Annual Mining Reporting Form - Energy and Earth Resources Page 1 of 6 RtGULATION VICTORIA Schedule 19: Annual Activity and Expenditure Return Mineral Resources (Sustainable Development) (Mineral Industries) Regulations 2013 - Regulation 35 Section 1: Mining licence number and operation name: (One licence only per form) Mining Licence Number Operation Name Licensee Operator (if not licensee) Reporting Period MIN 5004 Hazelwood Mine Hazelwood Power Corporation 2013/2 014 Declaration : To the best of my knowledge and belief the particulars entered on this return and in th e attachments are correct and no figures, information or diagrams required under Regulation 35 of the Mineral Resources (Sustainable Development) (Mineral Industries) Regulations 2013 have been omitted. Signature: Date: Name: (Block letters) Job Tit le : Telephone REPORT 4th September 2014 Stan Kemsley Manager Tech nical Compliance - Mine Section 2: Expenditure (Schedule 19, Section 4 to 9) Wages and Salaries Land Access Compensation - Access to land (Private) - Native Title Compensation Expenditure on equipment, plant or machinery Overheads* (should not exceed 20% of the total expenditure) Expenditure on rehabilitation Expenditure on exploration (as distinct from mining) if any; under the following headings: Office Studies Airborne exploration surveys $123,753 Nil Nil http: // www.energyandresources.vie.gov .au/earth-resources/licensing-and-approvals/minerals/li... 410912014 DEDJTR.1007.001.0189
12
Embed
Schedule 19: Annual Activity and Expenditure Returnhazelwoodinquiry.vic.gov.au/wp-content/uploads/2016/02/Schedule-19... · Schedule 19: Annual Activity and Expenditure Return Mineral
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Annual Mining Reporting Form - Energy and Earth Resources Page 1 of 6
.t!:~VED E.~r·.i:i;· ;~ESOURces RtGULATION VICTORIA
Schedule 19: Annual Activity and Expenditure Return Mineral Resources (Sustainable Development) (Mineral Industries) Regulations 2013 - Regulation 35
Section 1: Mining licence number and operation name: (One licence only
per form)
Mining Licence Number
Operation Name
Licensee
Operator (if not licensee)
Reporting Period
MIN 5004
Hazelwood Mine
Hazelwood Power Corporation
2013/2014
Declaration : To the best of my knowledge and belief the particulars entered on this return and in the attachments are correct and no figures, information or diagrams required under Regulation 35 of the Mineral Resources (Sustainable Development)
(Mineral Industries) Regulations 2013 have been omitted.
Signature:
Date:
Name: (Block letters)
Job Title:
Telephone
REPORT
4th September 2014
Stan Kemsley
Manager Technica l Compliance - Mine
Section 2: Expenditure (Schedule 19, Section 4 to 9)
Wages and Salaries
Land Access Compensation - Access to land (Private) - Native Title Compensation
Expenditure on equipment, plant or machinery
Overheads* (should not exceed 20% of the total expenditure)
Expenditure on rehabilitation
Expenditure on exploration (as distinct from mining) if any; under the following headings:
Annual Mining Reporting Form - Energy and Earth Resources Page 3 of 6
4. 2 Surface mine facilities and works
1. Describe any development or extensions to surface mine facilities and works; (Attach additional pages if necessary)
2 . If there have been significant changes a scale plan of the site should be attached to clearly indicate developments or
extensions to the site over the reporting period. (eg Infrastructure, dams, plant, etc)
As per t he Appr ove d Work Plan , developme nt of the Mine ha s co~ti~ued to the West . The attache d Drawing (LV66/20-l /034) shows the ope r a ting face positions for tne Mine at t he s ~ s rt of July 20 13 a nd e nd o f Ju~e 2014
Section 5: Land Disturbance and Land Rehabilitation (Schedule 19,
sections 11 ,a,b,c,d)
5.1 Details of land disturbance and rehabilitation
A the total current area of land disturbed
The proportion of this area that has been disturbed in relation to each of the following:
Pits
ii Overburden and waste rock dumps
iii Tailings storage facilities
iv Infrastructure
B Area of land disturbed during the fast reporting period
C Area rehabilitated over the fast reporting period
The proportion of this area that has been disturbed in relation to each of the following:
Annual Mining Repo11ing Form - Energy and Earth Resources
iv Infrastructure Nil ha
Page 4-of 6
D Proportion of the area rehabilitated over the reporting period (C above) that was revegetated with local 0 native species: %
5.2 Estimate of rehabilitation liability
What is the current bond for the site
What is the current estimated rehabilitation liability for the site
Describe any methods and assumptions used in calculation
$ 15,000,000
$ 850,000
The method and assumptions used for calculating the liability for the next reporting period were : For the July 2014 to December 2014 period the estimate based on scoped works for rehabiliLation of the Northern Batters (see Drawing LV66/20 - l/053) was $800 , 000
For the January 2015 to June 2015 period the estimate is $50 , 000 based on minor maintenance and rehabilitation preparation for the reaminder of the year.
Thus the total Estimated Liability for the 2014/2015 reporting period is $850 , 000
ANY M[ANS WITHOUT TH[ WRlll[N P[RHJSSICN Of GDF SUH HAZEL WOOD
ORAWN IWt GDF SUEZ HAZELWOOD. PO BOX 195. HORWELL.VICTORIA. 3840. AUSTRALIA J DATE Ml: JOtl - - l CHECKCO IOIS ORG No LV66/20 - l/034 R3Ev i-----;,- ;-, -----------------~---;r----; DATE