MONTENEGRO Ministry of Transport and Maritime Affairs Reconstruction of the Main Road Scepan Polje-Pluzine November 14, 2013
16

Scepan Polje - Pluzine road

Jan 20, 2016

Download

Documents

CarrieCg

It is short presentation about project financed through WBIF instrument related to road Scepan Polje Pluzine.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Scepan Polje - Pluzine road

MONTENEGROMinistry of Transport and Maritime Affairs

Reconstruction of the Main Road Scepan Polje-PluzineNovember 14, 2013

Page 2: Scepan Polje - Pluzine road

• Introduction

• Project Overview

Page 3: Scepan Polje - Pluzine road

Introduction

• The first project in WBIF/IPF with regional component

• Project objective: reconstruction of the main road from Scepan Polje-

Pluzine

• M18 regional road – the shortest route from Albania, via Montenegro

and B&H to Central Europe via Corridor Vc

• E Route (E762) at SEETO Core Road Network

• The project component in B&H: reconstruction of the main road from

Foca to Hum

Page 4: Scepan Polje - Pluzine road
Page 5: Scepan Polje - Pluzine road

Project Overview

• The exiting conditions of the road:

• Road width is not in compliance with standards for this type of road;

• Tunnels are without lining;

• Road sections with speed limits below 30 km/h;

• Road is not in accordance with EU requirements related to road

safety;

• The road is closed for traffic during the winter;

• The road is closed for traffic for heavy trucks.

Page 6: Scepan Polje - Pluzine road

Project Overview

• The project objective was preparation of the Feasibility study with

CBA and Preliminary Design in accordance with national legislative

• The main road from Scepan Polje to Pluzine has two sections:

• First section is 2,5 km alignment from border crossing bridge on Tara

River to Paklice (Conceptual design)

• Second section is 22.5 km alignment from Paklice to Pluzine

(Preliminary Design)

Page 7: Scepan Polje - Pluzine road

Section from bridge on Tara river to Paklice

• Bridge on Tara River is one

line bridge with no

satisfaction of safety

requirements.

• Based on multi criteria

analyses, it is proposed to

construct new, 184 m long

bridge

• Interstate committee to

decide

Page 8: Scepan Polje - Pluzine road

Section from bridge on Tara river to Paklice

• Section from new bridge to Paklice will require design of new

alignment

• New alignment to be designed after new bridge location is agreed

between two countries

• Conceptual design prepared

Page 9: Scepan Polje - Pluzine road

Section from Paklice to Pluzine

• 22.5 km

• No safety requirements

• Speed limits 30 km/h

• 56 tunnels in total, not in accordance with EU standards

• Project objective: Preliminary Design (in accordance with national

legislation) and ESIA

Page 10: Scepan Polje - Pluzine road
Page 11: Scepan Polje - Pluzine road

Section from Paklice to Pluzine

Reconstruction of the section -Preliminary Design

Reconstruction of the alignment

Reconstruction of tunnels Reconstruction of the

retaining walls, safety constructions and other structures on the road

Page 12: Scepan Polje - Pluzine road

Second section from Paklice to Pluzine

• The design considered two reconstruction alternatives

• Alternative 1

• Reconstruction of the existing alignment in order to improve road

safety

• Sanitation of tunnels in order to meet safety requirements

• Reconstruction of existing structures

• Sections with speed limits 40 km/h

Page 13: Scepan Polje - Pluzine road

Section from Paklice to Pluzine

• Alternative 2

• Provision of high quality service through development of new sections

• High road safety standards

• Protection of rock falls and snowfalls

• Design of new tunnels in order to avoid risky sections and safety

requirements

• Speed limit 70 km/h (even in tunnels)

Page 14: Scepan Polje - Pluzine road

Section from Paklice to Pluzine

Alternative 1 Alternative 2

Total length 21,109 m 19,703 m

No of tunnels 44 30

Tunnels 7,223 m 9,492 m

Galleries 360 m 186 m

Walls 2,252 m 1,764 m

Page 15: Scepan Polje - Pluzine road

Section from Paklice to Pluzine

• Financial considerations

• Alternative 1 – EUR 51.6 million

• Alternative 2 – EUR 62.4 million

• Construction by priority sections