SBI Tactical Infrastructure Program Review Loren Flossman Program Manager, SBI Tactical Infrastructure Program Office U.S. Customs and Border Protection Version 5 005831
49

SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

Apr 07, 2015

Download

Documents

Scott Nicol

p. 3 says "resulting in potential savings of [redacted]"
p. 8 “SBI TI Budget” entirely redacted
p. 10 “BSFIT Additional Fence Funding Needed” entirely redacted
p. 12 describes % over estimated cost of cement, etc. Actual $ figure redacted.
p. 44 Real Estate stats, including condemnation actions
p. 47 – 48 list of contractors by sector
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

SBI Tactical Infrastructure Program Review

Loren FlossmanProgram Manager, SBI Tactical Infrastructure Program OfficeU.S. Customs and Border ProtectionVersion 5

005831

Page 2: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

25/27/2010 For Official Use Only For Official Use Only 2

SBI TI Program Overview

Authorities for the construction of tactical infrastructure

Illegal Immigration Reform and Immigrant Responsibility Act of 1996

The Secure Fence Act of 2006

CBP established the Secure Border Initiative (SBI) Tactical Infrastructure (TI) Program to develop and install fencing (pedestrian and vehicle), roads, and lighting solutions along the Southwest Border.

In order to enhance efficiencies and improve program performance, CBP functionally separated

TI from SBInet in October 2007.

Prior to that separation, SBI TI was managed as a component of SBInet.

While SBI TI is managed independently, its funding remains consolidated under the BSFIT account.

Fence completed as of August 8, 2008:― 184.8 miles of Pedestrian Fence on Southwest Border

Under construction 56.2―

Awarded 92.3―

To be Awarded 89.0― 154.3 miles of Vehicle Fence on Southwest Border

Under construction 2.3―

Awarded 22.8―

To be Awarded 126.3

SBI TI to complete 669.5 total miles of fence by December 31, 2008 :― 366.1 total miles of Pedestrian Fence on Southwest Border ―

303.4 total miles of Vehicle Fence on Southwest Border

005832

Page 3: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

3

Program Management

SBI TI broke down the goal of 670 fence miles into 118 fence segments (projects) to complete by 31 Dec 2008

Grouped by Border Patrol Sector (8 are receiving fence)

SBI TI/USACE awarded a Multiple Award Task Order Contract (MATOC) to create a pool of contractors pre-qualified to bid for each segment.

CBP obtains real estate through a MOA authorizing USACE to act on behalf of DHS-CBP

Environmental processes include conducting environmental surveys, using existing EAs, or preparing Environmental Stewardship Plans (ESPs) under S1 Waiver

Long lead construction materials (steel and mesh) are Government Furnished Materials (GFM); a supply and supply chain management Task Order awarded to Boeing is used to manage and execute the process

Resulting in potential savings of

005833

(b) (4)

Page 4: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

4

Project Management FY09 and Beyond

SBI TI is reorganizing to become a DHS Level I Investment Program consisting of a portfolio of multiple DHS Investment Levels.

Level of project review and milestone decision authority determined by DHS policy based on the portfolio sum total and the investment level of each project within the portfolio.

Program:

Level I:

ARB

Reviews and Approves/JRC Reviews

Projects:

Level I:

ARB Reviews and Approves/JRC Reviews

Level II: ARB Reviews and Approves

Level III: CBP Head approves

SBI TI will request IRB approval for execution of the entire program as well as approval of milestones for individual DHS Level I and II projects within the program.

Working level approval received; requires further discussion within CBP

Milestone decision authority and milestone approval for all other projects within the portfolio will be delegated as recommended above.

Consistent with DHS Investment Management Handbook, draft, dated

July 2008

For Official Use Only For Official Use Only 45/27/2010

005834

Page 5: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

5

Project Management FY09 and Beyond

Pre-Acq Acquisition Phases Sustainment

# Project NameTactical Infrastructure

DescriptionQuantity(Miles)

Pre Acquisition (Initiation)

Concept and Technology

Development

Capability Development and

DemonstrationProduction and

DeploymentOperations and

Support

1

Pedestrian Fence

Construction of 370 miles of Pedestrian Fence along areas experiencing significant illegal

cross-border activities and traffic.

366.3

2

Vehicle Fence

Construction of 300 miles of Vehicle Fence along areas

experiencing significant illegal cross-border activities and traffic.

303.4

3

Laredo Cane

Removal of Carrizo cane along Rio Grande River in Laredo, TX to

deter illegal activity and provide line of sight to river for Border

Patrol Agents.

16.1

4San Diego Border

Infrastructure System (BIS)

Construction of 3.5 miles of Border Infrastructure System (BIS) and associated site improvements in

the Smuggler’s Gulch and Border Field State Park areas.

14.0

5Douglas

International Ditch

Construction of 1.3 miles of erosion-control channel, fence,

lighting, and patrol roads in Arizona.

1.3

PROGRAM: Tactical Infrastructure Program COMPONENT: Customs and Border Protection (Office of the Commissioner)

Life Cycle Phase: Mixed

For Official Use Only For Official Use Only 55/27/2010

005835

Page 6: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

65/27/2010 For Official Use Only For Official Use Only 6

FY08 is Performance driven program

Cost: Threshold - (8% above Objective) (procurement cost)

Objective - (procurement cost. Does not include patrol roads and lighting)(O&M assumptions and cost estimate are being updated.)

