ASTM C-33, including breaking
chips and screening through proper sieves, making and placing
shutter in position and maintaining true to plumb, making shutter
water-tight properly, placing reinforcement in position; mixing
with standard mixer machine with hoper and fed by standard
measuring boxes, casting in forms, compacting by vibrator machine
and curing at least for 28 days, removing centering-shuttering
including cost of water, electricity, testing and other charges
etc. all complete approved and accepted by the Engineer.(Dose of
admixture in the mix to be fixed by mix design) [Rate is excluding
the cost of reinforcement and its fabrication, binding, welding and
placing, admixture and mix design]07.8.1Individual and continuous
footings of column at plinth
level.07.8.1.1Concretecum753107.8.1.2Formwork/shuttering, prop and
necessary supports etc. (steel)sqm.27207.8.2Raft or
Mat07.8.2.1Concretecum753107.8.2.2Formwork/shuttering, prop and
necessary supports etc. (steel)sqm.27707.8.3Foundation
beam07.8.3.1Concretecum753107.8.3.2Formwork/shuttering, prop and
necessary supports etc. (steel)sqm.22607.8.4Padestals, column,
column capitals, lift walls and walls07.8.4.1ConcreteGround floor
and below plinth levelcum762007.8.4.2Formwork/shuttering, prop and
necessary supports etc. (steel)Ground floor and below plinth
levelsqm.27507.8.5Tee beams, Ell beams and Rectangular beams
etc07.8.5.1ConcreteGround floorcum753107.8.5.2Formwork/shuttering,
prop and necessary supports etc. (steel)Ground
floorsqm.31907.8.6Floor and roof slab07.8.6.1ConcreteGround
floorcum753107.8.6.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floorsqm.40707.8.7Stair case slab and
steps07.8.7.1ConcreteGround
floorcum776607.8.7.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floorsqm.32607.8.8Waffle or Ribbed
floor/roof slab07.8.8.1ConcreteGround
floorcum776607.8.8.2Formwork/shuttering, prop and necessary
supports etc. (steel)Ground floorsqm.42007.9Extra rate over the
rate of RCC (materials, consumables and laying/placing concrete)
works in columns, capitals, liftwalls & walls where the free
height of the structure exceeds 4 meter [rate is considered for the
height of each additional 4 (four) meter or part]cum11907.10Extra
rate over the rate of form work / shuttering (wooden) of RCC works
in columns, capitals, liftwalls & walls where the free height
of the structure exceeds 4 meter [rate is considered for the height
of each addl. 4 (four) meter or part]sqm.1407.11Extra rate over the
rate of form work / shuttering (steel) of RCC works in columns,
capitals, liftwalls & walls where the free height of the
structure exceeds 4 meter [rate is considered for the height of
each addl. 4 (four) meter or part]sqm.1407.12Extra rate over the
rate of RCC (materials, consumables and laying/placing concrete)
works in Tee beams, Ell beams and rectangular beams where thefree
height of the structure exceeds 4 meter (rate is considered for
each addl. meter height)cum12207.13Extra rate over the rate of form
work / shuttering (wooden) of RCC works in Tee beams, Ell beams and
rectangular beams where thefree height of the structure exceeds 4
meter (rate is considered for each addl. meter
height)sqm.3207.14Extra rate over the rate of form work /
shuttering (steel) of RCC works in Tee beams, Ell beams and
rectangular beams where the free height of the structure exceeds 4
meter (rate is considered for each addl. meter
height)sqm.3207.15Extra rate over the rate of RCC (materials,
consumables and laying/placing concrete) works in floor / roof
slab, cantilever slab, waffle slab and drop panels where the free
height of the structure exceeds 4 meter (rate is considered for
each addl. meter height)cum12207.16Extra rate over the rate of form
work / shuttering for RCC works in floor / roof slab, cantilever
slab, waffle slab and drop panels where the free height of the
structure exceeds 4 meter (rate is considered for each addl. meter
height)sqm.2107.17Extra rate for RCC work in additional floor:
Concrete07.17.1Add for each addl. floor up to 5th
floorcum5007.17.2Add for each addl. floor from 6th floor to 9th
floorcum6607.17.3Add for each addl. floor for 10th floor &
abovecum8207.18Extra rate for RCC work in additional floor:
Formwork / shuttering including curing07.18.1Add for each addl.
