Page 1
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Nicholoson Road Davis Road PWR Allama Iqbal Road
2 Empress Road -do- Sunny View Empress Road
3 McLeod Road Royal Park -do McLeod Road
4 Royal Park -do- McLeod RoadMcLeod Road
Laxmi Chowk
6 95001 Shah Fareed Said Pur Sabzazar Shah FareedELR Construction
Division
7 95012 A-Block Said Pur Sabzazar A-BlockELR Construction
Division
8 95011 Jafria Colony Chuburji Park Sabzazar Jafria ColonyELR Construction
Division
9 95006 Al Mumtaz Ittehad Colony Sabzazar Al MumtazELR Construction
Division
10 18412 Nawan Kot Dholanwal Said Pur Nawan KotELR Construction
Division
11 18403 Chuburji Park Chuburji Park Said Pur Chuburji ParkELR Construction
Division
12 18419 Sodiwal Nawan Kot Said Pur SodiwalELR Construction
Division
13 18407 Bastami Road Ittehad Colony Said Pur Bastami RoadELR Construction
Division
14 18416 Studio Ittehad Colony Said Pur StudioELR Construction
Division
15 42913 Nonariyan Nawan Kot Gulshan Ravi NonariyanELR Construction
Division
07:00
To
01:00
D/W Orange line Metro Train
Project Lahore
Such Chain
Orange Line Metro Train ProjectELR Construction
Division
Canal Bank Road Manga Canal Road South
SCHEDULE OF APPROVED SHUT DOWNS DATED 01-08-2016 O&M DISTT (South):
S #Feeder
CodeTIME REASON
07:30
To
15:30
D/W Superior Services H/Scheme
feed line Multan Road Lahore5
0730 Hrs
Page 2
16 42906 Rustam Park Nawan Kot Gulshan Ravi Rustam ParkELR Construction
Division
17 42918 Jinnah Colony Ittehad Colony Gulshan Ravi Jinnah ColonyELR Construction
Division
18 42917 Multan Road Ittehad Colony Gulshan Ravi Multan RoadELR Construction
Division
19 18422 Nargis Feeder Cannal Road Said Pur Nargis FeederELR Construction
Division
S Feeder 11 KV SUB 132 KV AREA CONST. TIME REASON
# Code FEEDER DIVISION G/STATION EFFECTED DIVISION
1 ITI Kot Abdul Malik Atta Abad ITI 0800-1800 GSC
for upgradation of 66 KV T/Line
Attabad-EMCO-UIS-Green View-
Rustam into 132KV T/Line for
safety purpose
2 Alfatha -do-66 KV G/S
EMCO Alfatha -do- -do- -do-
3 EFCO -do- -do- EFCO -do- -do- -do-
4 EFCO Matel -do- -do- EFCO Matel -do- -do- -do-
5 Saeed Paper
Mills-do- -do- Saeed Paper Mills -do- -do- -do-
6 Mandyali Paper
Mill Kot Abdul Malik Atta Abad Mandyali Paper Mill 0800-1800 -do- -do-
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Shabir Town Niaz Baig Johar TownShair Imam Colony,
Shabir Town
ELR
Construction
Division 0730 Hrs
2 Sher Shah-2 Ali Raza AbadPunjab
UniversityRaiwind Road
ELR
Construction
Division
To
3Abu Dhabi
PalaceAli Raza Abad
Punjab
University
Abu Zehbi, Shabir
Imam Colony
ELR
Construction
Division
1330 Hrs
SCHEDULE OF APPROVED SHUT DOWNS DATED 01-08-2016 (MONDAY) O&M DISTT: (North)
SCHEDULE OF APPROVED SHUT DOWNS DATED 02-08-2016 O&M DISTT (South):
S #Feeder
CodeTIME REASON
D/WPunjab University
Employee Housing Scheme
07:00
To
01:00
D/W Orange line Metro Train
Project Lahore
Page 3
4 Eden Palace Ali Raza AbadPunjab
UniversityEden Palace
ELR
Construction
Division
5 Mohallam Kasur (Rural) Kasur Old Rural/City AreaOkara
Construction
6Satluj Kasur (Rural) Kasur Old Rural/City Area
Okara
Construction
7Ganda Singh Kasur (Rural) Kasur Old Rural/City Area
Okara
Construction
8 Industrial Multan Road Saidpur Multan Road
9 Gulshab Abbas Multan Road Saidpur Multan Road
10 Canal Park Niaz Baig Johar Town Canal View
S Feeder 11 KV SUB 132 KV AREA CONST. TIME REASON
# Code FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Jahangir AbadHaveli Lakha
UrbanHaveli Jahangir Abad Operation 0800-1400
for deposit work (Mian Yasin
wattoo welcome gate) Chowk
Shaheeda Haveli Lakha
2 Jamalkot -do- -do- Jamalkot -do- -do- -do-
3 Zafar Abad132-KV
AYESHAMixed SKP 0900-1500
4 075318 CH. Textile Independent -do- -do-
5 075317 Ghani Glass Independent -do- -do-
6 075319 C.A Textile Independent -do- -do-
7 075301 C.K.M Independent -do- -do-
8 075322 A.A Paper Independent -do- -do-
9 075311 N.T.M Independent -do- -do-
10 075309 Rupali Independent -do- -do-
11 075305 Qadria Board Independent -do- -do-
12 91207 Zafar Abad Mixed -do- -do-
13 91208 New Industrial132 KV Atta
AbadMixed -do- -do-
14 019715 NCM-2 Independent -do- -do-
07:30
To
13:30
D/W of Lahore Orange Train
from Multan Chungi to Canal
View Station
Kharianwala
132-KV SKPM/S Malik & Sons Steel Mills
Jewan Pura Faislabad Road SKP
SCHEDULE OF APPROVED SHUT DOWNS DATED 02-08-2016 (TUESDAY) O&M DISTT: (North)
Atta AbadApp# 127/E.2 M/S Punjab
Industrial Estate
132 KV ICI
Public
D/WPunjab University
Employee Housing Scheme
07:00
To
13:30
11 KV Mohalam Feeder
Page 4
15 019732 Wisal Kamal Independent -do- -do-
16 019726 AMK Independent -do- -do-
17 019728 Industrial-1 Independent -do- -do-
18 019729 Model Spinning Independent -do- -do-
19 019731 Sial Flour Independent -do- -do-
20 019711 NCM-1 Independent -do- -do-
21 019712 Sargodha Jute Independent -do- -do-
22 Ali Nawaz Independent -do- -do-
23 019720 Neelum Cotton Independent -do- -do-
24 019714 Faislabad Road Mixed -do- -do-
25 037202 Lahore Road Mixed -do- -do-
26 037206 Mandian Wala Mixed -do- -do-
27 008416 Siraj Steel Mixed -do- -do-
28 008403 Old Industrial Mixed -do- -do-
29 008420 Rifaqat Steel Independent -do- -do-
30 008411 SF-4 Mixed -do- -do-
31 008425 Zafer Park Mixed -do- -do-
32 008422 L.C.E Independent -do- -do-
33 Sandal Bar Independent -do- -do-
34 008412 SF-5 Mixed -do- -do-
35 008405 O.K Mixed -do- -do-
36 Morekhunda Independent -do- -do-
37 032004 D-4 Independent -do- -do-
38 032003 C-3 Independent -do- -do-
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 New Chung Chung Chung Mohlanwal South
2 Rangeelpur Chung Chung Main Multan Road South
3 Madina Colony Walton RoadOld Kot
Lakhpat- South
07:30
To
1330
For safety purpose
4 Hassan Town Awan Town132KV G/S
SabzazarHassan Town
09:00
To
16:00
For Safety Purpose.
SCHEDULE OF APPROVED SHUT DOWNS DATED 03-08-2016 (WEDNESDAY) O&M DIST:(North)
07:00
To
13:30
A/P Industrial-I from Chung grid
SCHEDULE OF APPROVED SHUT DOWNS DATED 03-08-2016 O&M DISTT (South):
S #Feeder
CodeTIME REASON
Mangtanwala66-KV
Malikpur 11KV More Khunda Feeder
Jaranwala Road132-KV
Sharqpur Karachi Lahore Motorway Project
Muridke City
220KV KSK LTP 1652070 Abadi Manoo Abad
Ravi Rayan
Kharianwala
132-KV SKPM/S Malik & Sons Steel Mills
Jewan Pura Faislabad Road SKP
Civil Line
Page 5
S Feeder 11 KV SUB 132 KV AREA CONST. TIME REASON
# Code FEEDER DIVISION G/STATION EFFECTED DIVISION
1 019710 Tariq Road Mixed SKP 0900-1500
2 019703 Ahmad Pura Mixed -do- -do-
3 A-ICheckoki
Mallian P/HMixed -do- -do-
4 Nishtar Road132-KV
BaigpurMixed -do- -do-
5 Sargodha Road Mixed -do- -do-
6 Ghazni Road Mixed -do- -do-
7 091205 Habib Colony Mixed -do- -do-
8 037208 Faizabad Mixed -do- -do-
9 037201 City Feeder Mixed -do- -do-
10 037202 Lahore Road Mixed -do- -do-
11 037206 Mandian Wala Mixed -do- -do-
12 037205 Head Lalian Mixed -do- -do-
13 037204 Jalal Pur Mixed -do- -do-
14041204 Tube well
132-KV
Rustam Mixed -do- -do-
15
New Muslim
InternationalIndependent -do- -do-
16 U.E.T Independent -do- -do-
17 050801 Islam Steel Mixed -do- -do-
18 050802 Ruchna Town Mixed -do- -do-
19 050808 Ali Park Mixed -do- -do-
20 050824 Sharif Oxygen Independent -do- -do-
21 050826 Sher-E-Bangal Mixed -do- -do-
22 050832 Unipet Independent -do- -do-
23 050831 Diamond Polly Independent -do- -do-
24 050834 Sadiq Paper Independent -do- -do-
25 050819 P.T.V Mixed -do- -do-
26 050804 P.C.O Mixed -do- -do-
27 Punjab Steel Independent -do- -do-
28 Nabipura Mixed -do- -do-
29 Khiary Kala Mixed -do- -do-Nankana City
132-KV
NankanaKarachi Lahore Motorway Project
Ruchna Town
132-KV
Shamkay
Punjab Judicial Complex New
Campus Kala Shah Kaku
Ravi Rayan
SCHEDULE OF APPROVED SHUT DOWNS DATED 04-08-2016 O&M DISTT (South):
Sharqpur
132-KV
Sharqpur 11-KV Mian Sher Muhammad
FeederJaranwala Road
City SKP
132-KV SKP
R/W National Model School SKP
P-2
132-KV
AYESHA
Page 6
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1
Comsat Ali Razabad Wapda TownEHV NTDCL
2 Klass -do- -do- EHV NTDCL
3 Ali Razabad-II -do- -do- EHV NTDCL
4 Chanab Steel Mahmood Booti Darogawala Independent
5 Lakhodair Mahmood Booti Shalamar-I Lakhodair
6 Umer Farooq Mahmood Booti Shalamar-IAwan Dhawale, Navl
Mori, Gunja Siidhuwan
7 Mastwaal Ellah Abad132KV G/S
Ellah Abad
08:00
To
19:00
Re-conducting
8 Ham Aziz Raiwind Raiwind Old Ham Aziz South
9 Din Textile -do- Raiwind Old Din Textile South
10 Eastern -I -do- Raiwind Old Eastern -I South
11 Industrial -do- Raiwind New Industrial South
12Ehsan Cotton -do- Raiwind New Ehsan Cotton
South
13 Manga Road Model Raiwind New Manga Road South
14 Sunder Road Model Raiwind New Sunder Road South
15 Eastern Leather Model Raiwind New Eastern Leather South
16 Sharif Model Chak-65 Sharif South
17Tritax Model
132 KVA
Phool Nagar TritaxDiposit Work
18 Shah Pur -do- -do- Shah Pur Diposit Work
19 Dynamic -do- -do- Dynamic Diposit Work
20 Novelty -do- -do- Union Paper Mills Diposit Work
21 Pattoki Jumber -do- Village Khankey Noor Diposit Work
22 Jumber -do- -do- Village Jumber Diposit Work
23 Gulshan Gulistan -do- -do- Shahbir Paper Mill Diposit Work
07:30
To
13:30
D/W of Umer Spinning Mills
Manga Raiwind Road.
S #Feeder
CodeTIME REASON
07:30
To
13:30
A/P of 11 KV Umer Farooq, Karol
T/Well, Lakhordairand Kot
Farzand feeder.