Schedule: Threshold – Substantially Under construction by 31 Dec 2008Objective – 670 Fence Miles by 31 Dec 2008

Performance: Threshold/Objective – 670 Fence Miles

Persistent Impedance KPPs: 1. Ability to stop 10,000lbs vehicle traveling at 40 mph.2. Cannot cut 12” x 12” in 30 minutes.3. Not easily climbed over or penetrated by a pedestrian

Acquisition Program Baseline

OBP Assessed Fence Designs as Operationally Effective

005836

(b) (4)

(b) (4)

Page 7: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

PF225 Design & Construction

Supply Chain Management

Fence Design IPT

System Development& Demonstration

VF300 Fence Construction

As of 1 Aug 2008

SBI Tactical Infrastructure Master Schedule

VF300 Design & Construction

Kick-off

PF70 Design & Construction

Contract AwardInitial Phase StartJuly 2007

COMPLETEDFence LabFinal Report

Continuing Deliveries to Support PF225 Construction

AWD

COMPLETEDValue EngineeringReport Completed

Legacy Fence Construction

Kickoff

Kickoff

Primary Phase Kickoff

PF 70 Fence Construction

PF 225 Fence Construction

005837

Page 8: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

85/27/2010 For Official Use Only For Official Use Only 8

SBI TI Budget ($K)

*Supporting previously constructed fence

CarryoverFY 06 FY 07 FY 07 FY 08 Total Total TISuppl. BSFIT BSFIT Enacted Budget TI Current Projected Actual Actual Projected Projected FY06-FY08 Projection Deficit

Pedestrian Fence (PF)HidalgoPF 225PF 70 (3)

Vehicle Fence (VF)VF 300

Other TISan Diego BIS (3)Other

Subtotal

O&M

TOTAL

005838

(b) (4)

Page 9: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

9

Current Program Cost

For FY08, SBI TI identified 118 fence segments (projects) to meet the goal of 670 fence miles by 31 Dec 2008

Grouped into the 8 Border Patrol Sectors receiving fence

SBI TI/USACE awarded an Multiple Award Task Order Contract (MATOC) to create a pool of contractors pre qualified to bid for each segment.

An initial ROM Program-Level Cost Estimate to include all segments was produced in Mar 2007 to identify initial budget inputs

USACE develops and issues RFPs, MATOC contractors/USACE/CBP walk

each segment as part of Bidder’s Conference and contractors submit their bid with Actual Pricing.

USACE District Offices (LA, Galveston, ABQ) prepare an IGCE (With Current cost ) just prior to Source Selection Evaluation Board (SSEB) and award each segment contract to the Lowest Price Technically Acceptable bid

Cost Estimate to complete projects will be reassessed after all segment bids are received in September.

Variations to costs after bids are received are possible due to contract modifications resulting from required mitigations on found cultural sites and construction delays due to delays in real estate and extreme weather conditions.

005839

Page 10: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

10

BSFIT Additional Fence Funding Needed

Original Unfunded Fence Needs EstimateUTB reductionApproved for award below average cost/mileUnfunded Fence Needs (as of 8/11/08)

TI Baseline Funding Available

Immediate Actions Not Requiring a Reprogrammi

Realign Technology Funding within BSFIT Tactical Infrastructure (TI) Realignment

Subtotal of Actions Not Requiring Reprogramming

Reprogram within BSFIT across PPAs:

Operations & Maintenance Program Management Office

Subtotal Reprogramming Amount

Transfers (maximum ):

Fiscal Year 2007 S&E Lapse Balance Fiscal Year 2006/07 Supp Lapse Balance Border Patrol S&E Support Funding Container Security Initiative

Subtotal of Transfers

Total Funds Identified for Border Fencing

Balance Needed for Border Fencing

($millions)Need for Additional Fence Funding

005840

(b) (4)

(b) (4)

Page 11: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

11

Current Program Cost (cont.)

Variable costs (e.g. fuel, labor, commodities) have risen over time since original program-level cost estimate

Initial budget matched baseline schedule and ROM cost estimate–

Proposals received in May and early June 08 were below ROM–

Proposals received later in June 08 were slightly above ROM–

Proposals received in late June and early Jul 08 were significantly above ROM–

Proposals received in August were below the revised estimate of per mile (not including Hidalgo)

Remaining proposals for PF will be submitted by the end of August•

11 proposals –

43.17 miles–

The one proposal received for FV was 50% of the revised estimate

of per mile

19 proposals –

126.07 miles

005841

(b) (4)

(b) (4)

Page 12: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

12

Current Program Cost (cont.)

•Upon receiving significantly higher then budgeted cost proposals from the MATOC’s, SBI TI and USACE paused and entered into analysis to identify cost drivers and look for potential reductions

Fuel

-

63% Increase–

Labor –

15% Increase–

Local market conditions –

Cement –

33% Increase–

Steel –

37% increase–

Schedule compression –

5-20% Increase–

Transportation•

These estimations came from USACoE Millitary

Program

• Current escalation is approximated at over budget

005842

(b) (4)

Page 13: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

13

Out Year Program Cost

OBP provided projects for FY09 based upon Operational Requirements Based Budget Program (ORBBP)

RGV Gates –

Helipads –

Lighting –

Roads (all weather and drag) –

Bridges

For FY09, SBI TI working with USACE and Tecolote to produce engineering cost estimates and an IGCE for each future project within the SBI TI Program.

Available funding and OBP prioritization will determine the final projects for execution.

Multiple planning and budgeting steps–

Initial IGCE for review and reprioritization with OBP–

Follow on Engineering Cost Estimate (higher fidelity) for final planning and budgeting

005843

Page 14: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

14

Fence Lab evaluated 9 designs in a “laboratory” environment

Texas Dept of Transportation Facility: Texas Test Institute (TTI)

Border Patrol identified designs based upon existing fence

Boeing as Fence Lab contractor identified additional COTS designs

Performed Developmental Testing including vehicle ramming, fence

cutting, climbing, and digging

Fence Lab results passed to SBI-TI Fence Design IPT to conduct trades, iterate designs, and document final fence designs.