floor up to 5th floorsqm.1907.18.2Add for each addl. floor from 6th
floor to 9th floorsqm.2807.18.3Add for each addl. floor for 10th
floor & abovesqm.3707.19Extra cost for making as-cast surface
of the concrete approved and accepted by the Engineer. (formwork
cost)sqm.23407.2007.20.1Supply and use of water reducing chemical
admixture ASTM C-494 Type - A of approved brand/origin/manufacturer
in concrete: The admixture to reduce quantity of mixing water
required for normal workability and to maintain low water-cement
(W/C) ratio for improved concrete.liter17907.20.2Supply and use of
retarding chemical admixture ASTM C-494 Type - B of approved
brand/origin/manufacturer in concrete: The admixture for retarding
setting time of concrete, there by reducing shrinkage in concrete
specially for concrete laid in thick layers and intended delayed
construction for improved construction joints, re-concreting
etc.liter18507.20.3Supply and use of accelerating chemical
admixture ASTM C-494 Type - C of approved brand/origin/manufacturer
in concrete: An admixture that is to accelerate the setting time
and early strength gain of concrete.liter18307.20.4Supply and use
of water-reducing and retarding chemical admixture ASTM C-494 Type
- D of approved brand/origin/manufacturer in concrete: The
admixture to reduce the quantity of mixing water required to
produce concrete of given consistency, i.e. low water-cement (W/C)
ratio and intend to retard setting time of concrete, specially for
layered, thick laid concrete etc.liter17507.20.5Supply and use of
water-reducing and accelerating chemical admixture ASTM C-494 Type
- E of approved brand/origin/manufacturer in concrete: The
admixture to reduce the quantity of mixing water required to
produce concrete of given consistency, i.e. low water-cement (W/C)
ratio and intend to accelerate setting time of concrete, and early
strength gain in concrete etc.liter19207.20.6Supply and use of
water-reducing high range chemical admixture ASTM C-494 Type - F of
approved brand/origin/manufacturer in concrete: The admixture
required to produce concrete of consistency by 12% or greater
(flowing concrete) and for higher strength of
concrete.liter18807.20.7Supply and use of water-reducing high range
and retarding chemical admixture ASTM C-494 Type - G of approved
brand/origin/manufacturer in concrete: The admixture required to
produce concrete of consistency by 12% or greater (flowing
concrete) and for higher strength of concrete and intend to retard
setting time of concrete.liter16607.21Supplying, best quality
pliable, cold applied pre-formed self adhesive rubberized/
bituminous water proofing membrane of approved brand / origin /
manufacturer from an authorized local agent or manufacturer having
minimum thickness 1.5 mm, lined with 2 ply cross laminated high
density polyethylene film performances and properties all
conforming to ASTM standards and laying, placing, fixing on made up
firm and dry surfaces free from hollows, sharp protrusions,
contaminates etc. laid over-lap by at least 75 mm along the edges
and 125 mm at ends ensuring good initial bond with the surfaces all
complete under the strict accordance with the manufacturer
recommendations and instructions providing all safety provisions in
all respects and accepted by the Engineer.07.21.1Water-proofing
membrane on external surface of primed vertical or inclined wall
/on plastered and primed back-wall and concrete cast against
membrane. (Excluding cost of back fill/brick wall on back/plaster
when membrane laid on back-wall and concrete cast against membrane
which to be paid as per corresponding items in this
schedule)sqm.73407.21.2Water-proofing membrane on made up surface
below the floor or below the horizontal surfaces with temporary
protective cover using polysterene/1.5" thick sand-cement mortar in
4:1 /or by equally effective alternative. (Rate is excluding the
cost of protective cover which to be paid as per corresponding
items in this schedule)sqm.65507.21.3Water-proofing membrane on the
floor or on the horizontal surfaces with permanent protective cover
& wearing coarse. (Rate is excluding the cost of protective
cover and wearing coarse which to be paid as per corresponding
items in this schedule)sqm.68307.2220 mm thick water-proofing work
in masonry or concrete surface with sand-cement mortar mixed with
specified admixture (supplied from authorized local agent or from
manufacturer comply with ASTM/BS/IS requirements, confirming
current compliance of the admixture to specification requirements
like physical properties, uniformity and equivalence in
composition, performance requirements, delivered in sealed
containers having and confirming plainly marked the proprietary
name of the admixture type under this specification, net weight and
or volume, manufacturing and expiry date, shelve life, non
aggressiveness to environment and metals in concrete etc.) under
the strict accordance with manufacturer recommendations /
instructions and providing safety provisions in all respect etc. on
sound, firm surfaces all complete including cleaning the surface
from dust, loose particles, remains of oil, grease etc. all
complete approved and accepted by the Engineer. (Cement:
CEM-II/A-M)sqm.387DIVISION 08 : M.S. FABRICATION, EXPANSION JOINT
IN RCC WORKS & BEARING JOINT08.1Supplying, fabrication and
fixing to details as per design deformed bar reinforcement in
concrete in accordance with BDS 1313 : 1991 standard including
straightening and cleaning rust, if any, bending and binding in
position including supply of G.I. wires etc. complete in all
respects and accepted by the Engineer.08.1.1275-grade deformed bar
with minimum fy = 275 MPa & tensile strength at least 316 MPa.:
up to ground floorPer 100kg833808.1.2400-grade deformed bar with
minimum fy = 400 MPa & tensile strength at least 460 MPa: up to
ground floorPer 100kg869908.2Extra rate for M.S. Fabrication work
in additional floor shall be incorporated in the estimate08.2.1Add
for each addl. floor up to 5th floorPer 100kg2408.2.2Add for each
addl. floor from 6th floor to 9th floorPer 100kg4708.2.3Add for
each addl. floor for 10th floor and abovePer 100kg7008.3Mild steel
Grade - 250 with minimum fy = 250 MPa work in roof truss: supplying
and fabrication of mild steel sections as per design. Hoisting,
fitting and fixing in position with bolts and nuts or rivets or
welded and providing two coats of anti-corrosive paint over a prime
coat of red oxide paint etc. complete and accepted by the
Engineer.(Measurement to be given for Truss member only).Per
100kg1137108.4Supplying fan hook of 16 mm diameter M.S. rod (one
meter straight length) having rounded hook at the middle of bar in
proper size so as to be concealed within fan cup including
fabrication and fitting fixing in all floor accepted by the
Engineer.each9408.5Constructing expansion joints 25 mm / 38 mm gap
in R.C.C. floor or roof slab or beam provided with V folded copper/
aluminium water stop sheet with loop notch and inserted 75 mm
concrete shoulders, the gap being filled up with mixture of hot
applied bituminous sealing compound etc. all complete and accepted
by the Engineer.(Rate is excluding the cost of floor shoulders and
floor finishes).08.5.1With copper sheetrm.129308.5.2With Aluminum
sheetrm.111108.5.3With Aluminium sheet and 6 mm x 75 mm size M.S.
plate.rm.199008.6Supplying, fitting and fixing PVC water stopper in
10" wide horizontal construction joint of RCC basement slab with
1.5" x 2.5" wooden batten at the top and bottom, bi