07:30
To
13:30
D/W Shabbir Paper & Bord Mills
Phool Nagar
07:30
To
1530
Shutdown is mandatory on all 03
No feeders to carry out erection &
stringing works on 220 KV T/Line
for human safety
Page 7
24 Naiz Baig Bhai Pheru -do- Village Sahran Diposit Work
25 Malik Steel Batapur Shalamar-II Independent North
26 S.J Steel Bilal Colony Shalamar-II Independent North
27 Rafique Steel -do- -do- -do- North
28 Zatun Colony -do- -do- Mixed North
29Pakistna Mint -do- Shalamar-I Mixed
North
30 Soharwardi -do- Shalamar-I Mixed North
31 Javaid Furnace -do- -do- Mixed North
32 Industrail Shalamar -do- Independent North
33 Data Floor Mill Bilal Colony -do- Independent North
34 Model Steel -do- Shalamar-I Mixed North
35 Bilal Colony -do- Shalamar-II Mixed North
36 G.T Road -do- -do- Mixed North
S Feeder 11 KV SUB 132 KV AREA CONST. TIME REASON
# Code FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Zafar Abad132-KV
AYESHAMixed SKP 0900-1500
2 075318 CH. Textile Independent -do- -do-
3 075317 Ghani Glass Independent -do- -do-
4 075319 C.A Textile Independent -do- -do-
5 075301 C.K.M Independent -do- -do-
6 075322 A.A Paper Independent -do- -do-
7 075311 N.T.M Independent -do- -do-
8 075309 Rupali Independent -do- -do-
9 075305 Qadria Board Independent -do- -do-
10 91207 Zafar Abad Mixed -do- -do-
11 91208 New Industrial132 KV Atta
AbadMixed -do- -do-
12 Nishat-2 Independent -do- -do-
13 087104 Industrial-3 Independent -do- -do-
14 087111 Amin Independent -do- -do-
15 087117 Ijaz Independent -do- -do-
16 087102 Cresent Mixed -do- -do-
17 087103 NCM-3 Independent -do- -do-
18 087106 11-KV Zaman Independent -do- -do-
19 087109 Kotla Independent -do- -do-
SCHEDULE OF APPROVED SHUT DOWNS DATED 04-08-2016 (THURSDAY) O&M DISTT: (North)
Atta AbadApp# 127/E.2 M/S Punjab
Industrial Estate
132 KV ICI
Public
Kharianwala 132-KV BhikhiM/S King Fiber 7-KM Faislabad
Road Kharianwala SKP
07:30
To
13:30
Shifting of HT/LT Line for
Orange Line Train
07:30
To
13:30
D/W Shabbir Paper & Bord Mills
Phool Nagar
Page 8
20 037206 Mandian Wala132-KV
Sharqpur Mixed -do- -do-
21 041204 Tube well132-KV
Rustam Mixed -do- -do-
22 033608 Bhool Chak Mixed -do- -do-
23 033607 Gheryal Mixed -do- -do-
24 033606 Narang More Mixed -do- -do-
25 033602 Rustampur Mixed -do- -do-
26 040101 A-103 Mixed -do- -do-
27 040102 C-103 Mixed -do- -do-
28 0401 Mehmowali Mixed -do- -do-
29 040117 Wali Oil Independent -do- -do-
30 082606 Riaz Textile Independent -do- -do-
31 082608 Maan Mixed -do- -do-
32 082607 Shafi Fahid Independent -do- -do-
33 082612 Gulshan Weaving Independent -do- -do-
34 082605 Gulistan Textile Independent -do- -do-
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Bhobtian Chowk Ali Razabad Jubli Town Saira H/S
2 Labour Colony -do- Sukh Chain Independent
3 Kot Sheikhan -do- Chung Labour Colony
4Novina Chung Sukh Chain Independent
5 Defence Road -do- Jubli Town Defence Road
6 Sukh Chain -do- Sukh Chain Rohi Nala
Feeder
CodeTIME REASON
XEN ELR
Construction
Division
0730
to
1330
External Electrification of Dream
Garden Housing Scheme
SCHEDULE OF APPROVED SHUT DOWNS DATED 06-08-2016 O&M DISTT (South):
S #
Area Planning and Bifurcation of
11KV C-103 & 11KV A-103 feeder
emanating from 132KV G/Station
and Load Shifting of load on 11KV
C-103 (EM) Feeder
132-KV
Walgon Sohail
Jaranwala Road Karachi Lahore Motorway Project
Narang North132-KV
Nararng
Deposit Work R/W MDK/ Norowal
Road P-III
Warburton
132-KV
Warburton
Page 9
8 Mastwaal Ellah Abad132KV G/S
Ellah AbadMastwaal / Ellah Abad GSC
08:00
To
19:00
Re-conducting
9 Lasani Kahna KahnaFeroaz Pur Road,
Jhulkey, Sharif ParkD.M KLP
07:30
To
13:30
Re-conducting near Central Park
Housing Scheme & Installation of
one .No Capacitor
S Feeder 11 KV SUB 132 KV AREA CONST. TIME REASON
# Code FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Kasher Shahkot ShahkotIndependent (No
Load)
FESCO
Construction0800-1400
for deposit work of 11 KV Mema
Cotton Mills
2 Nayab (jadeed) -do- -do- -do- -do- -do- -do-
3 Chanab -do- -do- -do- -do- -do- -do-
4 H-101 -do- -do- -do- -do- -do- -do-
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1Mayfiar Raiwind Raiwind-I Independent
2Lahore Road Jia Baga -do- Lahore Road
3Rubi Model Divn -do- Independent
4Ravi Model Divn -do- Independent
5Nisaar Raiwind -do- Independent
6 Surag Cotton Raiwind -do- Independent
XEN ELR
Construction
Division
0730
to
1330
External Electrification of Dream
Garden Housing Scheme
7 Defence Road -do- ChungDefence Road
Canal Road
SCHEDULE OF APPROVED SHUT DOWNS DATED 07-08-2016 O&M DISTT (South):
S #Feeder
CodeTIME REASON
SCHEDULE OF APPROVED SHUT DOWNS DATED 06-08-2016 (SATURDAY) O&M DISTT:(North)
Addl Manager
Constriction
07:30
To
13:30
Deposit Works M/S Khalis Fiber
PVT LTD Raiwind
Page 10
7 Din Textile Mill Raiwind -do- Independent
8Eastran Model Divn -do- Independent
9Bhatti Cotton Jia Baga -do- Independent
10Raiwind City Raiwind -do- Domastic
11Hair Jia Baga -do- Hair
12Hum Aziz Raiwind -do- Independent
13Moeez Model Divn -do- Independent
14 Kalokhara Raja Jang -do- Domastic
1550326 Architect (A.H.S) Air Line Wapda Town Architect (A.H.S)
1678225 U.C.P Air Line Johar Town-I Independent
1778204 PCSIR Wapda Town Johar Town-I PCSIR
18Treet Liqat Abad LEFO Treet
19Ghousia Ismail Nagar LEFO Ghousia
20Industrial-I Township LEFO Industrial-I
21Irrigation Hamza Town LEFO Irrigation
City Lahore
0730
to
1330
Shifting of HT/LT lines at
Nasheman Iqbal to Shoukat
Khanam Chowk
South Construction
0730
to
1330
11 KV Independent feeder for
Punjab Small Estate No 1 Kacha
Jail Road
Addl Manager
Constriction
07:30
To
13:30
Deposit Works M/S Khalis Fiber
PVT LTD Raiwind
Page 11
22Chandre Road Hamza Town LEFO Chandre Road
23Zia Hamza Town LEFO Zia
24
Comsat Ali Razabad Wapda Town
EHV NTDCL
25Klass -do- -do-
EHV NTDCL
26Ali Razabad-II -do- -do-
EHV NTDCL
27 Ismail Nagar Ismail Nagar LEFO Kacha Jail Road South Construction
07:30
To
13:30
D/W Punjab Small Ind Estate
Kacha Jail Road
28 Mastwaal Ellah Abad132KV G/S
Ellah AbadMastwaal / Ellah Abad GSC
08:00
To
19:00
Re-conducting
29 - Moiz Raiwind 132 KV
Raiwind Old Independent TLC
30 35322 Deen Raiwind132 KV
Raiwind OldIndependent TLC
31 - N.P Raiwind132 KV
Raiwind OldIndependent TLC
For concreting of SPD & SPG pole
founations under 11 KV Feeders
(for Operating Rigging machine)
Shutdown is mandatory on all 03
No feeders to carry out erection &
stringing works on 220 KV T/Line
for human safety
07:00
To
1700
South Construction
0730
to
1330
11 KV Independent feeder for
Punjab Small Estate No 1 Kacha
Jail Road
07:30
To
1530
Page 12
32 - Ravi Raiwind132 KV
Raiwind OldIndependent TLC
33 35314 Mayfair Raiwind132 KV
Raiwind OldIndependent TLC
34 - Moiz Raiwind 132 KV
Raiwind Old Independent TLC
35 35322 Deen Raiwind132 KV
Raiwind OldIndependent TLC
35 - N.P Raiwind132 KV
Raiwind OldIndependent TLC
36 - Ravi Raiwind132 KV
Raiwind OldIndependent TLC
37 35314 Mayfair Raiwind132 KV
Raiwind OldIndependent TLC
38 Anarkli Anarkli Mcleod Road Anarkli, Nila Gumbad
39 Bank Square Anarkli Mcleod Road Hall Road
40 Lady Achsion Anarkli Mcleod Road Niper Road
41 Moyo Hospital Anarkli Mcleod Road Independent
42 High Court Anarkli Mcleod Road Independent
For concreting of SPD & SPG pole
founations under 11 KV Feeders
(for Operating Rigging machine)
07:00
To
1700
For concreting of SPD & SPG pole
founations under 11 KV Feeders
(for Operating Rigging machine)
07:00
To
1700
ELR Construction
06:00
To
10:00
Orange Line Metro Train Project
Page 13
42 C.T.O Anarkli CTO Qartaba AG office / High Court
43 Mozang Adda Anarkli Rewaz Garden Mozang
44 East End Green Town Town Ship East End
45 Warid -do- -do- Independent
46 Industrial-3 -do- -do- -do-
47 Industrial-4 -do- -do- -do-
48 Industrial-5 -do- -do- -do-
49 Industrial-6 -do- -do- -do-
50 Industrial-7 -do- -do- -do-
51 Style Textile -do- -do- -do-
52 Fine Gass -do- -do- -do-
53 Mader-e-Millat -do- -do- Mader-e-Millat
54 Haider Road Town Ship -do- Haider Road
55 Society -do- -do- Society
56 Town Ship -do- -do- Town Ship
57 Plas Pack -do- -do- Independent
58 Krisca Light -do- -do- -do-
ELR Construction
07:30
To
13:30
Extension of Load from 826-KW to
2500-KW (Net Ext. 1674-KW)
under tariff B-III for M/S Medi
Pak Ltd.
ELR Construction
06:00
To
10:00
Orange Line Metro Train Project
SCHEDULE OF APPROVED SHUT DOWNS DATED 07-08-2016 (SUNDAY) O&M DISTT:North
Page 14
S Feeder 11 KV SUB 132 KV AREA CONST. TIME REASON
# Code FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Fort-II Sheranwala Fort Chuna Mandi South 0730 -1230for LT Proposals under Walled
City Project.
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Nicholoson Road Davis Road PWR Allama Iqbal Road 0730 Hrs
2 Empress Road -do- Sunny View Empress Road To
3 McLeod Road Royal Park -do McLeod Road 1330 Hrs
4 Royal Park -do- McLeod RoadMcLeod Road
Laxmi Chowk
5 95001 Shah Fareed Said Pur Sabzazar Shah FareedELR Construction
Division
6 95012 A-Block Said Pur Sabzazar A-BlockELR Construction
Division
7 95011 Jafria Colony Chuburji Park Sabzazar Jafria ColonyELR Construction
Division
8 95006 Al Mumtaz Ittehad Colony Sabzazar Al MumtazELR Construction
Division
Feeder
CodeTIME REASON
ELR Construction
DivisionOrange Line Metro Train Project
SCHEDULE OF APPROVED SHUT DOWNS DATED 08-08-2016 O&M DISTT (South):
S #
07:00
To
01:00
D/W Orange line Metro Train
Project Lahore
Page 15
9 18412 Nawan Kot Dholanwal Said Pur Nawan KotELR Construction
Division
10 18403 Chuburji Park Chuburji Park Said Pur Chuburji ParkELR Construction
Division
11 18419 Sodiwal Nawan Kot Said Pur SodiwalELR Construction
Division
12 18407 Bastami Road Ittehad Colony Said Pur Bastami RoadELR Construction
Division
13 18416 Studio Ittehad Colony Said Pur StudioELR Construction
Division
14 42913 Nonariyan Nawan Kot Gulshan Ravi NonariyanELR Construction
Division
15 42906 Rustam Park Nawan Kot Gulshan Ravi Rustam ParkELR Construction
Division
16 42918 Jinnah Colony Ittehad Colony Gulshan Ravi Jinnah ColonyELR Construction
Division
17 42917 Multan Road Ittehad Colony Gulshan Ravi Multan RoadELR Construction
Division
18 18422 Nargis Feeder Cannal Road Said Pur Nargis FeederELR Construction
Division
19 Comsat Ali Razabad Wapda Town EHV NTDCL
20 Klass -do- -do- EHV NTDCL
21 Ali Razabad-II -do- -do- EHV NTDCL
07:30
To
1530
Shutdown is mandatory on all 03
No feeders to carry out erection &
stringing works on 220 KV T/Line
for human safety
07:00
To
01:00
D/W Orange line Metro Train
Project Lahore
Page 16
22 Tritax Model132 KVA
Phool NagarTritax Diposit Work
23 Shah Pur -do- -do- Shah Pur Diposit Work
24 Dynamic -do- -do- Dynamic Diposit Work
25 Novelty -do- -do- Union Paper Mills Diposit Work
26 Pattoki Jumber -do- Village Khankey Noor Diposit Work
27 Jumber -do- -do- Village Jumber Diposit Work
28 Gulshan Gulistan -do- -do- Shahbir Paper Mill Diposit Work
29 Naiz Baig Bhai Pheru -do- Village Sahran Diposit Work
32 MI Textile Gea Bagga Rawind-I Independent
33 Novina Chung Sukh Chain Independent South
D/W for M/S Royal Packages
(PVT) LTD Rawind Asal Road
Lahore.
Sui Asal Road
Spell Gea Bagga Rawind-I Independent
07:30
To
13:30
30
07:30
To
13:30
D/W Shabbir Paper & Bord Mills
Phool Nagar
31
07:30
To
13:30
External elerctrification TIP Co-
Operative Housing Scheme
Tubewell Gea Bagga Rawind-I
Page 17
34Labour Colony Ali Razabad Sukh Chain Independent
South
35
Sukh Chain Chung Sukh Chain Independent
South
36Defence Road -do- Jubli Town Mix Dominated
South
37
Kot Sheikhan Ali Razabad Chung Mix Dominated
South
38Malik Steel Batapur Shalamar-II Independent
North
39S.J Steel Bilal Colony Shalamar-II Independent
North
40Rafique Steel -do- -do- -do-
North
41Zatun Colony -do- -do- Mixed
North
42Pakistna Mint -do- Shalamar-I Mixed
North
43
Soharwardi -do- Shalamar-I Mixed
North
44
Javaid Furnace -do- -do- Mixed
North
45 Industrail Shalamar -do- Independent North
07:30
To
13:30
External elerctrification TIP Co-
Operative Housing Scheme
07:30
To
13:30
Shifting of HT/LT Line for Orange
Line Train
Page 18
46Data Floor Mill Bilal Colony -do- Independent
North
47 Model Steel -do- Shalamar-I Mixed North
48Bilal Colony -do- Shalamar-II Mixed
North
49G.T Road -do- -do- Mixed
North
50 110602 Gulbahar Town Bilal Colony Moman Pura Gulbahar Town North
51 110603 Haji Park Wahga Moman Pura Haji Park North
52 Mastwaal Ellah Abad132KV G/S
Ellah AbadMastwaal / Ellah Abad GSC
08:00
To
19:00
Re-conducting
53 35319 Nisar Raiwind132 KV
Raiwind OldIndependent TLC
54 35320 Suraj Raiwind132 KV
Raiwind OldIndependent TLC
55 35308 M.I Raiwind132 KV
Raiwind OldIndependent TLC
56 35319 Nisar Raiwind132 KV
Raiwind OldIndependent TLC
57 35320 Suraj Raiwind132 KV
Raiwind OldIndependent TLC
58 35308 M.I Raiwind132 KV
Raiwind OldIndependent TLC
08:00
To
13:30
Shifiting of HT/LT Lines & T/F for
orange line Dera Gujjran Station
No-1 River Side
07:00
To
1700
For concreting of SPD & SPG pole
founations under 11 KV Feeders
(for Operating Rigging machine)
07:00
To
1700
For concreting of SPD & SPG pole
founations under 11 KV Feeders
(for Operating Rigging machine)
07:30
To
13:30
Shifting of HT/LT Line for Orange
Line Train
Page 19
59 Gulbahar Town Bilal Colony Moman Pura Gulbahar Town
60 Haji ParkFarooqabad
South
132-KV
FarooqabadHaji Park
Approach Road Farooqabad
(Shifting of Poles & Transformers)
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Shabir Town Niaz Baig Johar TownShair Imam Colony,
Shabir Town
ELR Construction
Division0730 Hrs
2 Sher Shah-2 Ali Raza AbadPunjab
UniversityRaiwind Road
ELR Construction
DivisionTo
3 Abu Dhabi Palace Ali Raza AbadPunjab
University
Abu Zehbi, Shabir
Imam Colony
ELR Construction
Division1330 Hrs
4 Eden Palace Ali Raza AbadPunjab
UniversityEden Palace
ELR Construction
Division
5 Mohallam Kasur (Rural) Kasur Old Rural/City Area Okara Construction
REASON
08:00
To
13:00
D/WPunjab University Employee
Housing Scheme
07:00
To
13:30
11 KV Mohalam Feeder
D.M Construction
North
SCHEDULE OF APPROVED SHUT DOWNS DATED 09-08-2016 O&M DISTT (South):
S #Feeder
CodeTIME
Page 20
6 Satluj Kasur (Rural) Kasur Old Rural/City Area Okara Construction
7 Ganda Singh Kasur (Rural) Kasur Old Rural/City Area Okara Construction
8 Industrial Multan Road Saidpur Multan Road
9 Gulshab Abbas Multan Road Saidpur Multan Road
10 Canal Park Niaz Baig Johar Town Canal View
11Ganda Singh
WalaRural Kasur
132 KVA
Kasur Old
Village Ganda Singh
WalaDiposit Work
12 Maan -do- -do- Village Maan Diposit Work
13 Bahadur Pura Bahadur Pura -do- Village Bahadar Pura Diposit Work
14 Atheel Pur -do- -do- Village Atheel Pur Diposit Work
15 Hospital Civil Area -do-Village Kot Fateh
Bazar KhanDiposit Work
16 Mastwaal Ellah Abad132KV G/S
Ellah AbadMastwaal / Ellah Abad GSC
08:00
To
19:00
Re-conducting
17 Lasani Kahna KahnaFeroaz Pur Road,
Jhulkey, Sharif ParkD.M KLP
07:30
To
13:30
Re-conducting near Central Park
Housing Scheme & Installation of
one .No Capacitor
S Feeder 11 KV SUB 132 KV AREA CONST. TIME REASON
# Code FEEDER DIVISION G/STATION EFFECTED DIVISION
1Zafar Abad
132-KV
AYESHAMixed SKP 0900-1500
2 075318 CH. Textile Independent -do- -do-
3 075317 Ghani Glass Independent -do- -do-
4075319 C.A Textile Independent -do- -do-
SCHEDULE OF APPROVED SHUT DOWNS DATED 09-08-2016 (TUESDAY) O&M DISTT: (North)
Atta Abad
07:30
To
13:30
D/W of Lahore Orange Train from
Multan Chungi to Canal View
Station
07:30
To
13:30
D/W Ideal Gardens Housing
Scheme Kasur
07:00
To
13:30
11 KV Mohalam Feeder
App# 127/E.2 M/S Punjab
Industrial Estate
132 KV ICI
Public
Page 21
5
075301 C.K.M Independent -do- -do-
6 075322 A.A Paper Independent -do- -do-
7 075311 N.T.M Independent -do- -do-
8 075309 Rupali Independent -do- -do-
9 075305 Qadria Board Independent -do- -do-
10 91207 Zafar Abad Mixed -do- -do-
1191208 New Industrial
132 KV Atta
AbadMixed -do- -do-
12 019715 NCM-2 Independent -do- -do-
13019732 Wisal Kamal Independent -do- -do-
14 019726 AMK Independent -do- -do-
15 019728 Industrial-1 Independent -do- -do-
16 019729 Model Spinning Independent -do- -do-
17 019731 Sial Flour Independent -do- -do-
18 019711 NCM-1 Independent -do- -do-
19 019712 Sargodha Jute Independent -do- -do-
20 Ali Nawaz Independent -do- -do-
21019720 Neelum Cotton Independent -do- -do-
22019714 Faislabad Road Mixed -do- -do-
23 037202 Lahore Road Mixed -do- -do-
24 037206 Mandian Wala Mixed -do- -do-
25 008416 Siraj Steel Mixed -do- -do-
26 008403 Old Industrial Mixed -do- -do-
27 008420 Rifaqat Steel Independent -do- -do-
28008411 SF-4 Mixed -do- -do-
29 008425 Zafer Park Mixed -do- -do-
30 008422 L.C.E Independent -do- -do-
31 Sandal Bar Independent -do- -do-
Atta Abad
M/S Malik & Sons Steel Mills
Jewan Pura Faislabad Road SKP
Civil Line
Jaranwala Road132-KV
Sharqpur Karachi Lahore Motorway Project
Muridke City
220KV KSK LTP 1652070 Abadi Manoo Abad
App# 127/E.2 M/S Punjab
Industrial Estate
132 KV ICI
Public
Kharianwala
132-KV SKP
Page 22
32 008412 SF-5 Mixed -do- -do-
33 008405 O.K Mixed -do- -do-
34 Morekhunda Independent -do- -do-
35 032004 D-4 Independent -do- -do-
36 032003 C-3 Independent -do- -do-
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1New Chung Chung Chung Mohlanwal
South
2 Rangeelpur Chung Chung Main Multan Road South
3 Mastwaal Ellah Abad132KV G/S
Ellah AbadMastwaal / Ellah Abad GSC
08:00
To
19:00
Re-conducting
4 41107 Raiwind Road Manga Manga Multan Road North
5 41119 PFC Model -do- Independent North
6 41115 Kohenoor -do- -do- -do- North
7 41125 Indus Home -do- -do- -do- North
8 41123 Asia Spinning -do- -do- -do- North
9 41122 A.L Textile -do- -do- -do- North
10 41112 Industrial-I Manga -do- Multan Road North
11 41105 Manga Town -do- -do- -do- North
12 41120 Ali Haq Model -do- Independent North
13 41124 Layear Model -do- Independent North
14 41116 Chiragh Manga -do- Independent North
15 41109 Servis Manga -do- Independent North
16 Industrial-I Hamza Town NKLPAsif Town & Mujhid
Colony -
17 Hamza Town Hamza Town NKLPAnam Road & Hamza
Town -
18 Ravi Model Old Raiwind Independent Model Divn
19 Ruby Model Old Raiwind Independent Model Divn
20 May Fair Raiwind Old Raiwind Independent Model Divn
07:00
To
13:30
M/S United Snakes PVT Ltd &
Rupali Foods PVT Ltd.