IPT members included Border Patrol and Value Engineers to ensure

fence designs are operationally effective and reasonably priced

Trades based upon operational and engineering experience

SBI-TI Fence Design IPT produced final designs and Fence “Toolbox”

Documents fence designs presently being deployed

No further physical testing beyond Fence Lab was conducted

Fence designs tested during Fence Lab to meet persistent impedance KPPs.

System Development & Demonstration Phase

For Official Use Only For Official Use Only 145/27/2010OBP Assessed Fence Designs as Operationally Effective

005844

Page 15: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

15

Program Documentation

The SBI TI program documentation is a tailored package of lifecycle management documents presently being created or updated.

Mission Needs Statement (MNS)

Analysis of Alternatives (AOA)

Operational Requirements Document (ORD)

Acquisition Program Baseline (APB)

Program Lifecycle Cost Estimate (PLCCE)

Program Management Plan (PMP)

Risk Management Plan (RMP)

Integrated Logistics Support Plan (ILSP)

Acquisition Plan

Planned submission of drafts to CBP is 30 September 2008

For Official Use Only For Official Use Only 155/27/2010

005845

Page 16: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

MNS

AoA

ORD

APB

PLCCE

PMP

RMP

ILSPAs of 1 Aug 2008

SBI TI Program Draft Documentation Schedule

Aug 08 Sep 083rd week 4th week 1st week 2nd week 3rd week 4th week

005846

Page 17: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

17

SBI Program Risk

The SBI TI PMO has a Risk Management Program that employs processes, a risk item tracking data base (RiskNav) which is a risk tracking tool , and best practices to identify

and resolve risks

Cost and Schedule are biggest risk areas: –

Cost risk of managing MATOC contract costs–

Schedule risk of managing compressed construction time lines–

Cost and Schedule risk of navigating process to obtain real estate (e.g. Federal judge determines court dates)

Schedule risk due to weather (i.e. 30 Nov is end of Hurricane Season)

Mitigation includes:–

Pre-qualification of contractors to ensure ability to perform–

Cultural & Biological surveys and environmental stewardship to identify sensitive areas–

Establish supply chain to availability of materials and control cost–

Moved from design-build to design-bid-build–

Incorporated Lessons learned from PF70

17For Official Use Only For Official Use Only 5/27/2010

005847

Page 18: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

18

Conclusions

Issues identified and addressed:

Development of SBI TI APB–

Clarified Scope–

Provided program definition–

Identified KPPs–

Identified current and outyear

cost issues

Address FY08 Funding Situation

Addressed Performance of Fence Types

18For Official Use Only For Official Use Only 5/27/2010

005848

Page 19: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

195/27/2010 For Official Use Only For Official Use Only 19

Background SlidesSBI Tactical Infrastructure

005849

Page 20: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

205/27/2010 For Official Use Only For Official Use Only 20

Mission Needs Statement

Mission Need

Provide persistent impedance to illegal cross-border activity

Provide time for agents and officers to respond

The mission needs for TI were captured as a part of the original SBInet Mission Needs Statement (MNS).

SBI TI recognizes the need for a separate TI MNS and is undertaking an effort to develop this document.

005850

Page 21: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

215/27/2010 For Official Use Only For Official Use Only 21

Operational Requirements

Operational requirements for TI were captured as a part of the overall SBInet ORD. The relevant excerpt from that document is included below.

“Tactical Infrastructure such as fences, vehicle barriers, lighting, bridges, checkpoints, forward operating bases and road improvements greatly enhance the effectiveness and response time of agents by physically preventing or slowing crossing activity, channeling illegal flows to enforcement zones, illuminating crossing points and improving agent freedom of movement…These assets are strategically deployed through the various southwest border sectors. The constructions makeup of these assets also varies from one location to the next as most are adapted to meet the area’s specific needs.”

SBI TI recognizes the need for a separate TI ORD and is undertaking an effort to develop this document.

005851

Page 22: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

22

Roadmap to Portfolio Approach

Current SBI TI acquisition documentation will be reworked for review and approval to be applied at the portfolio level

Each project within the SBI TI portfolio will have a tailored acquisition documentation package suitable and scaled to its level of investment and will be subject to the direction of the corresponding milestone decision authority

For Official Use Only For Official Use Only 225/27/2010

005852

Page 23: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

23

SBI TI Budget

• SBI TI Budget based upon ROM cost estimates –

Cost variables presently going up

Fluctuating cost of raw materials

Threat activity

Real estate acquisition

Environmental mitigations

Lack of experience with river and mountain construction

Local market conditions (Texas)

• FY09 Budget has for additional TI construction–

Roads–

Lights

• FY09 Budget has for O&M for TI

• Segment IGEs and contractor bids coming in above original planning ROMS–

Presently coordinating budget shortfall–

Strategies to close shortfall:•

Internal CBP emergency reprogramming (must be approved by Hill)•

Other DHS Agencies may contribute FY08 funding•

Authority in FY09 CR to spend FY09 SBI TI budget early in Oct.

For Official Use Only For Official Use Only 235/27/2010

005853

(b) (4)

(b) (4)

(b) (4)

Page 24: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

245/27/2010 For Official Use Only For Official Use Only 24

TI Baseline Milestone Schedule

*Baseline schedule impacted by funding and court decisions*RGV Impacted. Will reformat for readability

005854

Page 25: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

25

150

170

190

210

230

250

270

290

310

330

350

370

390

12/28/2007 1/28/2008 2/28/2008 3/28/2008 4/28/2008 5/28/2008 6/28/2008 7/28/2008 8/28/2008 9/28/2008 10/28/2008 11/28/2008 12/28/2008

PF Planned PF Actual PF Goal PF Milestones PF Milestones Complete

Construction Complete

All ESPs Complete

Contingency Decision Date

All T.O.s Aw arded

Real Estate

Certif iedWaiver Signed

All Condemnation Filings Started

Baseline Path to 366.3 Miles of Pedestrian Fencing

For Official Use Only For Official Use Only 255/27/2010

•ESPs completed except:• D-5b/D-6 within DHS CBP staffing• A-1 awaiting final approval

1 Aug @ 184.2 miles

005855

Page 26: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

26

Path to 303.4 Miles of Vehicle Fencing

* “Actual”

: Total miles of vehicle fence (VF) completed, includes miles completed to date under VF300 and legacy VF.

For Official Use Only For Official Use Only 265/27/2010

ESP Status: • Draft ESPs presently being completed and submitted• Expect Approval of ESPs by early Sep 08

1 2 0

1 4 0

1 6 0

1 8 0

2 0 0

2 2 0

2 4 0

2 6 0

2 8 0

3 0 0

3 2 0

12 /2 8 /2 00 7 1 /2 8 /2 00 8 2 /2 8 /2 00 8 3 /2 8 /20 08 4 /2 8 /2 0 08 5 /2 8 /2 00 8 6 /28 /20 0 8 7 /2 8 /20 08 8 /28 /20 08 9 /2 8 /20 08 10 /2 8 /2 00 8 11 /28 /20 0 8 12 /28 /20 0 8

VF-300 Planned VF-300 Goal VF-300 Actual VF-300 Milestones VF-300 Milestones Complete

Real Estate

Certif iedWaiver Signed

Contingency Decision CompleteAll RFPs

Issued

All ESPs Complete

Construction Complete

All Task Orders

Aw arded

005856

Page 27: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

27

Fence Completed as of August 1, 2008

For Official Use Only For Official Use Only 275/27/2010

PF VF Total

Fence required by December 2008 366.3 303.4 669.7

Fence completed (as of 8/01/08) -184.2 -153.8 -338.0

Planned conversion of VF to PF 0.0 11.9 11.9

Remaining to be built 182.1 161.5 343.6

005857

Page 28: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

28

Project Health – Risk Rating as of August 12, 2008

Fence completion date later than 12/15/08Fence completion date 12/1/08 through 12/15/08Fence Complete prior to 12/08

VF Risk Rating

PF Risk RatingBased on comprehensive evaluation of project status

For Official Use Only For Official Use Only 285/27/2010

Status of Core PF225 and VF300 Projects

# ProjectsStatus PF VF Total

Low Risk (Green) 6 26 32Medium Risk (Yellow) 27 1 28High Risk (Red) 34 2 36

Totals 67 29 96

005858

Page 29: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

29

Program Management Plan

As the TI Program was previously a part of the SBInet program it had been covered under that Program Management Plan

SBI TI has a draft Project Management Plan for PF 225 only

SBI TI recognizes the need for a consolidated Program Management Plan and is undertaking an effort to develop this document

29For Official Use Only For Official Use Only 5/27/2010

005859

Page 30: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

305/27/2010 For Official Use Only For Official Use Only 30

Test & Evaluation Completed

CBP conducted developmental testing and evaluation at the fence lab that included studies, modeling and simulation, and prototype testing.

Prototype testing was conducted in a field environment to understand deterrence capabilities and create the fence “tool box.”

Operational testing and evaluation captured through deployment.

Sector data collection on attempted breaches

Data will be analyzed to:

Define repair approach

Determine design upgrade requirements

005860

Page 31: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

31

Risk Management Plan

The SBI TI PMO has a Risk Management Program that employs processes, tools and best practices to identify, track and resolve risks

The SBI-TI Risk Manager administers the SBI-TI Risk Management Plan and Risk Management Program

One of the significant mitigation activities of the program is the pre-qualification of contractors to ensure the selected contractor will be able to perform and build fence segments successfully

As the programs mature, lessons learned will be captured and incorporated to ensure continuous program improvement

31For Official Use Only For Official Use Only 5/27/2010

005861

Page 32: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

325/27/2010 For Official Use Only For Official Use Only 32

Lifecycle Cost Estimate (LCCE)

A LCCE was previously created for the TI program and is currently being updated to reflect current program requirements

Independent government cost estimates are prepared for each segment to prepare for contract award

Reflects more accurate procurement cost

MATOC bids further refine procurement cost

Low price-technically acceptable contract approach limits government cost risk

For fence, O&M lifecycle cost will be calculated and refined as using assumptions developed with OBP

Cost estimating is complicated by assumptions such as:

Fluctuating cost of raw materials

Threat activity

Real estate acquisition

Environmental mitigations

005862

Page 33: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

33

O & M Lifecycle Costs

O&M Life Cycle Costs based upon assumption of breaches agreed to by OBP

Will continue to validate the assumptions and update our estimates

Possibly 3-5 years and across the four seasons

O&M Cost Estimate for FY09 is •

Out years will be adjusted based on threat activity and level of

repair required

Distribution of funding and maintenance concept are TBD•

Dependent upon:–

Frequency of breach and associated damage–

Skill set required to repair–

Maximum acceptable repair time

33For Official Use Only For Official Use Only 5/27/2010

005863

(b) (4)

Page 34: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

34

Integrated Logistics Support Plan (ILSP)

The SBI TI Integrated Logistics Support Management Team is working on an ILSP

Level of support required will be based on the assumptions developed in collaboration with OBP for the major TI assets.