07:30
To
13:30
Set right the lose Sag of H/T & LT
Line at Street Jamia Masjid Ume-
Ashraf Jamal Iqbal Pur Lahore for
Safety Purpose.
07:30
To
13:30
D/W Shifting of HT Lines at the
Mumtaz Masjid Daras Road
Raiwind
TIME REASON
Mangtanwala66-KV
Malikpur 11KV More Khunda Feeder
220KV KSK LTP 1652070 Abadi Manoo Abad
Ravi Rayan
07:00
To
13:30
A/P Industrial-I from Chung grid
S #Feeder
Code
SCHEDULE OF APPROVED SHUT DOWNS DATED 10-08-2016 O&M DISTT (South):
Page 23
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Chanab Steel Mahmood Booti Darogawala Independent
2Lakhodair Mahmood Booti Shalamar-I Lakhodair
3 Umer Farooq Mahmood Booti Shalamar-IAwan Dhawale, Navl
Mori, Gunja Siidhuwan
4 Mastwaal Ellah Abad132KV G/S
Ellah Abad
08:00
To
19:00
Re-conducting
5 Ham Aziz Raiwind Raiwind Old Ham Aziz South
6 Din Textile -do- Raiwind Old Din Textile South
7 Eastern -I -do- Raiwind Old Eastern -I South
8 Industrial-do-
Raiwind New Industrial South
9 Ehsan Cotton -do- Raiwind New Ehsan Cotton South
10 Manga Road Model Raiwind New Manga Road South
11 Sunder Road Model Raiwind New Sunder Road South
12 Eastern Leather Model Raiwind New Eastern Leather South
13 Sharif Model Chak-65 Sharif South
14Tritax Model
132 KVA
Phool Nagar TritaxDiposit Work
15
Shah Pur -do-
-do-
Shah Pur
Diposit Work
16Dynamic -do-
-do-
DynamicDiposit Work
17 Novelty -do--do-
Union Paper Mills Diposit Work
18 Pattoki Jumber-do-
Village Khankey Noor Diposit Work
D/W Shabbir Paper & Bord Mills
Phool Nagar
SCHEDULE OF APPROVED SHUT DOWNS DATED 11-08-2016 O&M DISTT (South):
S #Feeder
CodeTIME REASON
07:30
To
13:30
A/P of 11 KV Umer Farooq, Karol
T/Well, Lakhordairand Kot
Farzand feeder.
07:30
To
13:30
07:30
To
13:30
D/W of Umer Spinning Mills
Manga Raiwind Road.
Page 24
19Jumber -do-
-do-
Village JumberDiposit Work
20Gulshan Gulistan -do-
-do-
Shahbir Paper MillDiposit Work
21 Naiz Baig Bhai Pheru -do- Village Sahran Diposit Work
22 Shama Park Bata Moman Park Mix North
23 Tuls Pura Bata Moman Park Mix North
24 Muslima Abad Bata Fateh Ghar Canal Road North
25 Manawan Bata Bata
GT Road North
26 Behni Road Wahga Bata GT Road North
27 Akber Colony Bata Bata GT Road North
28 Iqbal Furnace Bata Bata GT Road North
29 Data Park Bata Bata GT Road North
30 19424 Javed Farnace Shalamar Shalamar-I Independent North
31 100312 Industrail-6 Shalamar Daroghwala Daroghwala North
32 110601Moman Pura
RoadWahga Moman Pura Moman Pura North
33 110606 Shama Park Bata Pur Moman PuraData Park & Shma
ParkNorth
34 Mastwaal Ellah Abad132KV G/S
Ellah AbadMastwaal / Ellah Abad GSC
08:00
To
19:00
Re-conducting
35 Industrial-2 Sarfraz Nagar Manga Mandi Independent ELR
36 Yousaf Chakwal Sarfraz Nagar Manga Mandi Independent ELR
37 Lahore Poly Sarfraz Nagar Manga Mandi Independent ELR
38 Zahoor Sarfraz Nagar Manga Mandi Mix ELR
39 Rakj Mudkey Sarfraz Nagar Manga Mandi Mix ELR
40 Kot Asad ullah Sarfraz Nagar Manga Mandi Mix ELR
41 Malik Steel Batapur Shalamar-II Independent North
42 S.J Steel Bilal Colony Shalamar-II Independent North
D/W Shabbir Paper & Bord Mills
Phool Nagar
07:30
To
13:30
11 KV Ali Hajvery Feeder
Shifiting of HT/LT Lines & T/F for
orange line Dera Gujjran Station
No-1 City Side
07:30
To
13:30
D/W Waqas Rafique & Sardar Pur
07:30
To
13:30
Shifting of HT/LT Line for Orange
Line Train
08:00
To
13:30
11 KV Industrail-6 Feeder
08:00
To
13:30
07:30
To
13:30
Page 25
43 Rafique Steel -do- -do- Independent North
44 Zatun Colony -do- -do- Independent North
45 Pakistna Mint -do- Shalamar-I Independent North
46 Soharwardi -do- Shalamar-I Independent North
47 Javaid Furnace -do- -do- Independent North
48 Industrail Shalamar -do- Independent North
49 Data Floor Mill Bilal Colony -do- Independent North
50 Model Steel -do- Shalamar-I Independent North
51 Bilal Colony -do- Shalamar-IIBilal Colony,
DaroghawalaNorth
52 G.T Road -do- -do- Mint Stop North
53 Chiragh Model Division Manga Independent South
54 Kohinoor -do- -do- Independent South
55 Indus Home -do- -do- Independent South
56 Service Manga -do- Manga Raiwind Road South
57 P.F.C Model Division -do- Independent South
58 Raiwind Road Manga -do- Manga Raiwind Road South
59 New Mandi Chunain Rural Pattoki Rural Area Diposit Work
07:30
To
13:30
D/W of Judicail Complex Pattoki
6015310
RCS U.E.T P.W.R Ghoray Shah Road North
6115303
G.T Road-I -do- -do- Gujjar Pura North
62 - Sabzi Mandi Angori Bagh Shalamar-II North
63 - Dars Road Angoori Bagh PWR G.T Road North
64 89303 Baghbanpura Baghbanpura Shalamar-II Muslim Park North
65 89316 Shalimar Chowk Baghbanpura Shalamar-II Madina Colony North
66 15317 Nicholson Road Davis Road P.W.R Nicholson Road North
07:30
To
13:30
Shifting of HT/LT Line for Orange
Line Train
07:30
To
13:30
D/W M/S Dalda Foods Manga
Raiwind Road
07:30
To
13:30
D/W Orange Line Project
Page 26
67
3021
US Apperal Chung Chung Independent ELR
68
3028
Tri Con Chung Chung Independent ELR
693017
MST Chung Chung Independent ELR
703015
EME Chung Chung Independent ELR
713027
P&D Chung Chung Independent ELR
723013
Defence Road Chung ChungDefence Road NES
PakELR
733007
Mannoo Chung Chung Independent ELR
74
3018
Sara Ali Raza Abad Chung Village Musala ELR
S Feeder 11 KV SUB 132 KV AREA CONST. TIME REASON
# Code FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Zafar Abad132-KV
AYESHAMixed SKP 0900-1500
2 075318 CH. Textile Independent -do- -do-
3 075317 Ghani Glass Independent -do- -do-
4 075319 C.A Textile Independent -do- -do-
5 075301 C.K.M Independent -do- -do-
6 075322 A.A Paper Independent -do- -do-
SCHEDULE OF APPROVED SHUT DOWNS DATED 11-08-2016 (THURSDAY) O&M DISTT: (North)
Atta AbadApp# 127/E.2 M/S Punjab
Industrial Estate132 KV ICI
Public
07:30
To
12:30
D/W source Feed line for sop to
Iqbal Avenue Cooperative
Housing Society Phase-III Canal
Road Lahore
Page 27
7 075311 N.T.M Independent -do- -do-
8 075309 Rupali Independent -do- -do-
9 075305 Qadria Board Independent -do- -do-
10 91207 Zafar Abad Mixed -do- -do-
11 91208 New Industrial132 KV Atta
AbadMixed -do- -do-
12 Nishat-2 Independent -do- -do-
13 087104 Industrial-3 Independent -do- -do-
14 087111 Amin Independent -do- -do-
15 087117 Ijaz Independent -do- -do-
16 087102 Cresent Mixed -do- -do-
17 087103 NCM-3 Independent -do- -do-
18 087106 11-KV Zaman Independent -do- -do-
19 087109 Kotla Independent -do- -do-
20 037206 Mandian Wala132-KV
Sharqpur Mixed -do- -do-
21 041204 Tube well132-KV
Rustam Mixed -do- -do-
22 033608 Bhool Chak Mixed -do- -do-
23 033607 Gheryal Mixed -do- -do-
24 033606 Narang More Mixed -do- -do-
25 033602 Rustampur Mixed -do- -do-
26 040101 A-103 Mixed -do- -do-
27 040102 C-103 Mixed -do- -do-
28 0401 Mehmowali Mixed -do- -do-
29 040117 Wali Oil Independent -do- -do-
30 082606 Riaz Textile Independent -do- -do-
31 082608 Maan Mixed -do- -do-
32 082607 Shafi Fahid Independent -do- -do-
33 082612 Gulshan Weaving Independent -do- -do-
34 082605 Gulistan Textile Independent -do- -do-
Kharianwala 132-KV BhikhiM/S King Fiber 7-KM Faislabad
Road Kharianwala SKP
Jaranwala Road Karachi Lahore Motorway Project
Narang North132-KV
Nararng
Deposit Work R/W MDK/ Norowal
Road P-III
Warburton
132-KV
Warburton
Area Planning and Bifurcation of
11KV C-103 & 11KV A-103 feeder
emanating from 132KV G/Station
and Load Shifting of load on 11KV
C-103 (EM) Feeder132-KV
Walgon Sohail
Atta AbadApp# 127/E.2 M/S Punjab
Industrial Estate132 KV ICI
Public
Page 28
35 91202 Qaim Pur Atta Abad AyeshaQaim Pur,Sahoke
MallianSKP 0900-1300 for D/W M/S DHQ Hospital SKP.
36 91212 Rehmat Colony -do- -do-Rehmat Colony,Bati
Chowk SKP-do- -do- -do-
37 91211 Miraj Park SKP Fort -do-Miraj Park ,Jandiala
Road-do- -do- -do-
38 91213 Sargodha Road SKP City -do-Sargodha Road, Habib
Colony-do- -do- -do-
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Mastwaal Ellah Abad132KV G/S
Ellah AbadMastwaal / Ellah Abad GSC
08:00
To
19:00
Re-conducting
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Lahore Road Jia Bagga Raiwind Lahore Road ELR
2 Bhatti Cotton -do- -do- Bhatti Cotton ELR
3 Haier -do- -do- Haier ELR
4 Ravi Textile -do- -do- Ravi Textile ELR
5 Ruby -do- -do- Ruby ELR
6 Moiz Textile Model Industrial -do- Moiz Textile ELR
7 Nisar Spinning -do- -do- Nisar Spinning ELR
8 Din Textile -do- -do- Din Textile ELR
9 Bio Suraj -do- -do- Bio Suraj ELR
10 May Fair -do- -do- May Fair ELR
11 Mobilink Township LEFO Independent South
12 Army Industry -do- LEFO -do- South
13 PECO-I Liqat Abad LEFO -do- South
14 Industrail-I Township LEFO Domainted South
SCHEDULE OF APPROVED SHUT DOWNS DATED 13-08-2016 O&M DISTT (South):
S #Feeder
CodeTIME REASON
07:30
To
13:30
M/S Din Textile Mill.
07:30
To
14:30
Road wieding of Kacha Jail Road
Lahore.
SCHEDULE OF APPROVED SHUT DOWNS DATED 12-08-2016 O&M DISTT (South):
S #Feeder
CodeTIME REASON
Page 29
15 Ghosia Ismail Nagar LEFO -do- South
16 Itehad Colony Ismail Nagar LEFO Domastic South
17 Treet Liqat Abad LEFO Independent South
18 I.T Tower Liqat Abad LEFO Independent South
19 Tariq Liqat Abad O.K.L.P Domainted South
20 Peco-II Liqat Abad O.K.L.P Domainted South
21 New Mandi Township O.K.L.P Domastic South
22 Liaqat Abad Liqat Abad O.K.L.P Domastic South
23 Bahar Colony Bahar Colony O.K.L.P Domastic South
S Feeder 11 KV SUB 132 KV AREA CONST. TIME REASON
# Code FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Fort-II Sheranwala Fort Chuna Mandi South 0730 -1230for LT Proposals under Walled
City Project.
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Treet Liqat Abad LEFO Treet 0730 Hrs
2 Ghousia Ismail NagarLEFO
Ghousia To
3 Industrial-I Township LEFO Industrial-I
1330 Hrs
4 Irrigation Hamza Town LEFO Irrigation
5 Chandre Road Hamza TownLEFO
Chandre Road
6 Zia Hamza TownLEFO
Zia
7 Ismail Nagar Ismail Nagar LEFO Kacha Jail Road South Construction
07:30
To
13:30
D/W Punjab Small Ind Estate
Kacha Jail Road
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
07:30
To
14:30
Road wieding of Kacha Jail Road
Lahore.
SCHEDULE OF APPROVED SHUT DOWNS DATED 14-08-2016 O&M DISTT (South):
SCHEDULE OF APPROVED SHUT DOWNS DATED 15-08-2016 O&M DISTT (South):
S #Feeder
CodeTIME REASON
S #Feeder
CodeTIME REASON
South Construction
11 KV Independent feeder for
Punjab Small Estate No 1 Kacha
Jail Road
SCHEDULE OF APPROVED SHUT DOWNS DATED 13-08-2016 (SATURDAY) O&M DISTT:(North)
Page 30
95001 Shah FareedSaid Pur
Sabzazar Shah FareedELR Construction
Division
95012 A-BlockSaid Pur
Sabzazar A-BlockELR Construction
Division
95011 Jafria ColonyChuburji Park
Sabzazar Jafria ColonyELR Construction
Division
95006 Al MumtazIttehad Colony
Sabzazar Al MumtazELR Construction
Division
18412 Nawan KotDholanwal Said Pur
Nawan KotELR Construction
Division
18403 Chuburji Park Chuburji Park Said Pur
Chuburji ParkELR Construction
Division
18419 SodiwalNawan Kot Said Pur
SodiwalELR Construction
Division
18407 Bastami RoadIttehad Colony Said Pur
Bastami RoadELR Construction
Division
18416Studio Ittehad Colony Said Pur Studio
ELR Construction
Division
42913Nonariyan Nawan Kot Gulshan Ravi Nonariyan
ELR Construction
Division
42906Rustam Park Nawan Kot Gulshan Ravi Rustam Park
ELR Construction
Division
42918Jinnah Colony Ittehad Colony Gulshan Ravi Jinnah Colony
ELR Construction
Division
42917 Multan Road Ittehad Colony Gulshan Ravi Multan RoadELR Construction
Division
18422 Nargis FeederCannal Road Said Pur
Nargis FeederELR Construction
Division
Tritax Model
132 KVA
Phool Nagar
Tritax
Diposit Work
Shah Pur -do- -do- Shah Pur Diposit Work
Dynamic -do- -do- Dynamic Diposit Work
Novelty -do- -do- Union Paper Mills Diposit Work
Pattoki Jumber -do- Village Khankey Noor Diposit Work
Jumber -do- -do- Village Jumber Diposit Work
Canal Bank Road
11
9
10
South
6
7
8
07:00
To
01:00
D/W Orange line Metro Train
Project Lahore
4
5
07:30
To
13:30
D/W Shabbir Paper & Bord
Mills Phool Nagar
2
3
Manga Canal RoadSuch Chain
07:30
To
13:30
1
D/W Superior Services
H/Scheme feed line Multan
Road Lahore
Page 31
Gulshan Gulistan -do- -do- Shahbir Paper Mill Diposit Work
Naiz Baig Bhai Pheru -do- Village Sahran Diposit Work
15 MI Textile Gea Bagga Rawind-I Independent
16 Novina Chung Sukh Chain Independent South
17 Labour Colony Ali Razabad Sukh Chain Independent South
18 Sukh Chain Chung Sukh Chain Independent South
19 Defence Road -do- Jubli Town Mix Dominated South
20 Kot Sheikhan Ali Razabad Chung Mix Dominated South
21 Malik Steel Batapur Shalamar-II Independent North
22S.J Steel Bilal Colony Shalamar-II Independent
North
23 Rafique Steel -do- -do- -do- North
24 Zatun Colony -do- -do- Mixed North
25 Pakistna Mint -do- Shalamar-I Mixed North
26 Soharwardi -do- Shalamar-I Mixed North
27 Javaid Furnace -do- -do- Mixed North
28 Industrail Shalamar -do- Independent North
29
Data Floor Mill Bilal Colony -do- Independent
North
30 Model Steel -do- Shalamar-I Mixed North
31 Bilal Colony -do- Shalamar-II Mixed North
32 G.T Road -do- -do- Mixed North
33 19435 Model Steel Bilal Colony Shalamar-I Independent North
34 110601Moman Pura
RoadWahga Moman Pura Moman Pura North
35 110606 Shama Park Bata Pur Moman PuraData Park & Shma
ParkNorth
36 19436 Model Steel Bilal Colony Shalamar-I Independent North
Independent
Sui Asal Road
08:00
To
13:30
Shifiting of HT/LT Lines & T/F for
orange line Islam Park Station
No.2 City Side
08:00
To
13:30
Shifiting of HT/LT Lines & T/F for
orange line Salamat Pura Station
No. 3 City Side
07:30
To
13:30
External elerctrification TIP Co-
Operative Housing Scheme
07:30
To
13:30
12
13
14
Rawind-I
07:30
To
13:30
D/W Shabbir Paper & Bord
Mills Phool Nagar
Spell Gea Bagga Rawind-I
07:30
To
13:30
Shifting of HT/LT Line for
Orange Line Train
Tubewell D/W for M/S Royal Packages
(PVT) LTD Rawind Asal Road
Lahore.