Fence

Roads

Cane

Lights

Bridges

ILSP will be created and documented to support capitalization of PF and VF segments

For Official Use Only For Official Use Only 345/27/2010

005864

Page 35: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

35

SBInet Acquisition Program Baseline(s)

“Blocks” describe the time-phased configurations/deliveries of the SBInet System, and include—

Allocated operational requirements, or agreed-to functional capabilities statements–

An engineering/technical configuration, ie, system design, config items, software release(s), performance

A program of work, ie, a description of major events, accomplishments, and tasks (IMP)–

A quantified deployment (production) plan, ie, laydown(s) configured over geographical area(s)–

Cost and

schedule estimates, an allocated budget, and assigned personnel

(Orgs, IPTs)Additionally, Blocks may be developed, delivered incrementally as well, for example “1.x Dot” builds

Block 1.0 is the initial SBInet delivery to TUS-1, AJO-1–

Block 1.1 incorporates new software functionality (useability

enhancements, laser illuminator)

Block 1.2 incorporates new hi-speed wireless comms for Mobile COP implementation–

“Dot”

builds must be synchronized with the operator’s ability to stand-down for installation and training for new equipment and applications

Blocks are essentially mini-programs; appropriate forSBInet formal scope, schedule, and budget baselines

(APBs)

005865

Page 36: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

365/27/2010 For Official Use Only For Official Use Only 36

Tactical Infrastructure

What is it?Tactical Infrastructure (TI) is a term used by CBP to describe physical components that help secure our borders, such as lighting, roads, pedestrian and

vehicle fencing.

Why do we use fence? Installation of fence has proven to be a persistent impedance to

illegal cross-border activity, slowing, redirecting, and deterring illegal entries in

areas where personnel and technology alone cannot sufficiently secure our border.

Where does it go? Proposed fence locations are determined through operational assessments made by the local Border Patrol Agents and Chiefs, based on illegal cross-border activity and the Border Patrol’s extensive field experience in these areas. The primary objective in targeting certain areas is to provide an additional security measure in areas experiencing significant illegal cross-border activities and traffic.

Other considerations?Three main factors contribute to fence location decisions in addition to the initial Border Patrol operational assessments: (1) engineering assessments, which included construction costs; (2) environmental analyses; and (3) input from stakeholders. Each of these steps is a standard element of the planning process that enables DHS to make informed decisions in deploying a fence as operationally required.

005866

Page 37: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

37

PF225 Project Schedule Forecast

For Official Use Only For Official Use Only 375/27/2010

Sector Project MilesReal Estate

CertifiedAward

T.O.Fence

Complete R/Y/G StatusSan Diego A-1 3.6 5/30/2008 5/27/2008 5/6/2009 Awarded

San Diego A-2A 0.8 7/11/2008 7/8/2008 12/1/2008 Awarded

San Diego A-2B 0.5 7/11/2008 7/8/2008 12/1/2008 Awarded

San Diego A-2C 0.5 8/18/2008 7/8/2008 12/1/2008 Awarded

San Diego A-2D 0.8 8/18/2008 7/8/2008 12/1/2008 Awarded

San Diego A-2E 0.2 8/18/2008 7/8/2008 12/1/2008 Awarded

San Diego A-2F 1.1 6/27/2008 7/8/2008 12/1/2008 Awarded

San Diego A-2G 0.4 6/2/2008 7/8/2008 12/1/2008 Awarded

San Diego A-2H 0.2 6/2/2008 7/8/2008 12/1/2008 Awarded

San Diego A-2I 1.1 8/18/2008 7/8/2008 12/1/2008 Awarded

San Diego A-2J 0.1 8/18/2008 7/8/2008 12/1/2008 Awarded

San Diego A-2K 1.7 8/18/2008 7/8/2008 12/1/2008 Awarded

San Diego A-2L 2.1 8/18/2008 7/8/2008 12/1/2008 Awarded

San Diego A-2M 0.1 7/11/2008 7/8/2008 12/1/2008 Awarded

San Diego A-2N 1.5 7/11/2008 7/8/2008 12/1/2008 Awarded

El Centro B-4 8.7 5/9/2008 5/8/2008 12/3/2008 Under Construction

El Centro B-5B 2.9 4/21/2008 5/8/2008 12/1/2008 Under Construction

Yuma C-1 10.4 4/30/2008 5/8/2008 12/1/2008 Under Construction

Yuma C-2B 3.8 4/28/2008 5/8/2008 9/18/2008 Under Construction

Tucson D-2 5.1 9/28/2007 9/21/2007 8/1/2008 Complete

Tucson D-5A 2.1 9/28/2007 9/28/2007 3/13/2008 Complete

Tucson D-5B 5.3 8/29/2008 7/7/2008 12/1/2008 Awarded

Tucson D-6 2.2 8/29/2008 7/7/2008 12/21/2008 Awarded

54.8Italics = Planned date

Subtotal Mileage

005867

Page 38: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

38

PF225 Project Schedule Forecast

For Official Use Only For Official Use Only 385/27/2010

Sector Project MilesReal Estate

Certified Award T.O.Fence

Complete R/Y/G StatusTucson E-2A 6.1 4/30/2008 6/26/2008 12/1/2008 Under Construction