Gea Bagga
Page 32
37 100315 Prime Steel Bilal Colony Daroghwala Independent North
38 100316 A.R Steel Bilal Colony Daroghwala Independent North
39 110606 Shama Park Bata Pur Moman PuraData Park & Shma
ParkNorth
40 89314 Malik Steel Bilal Colony Shalamar-II Independent North
41 89315 Rafique Steel Bilal Colony Shalamar-II Independent North
42 89305 S.J Steel Bilal Colony Shalamar-II Independent North
43 100307 Industrail-3 Bilal Colony Daroghwala Daroghwala North
44 3814 Eid Gah Amir Town Fateh Garh Fayaz Coly, Bilal Park North
45 3801 Bund Road Fateh Garh Fateh GarhCanal Park Salamat
puraNorth
46 3820 Canal Bank Amir Town Fateh GarhAmir Town Harbance
puraNorth
47 3802 Fateh Garh Fateh Garh Fateh GarhFateh Garh Chaman
ParkNorth
48 3832 Amir Town Amir Town Fateh Garh Amir Town North
49 16716 C.T.O Mozang Qartaba Mazang ELR Construction
Division
50 Mazang Adda Islamia Park Qartaba Liton RoadELR Construction
Division
51 58310 Lady Echison Anarkli Mecload Road Independent ELR Construction
Division
52 35707 Mazang Adda Anarkli Rewaz Garden Mazang ELR Construction
Division
53 35717 Nela Gumbed Anarkli Rewaz Garden Rewaz GardenELR Construction
Division
08:00
To
13:30
11 KV Fateh Ghar and Hafeez
Pura Feeders
08:00
To
13:30
Shifiting of HT/LT Lines & T/F for
orange line Salamat Pura Station
No-3 River Side
08:00
To
13:30
Shifiting of HT/LT Lines & T/F for
orange line Salamat Pura Station
No. 3 City Side
07:30
To
13:30
D/W SOL for Orange Train Project
Chuburji Chowk Lahore
Page 33
54 35702 Old Anarkli Islam Pura Rewaz Garden Old Anarkli ELR Construction
Division
S Feeder 11 KV SUB 132 KV AREA CONST. TIME REASON
# Code FEEDER DIVISION G/STATION EFFECTED DIVISION
1050715 SKP Road
132 KV Green
ViewMixed SKP 0900-1500
2 Sareena Independent -do- -do-
3027014 Al-Fateh Independent -do- -do-
4000601 Appallo Mixed -do- -do-
5 000617 I.T.I Mixed -do- -do-
6 027003 Javaid Pervaiz Independent -do- -do-
7 027006 Nawaz shehbaz Independent -do- -do-
8 027119 Jhamkey Mixed -do- -do-
9 027116 Ghang Mixed -do- -do-
10 027109 Sohail & Hajra Independent -do- -do-
11 027107 City Mixed -do- -do-
12
027113 Parco Independent -do- -do-
13 027114 Shell Independent -do- -do-
14 027108 Colony Mixed -do- -do-
15 037205 Head Lalian Mixed -do- -do-
16 037204 Jalal Pur Mixed -do- -do-
17
New Muslim
InternationalIndependent -do- -do-
18 U.E.T Independent -do- -do-
19 050801 Islam Steel Mixed -do- -do-
20 050802 Ruchna Town Mixed -do- -do-
21 050808 Ali Park Mixed -do- -do-
22 050824 Sharif Oxygen Independent -do- -do-
23 050826 Sher-E-Bangal Mixed -do- -do-
24 050832 Unipet Independent -do- -do-
Ruchna Town
132-KV
Shamkay
Punjab Judicial Complex New
Campus Kala Shah Kaku
132-KV
Sharqpur Karachi Lahore Motorway Project
07:30
To
13:30
D/W SOL for Orange Train Project
Chuburji Chowk Lahore
Jaranwala Road
Farooqabad
South
132-KV
Farooqabad
Approach Road Farooqabad
(Shifting of Poles & Transformers)
Soucha Souda
SCHEDULE OF APPROVED SHUT DOWNS DATED 15-08-2016 (MONDAY) O&M DISTT:(North)
Kot Abdul MalikDeposite Work M/S Bashir Pipe &
Iron PVT Ltd
66 KV Emco
132 KV Atta
Abad
faiz pur 66 KV Emco
Page 34
25 050831 Diamond Polly Independent -do- -do-
26 050834 Sadiq Paper Independent -do- -do-
27 050819 P.T.V Mixed -do- -do-
28050804 P.C.O Mixed -do- -do-
29Punjab Steel Independent -do- -do-
30F-6 Butcheki
132-KV
ButchekiMixed -do- -do- Karachi Lahore Motorway Project
31
Nishter Road Waris Shah Sheikhpura
Industrial
Nishter Road GEPCO
Construction
0900-1500 for Area Planning/Bifurcation of
11KV Baig Pur Feeder
32
Waris Shah -do- -do- Waris Shah -do- -do- -do-
33
Hardev -do- -do- Hardev -do- -do- -do-
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Shabir Town Niaz Baig Johar TownShair Imam Colony,
Shabir Town
ELR Construction
Division0730 Hrs
2 Sher Shah-2 Ali Raza AbadPunjab
UniversityRaiwind Road
ELR Construction
Division To
3 Abu Dhabi Palace Ali Raza AbadPunjab
University
Abu Zehbi, Shabir
Imam Colony
ELR Construction
Division 1330 Hrs
4 Eden Palace Ali Raza AbadPunjab
UniversityEden Palace
ELR Construction
Division
5Mohallam Kasur (Rural) Kasur Old Rural/City Area
Okara Construction
6Satluj Kasur (Rural) Kasur Old Rural/City Area
Okara Construction
7Ganda Singh Kasur (Rural) Kasur Old Rural/City Area
Okara Construction
Ruchna Town
132-KV
Shamkay
Punjab Judicial Complex New
Campus Kala Shah Kaku
Ravi Rayan
D/WPunjab University Employee
Housing Scheme
SCHEDULE OF APPROVED SHUT DOWNS DATED 16-08-2016 O&M DISTT (South):
S #Feeder
CodeTIME REASON
07:00
To
13:30
11 KV Mohalam Feeder
Page 35
8 Industrial Multan Road Saidpur Multan Road
9 Gulshab Abbas Multan Road Saidpur Multan Road
10 Canal Park Niaz Baig Johar Town Canal View
11Ganda Singh
Wala Rural Kasur
132 KVA
Kasur Old
Village Ganda Singh
WalaDiposit Work
12 Maan -do- -do- Village Maan Diposit Work
13 Bahadur Pura Bahadur Pura -do- Village Bahadar Pura Diposit Work
14 Atheel Pur -do- -do- Village Atheel Pur Diposit Work
15Hospital Civil Area
-do- Village Kot Fateh
Bazar KhanDiposit Work
16 3809 Nabi Pura Salamat Pura Fateh Garh Nabipura North
17 3829 Gulshan Park Salamat Pura Fateh Garh Gulshan Park North
18 3804 Ghee Mill Salamat Pura Fateh Garh Lalpul North
19 - PRSS-2 Salamat Pura Fateh Garh Independent North
20 - PRSS-3 Salamat Pura Fateh Garh Independent North
21-
Haider Karar Salamat Pura Fateh GarhJahangir Road, Millat
ColyNorth
22 Kot Asad Ullah Sarfraz Nagar Manga Kot Asad Ullah South
23 Zahoor Sarfraz Nagar -do- Multan Road South
24 Umar Jabran Sarfraz Nagar -do- Independent South
25 T.U Plastic Model -do- -do- South
26 Yousaf Chakwal Sarfraz Nagar -do-Multan Road
South
27 Industrial-II Sarfraz Nagar -do-
-do-
South
28 Lahore Polly Sarfraz Nagar -do- Independent South
29 Rakh Mudhkay Sarfraz Nagar -do- Sarfraz Nagar South
30 Express Guldast Town New GhaziB Block, C Block & E
Block South
31 Askari-10 Guldast Town New GhaziA Block, D Block E
BlockSouth
32 Mobilink Township LEFO Independent South
07:30
To
13:30
D/W of Lahore Orange Train from
Multan Chungi to Canal View
Station
07:30
To
13:30
D/W Ideal Gardens Housing
Scheme Kasur
D/W for MASCO Spining Mills
Dian Nath Bhai Pheru
05:00
To
11:00
AHD (Works)-IV Army Officers
Housing Complex Sector- F Askari-
X Lahore.
07:30
To
14:30
Road wieding of Kacha Jail Road
Lahore.
07:30
To
13:30
11 KV Ram Ghar Perposed
Feeder
07:30
To
13:30
Page 36
33 Army Industry -do- LEFO -do- South
34 PECO-I Liqat Abad LEFO -do- South
35 Industrail-I Township LEFO Domainted South
36 Ghosia Ismail Nagar LEFO -do- South
37 Itehad Colony Ismail Nagar LEFO Domastic South
38 Treet Liqat Abad LEFO Independent South
39 I.T Tower Liqat Abad LEFO Independent South
40 Tariq Liqat Abad O.K.L.P Domainted South
41 Peco-II Liqat Abad O.K.L.P Domainted South
42 New Mandi Township O.K.L.P Domastic South
43 Liaqat Abad Liqat Abad O.K.L.P Domastic South
44 Bahar Colony Bahar Colony O.K.L.P Domastic South
45 Lasani Kahna Kahna
Ferozpur Road,
Jhulkey, Sharif Park
etc.
KLP (OP)
7:30:
To
13:30
Re-Conducting near Central Park
Housing Scheme & installation of
One No. Capacitor.
46 K-Block Niaz Baig Johar Town K-Block
FerozPur Road
Construction
S/Divn
07:30
To
14:30
Road wieding of Kacha Jail Road
Lahore.
7:30:
To
13:30
Shifting of HT/LT line &T/F Orange
Line Metro Train Project from Ali
Town Niaz Baig Lahore
Page 37
47 Raiwind Road Niaz Baig Johar Town Raiwind Road
FerozPur Road
Construction
S/Divn
48 Canal Park Niaz Baig Johar Town Canal Park
FerozPur Road
Construction
S/Divn
49 Judicail Colony Niaz Baig Johar Town Judicail Colony
FerozPur Road
Construction
S/Divn
50 Defence-9 Defence West Defence DefenceELR Construction
Division
51 Defence-1 Defence West Defence Defence-1ELR Construction
Division
52 Defence-2 Defence West Defence Defence-2ELR Construction
Division
53 Defence-4 Defence East Defence Defence-4ELR Construction
Division
54 Defence-7 Defence East Defence Defence-7ELR Construction
Division
55 Nishat Colony Badian Road Defence Badian Road ELR Construction
Division
56 Sui Gas Badian Road Defence Sui Gas H/ SchemeELR Construction
Division
57 Lums Badian Road Defence IndependentELR Construction
Division
58 Cant View Badian Road Defence Cantt viewELR Construction
Division
59 Lidhar Badian Road Defence Village LidharELR Construction
Division
7:30:
To
13:30
Shifting of HT/LT line &T/F Orange
Line Metro Train Project from Ali
Town Niaz Baig Lahore
07:30
To
13:30
D/W DHA Hally Tower.
Page 38
60Punjab Small
IndustriesBadian Road Defence
Punjab Small
Industries
ELR Construction
Division
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 New Chung Chung Chung Mohlanwal South
2 Rangeelpur Chung Chung Main Multan Road South
3 41107 Raiwind Road Manga Manga Multan Road North
4 41119 PFC Model -do- Independent North
5 41115 Kohenoor -do- -do- -do- North
6 41125 Indus Home -do- -do- -do- North
7 41123 Asia Spinning -do- -do- -do- North
8 41122 A.L Textile -do- -do- -do- North
9 41112 Industrial-I Manga -do- Multan Road North
10 41105 Manga Town -do- -do- -do- North
11 41120 Ali Haq Model -do- Independent North
12 41124 Layear Model -do- Independent North
13 41116 Chiragh Manga -do- Independent North
14 41109 Servis Manga -do- Independent North
15 Ravi Model Old Raiwind Independent Model Divn
16 Ruby Model Old Raiwind Independent Model Divn
17 May Fair Raiwind Old Raiwind Independent Model Divn
18 1501 Bhai Pheru-1 Phool Nagar Phool Nagar Mix. Ind ELR
19 1528 Bhai Pheru-2 Phool Nagar Phool Nagar Mix. Ind ELR
20 1505 Manga2 Sarfarz Nagar Phool Nagar Mix. Ind ELR
21 1517 Bilal Textile Model Division Phool Nagar Ind. ELR
07:00
To
13:30
A/P Industrial-I from Chung grid
07:30
To
13:30
07:00
To
13:30
M/S United Snakes PVT Ltd &
Rupali Foods PVT Ltd.
07:30
To
13:30
D/W Shifting of HT Lines at the
Mumtaz Masjid Daras Road
Raiwind
07:30
To
13:30
M/S BBJ Pipe Industries
D/W DHA Hally Tower.
S #Feeder
CodeTIME REASON
SCHEDULE OF APPROVED SHUT DOWNS DATED 17-08-2016 O&M DISTT (South):
Page 39
22 1501 Bhai Pheru-1 Phool Nagar Phool Nagar Mix. Ind ELR
23 1528 Bhai Pheru-2 Phool Nagar Phool Nagar Mix. Ind ELR
24 1505 Manga2 Sarfarz Nagar Phool Nagar Mix. Ind ELR
25 1517 Bilal Textile Model Division Phool Nagar Ind. ELR
26 Tubewell Raiwind Raiwind OldDina Asal, Usman
LadhekeyTLC Division GSC
27 Rao Khanwala Raiwind Raiwind OldKot Hakin Ali, Sattoki,
OraraTLC Division GSC
28 Jinah Raiwind Raiwind Old Jinnah Abad TLC Division GSC
29 Raja Jhang Raja Jhang Raiwind Old
Raja Jhang Town,
Matta, Bhamba, Kot
Metab
TLC Division GSC
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Ham Aziz Raiwind Raiwind Old Ham Aziz South
2
Din Textile -do- Raiwind Old Din Textile
South
3 Eastern -I -do- Raiwind Old Eastern -I South
4 Industrial -do- Raiwind New Industrial South
5 Ehsan Cotton -do- Raiwind New Ehsan Cotton South
6 Manga Road Model Raiwind New Manga Road South
7 Sunder Road Model Raiwind New Sunder Road South
8 Eastern Leather Model Raiwind New Eastern Leather South
9 Sharif Model Chak-65 Sharif South
10
Tritax Model
132 KVA
Phool Nagar
Tritax
Diposit Work
11 Shah Pur -do- -do- Shah Pur Diposit Work
07:30
To
13:30
M/S BBJ Pipe Industries
07:30
To
16:30
For concreting of Terminal Pole
SPG founations under 11 KV
Feeders (for Operating machine)
07:30
To
13:30
D/W Shabbir Paper & Bord Mills
Phool Nagar
07:30
To
13:30
D/W of Umer Spinning Mills
Manga Raiwind Road.
SCHEDULE OF APPROVED SHUT DOWNS DATED 18-08-2016 O&M DISTT (South):
S #Feeder
CodeTIME REASON
Page 40
12 Dynamic -do- -do- Dynamic Diposit Work
13Novelty -do-
-do-
Union Paper MillsDiposit Work
14 Pattoki Jumber -do- Village Khankey Noor Diposit Work
15 Jumber -do- -do- Village Jumber Diposit Work
16Gulshan Gulistan -do-
-do-
Shahbir Paper MillDiposit Work
17 Naiz Baig Bhai Pheru -do- Village Sahran Diposit Work
18 Shama Park Bata Moman Park Mix North
19 Tuls Pura Bata Moman Park Mix North
20 Muslima Abad Bata Fateh Ghar Canal Road North
21Manawan Bata
BataGT Road
North
22 Behni Road Wahga Bata GT Road North
23 Akber Colony Bata Bata GT Road North
24 Iqbal Furnace Bata Bata GT Road North
25Data Park Bata
Bata GT RoadNorth
26 19424 Javed Farnace Shalamar Shalamar-I Independent North
27 100312 Industrail-6 Shalamar Daroghwala Daroghwala North
28 110601Moman Pura
RoadWahga Moman Pura Moman Pura North
29 110606 Shama Park Bata Pur Moman PuraData Park & Shma
ParkNorth
30 Malik Steel Batapur Shalamar-II Independent North
31 S.J Steel Bilal Colony Shalamar-II Independent North
32 Rafique Steel -do- -do- Independent North
33 Zatun Colony -do- -do- Independent North
34 Pakistna Mint -do- Shalamar-I Independent North
35 Soharwardi -do- Shalamar-I Independent North
36 Javaid Furnace -do- -do- Independent North
37 Industrail Shalamar -do- Independent North
38 Data Floor Mill Bilal Colony -do- Independent North
11 KV Ali Hajvery Feeder
07:30
To
13:30
Shifting of HT/LT Line for Orange
Line Train
08:00
To
13:30
11 KV Industrail-6 Feeder
08:00
To
13:30
Shifiting of HT/LT Lines & T/F for
orange line Dera Gujjran Station
No-1 City Side
07:30
To
13:30
07:30
To
13:30
D/W Shabbir Paper & Bord Mills
Phool Nagar
Page 41
39 Model Steel -do- Shalamar-I Independent North
40 Bilal Colony -do- Shalamar-IIBilal Colony,
DaroghawalaNorth
41 G.T Road -do- -do- Mint Stop North
42 Chiragh Model Division Manga Independent South
43 Kohinoor -do- -do- Independent South
44 Indus Home -do- -do- Independent South
45 Service Manga -do- Manga Raiwind Road South
46 P.F.C Model Division -do- Independent South
47 Raiwind Road Manga -do- Manga Raiwind Road South
48 New Mandi Chunain Rural Pattoki Rural Area Diposit Work
07:30
To
13:30
D/W of Judicail Complex Pattoki
49 15310 RCS U.E.T P.W.R Ghoray Shah Road North
50 15303 G.T Road-I -do- -do- Gujjar Pura North
51 - Sabzi Mandi Angori Bagh Shalamar-II North
52 - Dars Road Angoori Bagh PWR G.T Road North
53 89303 Baghbanpura Baghbanpura Shalamar-II Muslim Park North
54 89316 Shalimar Chowk Baghbanpura Shalamar-II Madina Colony North
55 15317 Nicholson Road Davis Road P.W.R Nicholson Road North
56 Express Guldast Town New GhaziB Block, C Block & E
Block South
57 Askari-10 Guldast Town New GhaziA Block, D Block E
BlockSouth
58 Nicholosan Road Davis Road PWR Allama Iqbal Road ELR
59 Empress Road Davis Road Sunny View Empress Road ELR
60 Mcleod Road Royal Park Sunny View Mcleod Road ELR
61 Royal Park Royal Park Mcleod Road Mcleod Road ELR
07:30
To
13:30
D/W Orange Line Project
05:00
To
11:00
AHD (Works)-IV Army Officers
Housing Complex Sector- F Askari-
X Lahore.
07:30
To
13:30
Orange Line Metro Train Project
07:30
To
13:30
Shifting of HT/LT Line for Orange
Line Train
07:30
To
13:30
D/W M/S Dalda Foods Manga
Raiwind Road
Page 42
62 Allama Iqbal Saidpur Sabza Zar Allama Iqbal ELR
63 P Block Saidpur Sabza Zar P Block ELR
64 Nisar Raiwind Raiwind Old Independent TLC
65 Eastern Raiwind Raiwind Old Independent TLC
66 Kalu Khaira Raiwind Raiwind Old Independent TLC
67 Suraj Raiwind Raiwind Old Independent TLC
68 Rubi Raiwind Raiwind Old Independent TLC
69 Lahore Road Raiwind Raiwind Old Independent TLC
70 M.I Raiwind Raiwind Old Independent TLC
71 Tubewell Raiwind Raiwind OldDina Asal, Usman
LadhekeyTLC
72 Rao Khanwala Raiwind Raiwind OldKot Hakin Ali, Sattoki,
OraraTLC
73 Jinah Raiwind Raiwind Old Jinnah Abad TLC
74 Raja Jhang Raja Jhang Raiwind Old
Raja Jhang Town,
Matta, Bhamba, Kot
Metab
TLC
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Nisar Raiwind Raiwind Old Independent TLC
2 Eastern Raiwind Raiwind Old Independent TLC
3 Kalu Khaira Raiwind Raiwind Old Independent TLC
07:30
To
16:00
Stringing of ACSR Rail Conductor
from Loc No. 17 to 21.
07:30
To
13:30
D/W of P Block Sabza Zar Lahore
07:30
To
16:00
Stringing of ACSR Rail Conductor
from Loc No. 17 to 21.
07:00
To
17:00
For concreting of Terminal Pole
SPG founations under 11 KV
Feeders (for Operating machine)
SCHEDULE OF APPROVED SHUT DOWNS DATED 19-08-2016 O&M DISTT (South):
S #Feeder
CodeTIME REASON
Page 43
4 Suraj Raiwind Raiwind Old Independent TLC
5 Rubi Raiwind Raiwind Old Independent TLC
6 Lahore Road Raiwind Raiwind Old Independent TLC
7 M.I Raiwind Raiwind Old Independent TLC
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Nisar Raiwind Raiwind Old Independent TLC
2 Eastern Raiwind Raiwind Old Independent TLC
3 Kalu Khaira Raiwind Raiwind Old Independent TLC
4 Suraj Raiwind Raiwind Old Independent TLC
5 Rubi Raiwind Raiwind Old Independent TLC
6 Lahore Road Raiwind Raiwind Old Independent TLC
7 M.I Raiwind Raiwind Old Independent TLC
8 Defence Road Chung Jubli Town Defence Road South
9 US Apparal -do- Sukh Chain Independent South
10 US Denim -do- -do- Independent South
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
07:30
To
13:30
D/W for in the name of M/S Shms
Bin Ikram Industries (PVT) Ltd
under tariff B-III At 3-KM Defence
Road Lahore
07:30
To
16:00
Stringing of ACSR Rail Conductor
from Loc No. 17 to 21.
SCHEDULE OF APPROVED SHUT DOWNS DATED 21-08-2016 O&M DISTT (South):
S #Feeder
CodeTIME
Feeder
CodeTIME REASON
07:30
To
16:00
Stringing of ACSR Rail Conductor
from Loc No. 17 to 21.
REASON
SCHEDULE OF APPROVED SHUT DOWNS DATED 20-08-2016 O&M DISTT (South):
S #
Page 44
1 Ismail Nagar Ismail Nagar LEFO Kacha Jail Road South Construction
07:30
To
13:30
D/W Punjab Small Ind Estate
Kacha Jail Road
2 Anarkli Anarkli Mcleod Road Anarkli, Nila Gumbad
3 Bank Square Anarkli Mcleod Road Hall Road
4 Lady Achsion Anarkli Mcleod Road Niper Road
5 Moyo Hospital Anarkli Mcleod Road Independent
6 High Court Anarkli Mcleod Road Independent
7 C.T.O Anarkli CTO Qartaba AG office / High Court
8 Mozang Adda Anarkli Rewaz Garden Mozang
9 Industrial-2 Sarfraz Nagar Manga Mandi Independent ELR
10 Yousaf Chakwal Sarfraz Nagar Manga Mandi Independent ELR
11 Lahore Poly Sarfraz Nagar Manga Mandi Independent ELR
12 Zahoor Sarfraz Nagar Manga Mandi Mix ELR
13 Rakj Mudkey Sarfraz Nagar Manga Mandi Mix ELR
14 Kot Asad ullah Sarfraz Nagar Manga Mandi Mix ELR
15 Lahore Road Jia Bagga Raiwind Lahore Road ELR
16 Bhatti Cotton -do- -do- Bhatti Cotton ELR
17 Haier -do- -do- Haier ELR
18 Ravi Textile -do- -do- Ravi Textile ELR
19 Ruby -do- -do- Ruby ELR
20 Moiz Textile Model Industrial -do- Moiz Textile ELR
21 Nisar Spinning -do- -do- Nisar Spinning ELR
22 Din Textile -do- -do- Din Textile ELR
23 Bio Suraj -do- -do- Bio Suraj ELR
24 May Fair -do- -do- May Fair ELR
25 Ali Raza Abad-II Ali Raza Abad Wapda Town Defence Road South Construction
07:30
To
13:30
M/S Din Textile Mill.
07:30
To
13:30
Shifting of HT/LT line &T/Fs at
Alternate route to Raiwind Road
Defence Road Lahore.
06:00
To
10:00
Orange Line Metro Train Project
07:30
To
13:30
D/W Waqas Rafique & Sardar Pur
ELR Construction
Page 45
26 Comsat Ali Raza Abad Wapda Town Independent South Construction
27 Kalas Ali Raza Abad Wapda Town Independent South Construction
28 Canal Road Ali Raza Abad AWT Raiwind Road South Construction
29 Coca Cola Ali Raza Abad Wapda Town Independent South Construction
30 Treet Liaqat Abad LEFO Independent South Construction
31 Ghouisa Ismail Nagar LEFO Ghouisa South Construction
32 Industrail-I Township LEFO Kacha Jail Road South Construction
33 Irrigation Hamza Town LEFO Irrigation South Construction
34 Chandrai Road Hamza Town LEFO Chandrai Road South Construction
35 Ismail Nagar Ismail Nagar LEFO Ismail Nagar South Construction
36 Zia Hamza Town LEFO Zia South Construction
37 Nisar Raiwind Raiwind Old Independent TLC
38 Eastern Raiwind Raiwind Old Independent TLC
39 Kalu Khaira Raiwind Raiwind Old Independent TLC
40 Suraj Raiwind Raiwind Old Independent TLC
41 Rubi Raiwind Raiwind Old Independent TLC
42 Lahore Road Raiwind Raiwind Old Independent TLC
43 M.I Raiwind Raiwind Old Independent TLC
S Feeder 11 KV SUB 132 KV AREA CONST. TIME REASON
# Code FEEDER DIVISION G/STATION EFFECTED DIVISION
07:30
To
13:30
Shifting of HT/LT line &T/Fs at
Alternate route to Raiwind Road
Defence Road Lahore.
07:30
To
13:30
D/W of 11KV independent Feeder
for Punjab Small Estate No.1
Kacha Jail Road.
07:30
To
16:00
Stringing of ACSR Rail Conductor
from Loc No. 17 to 21.
SCHEDULE OF APPROVED SHUT DOWNS DATED 21-08-2016 (SUNDAY) O&M DISTT:(North)
Page 46
1 91202 Qaim Pur Atta Abad AyeshaQaim Pur,Sahoke
MallianSKP 0900-1300 for D/W M/S DHQ Hospital SKP.
2 91212 Rehmat Colony -do- -do-Rehmat Colony,Bati
Chowk SKP-do- -do- -do-
3 91211 Miraj Park SKP Fort -do-Miraj Park ,Jandiala
Road-do- -do- -do-
4 91213 Sargodha Road SKP City -do-Sargodha Road, Habib
Colony-do- -do- -do-
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
195001 Shah Fareed
Said Pur Sabzazar Shah Fareed
ELR Construction
Division
295012 A-Block
Said Pur
Sabzazar A-Block
ELR Construction
Division
3 95011 Jafria Colony Chuburji Park Sabzazar Jafria ColonyELR Construction
Division
4 95006 Al Mumtaz Ittehad Colony Sabzazar Al MumtazELR Construction
Division
5 18412 Nawan Kot Dholanwal Said Pur Nawan KotELR Construction
Division
618403 Chuburji Park
Chuburji Park Said Pur Chuburji Park
ELR Construction
Division
718419 Sodiwal
Nawan Kot Said Pur Sodiwal
ELR Construction
Division
818407 Bastami Road
Ittehad Colony Said Pur Bastami Road
ELR Construction
Division
9
18416 Studio
Ittehad Colony Said Pur
Studio
ELR Construction
Division
1042913 Nonariyan
Nawan Kot Gulshan Ravi
Nonariyan
ELR Construction
Division
1142906 Rustam Park
Nawan Kot Gulshan Ravi Rustam Park
ELR Construction
Division
1242918 Jinnah Colony
Ittehad Colony Gulshan Ravi Jinnah Colony
ELR Construction
Division
1342917 Multan Road
Ittehad Colony Gulshan Ravi Multan Road
ELR Construction
Division
D/W Orange line Metro Train
Project Lahore
07:00
To
01:00
TIME REASON
SCHEDULE OF APPROVED SHUT DOWNS DATED 22-08-2016 O&M DISTT (South):
S #Feeder
Code
Page 47
1418422 Nargis Feeder
Cannal Road Said Pur Nargis Feeder
ELR Construction
Division
15Tritax Model
132 KVA
Phool Nagar TritaxDiposit Work
16 Shah Pur -do- -do- Shah Pur Diposit Work
17 Dynamic -do- -do- Dynamic Diposit Work
18
Novelty -do-
-do-
Union Paper Mills
Diposit Work
19 Pattoki Jumber -do- Village Khankey Noor Diposit Work
20Jumber -do-
-do-Village Jumber
Diposit Work
21Gulshan Gulistan -do-
-do-
Shahbir Paper MillDiposit Work
22 Naiz Baig Bhai Pheru -do- Village Sahran Diposit Work
25 MI Textile Gea Bagga Rawind-I Independent
26 Novina Chung Sukh Chain Independent South
27 Labour Colony Ali Razabad Sukh Chain Independent South
28 Sukh Chain Chung Sukh Chain Independent South
29 Defence Road -do- Jubli Town Mix Dominated South
30 Kot Sheikhan Ali Razabad Chung Mix Dominated South
31 Malik Steel Batapur Shalamar-II Independent North
32S.J Steel Bilal Colony Shalamar-II Independent
North
33Rafique Steel -do- -do- -do-
North
34 Zatun Colony -do- -do- Mixed North
35 Pakistna Mint -do- Shalamar-I Mixed North
36 Soharwardi -do- Shalamar-I Mixed North
37 Javaid Furnace -do- -do- Mixed North
38 Industrail Shalamar -do- Independent North
39 Data Floor Mill Bilal Colony -do- Independent North
40 Model Steel -do- Shalamar-I Mixed North
41 Bilal Colony -do- Shalamar-II Mixed North
42 G.T Road -do- -do- Mixed North
D/W Orange line Metro Train
Project Lahore
07:00
To
01:00
Tubewell Gea Bagga Rawind-I Sui Asal Road07:30
To
13:30
D/W for M/S Royal Packages
(PVT) LTD Rawind Asal Road
Lahore.
23
24 Independent
07:30
To
13:30
D/W Shabbir Paper & Bord Mills
Phool Nagar
07:30
To
13:30
External elerctrification TIP Co-
Operative Housing Scheme
07:30
To
13:30
Shifting of HT/LT Line for Orange
Line Train
Spell Gea Bagga Rawind-I
Page 48
43 110602 Gulbahar Town Bilal Colony Moman Pura Gulbahar Town North
44 110603 Haji Park Wahga Moman Pura Haji Park North
45 19436 Model Steel Bilal Colony Shalamar-I Independent North
46 100315 Prime Steel Bilal Colony Daroghwala Independent North
47 100316 A.R Steel Bilal Colony Daroghwala Independent North
48 110606 Shama Park Bata Pur Moman Pura Data Park & Shma Park North
49 Gulbahar Town Bilal Colony Moman Pura Gulbahar Town
50 Haji Park Wahga Moman Pura Haji Park
51 3814 Eid Gah Amir Town Fateh Garh Fayaz Coly, Bilal Park North
52 3801 Bund Road Fateh Garh Fateh GarhCanal Park Salamat
puraNorth
53 3820 Canal Bank Amir Town Fateh GarhAmir Town Harbance
puraNorth
54 3802 Fateh Garh Fateh Garh Fateh GarhFateh Garh Chaman
ParkNorth
553832 Amir Town Amir Town Fateh Garh Amir Town
North
56 GSC House Liberty Rehman Park - XEN (OP) Gulberg
57 Pepsi Cola Liberty Rehman Park - XEN (OP) Gulberg
11 KV Fateh Ghar and Hafeez
Pura Feeders
07:30
to
13:30
Energization of new feeder “Ali
Trade Center”
08:00
To
13:30
Shifiting of HT/LT Lines & T/F
for orange line Salamat Pura
Station No. 3 City
Side
Shifiting of HT/LT Lines & T/F
for orange line Dera Gujjran
Station No-1 River Side
08:00
To
13:30
Shifiting of HT/LT Lines & T/F
for orange line Dera Gujjran
Station No-1 River Side
08:00
To
13:30
D.M Construction
North
08:00
To
13:00
Page 49
58 M.M Alam Road Liberty Rehman Park - XEN (OP) Gulberg
59 Sunny Flour Mill Liberty Rehman Park - XEN (OP) Gulberg
60 Makkah Colony Liberty Rehman Park - XEN (OP) Gulberg
61 Land Mark Gulberg Rehman Park - XEN (OP) Gulberg
62 City Tower Gulberg Rehman Park - XEN (OP) Gulberg
63 Mini Market Gulberg Rehman Park - XEN (OP) Gulberg
64 Saddique Trade Gulberg Rehman Park - XEN (OP) Gulberg
65 Cardiac Center GOR Rehman Park - XEN (OP) Gulberg
S Feeder 11 KV SUB 132 KV AREA CONST. TIME REASON
# Code FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Canal Rural Depal Pur Depal Pur Rural Area Okara 0730-1200for 11 KV Piply Pahar (P)
Feeder.