Tucson E-2B 6.9 9/12/2007 8/20/2007 3/28/2008 Complete

Tucson E-3 4.3 9/24/2007 9/24/2007 8/1/2008 Complete

Tucson F-1 1.0 5/6/2008 5/16/2008 10/14/2008 Under Construction

El Paso I-1A 2.8 8/17/2007 9/28/2007 8/8/2008 Under Construction

El Paso J-1 2.2 7/17/2007 9/28/2007 5/9/2008 Complete

El Paso J-2 3.5 1/15/2008 6/18/2008 10/26/2008 Awarded

El Paso J-3 1.1 7/17/2007 9/28/2007 5/16/2008 Complete

El Paso K-1A 1.07 1/21/2008 TBD TBDEl Paso K-1C 1.3 1/21/2008 TBD TBDEl Paso K-2A 9.6 6/30/2008 7/2/2008 12/16/2008 Under Construction

El Paso K-2B* 2.3 8/29/2008 7/8/2008 12/23/2008 Awarded

El Paso K-2C* 7.2 8/29/2008 TBD TBDEl Paso K-2D* 9.6 8/29/2008 TBD TBDEl Paso K-3* 9.0 6/30/2008 6/27/2008 11/15/2008 Awarded

El Paso K-5 5.2 6/30/2008 TBD TBDMarfa L-1 4.5 10/5/2007 TBD TBD

Del Rio M-1 2.2 7/14/2008 7/3/2008 10/27/2008 Awarded

Del Rio M-2A 0.8 8/22/2008 TBD TBDDel Rio M-2B 1.0 7/7/2008 7/8/2008 12/29/2008 Awarded

81.7Italics = Planned date

Subtotal Mileage

005868

Page 39: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

39

PF225 Project Schedule Forecast

For Official Use Only For Official Use Only 395/27/2010

Sector Project MilesReal Estate

CertifiedAward

T.O.Fence

Complete R/Y/G StatusRio Grande Valley O-1 3.7 7/28/2008 TBD TBDRio Grande Valley O-2 8.7 7/28/2008 TBD TBDRio Grande Valley O-3 2.0 7/28/2008 TBD TBDRio Grande Valley O-4A 4.5 - TBD 12/1/2008Rio Grande Valley O-4B 0.1 - TBD 12/1/2008Rio Grande Valley O-5 1.8 - 7/8/2008 12/1/2008 Under Construction

Rio Grande Valley O-6A 2.6 - TBD 12/1/2008Rio Grande Valley O-6B/C 1.4 - TBD 12/1/2008Rio Grande Valley O-7 0.9 - 7/8/2008 12/1/2008 Under Construction

Rio Grande Valley O-8 3.3 - 7/7/2008 12/1/2008Rio Grande Valley O-9A 2.1 - 7/8/2008 12/1/2008Rio Grande Valley O-9B 1.7 - TBD 12/1/2008Rio Grande Valley O-10 2.4 - 7/15/2008 12/1/2008Rio Grande Valley O-10 ext 0.3 - TBD 12/1/2008Rio Grande Valley O-11 2.3 TBD TBD TBD On Hold

Rio Grande Valley O-12 1.0 8/28/2008 TBD TBDRio Grande Valley O-13 1.6 7/28/2008 TBD TBDRio Grande Valley O-14 3.6 7/28/2008 TBD TBDRio Grande Valley O-15 2.2 TBD TBD TBD On Hold

Rio Grande Valley O-16 2.1 8/28/2008 TBD TBD On Hold

Rio Grande Valley O-17 1.6 TBD TBD TBDRio Grande Valley O-18 3.6 TBD TBD TBDRio Grande Valley O-19 3.4 TBD TBD TBDRio Grande Valley O-20 0.9 7/28/2008 TBD TBDRio Grande Valley O-21 13.0 TBD TBD TBD

70.8207.225.2

184.9366.9

* The 207.2 planned miles under PF225, along with actual baseline miles (78.4 mi) and PF70 actual constructed miles (80.7 mi), will yield approximately 366 total miles of PF once construction on all planned miles is complete.

PF 225 Constructed8/1 Total Constructed PF

Total End State PF CY08

Italics = Planned date

Subtotal MileageTotal PF225 Mileage*

005869

Page 40: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

40

VF300 Project Schedule Forecast

For Official Use Only For Official Use Only 405/27/2010

Sector Project MilesReal Estate

CertifiedAward

T.O.Fence

Complete R/Y/G StatusEl Centro BV-1 6.5 6/13/2008 TBD 12/18/2008Yuma CV-1a 5.0 4/30/2008 TBD 12/17/2008Yuma CV-1b 8.0 4/30/2008 TBD 12/21/2008Yuma CV-2 9.0 - TBD 12/22/2008Yuma CV-3 22.5 1/1/2007 8/1/2007 11/13/2008 Under Construction

Tucson DV-1 13.0 1/1/2007 8/20/2007 1/28/2008 Complete

Tucson DV-2 1.5 12/31/2007 TBD 12/3/2008Tucson DV-3 11.1 12/31/2007 TBD 12/1/2008Tucson DV-4a&c 20.5 12/31/2007 7/10/2008 12/17/2008 Awarded

Tucson DV-4b 10.7 12/31/2007 N/A 5/30/2008 Complete

Tucson DV-5b 1.0 8/12/2008 TBD 12/3/2008Tucson EV-1a 11.1 7/1/2007 N/A 4/25/2008 Complete

Tucson EV-1b 2.8 8/20/2008 TBD 12/4/2008Tucson FV-1a 3.2 12/31/2007 N/A 6/20/2008 Complete

Tucson FV-1b 16.4 8/15/2008 TBD 12/14/2008142.2Subtotal Mileage

Italics = Planned date

005870

Page 41: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

41

VF300 Project Schedule Forecast

*The 229.1 miles associated with VF300, along with mileage completed prior to July 2007 will allow us to achieve our goal of 300 miles by the end of CY08.