2 Scarp -do- -do- -do- -do- -do- -do-
3 Okara UrbanDepal Pur -do- -do- -do- -do- -do-
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Shabir Town Niaz Baig Johar TownShair Imam Colony,
Shabir Town
ELR Construction
Division
2 Sher Shah-2 Ali Raza AbadPunjab
UniversityRaiwind Road
ELR Construction
Division
3 Abu Dhabi Palace Ali Raza AbadPunjab
University
Abu Zehbi, Shabir
Imam Colony
ELR Construction
Division
07:30
to
13:30
Energization of new feeder “Ali
Trade Center”
SCHEDULE OF APPROVED SHUT DOWNS DATED 22-08-2016 (MONDAY) O&M DISTT:(North)
S #Feeder
Code
SCHEDULE OF APPROVED SHUT DOWNS DATED 23-08-2016 O&M DISTT (South):
0730 Hrs
TIME REASON
D/WPunjab University Employee
Housing Scheme
Page 50
4 Eden Palace Ali Raza AbadPunjab
UniversityEden Palace
ELR Construction
Division
5Mohallam Kasur (Rural) Kasur Old Rural/City Area
Okara Construction
6Satluj Kasur (Rural) Kasur Old Rural/City Area
Okara Construction
7 Ganda Singh Kasur (Rural) Kasur Old Rural/City Area Okara Construction
8 Industrial Multan Road Saidpur Multan Road
9 Gulshab Abbas Multan Road Saidpur Multan Road
10 Canal Park Niaz Baig Johar Town Canal View
11Ganda Singh
Wala Rural Kasur
132 KVA
Kasur Old
Village Ganda Singh
WalaDiposit Work
12
Maan -do-
-do-
Village Maan
Diposit Work
13Bahadur Pura Bahadur Pura
-do-
Village Bahadar PuraDiposit Work
14 Atheel Pur -do- -do- Village Atheel Pur Diposit Work
15Hospital Civil Area
-do- Village Kot Fateh
Bazar KhanDiposit Work
16 3809 Nabi Pura Salamat Pura Fateh Garh Nabipura North
17 3829 Gulshan Park Salamat Pura Fateh Garh Gulshan Park North
183804
Ghee Mill Salamat Pura Fateh Garh Lalpul North
19-
PRSS-2 Salamat Pura Fateh Garh Independent North
20 - PRSS-3 Salamat Pura Fateh Garh Independent North
21-
Haider Karar Salamat Pura Fateh GarhJahangir Road, Millat
ColyNorth
22 Kot Asad Ullah Sarfraz Nagar Manga Kot Asad Ullah South
23 Zahoor Sarfraz Nagar -do- Multan Road South
24 Umar Jabran Sarfraz Nagar -do- Independent South
25 T.U Plastic Model -do- -do- South
26 Yousaf Chakwal Sarfraz Nagar -do- Multan Road South
27 Industrial-II Sarfraz Nagar -do- -do- South
28 Lahore Polly Sarfraz Nagar -do- Independent South
29 Rakh Mudhkay Sarfraz Nagar -do- Sarfraz Nagar South
07:30
To
13:30
11 KV Ram Ghar Perposed
Feeder
07:30
To
13:30
D/W for MASCO Spining Mills
Dian Nath Bhai Pheru
11 KV Mohalam Feeder
07:30
To
13:30
D/W of Lahore Orange Train from
Multan Chungi to Canal View
Station
D/WPunjab University Employee
Housing Scheme
07:00
To
13:30
07:30
To
13:30
D/W Ideal Gardens Housing
Scheme Kasur
Page 51
30 Mobilink Township LEFO Independent South
31 Army Industry -do- LEFO -do- South
32 PECO-I Liqat Abad LEFO -do- South
33 Industrail-I Township LEFO Domainted South
34 Ghosia Ismail Nagar LEFO -do- South
35 Itehad Colony Ismail Nagar LEFO Domastic South
36 Treet Liqat Abad LEFO Independent South
37 I.T Tower Liqat Abad LEFO Independent South
38 Tariq Liqat Abad O.K.L.P Domainted South
39 Peco-II Liqat Abad O.K.L.P Domainted South
40 New Mandi Township O.K.L.P Domastic South
41 Liaqat Abad Liqat Abad O.K.L.P Domastic South
42 Bahar Colony Bahar Colony O.K.L.P Domastic South
43 Defence-1 Defence West Defence Defence-1ELR Construction
Division
44 Defence-2 Defence West Defence Defence-2ELR Construction
Division
45 Defence-4 Defence East Defence Defence-4ELR Construction
Division
46 Defence-7 Defence East Defence Defence-7ELR Construction
Division
47 Nishat Colony Badian Road Defence Badian Road ELR Construction
Division
48 Sui Gas Badian Road Defence Sui Gas H/ SchemeELR Construction
Division
49 Lums Badian Road Defence IndependentELR Construction
Division
50 Cant View Badian Road Defence Cantt viewELR Construction
Division
51 Lidhar Badian Road Defence Village LidharELR Construction
Division
07:30
To
14:30
Road wieding of Kacha Jail Road
Lahore.
07:30
To
13:30
D/W DHA Hally Tower.
Page 52
52Punjab Small
IndustriesBadian Road Defence
Punjab Small
Industries
ELR Construction
Division
53 Lahore Meet Shah Pur Chung Independent North
54 Bakhsh Steel Mill Shah Pur Chung -do- North
55 Industrial-II Shah Pur Chung Multan Road North
56 Angora Model Chung Independent North
57Eden Superior Shah Pur
ChungEden Housing Scheme
North
58 Khan pur Shah Pur Chung Shah Pur North
59Shah Pur Shah Pur
ChungMozammal Town
MohlanwalNorth
60 Mujahidabad Harbance pura Fateh GarhMujahid Abad, Ram
Garh BazarNorth
07:30
To
13:30
11 KV Ram Garh Feeder
61 Shama Park Bata Pur Momanpura Hurbance pura North
62 Tuls Pura -do- Momanpura -do- North
63 Muslim Abad -do- Fateh Garh Canal Road North
64 Bheni Road -do- Batapur G.T.Road North
65 Akbar Colony Wahga -do- -do- North
66 Iqbal Furance Batapur -do- -do- North
67 Data Park Batapur -do- -do- North
68 Ali Hajvari Batapur Momanpura Hurbancepura North
69 K-Block Niaz Baig Johar Town K-Block GC Division
08:00
To
15:00
Metro Train Project (For safety
purpose)
S Feeder 11 KV SUB 132 KV AREA CONST. TIME REASON
# Code FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Nishter Road Waris ShahSheikhpura
IndustrialNishter Road
GEPCO
Construction0900-1500
for Area Planning/Bifurcation of
11KV Baig Pur Feeder
2 Waris Shah -do- -do- Waris Shah -do- -do- -do-
3 Hardev -do- -do- Hardev -do- -do- -do-
4 Jaranwala Road Faiz Pur Rustam Jaranwala Road North 8001300for 11 KV Tube well Feeder
emanating from Rustam Grid.
5 Bhattian Wala -do- -do- Mix -do- -do- -do-
6 Tube Well -do- -do- Mix -do- -do- -do-
7 Rehman Garden -do- -do- Independent -do- -do- -do-
07:30
To
13:30
11KV Ali Hajvari Feeder
07:30
To
13:30
D/W DHA Hally Tower.
SCHEDULE OF APPROVED SHUT DOWNS DATED 23-08-2016 (TUESDAY) O&M DISTT:(North)
07:30
To
13:30
D/W Raziq International Multan
Road Lahore
Page 53
8Anees Qureeshi
Printing Press-do- -do- Independent -do- -do- -do-
9New Kot Abdul
Malik Kot Abdul Malik -do- Kot Abdul Malik -do- -do- -do-
10 Nizam Pura -do- -do- Nizam Pura -do- -do- -do-
11 KSF Plastic Faiz Pur -do- Independent -do- -do- -do-
12 Sharqpur Khurd Kot Abdul Malik -do- Sharqpur Khurd -do- -do- -do-
13 Zafar Abad132-KV
AYESHAMixed SKP 0900-1500
14 075318 CH. Textile Independent -do- -do-
15 075317 Ghani Glass Independent -do- -do-
16 075319 C.A Textile Independent -do- -do-
17 075301 C.K.M Independent -do- -do-
18 075322 A.A Paper Independent -do- -do-
19 075311 N.T.M Independent -do- -do-
20 075309 Rupali Independent -do- -do-
21 075305 Qadria Board Independent -do- -do-
22 91207 Zafar Abad Mixed -do- -do-
23 91208 New Industrial132 KV Atta
AbadMixed -do- -do-
24 019715 NCM-2 Independent -do- -do-
25 019732 Wisal Kamal Independent -do- -do-
26 019726 AMK Independent -do- -do-
27 019728 Industrial-1 Independent -do- -do-
App# 127/E.2 M/S Punjab
Industrial EstateAtta Abad
132 KV ICI
Public
Kharianwala
132-KV SKPM/S Malik & Sons Steel Mills
Jewan Pura Faislabad Road SKP
Page 54
28 019729 Model Spinning Independent -do- -do-
29 019731 Sial Flour Independent -do- -do-
30 019711 NCM-1 Independent -do- -do-
31 019712 Sargodha Jute Independent -do- -do-
32 Ali Nawaz Independent -do- -do-
33 019720 Neelum Cotton Independent -do- -do-
34 019714 Faislabad Road Mixed -do- -do-
35 037202 Lahore Road Mixed -do- -do-
36 037206 Mandian Wala Mixed -do- -do-
37 008416 Siraj Steel Mixed -do- -do-
38 008403 Old Industrial Mixed -do- -do-
39 008420 Rifaqat Steel Independent -do- -do-
40 008411 SF-4 Mixed -do- -do-
41 008425 Zafer Park Mixed -do- -do-
42 008422 L.C.E Independent -do- -do-
43 Sandal Bar Independent -do- -do-
44 008412 SF-5 Mixed -do- -do-
45 008405 O.K Mixed -do- -do-
46 Morekhunda Independent -do- -do-
47 032004 D-4 Independent -do- -do-
48 032003 C-3 Independent -do- -do-
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 41107 Raiwind Road Manga Manga Multan Road North
2 41119 PFC Model -do- Independent North
3 41115 Kohenoor -do- -do- -do- North
4 41125 Indus Home -do- -do- -do- North
5 41123 Asia Spinning -do- -do- -do- North
6 41122 A.L Textile -do- -do- -do- North
7 41112 Industrial-I Manga -do- Multan Road North
8 41105 Manga Town -do- -do- -do- North
9 41120 Ali Haq Model -do- Independent North
10 41124 Layear Model -do- Independent North
SCHEDULE OF APPROVED SHUT DOWNS DATED 24-08-2016 O&M DISTT (South):
S #Feeder
CodeTIME REASON
07:00
To
13:30
M/S United Snakes PVT Ltd &
Rupali Foods PVT Ltd.
Mangtanwala 11KV More Khunda Feeder
Muridke City
220KV KSK LTP 1652070 Abadi Manoo Abad
Ravi Rayan
Kharianwala
132-KV SKPM/S Malik & Sons Steel Mills
Jewan Pura Faislabad Road SKP
Civil Line
Jaranwala Road132-KV
Sharqpur Karachi Lahore Motorway Project
66-KV
Malikpur
Page 55
11 41116 Chiragh Manga -do- Independent North
12 41109 Servis Manga -do- Independent North
13 1501 Bhai Pheru-1 Phool Nagar Phool Nagar Mix. Ind ELR
14 1528 Bhai Pheru-2 Phool Nagar Phool Nagar Mix. Ind ELR
15 1505 Manga2 Sarfarz Nagar Phool Nagar Mix. Ind ELR
16 1517 Bilal Textile Model Division Phool Nagar Ind. ELR
17 16716 C.T.O Mozang Qartaba Mazang ELR Construction
Division
18 Mazang Adda Islamia Park Qartaba Liton RoadELR Construction
Division
19 58310 Lady Echison Anarkli Mecload Road Independent ELR Construction
Division
20 35707 Mazang Adda Anarkli Rewaz Garden Mazang ELR Construction
Division
21 35717 Nela Gumbed Anarkli Rewaz Garden Rewaz GardenELR Construction
Division
22 35702 Old Anarkli Islam Pura Rewaz Garden Old Anarkli ELR Construction
Division
23 1501 Bhai Pheru-1 Phool Nagar Phool Nagar Mix. Ind ELR
24 1528 Bhai Pheru-2 Phool Nagar Phool Nagar Mix. Ind ELR
25 1505 Manga2 Sarfarz Nagar Phool Nagar Mix. Ind ELR
26 1517 Bilal Textile Model Division Phool Nagar Ind. ELR
27 K-Block Niaz Baig Johar Town K-Block
FerozPur Road
Construction
S/Divn
28 Raiwind Road Niaz Baig Johar Town Raiwind Road
FerozPur Road
Construction
S/Divn
29 Canal Park Niaz Baig Johar Town Canal Park
FerozPur Road
Construction
S/Divn
30 Judicail Colony Niaz Baig Johar Town Judicail Colony
FerozPur Road
Construction
S/Divn
07:00
To
13:30
M/S United Snakes PVT Ltd &
Rupali Foods PVT Ltd.
07:30
To
13:30
M/S BBJ Pipe Industries
07:30
To
13:30
D/W SOL for Orange Train Project
Chuburji Chowk Lahore
07:30
To
13:30
M/S BBJ Pipe Industries
7:30:
To
13:30
Shifting of HT/LT line &T/F Orange
Line Metro Train Project from Ali
Town Niaz Baig Lahore
Page 56
31 Defence Road Chung Jubli Defence Road South
32 U.S Apparal-5 Chung Sukh Chain Independent South
33 U.S Apparal Chung Chung Independent South
34 U.S denim Chung Sukh Chain Independent South
35 Harbance Pura Guldasht Town Ghazi -Southern Circle
LESCO
07:30
To
13:30
For Stringing of 132 KV T/Line
Paragon City at 132 KV Grid
Station Ghazi
S Feeder 11 KV SUB 132 KV AREA CONST. TIME REASON
# Code FEEDER DIVISION G/STATION EFFECTED DIVISION
1 019710 Tariq Road Mixed SKP 0900-1500
2 019703 Ahmad Pura Mixed -do- -do-
3 A-ICheckoki
Mallian P/HMixed -do- -do-
4 Nishtar Road132-KV
BaigpurMixed -do- -do-
5 Sargodha Road Mixed -do- -do-
6 Ghazni Road Mixed -do- -do-
7 091205 Habib Colony Mixed -do- -do-
8 037208 Faizabad Mixed -do- -do-
9 037201 City Feeder Mixed -do- -do-
10 037202 Lahore Road Mixed -do- -do-
11 037206 Mandian Wala Mixed -do- -do-
12 037205 Head Lalian Mixed -do- -do-
13 037204 Jalal Pur Mixed -do- -do-
07:30
To
13:30
D/W for in the name of M/S Shms
Bin Ikram Industries (Pvt) Ltd
under Tariff B-III at 3-KM Defence
Road, Lahore.
SCHEDULE OF APPROVED SHUT DOWNS DATED 24-08-2016 (WEDNESDAY) O&M DISTT:(North)
City SKP
132-KV SKP
R/W National Model School SKP
P-2
132-KV
AYESHA
Sharqpur
132-KV
Sharqpur 11-KV Mian Sher Muhammad
Feeder
Jaranwala Road
Page 57
14 041204 Tube well132-KV
Rustam Mixed -do- -do-
15New Muslim
InternationalIndependent -do- -do-
16 U.E.T Independent -do- -do-
17 050801 Islam Steel Mixed -do- -do-
18 050802 Ruchna Town Mixed -do- -do-
19 050808 Ali Park Mixed -do- -do-
20 050824 Sharif Oxygen Independent -do- -do-
21 050826 Sher-E-Bangal Mixed -do- -do-
22 050832 Unipet Independent -do- -do-
23 050831 Diamond Polly Independent -do- -do-
24 050834 Sadiq Paper Independent -do- -do-
25 050819 P.T.V Mixed -do- -do-
26 050804 P.C.O Mixed -do- -do-
27 Punjab Steel Independent -do- -do-
28 Nabipura Mixed -do- -do-
29 Khiary Kala Mixed -do- -do-
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Ham Aziz Raiwind Raiwind Old Ham Aziz South
2 Din Textile -do- Raiwind Old Din Textile South
3 Eastern -I -do- Raiwind Old Eastern -I South
4 Industrial -do- Raiwind New Industrial South
5 Ehsan Cotton -do- Raiwind New Ehsan Cotton South
6 Manga Road Model Raiwind New Manga Road South
7 Sunder Road Model Raiwind New Sunder Road South
8 Eastern Leather Model Raiwind New Eastern Leather South
9 Sharif Model Chak-65 Sharif South
REASON
SCHEDULE OF APPROVED SHUT DOWNS DATED 25-08-2016 O&M DISTT (South):
S #
11-KV Mian Sher Muhammad
Feeder
Jaranwala Road
Ruchna Town
132-KV
Shamkay
Punjab Judicial Complex New
Campus Kala Shah Kaku
Ravi Rayan
Nankana City132-KV
NankanaKarachi Lahore Motorway Project
07:30
To
13:30
D/W of Umer Spinning Mills
Manga Raiwind Road.
TIMEFeeder
Code
Page 58
10 Tritax Model132 KVA
Phool NagarTritax Diposit Work
11 Shah Pur -do- -do- Shah Pur Diposit Work
12 Dynamic -do- -do- Dynamic Diposit Work
13 Novelty -do- -do- Union Paper Mills Diposit Work
14 Pattoki Jumber -do- Village Khankey Noor Diposit Work
15 Jumber -do- -do- Village Jumber Diposit Work
16Gulshan Gulistan -do-
-do-
Shahbir Paper MillDiposit Work
17 Naiz Baig Bhai Pheru -do- Village Sahran Diposit Work
18 Shama Park Bata Moman Park Mix North
19 Tuls Pura Bata Moman Park Mix North
20 Muslima Abad Bata Fateh Ghar Canal Road North
21 Manawan Bata Bata GT Road North
22 Behni Road Wahga Bata GT Road North
23 Akber Colony Bata Bata GT Road North
24 Iqbal Furnace Bata Bata GT Road North
25 Data Park Bata Bata GT Road North
26 110601Moman Pura
RoadWahga Moman Pura Moman Pura North
27 110606 Shama Park Bata Pur Moman PuraData Park & Shma
ParkNorth
28 Malik Steel Batapur Shalamar-II Independent North
29 S.J Steel Bilal Colony Shalamar-II Independent North
30 Rafique Steel -do- -do- Independent North
31 Zatun Colony -do- -do- Independent North
32 Pakistna Mint -do- Shalamar-I Independent North
33 Soharwardi -do- Shalamar-I Independent North
34 Javaid Furnace -do- -do- Independent North
35 Industrail Shalamar -do- Independent North
36 Data Floor Mill Bilal Colony -do- Independent North
37 Model Steel -do- Shalamar-I Independent North
38 Bilal Colony -do- Shalamar-IIBilal Colony,
DaroghawalaNorth
39 G.T Road -do- -do- Mint Stop North
40 Chiragh Model Division Manga Independent South
41 Kohinoor -do- -do- Independent South
07:30
To
13:30
D/W Shabbir Paper & Bord Mills
Phool Nagar
07:30
To
13:30
11 KV Ali Hajvery Feeder
07:30
To
13:30
Shifting of HT/LT Line for Orange
Line Train
07:30
To
13:30
08:00
To
13:30
Shifiting of HT/LT Lines & T/F for
orange line Dera Gujjran Station
No-1 City Side
D/W M/S Dalda Foods Manga
Raiwind Road
Page 59
42 Indus Home -do- -do- Independent South
43 Service Manga -do- Manga Raiwind Road South
44 P.F.C Model Division -do- Independent South
45 Raiwind Road Manga -do- Manga Raiwind Road South
46 15310 RCS U.E.T P.W.R Ghoray Shah Road North
47 15303 G.T Road-I -do- -do- Gujjar Pura North
48 - Sabzi Mandi Angori Bagh Shalamar-II North
49 - Dars Road Angoori Bagh PWR G.T Road North
50 89303 Baghbanpura Baghbanpura Shalamar-II Muslim Park North
51 89316 Shalimar Chowk Baghbanpura Shalamar-II Madina Colony North
52 15317 Nicholson Road Davis Road P.W.R Nicholson Road North
53 Nicholosan Road Davis Road PWR Allama Iqbal Road ELR
54 Empress Road Davis Road Sunny View Empress Road ELR
55 Mcleod Road Royal Park Sunny View Mcleod Road ELR
56 Royal Park Royal Park Mcleod Road Mcleod Road ELR
57 Allama Iqbal Saidpur Sabza Zar Allama Iqbal ELR
58 P Block Saidpur Sabza Zar P Block ELR
59 BagrianEngineering
TownWapda Town Bagrian Mall Road S/Divn
60 I.E.P Town-IIEngineering
TownWapda Town I.E.P Town-II Mall Road S/Divn
61 16716 C.T.O Mozang Qartaba Mazang ELR
62 Mazang Adda Islamia Park Qartaba Liton Road ELR
63 58310 Lady Echison Anarkli Mecload Road Independent ELR
64 35707 Mazang Adda Anarkli Rewaz Garden Mazang ELR
65 35717 Nela Gumbed Anarkli Rewaz Garden Rewaz Garden ELR
66 35702 Old Anarkli Islam Pura Rewaz Garden Old Anarkli ELR
67 3026 New Chung Chung Chung Mohlenwal South
68 3009 Rengeel Pur Chung Chung Main Multan Road South
D/W Orange Line Project
07:30
To
13:30
Orange Line Metro Train Project
07:30
To
13:30
07:30
To
13:30
D/W of P Block Sabza Zar Lahore
07:30
To
13:30
11 KV Bagrian (P) Feeder
07:30
To
13:30
D/W SOL for Orange Train Project
Chuburji Chowk Lahore.
07:30
To
13:30
A/P Industrial-I from Chung Grid
Station
D/W M/S Dalda Foods Manga
Raiwind Road
07:30
To
13:30
Page 60
69 Aamar Town Amer Town Fateh Garh
Aamar Town, Canal
Point, Mughees Town,
Dara Iqbal,Taj
Park,Deri Salamatpura
TLC
70 Canal Bank Amer Town Fateh GarhHarbansepura, Iqbal
Park, Harbance AbadiTLC
71 Muslimabad Taj Bagh Fateh Garh
Hanif Park, Jinnah
Park, Qalandar Pura,
Tufail Colony, Bohray
Basti
TLC
S Feeder 11 KV SUB 132 KV AREA CONST. TIME REASON
# Code FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Canal Rural Depal Pur Depal Pur Rural Area Okara 0730-1200for 11 KV Piply Pahar (P)
Feeder.
2 Scarp -do- -do- -do- -do- -do- -do-
3 Okara UrbanDepal Pur -do- -do- -do- -do- -do-
4 Zafar Abad132-KV
AYESHAMixed SKP 0900-1500
5 075318 CH. Textile Independent -do- -do-
6 075317 Ghani Glass Independent -do- -do-
7 075319 C.A Textile Independent -do- -do-
8 075301 C.K.M Independent -do- -do-
9 075322 A.A Paper Independent -do- -do-
10 075311 N.T.M Independent -do- -do-
11 075309 Rupali Independent -do- -do-
12 075305 Qadria Board Independent -do- -do-
13 91207 Zafar Abad Mixed -do- -do-
14 91208 New Industrial132 KV Atta
AbadMixed -do- -do-
15 Nishat-2 Independent -do- -do-
16 087104 Industrial-3 Independent -do- -do-
17 087111 Amin Independent -do- -do-
18 087117 Ijaz Independent -do- -do-
19 087102 Cresent Mixed -do- -do-
20 087103 NCM-3 Independent -do- -do-
SCHEDULE OF APPROVED SHUT DOWNS DATED 25-08-2016 (THURSDAY) O&M DISTT:(North)
Atta AbadApp# 127/E.2 M/S Punjab
Industrial Estate
132 KV ICI
Public
Kharianwala 132-KV BhikhiM/S King Fiber 7-KM Faislabad
Road Kharianwala SKP
08:00
To
16:00
For stringing of ACSR Rail
Conductor.
Page 61
21 087106 11-KV Zaman Independent -do- -do-
22 087109 Kotla Independent -do- -do-
23 037206 Mandian Wala132-KV
Sharqpur Mixed -do- -do-
24 041204 Tube well132-KV
Rustam Mixed -do- -do-
25 033608 Bhool Chak Mixed -do- -do-
26 033607 Gheryal Mixed -do- -do-
27 033606 Narang More Mixed -do- -do-
28 033602 Rustampur Mixed -do- -do-
29 040101 A-103 Mixed -do- -do-
30 040102 C-103 Mixed -do- -do-
31 0401 Mehmowali Mixed -do- -do-
32 040117 Wali Oil Independent -do- -do-
33 082606 Riaz Textile Independent -do- -do-
34 082608 Maan Mixed -do- -do-
35 082607 Shafi Fahid Independent -do- -do-
36 082612 Gulshan Weaving Independent -do- -do-
37 082605 Gulistan Textile Independent -do- -do-
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Aamar Town Amer Town Fateh GarhAamar Town, Canal
Point, Mughees Town,
Dara Iqbal,Taj
TLC
2 Canal Bank Amer Town Fateh GarhHarbansepura, Iqbal
Park, Harbance AbadiTLC
3 Muslimabad Taj Bagh Fateh Garh
Hanif Park, Jinnah
Park, Qalandar Pura,
Tufail Colony, Bohray
Basti
TLC
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISIONS #
Feeder
CodeTIME REASON
Kharianwala 132-KV BhikhiM/S King Fiber 7-KM Faislabad
Road Kharianwala SKP
Jaranwala Road Karachi Lahore Motorway Project
Narang North132-KV
Nararng
Deposit Work R/W MDK/ Norowal
Road P-III
Warburton
132-KV
Warburton
Area Planning and Bifurcation of
11KV C-103 & 11KV A-103 feeder
emanating from 132KV G/Station
and Load Shifting of load on 11KV
C-103 (EM) Feeder132-KV
Walgon Sohail
SCHEDULE OF APPROVED SHUT DOWNS DATED 26-08-2016 O&M DISTT (South):
S #Feeder
CodeTIME REASON
08:00
To
16:00
For stringing of ACSR Rail
Conductor.
SCHEDULE OF APPROVED SHUT DOWNS DATED 27-08-2016 O&M DISTT (South):
Page 62
1 Aamar Town Amer Town Fateh Garh
Aamar Town, Canal
Point, Mughees Town,
Dara Iqbal,Taj
Park,Deri Salamatpura
TLC
2 Canal Bank Amer Town Fateh GarhHarbansepura, Iqbal
Park, Harbance AbadiTLC
3 Muslimabad Taj Bagh Fateh Garh
Hanif Park, Jinnah
Park, Qalandar Pura,
Tufail Colony, Bohray
Basti
TLC
4 Defence Road Chung Jubli Town Defence Road South
5 US Apparal 5 -do- Sukh Chain Independent South
6 US Apparal -do- Chung Independent South
7 US Denim -do- Sukh Chain Independent South
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Ismail Nagar Ismail Nagar LEFO Kacha Jail Road South Construction
07:30
To
13:30
D/W Punjab Small Ind Estate
Kacha Jail Road
2 Industrial-2 Sarfraz Nagar Manga Mandi Independent ELR
3 Yousaf Chakwal Sarfraz Nagar Manga Mandi Independent ELR
4 Lahore Poly Sarfraz Nagar Manga Mandi Independent ELR
5 Zahoor Sarfraz Nagar Manga Mandi Mix ELR
6 Rakj Mudkey Sarfraz Nagar Manga Mandi Mix ELR
7 Kot Asad ullah Sarfraz Nagar Manga Mandi Mix ELR
8 Ali Raza Abad-II Ali Raza Abad Wapda Town Defence Road South Construction
9 Comsat Ali Raza Abad Wapda Town Independent South Construction
10 Kalas Ali Raza Abad Wapda Town Independent South Construction
07:30
To
13:30
D/W for in the name of M/S
Shams Bin Ikram Industries (PVT)
Ltd under tariff B-III At 3-KM
Defence Road Lahore
08:00
To
16:00
For stringing of ACSR Rail
Conductor.
07:30
To
13:30
Shifting of HT/LT line &T/Fs at
Alternate route to Raiwind Road
Defence Road Lahore.
TIME REASON
07:30
To
13:30
D/W Waqas Rafique & Sardar Pur
SCHEDULE OF APPROVED SHUT DOWNS DATED 28-08-2016 O&M DISTT (South):
S #Feeder
Code
Page 63
11 Canal Road Ali Raza Abad AWT Raiwind Road South Construction
12 Coca Cola Ali Raza Abad Wapda Town Independent South Construction
13 Treet Liaqat Abad LEFO Independent South Construction
14 Ghouisa Ismail Nagar LEFO Ghouisa South Construction
15 Industrail-I Township LEFO Kacha Jail Road South Construction
16 Irrigation Hamza Town LEFO Irrigation South Construction
17 Chandrai Road Hamza Town LEFO Chandrai Road South Construction
18 Ismail Nagar Ismail Nagar LEFO Ismail Nagar South Construction
19 Zia Hamza Town LEFO Zia South Construction
20 Aamar Town Amer Town Fateh Garh
Aamar Town, Canal
Point, Mughees Town,
Dara Iqbal,Taj
Park,Deri Salamatpura
TLC
21 Canal Bank Amer Town Fateh GarhHarbansepura, Iqbal
Park, Harbance AbadiTLC
22 Muslimabad Taj Bagh Fateh Garh
Hanif Park, Jinnah
Park, Qalandar Pura,
Tufail Colony, Bohray
Basti
TLC
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 95001 Shah Fareed Said Pur Sabzazar Shah FareedELR Construction
Division
08:00
To
16:00
For stringing of ACSR Rail
Conductor.
07:30
To
13:30
Shifting of HT/LT line &T/Fs at
Alternate route to Raiwind Road
Defence Road Lahore.
07:30
To
13:30
D/W of 11KV independent Feeder
for Punjab Small Estate No.1
Kacha Jail Road.
SCHEDULE OF APPROVED SHUT DOWNS DATED 29-08-2016 O&M DISTT (South):
07:00
To
01:00
D/W Orange line Metro Train
Project Lahore
S #Feeder
CodeTIME REASON
Page 64
2 95012 A-Block Said Pur Sabzazar A-BlockELR Construction
Division
3 95011 Jafria Colony Chuburji Park Sabzazar Jafria ColonyELR Construction
Division
4 95006 Al Mumtaz Ittehad Colony Sabzazar Al MumtazELR Construction
Division
5 18412 Nawan Kot Dholanwal Said Pur Nawan KotELR Construction
Division
6 18403 Chuburji Park Chuburji Park Said Pur Chuburji ParkELR Construction
Division
7 18419 Sodiwal Nawan Kot Said Pur SodiwalELR Construction
Division
8 18407 Bastami Road Ittehad Colony Said Pur Bastami RoadELR Construction
Division
9 18416 Studio Ittehad Colony Said Pur StudioELR Construction
Division
10 42913 Nonariyan Nawan Kot Gulshan Ravi NonariyanELR Construction
Division
11 42906 Rustam Park Nawan Kot Gulshan Ravi Rustam ParkELR Construction
Division
12 42918 Jinnah Colony Ittehad Colony Gulshan Ravi Jinnah ColonyELR Construction
Division
13 42917 Multan Road Ittehad Colony Gulshan Ravi Multan RoadELR Construction
Division
14 18422 Nargis Feeder Cannal Road Said Pur Nargis FeederELR Construction
Division
15 Tritax Model132 KVA
Phool NagarTritax Diposit Work
16 Shah Pur -do- -do- Shah Pur Diposit Work
17 Dynamic -do- -do- Dynamic Diposit Work
18 Novelty -do- -do- Union Paper Mills Diposit Work
19 Pattoki Jumber -do- Village Khankey Noor Diposit Work
20 Jumber -do- -do- Village Jumber Diposit Work
21 Gulshan Gulistan -do- -do- Shahbir Paper Mill Diposit Work
22 Naiz Baig Bhai Pheru -do- Village Sahran Diposit Work
25 MI Textile Gea Bagga Rawind-I Independent
07:30
To
13:30
D/W Shabbir Paper & Bord Mills
Phool Nagar
07:30
To
13:30
Tubewell Gea Bagga Rawind-ID/W for M/S Royal Packages
(PVT) LTD Rawind Asal Road
Lahore. Spell
07:00
To
01:00
D/W Orange line Metro Train
Project Lahore
Gea Bagga Rawind-I Independent
23
24
Sui Asal Road
Page 65
26 Novina Chung Sukh Chain Independent South
27 Labour Colony Ali Razabad Sukh Chain Independent South
28 Sukh Chain Chung Sukh Chain Independent South
29 Defence Road -do- Jubli Town Mix Dominated South
30 Kot Sheikhan Ali Razabad Chung Mix Dominated South
31 Malik Steel Batapur Shalamar-II Independent North
32
S.J Steel Bilal Colony Shalamar-II Independent
North
33Rafique Steel -do- -do- -do-
North
34 Zatun Colony -do- -do- Mixed North
35 Pakistna Mint -do- Shalamar-I Mixed North
36 Soharwardi -do- Shalamar-I Mixed North
37 Javaid Furnace -do- -do- Mixed North
38 Industrail Shalamar -do- Independent North
39 Data Floor Mill Bilal Colony -do- Independent North
40 Model Steel -do- Shalamar-I Mixed North
41 Bilal Colony -do- Shalamar-II Mixed North
42 G.T Road -do- -do- Mixed North
43 19435 Model Steel Bilal Colony Shalamar-I Independent North
44 110601 Moman Pura Road Wahga Moman Pura Moman Pura North
45 110606 Shama Park Bata Pur Moman Pura Data Park & Shma Park North
46 3814 Eid Gah Amir Town Fateh Garh Fayaz Coly, Bilal Park North
47 3801 Bund Road Fateh Garh Fateh GarhCanal Park Salamat
puraNorth
48 3820 Canal Bank Amir Town Fateh GarhAmir Town Harbance
puraNorth
49 3802 Fateh Garh Fateh Garh Fateh GarhFateh Garh Chaman
ParkNorth
50 3832 Amir Town Amir Town Fateh Garh Amir Town North
51 GSC House Liberty Rehman Park - XEN (OP) Gulberg
52 Pepsi Cola Liberty Rehman Park - XEN (OP) Gulberg
53 M.M Alam Road Liberty Rehman Park - XEN (OP) Gulberg
08:00
To
13:30
11 KV Fateh Ghar and Hafeez
Pura Feeders
07:30
to
13:30
Energization of new feeder “Ali
Trade Center”
08:00
To
13:30
Shifiting of HT/LT Lines & T/F for
orange line Islam Park Station
No.2 City Side
07:30
To
13:30
External elerctrification TIP Co-
Operative Housing Scheme
07:30
To
13:30
Shifting of HT/LT Line for Orange
Line Train
Page 66
54 Sunny Flour Mill Liberty Rehman Park - XEN (OP) Gulberg
55 Makkah Colony Liberty Rehman Park - XEN (OP) Gulberg
56 Land Mark Gulberg Rehman Park - XEN (OP) Gulberg
57 City Tower Gulberg Rehman Park - XEN (OP) Gulberg
58 Mini Market Gulberg Rehman Park - XEN (OP) Gulberg
59 Saddique Trade Gulberg Rehman Park - XEN (OP) Gulberg
60 Cardiac Center GOR Rehman Park - XEN (OP) Gulberg
S Feeder 11 KV SUB 132 KV AREA CONST. TIME REASON
# Code FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Shera Kot Bund Road Bund Road Shera Kot South 0800-1400
for Deposit work for LOLMTP from
shifting of HT/LT line & T/F form J-
block to E-block Sabzazar scheme
near Nala Shera Kot Lahore.