For Official Use Only For Official Use Only 415/27/2010

Sector Project MilesReal Estate

CertifiedAward

T.O.Fence

Complete R/Y/G StatusEl Paso HV-1 3.8 10/16/2008 TBD 12/31/2008El Paso HV-2 6.7 10/16/2008 TBD 12/30/2008El Paso HV-3 5.8 10/16/2008 TBD 1/2/2009El Paso HV-4 6.0 9/24/2008 TBD 1/1/2009El Paso IV-2 12.8 5/21/2008 TBD 1/4/2009El Paso IV-4A 3.7 1/1/2007 N/A 6/20/2008 Complete

El Paso IV-4B 2.0 1/1/2007 TBD 12/17/2008El Paso JV-1A 9.3 5/21/2008 TBD 12/28/2008El Paso JV-1B 8.9 4/23/2008 TBD 12/28/2008El Paso JV-2 11.9 4/23/2008 TBD 12/30/2008El Paso JV-3 10.0 4/23/2008 TBD 1/2/2009El Paso KV-1 0.0 5/21/2008 N/A 5/15/2008 Complete

80.9223.161.5153.8-11.9303.4

* Includes some fence that will be retro-fitted to PF & later subtracted out. Some retro-fit/conversion has already occurred

VF 300 Constructed

Total End State VF CY08*

Subtotal MileageTotal Mileage

Italics = Planned date

8/1 Total Constructed VF

005871

Page 42: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

425/27/2010 For Official Use Only For Official Use Only 42

Analysis of Alternatives

The Border Patrol has conducted comprehensive analyses of alternatives (AOAs) to determine which areas along the border would most benefit from fencing and which type of fencing would be most appropriate for each identified segment. The primary objective in targeting certain areas is to provide an additional security measure in areas experiencing significant illegal cross border activities and traffic.

Other SBI TI projects will conduct A0As consistent and scaled with their individual DHS Level of Investment.

005872

Page 43: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

43

PF225 Real Estate – Timeline As of August 5, 2008

PF225 MILESTONE SUMMARY:Planned

Complete Date

Revised Estimate Date Complete Milestone Status

5/1/2008 N/A 5/1/2008 Complete legal definitions for fee acquisitions

5/29/2008 Release all Value Letters 3 Letters left to release to Known Owners o Pending appraisals for properties valued over (1 on A-2D due NLT 08/08; 2 on K-2C due NLT 08/08)

(Substantially Complete)

Currently Value Letters released to 359 of 362 Known Owners (99%)

Special Cases: (Value Letters counted as released) ** 5 ROE-C's signed; Certified to Construct, Value Letters follow once appraisals complete - (3 on L-1A & B, 1 on A-1, 1 on A-2J) Of 370 total owners, 8 are Unknown – will not receive Value Letters; will move straight to condemnation.

Commence relocation process (DRT - Del Rio Sector began 5/16) (RGV - Rio Grande Sector began 8/1)Complete negotiations & mail condemnation notification letters

14 Negotiations Remain:

o 3 Negotiations pending Appraisals as noted above6/13/2008 7/29/2008 (224 of 315 expected

Condemnations are filed) Execute offers to sell (Purchase) OR file condemnation cases Of 370 Total Acquisitions: 50 Purchases / no Title Issues 5 Signed ROE-C's 315 Expected Condemnation Actions

Of Remaining 91 Condemnation Cases not yet filed: 14 Negotiations Remain 28 Packages being assembled & reviewed by USACE 29 in DOJ/CBP Legal Review 14 Completed Legal Review, Await USACE Certification to be signed by CBP 6 with DOJ not yet Filed in District Court

8/1/2008 Goal for gaining possession to all required real estate

44 Possessions out of 224 Condemnations Filed

8/16/2008 DRT Relocations to complete by 11/1; no impact to construction schedule. RGV Relocations to complete by late November -may arrange temporary living arrangements to expedite reloction

Complete relocation process, where applicable

8/28/2008 9/15 for Cases outside RGV & Friendly Cases in RGV 10/15 for Adverse Cases in RGV

Late finish date for gaining possession to real estate

5/15/2008 N/A

N/A

5/30/2008

5/16/2008

348 OF 362 Negotiations with Known Owners Complete (96%)

5/16/2008 9 total in DRT: 4 Owners & 5 Tenants 4 total in RGV

(14 Exceptions: 11 negotiations to close btwn 8/8 & 8/22. 3 Negotiations awaiting appraisals to begin)

08/05/08 (Substantially

Complete) o 11 open Negotiations for Special Situations (Cantu, Eagle Pass, UT-B, K-2C owners, etc.); (Due closed between 8/8 & 8/22)

005873

(b) (4)

Page 44: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

44

Real Estate – Status as of August 4, 2008

PROPERTY SUMMARY PFHidalgo Project – Access/Staging

(O-4 thru O-10) VF Total

Non-Federal Acquisitions * (# of Acquisitions > # of Owners) 370 10 14 394

California 42 3 45

Arizona 21 7 28

New Mexico 1 4 5

Texas 306 10 0 316

PROPERTY ACCESS

Voluntarily signed Rights of Entry (ROE's) of Above Cited Non-Fed Owners 309 8 12 329

Court issued order of possession 61 2 1 64

PROPERTY ACQUISITIONValue Letters released; out of 362 Actions for PF ( Other 8 actions for owners listed as Unknown; No Value Letter – Straight to Condemnation) 359 9 3 371

Offers to Sell voluntarily signed **May yet require condemnation to clear title 202 9 2 213