2 Bund Road -do- -do- Bund Road -do- -do- -do-
3 050715 SKP Road132 KV Green
ViewMixed SKP 0900-1500
4 Sareena Independent -do- -do-
5 027014 Al-Fateh Independent -do- -do-
6 000601 Appallo Mixed -do- -do-
7 000617 I.T.I Mixed -do- -do-
8 027003 Javaid Pervaiz Independent -do- -do-
9 027006 Nawaz shehbaz Independent -do- -do-
10 027119 Jhamkey Mixed -do- -do-
11 027116 Ghang Mixed -do- -do-
12 027109 Sohail & Hajra Independent -do- -do-
13 027107 City Mixed -do- -do-
14 027113 Parco Independent -do- -do-
15 027114 Shell Independent -do- -do-
16 027108 Colony Mixed -do- -do-
07:30
to
13:30
Energization of new feeder “Ali
Trade Center”
SCHEDULE OF APPROVED SHUT DOWNS DATED 29-08-2016 (MONDAY) O&M DISTT:(North)
Kot Abdul MalikDeposite Work M/S Bashir Pipe &
Iron PVT Ltd
66 KV Emco
132 KV Atta
Abad
faiz pur 66 KV Emco
Farooqabad
South
132-KV
Farooqabad
Approach Road Farooqabad
(Shifting of Poles & Transformers)
Soucha Souda
Page 67
17 037205 Head Lalian Mixed -do- -do-
18 037204 Jalal Pur Mixed -do- -do-
19New Muslim
InternationalIndependent -do- -do-
20 U.E.T Independent -do- -do-
21 050801 Islam Steel Mixed -do- -do-
22 050802 Ruchna Town Mixed -do- -do-
23 050808 Ali Park Mixed -do- -do-
24 050824 Sharif Oxygen Independent -do- -do-
25 050826 Sher-E-Bangal Mixed -do- -do-
26 050832 Unipet Independent -do- -do-
27 050831 Diamond Polly Independent -do- -do-
28 050834 Sadiq Paper Independent -do- -do-
29 050819 P.T.V Mixed -do- -do-
30 050804 P.C.O Mixed -do- -do-
31 Punjab Steel Independent -do- -do-
32 F-6 Butcheki132-KV
ButchekiMixed -do- -do- Karachi Lahore Motorway Project
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Shabir Town Niaz Baig Johar TownShair Imam Colony,
Shabir Town
ELR Construction
Division
2 Sher Shah-2 Ali Raza AbadPunjab
UniversityRaiwind Road
ELR Construction
Division
3 Abu Dhabi Palace Ali Raza AbadPunjab
University
Abu Zehbi, Shabir
Imam Colony
ELR Construction
Division
4 Eden Palace Ali Raza AbadPunjab
UniversityEden Palace
ELR Construction
Division
5Mohallam Kasur (Rural) Kasur Old Rural/City Area
Okara Construction
6Satluj Kasur (Rural) Kasur Old Rural/City Area
Okara Construction
7 Ganda Singh Kasur (Rural) Kasur Old Rural/City Area Okara Construction
07:00
To
13:30
11 KV Mohalam Feeder
0730 Hrs
Jaranwala Road132-KV
Sharqpur Karachi Lahore Motorway Project
Ruchna Town
132-KV
Shamkay
Punjab Judicial Complex New
Campus Kala Shah Kaku
Ravi Rayan
D/WPunjab University Employee
Housing Scheme
SCHEDULE OF APPROVED SHUT DOWNS DATED 30-08-2016 O&M DISTT (South):
S #Feeder
CodeTIME REASON
Page 68
8 Industrial Multan Road Saidpur Multan Road
9 Gulshab Abbas Multan Road Saidpur Multan Road
10 Canal Park Niaz Baig Johar Town Canal View
11Ganda Singh
WalaRural Kasur
132 KVA
Kasur Old
Village Ganda Singh
WalaDiposit Work
12 Maan -do- -do- Village Maan Diposit Work
13 Bahadur Pura Bahadur Pura -do- Village Bahadar Pura Diposit Work
14
Atheel Pur -do-
-do-
Village Atheel Pur
Diposit Work
15Hospital Civil Area
-do- Village Kot Fateh
Bazar KhanDiposit Work
16 3809 Nabi Pura Salamat Pura Fateh Garh Nabipura North
17 3829 Gulshan Park Salamat Pura Fateh Garh Gulshan Park North
18 3804 Ghee Mill Salamat Pura Fateh Garh Lalpul North
19 - PRSS-2 Salamat Pura Fateh Garh Independent North
20 - PRSS-3 Salamat Pura Fateh Garh Independent North
21-
Haider Karar Salamat Pura Fateh GarhJahangir Road, Millat
ColyNorth
22 Kot Asad Ullah Sarfraz Nagar Manga Kot Asad Ullah South
23 Zahoor Sarfraz Nagar -do- Multan Road South
24 Umar Jabran Sarfraz Nagar -do- Independent South
25 T.U Plastic Model -do- -do- South
26 Yousaf Chakwal Sarfraz Nagar -do- Multan Road South
27 Industrial-II Sarfraz Nagar -do- -do- South
28 Lahore Polly Sarfraz Nagar -do- Independent South
29 Rakh Mudhkay Sarfraz Nagar -do- Sarfraz Nagar South
30 Mobilink Township LEFO Independent South
31 Army Industry -do- LEFO -do- South
32 PECO-I Liqat Abad LEFO -do- South
33 Industrail-I Township LEFO Domainted South
34 Ghosia Ismail Nagar LEFO -do- South
35 Itehad Colony Ismail Nagar LEFO Domastic South
36 Treet Liqat Abad LEFO Independent South
37 I.T Tower Liqat Abad LEFO Independent South
07:30
To
13:30
11 KV Ram Ghar Perposed
Feeder
07:30
To
13:30
D/W for MASCO Spining Mills
Dian Nath Bhai Pheru
07:30
To
13:30
D/W Ideal Gardens Housing
Scheme Kasur
07:30
To
13:30
D/W of Lahore Orange Train from
Multan Chungi to Canal View
Station
07:30
To
14:30
Road wieding of Kacha Jail Road
Lahore.
Page 69
38 Tariq Liqat Abad O.K.L.P Domainted South
39 Peco-II Liqat Abad O.K.L.P Domainted South
40 New Mandi Township O.K.L.P Domastic South
41 Liaqat Abad Liqat Abad O.K.L.P Domastic South
42 Bahar Colony Bahar Colony O.K.L.P Domastic South
43 Defence-1 Defence West Defence Defence-1ELR Construction
Division
44 Defence-2 Defence West Defence Defence-2 ELR Construction
Division
45 Defence-4 Defence East Defence Defence-4ELR Construction
Division
46 Defence-7 Defence East Defence Defence-7ELR Construction
Division
47 Nishat Colony Badian Road Defence Badian Road ELR Construction
Division
48 Sui Gas Badian Road Defence Sui Gas H/ SchemeELR Construction
Division
49 Lums Badian Road Defence IndependentELR Construction
Division
50 Cant View Badian Road Defence Cantt viewELR Construction
Division
51 Lidhar Badian Road Defence Village LidharELR Construction
Division
52Punjab Small
IndustriesBadian Road Defence
Punjab Small
Industries
ELR Construction
Division
53 Mujahidabad Harbance pura Fateh GarhMujahid Abad, Ram
Garh BazarNorth
07:30
To
13:30
11 KV Ram Garh Feeder
54 Shama Park Bata Pur Momanpura Hurbance pura North
55 Tuls Pura -do- Momanpura -do- North
56 Muslim Abad -do- Fateh Garh Canal Road North
07:30
To
14:30
Road wieding of Kacha Jail Road
Lahore.
07:30
To
13:30
D/W DHA Hally Tower.
07:30
To
13:30
11KV Ali Hajvari Feeder
Page 70
57 Bheni Road -do- Batapur G.T.Road North
58 Akbar Colony Wahga -do- -do- North
59 Iqbal Furance Batapur -do- -do- North
60 Data Park Batapur -do- -do- North
61 Ali Hajvari Batapur Momanpura Hurbancepura North
62 Salman Park Madina Colony Chah Miran Salman Park GC Divn
63 Jani Pura Madina Colony Chah Miran Jani Pura GC Divn
S Feeder 11 KV SUB 132 KV AREA CONST. TIME REASON
# Code FEEDER DIVISION G/STATION EFFECTED DIVISION
1 Jaranwala Road Faiz Pur Rustam Jaranwala Road North 8001300for 11 KV Tube well Feeder
emanating from Rustam Grid.
2 Bhattian Wala -do- -do- Mix -do- -do- -do-
3 Tube Well -do- -do- Mix -do- -do- -do-
4 Rehman Garden -do- -do- Independent -do- -do- -do-
5Anees Qureeshi
Printing Press-do- -do- Independent -do- -do- -do-
6New Kot Abdul
Malik Kot Abdul Malik -do- Kot Abdul Malik -do- -do- -do-
7 Nizam Pura -do- -do- Nizam Pura -do- -do- -do-
8 KSF Plastic Faiz Pur -do- Independent -do- -do- -do-
9 Sharqpur Khurd Kot Abdul Malik -do- Sharqpur Khurd -do- -do- -do-
10 Zafar Abad132-KV
AYESHAMixed SKP 0900-1500
11 075318 CH. Textile Independent -do- -do-
12 075317 Ghani Glass Independent -do- -do-
13 075319 C.A Textile Independent -do- -do-
14 075301 C.K.M Independent -do- -do-
15 075322 A.A Paper Independent -do- -do-
16 075311 N.T.M Independent -do- -do-
17 075309 Rupali Independent -do- -do-
8:30
To
14:00
For Safety Purpose
SCHEDULE OF APPROVED SHUT DOWNS DATED 30-08-2016 (TUESDAY) O&M DISTT:(North)
Atta AbadApp# 127/E.2 M/S Punjab
Industrial Estate
132 KV ICI
Public
07:30
To
13:30
11KV Ali Hajvari Feeder
Page 71
18 075305 Qadria Board Independent -do- -do-
19 91207 Zafar Abad Mixed -do- -do-
20 91208 New Industrial132 KV Atta
AbadMixed -do- -do-
21 019715 NCM-2 Independent -do- -do-
22 019732 Wisal Kamal Independent -do- -do-
23 019726 AMK Independent -do- -do-
24 019728 Industrial-1 Independent -do- -do-
25 019729 Model Spinning Independent -do- -do-
26 019731 Sial Flour Independent -do- -do-
27 019711 NCM-1 Independent -do- -do-
28 019712 Sargodha Jute Independent -do- -do-
29 Ali Nawaz Independent -do- -do-
30 019720 Neelum Cotton Independent -do- -do-
31 019714 Faislabad Road Mixed -do- -do-
32 037202 Lahore Road Mixed -do- -do-
33 037206 Mandian Wala Mixed -do- -do-
34 008416 Siraj Steel Mixed -do- -do-
35 008403 Old Industrial Mixed -do- -do-
36 008420 Rifaqat Steel Independent -do- -do-
37 008411 SF-4 Mixed -do- -do-
38 008425 Zafer Park Mixed -do- -do-
39 008422 L.C.E Independent -do- -do-
40 Sandal Bar Independent -do- -do-
41 008412 SF-5 Mixed -do- -do-
42 008405 O.K Mixed -do- -do-
43 Morekhunda Independent -do- -do-
44 032004 D-4 Independent -do- -do-
45 032003 C-3 Independent -do- -do-
11 KV SUB 132 KV AREA CONST.
FEEDER DIVISION G/STATION EFFECTED DIVISION
1 41107 Raiwind Road Manga Manga Multan Road North
2 41119 PFC Model -do- Independent North
3 41115 Kohenoor -do- -do- -do- North
4 41125 Indus Home -do- -do- -do- North
07:00
To
13:30
M/S United Snakes PVT Ltd &
Rupali Foods PVT Ltd.
SCHEDULE OF APPROVED SHUT DOWNS DATED 31-08-2016 O&M DISTT (South):
S #Feeder
CodeTIME REASON
Kharianwala
132-KV SKPM/S Malik & Sons Steel Mills
Jewan Pura Faislabad Road SKP
Civil Line
Jaranwala Road132-KV
Sharqpur Karachi Lahore Motorway Project
Muridke City
220KV KSK LTP 1652070 Abadi Manoo Abad
Ravi Rayan
Mangtanwala66-KV
Malikpur 11KV More Khunda Feeder
Atta AbadApp# 127/E.2 M/S Punjab
Industrial Estate
132 KV ICI
Public
Page 72
5 41123 Asia Spinning -do- -do- -do- North
6 41122 A.L Textile -do- -do- -do- North
7 41112 Industrial-I Manga -do- Multan Road North
8 41105 Manga Town -do- -do- -do- North
9 41120 Ali Haq Model -do- Independent North
10 41124 Layear Model -do- Independent North
11 41116 Chiragh Manga -do- Independent North
12 41109 Servis Manga -do- Independent North
13 Chiragh Model Division Manga Independent South
14 Kohinoor -do- -do- Independent South
15 Indus Home -do- -do- Independent South
16 Service Manga -do- Manga Raiwind Road South
17 P.F.C Model Division -do- Independent South
18 Raiwind Road Manga -do- Manga Raiwind Road South
19 1501 Bhai Pheru-1 Phool Nagar Phool Nagar Mix. Ind ELR
20 1528 Bhai Pheru-2 Phool Nagar Phool Nagar Mix. Ind ELR
21 1505 Manga2 Sarfarz Nagar Phool Nagar Mix. Ind ELR
22 1517 Bilal Textile Model Division Phool Nagar Ind. ELR
23 16716 C.T.O Mozang Qartaba Mazang ELR Construction
Division
24 Mazang Adda Islamia Park Qartaba Liton RoadELR Construction
Division
25 58310 Lady Echison Anarkli Mecload Road Independent ELR Construction
Division
26 35707 Mazang Adda Anarkli Rewaz Garden Mazang ELR Construction
Division
27 35717 Nela Gumbed Anarkli Rewaz Garden Rewaz GardenELR Construction
Division
28 35702 Old Anarkli Islam Pura Rewaz Garden Old Anarkli ELR Construction
Division
29 1501 Bhai Pheru-1 Phool Nagar Phool Nagar Mix. Ind ELR
30 1528 Bhai Pheru-2 Phool Nagar Phool Nagar Mix. Ind ELR
31 1505 Manga2 Sarfarz Nagar Phool Nagar Mix. Ind ELR
32 1517 Bilal Textile Model Division Phool Nagar Ind. ELR
33 K-Block Niaz Baig Johar Town K-Block
FerozPur Road
Construction
S/Divn
Shifting of HT/LT line &T/F Orange
Line Metro Train Project from Ali
Town Niaz Baig Lahore
7:30:
To
13:30
07:00
To
13:30
M/S United Snakes PVT Ltd &
Rupali Foods PVT Ltd.
07:30
To
13:30
D/W M/S Dalda Foods Manga
Raiwind Road
07:30
To
13:30
M/S BBJ Pipe Industries
07:30
To
13:30
D/W SOL for Orange Train Project
Chuburji Chowk Lahore
07:30
To
13:30
M/S BBJ Pipe Industries
Page 73
34 Raiwind Road Niaz Baig Johar Town Raiwind Road
FerozPur Road
Construction
S/Divn
35 Canal Park Niaz Baig Johar Town Canal Park
FerozPur Road
Construction
S/Divn
36 Judicail Colony Niaz Baig Johar Town Judicail ColonyFerozPur Road
Construction
S/Divn37 Mian Feeder Kasur Rural
132 KV Kasur
GridRural Area Okara Construction
38 Maan Feeder Kasur Rural132 KV Kasur
GridRural Area Okara Construction
39 Salman Park Madina Colony Chah Miran Salman Park GC Divn
40 Jani Pura Madina Colony Chah Miran Jani Pura GC Divn
41 Allama Iqbal Said Pur Sabzazar Allama Iqbal ELR
42 P Block Said Pur Sabzazar P Block ELR
43 Royal Park Royal Park McLeod RoadMcLeod Road/Laxmi
ChowkELR
44 Bedian Road -do- -do-
Bedian
Road/Montgumary
Road
ELR
45 Anarkali Anarkali -do- Anarkali/Nila Gumbad ELR
46 Bank Square -do- -do- Hall Road ELR
47 Lady Achsion -do- -do- Niper Road ELR
48 Mayo Hospital -do- -do- Independent ELR
49 WAPDA House Davis Road -do- -do- ELR
50 Aiwan-E-Iqbal -do- -do- -do- ELR
51 High Court Mazang -do- -do- ELR
52 Nisbat Road Gawalmandi -do-Nisbat Road/Gawal
MandiELR
53 Shah Alam Shah Alam -do-Shah Alam
Market/Circular RoadELR
54 Shah Abul Mali Gawalmandi -do-Nisbat
Road/GawalmandiELR
Shifting of HT/LT line &T/F Orange
Line Metro Train Project from Ali
Town Niaz Baig Lahore
07:30
To
13:30
07:30
To
13:30D/W of P Block Sabzazar
07:30
To
13:30
Orange Line Metro Train Project.
8:30
To
14:00
For Safety Purpose
7:30:
To
13:30