Voluntary Sales Executed (Title acceptable; no Condemnation) 50 0 0 50

Condemnation Notification Letters mailed 293 9 3 305

Condemnation Packages Submitted by COE for DOJ & CBP legal review 273 9 3 285

Total Condemnation Packages awaiting DOJ & CBP Legal Review - 29 - 5 - 0 - 34

- Condemnation Packages Pending DOJ Legal Review 29 5 0 34

- Condemnation Packages Pending CBP Legal Review 7 0 0 7

- CBP/DOJ Legal Review Complete; Pending COE Final Legal Certification - 14 - 0 - 0 - 14

Condemnation Packages Signed by CBP; at DOJ to be Filed =230 = 4 = 3 = 237

- Condemnation Packages with DOJ not yet Filed in District Court - 6 - 0 - 0 - 6Condemnation Cases Filed in District Court by AUSA = 224 = 4 = 3 =231

Possession via Court Order or Negotiated Settlement 44 1 2 47* In Texas, 9 Landowners (7 on PF, 2 on Hidalgo) own more than one property being purchased or condemned as separate actions.

005874

Page 45: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

45

VF300 MILESTONE SUMMARY:

Planned Complete

Date

Revised Estimate

Date Complete Milestone Status

5/23/2008 N/A 5/23/2008 Complete all legal definitions for fee acquisitions

6/23/2008 N/A5/23/2008

(Substantially Complete)

Release all Value Letters (12 Non-Federal Owners, excluding Cocopah & T.O.N.)

Deferring Value Letters; no time to survey/appraise access roads - Using ROE for Construction to permit use - will negotiate for easement once survey and appraisal are complete.

6/30/2008 8/15/2008Execute Rights of Entry for Construction (ROE-C) (2 of 9 Signed)

USACE in process of drafting ROE-C's & scheduling meetings with landowners. High probability of getting voluntary signatures…need to solidify access road selection & define in the document.

7/5/2008 N/A6/10/2008

(Substantially Complete)

Complete negotiations & mail condemnation notification letters

Negotiations deferred pending surveys & appraisals; 3 Condemnations Letters sent to owners to clear title on BV-1.

7/31/2008 9/1/2001Execute offers to sell (Purchase) OR file condemnation cases

3 Condemnations for Segment BV-1 filed; 2 of 3 cases District Court issued an Immediate Order of Possession.

8/28/2008 Goal for gaining possession to all required real estate

9/15/2008 Late finish date for gaining possession to real estate

VF300 Real Estate – Timeline As of July 29, 2008

005875

Page 46: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

465/27/2010 For Official Use Only For Official Use Only 46

Waiver Litigation

Waiver Litigation – County of El Paso, et al. v. Chertoff, No. EP- 08-CA-0196-FM (W.D. Tex. June 2, 2008)

On June 2, 2008. The City and County of El Paso, Texas, joined by several other local government entities, local environmental groups, and the Native American tribe Ysleta del Sure Pueblo, filed suit against DHS in the U.S. District Court Western District of Texas.

The complaint alleges an unconstitutional delegation of legislative power, and a separation of powers claim based upon the Executive’s repeal of laws.

The complaint also alleges a Tenth Amendment challenge based upon the waiver’s inclusion of State and local laws.

On Thursday, June 5, 2008, plaintiffs filed an application for a

preliminary injunction seeking to halt construction in all the Texas project areas identified in the Secretary’s April 3, 2008 waivers.

DHS filed its opposition to the application and a motion to dismiss to dismiss the case with prejudice on June 19, 2008.

On June 20, 2008, the Court issued an order striking plaintiffs’

application for preliminary injunction because plaintiffs exceeded the ten page limitation without seeking the Court’s permission to do so.

On July 7, 2008, plaintiffs filed their brief in support of the application for preliminary injunction and reply to the government’s motion to dismiss.

The government’s response is due on July 21, 2008.

On July 21, 2008, DHS filed their response and are currently waiting upon the Court’s ruling.

No hearing has been scheduled as of August 8, 2008.

005876

Page 47: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

47

TI Construction MATOC Awards

Selected Unrestricted Contractors

San Diego/El Centro Sector

Tucson Sector El Paso Sector Yuma Sector Marfa Sector Del Rio Sector RGV Sector Laredo Sector

Kiewit Pacific Co.

Kiewit Western Co.

Twin Mountain Construction II

Kiewit Western Co.

Kiewit Texas Construction

Kiewit Texas Construction

Kiewit Texas Construction

Kiewit Texas Construction

Granite Construction

Granite Construction

Granite Construction

Granite Construction

Weston Solutions

Weston Solutions

Weston Solutions

Weston Solutions

Sundt Construction

Sundt Construction Tetra Tech Sundt

Construction ECC ECC ECC ECC

WGI Straub Construction

Weston Solutions

HDR Design- Build Tetra Tech KBR

005877

Page 48: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

48

TI Construction MATOC Awards

Selected Small Business Contractors

San Diego/El Centro Sector El Paso Sector Laredo Sector Yuma Sector Tucson Sector Marfa Sector RGV Sector

Candelaria-EPC LLC (JV)

Cerrudo Services

Cerrudo Services Candelaria-EPC LLC (JV)

Candelaria-EPC LLC (JV)

Hallmark Capital Group LLC

Cerrudo Services

Hal Hays Construction

Nova Electric, Inc.

CKY Inc. CJW-MZT, Project 1

Hal Hays Construction

CKY Inc. JACO-MCC (JV)

RMA Land Construction

RMA Land Construction

Hallmark Capital Group, LLC

Hal Hays Construction

Marcon Engineering

Marsh Development

LEC/Amigo (JV)

RMA Land Construction

Reyes Construction

005878

Page 49: SBI SBI TI IRB Short 14 Aug 08 Rev 6 JmoKMS Final 49

Block 1 APB – Baselined Parameters005879

(b) (5)