    TERMS OF PPC:-

    Production

    Production Planning &

    Production control

  • 8/7/2019 SAYLESH DEOGAM

    3/16

    3

    THREE STAGES IN PPC

    FUNCTIONS ARE:- Planning- Choosing the best course of

    action among several ulternatives.

    Operations-Execution as per plan.

    Cont

    rol-

    M

    aintaining the

    performanc

    ebycomparing the actual results with standards

    set and taking corrective action to reducevariance.

  • 8/7/2019 SAYLESH DEOGAM

    4/16

    4

    CONCEPT OF PPC:-

    PPCessentially consist of planning productionin a manufacturing organization.

    It starts before production activity andexercising control activities.

    To ensure that the planned production isreleased in terms of quantity, quality, deliveryschedule and the cost of production.

  • 8/7/2019 SAYLESH DEOGAM

    5/16

    5

    OBJECTIVE OF PPC:-

    To deliver quality goods

    To ensure maximum utilization of allresources

    To ensure production of quality products

    continue..

  • 8/7/2019 SAYLESH DEOGAM

    6/16

    6

    - To minimise the product manufacturing

    cycle time

    To maintain optimum inventory level.

    To maintain flexibility

    To co-ordinate between labour andmachines

    continue

  • 8/7/2019 SAYLESH DEOGAM

    7/16

    7

    - To plan for plant capacities for future

    requirements.

    To remove problems related to production.

    To ensureeffective cost reduction and costcontrol.

    To ensure production schedules andpromised delivery dates.

    continue

  • 8/7/2019 SAYLESH DEOGAM

    8/16

    8

    - To produceeffective result for least total

    cost.

    To establish routes and schedules forwork.

    The ultimate objective is to contribute tothe profit of theenterprise.

  • 8/7/2019 SAYLESH DEOGAM

    9/16

    9

    MAIN FUNCTIONS OF PPC:-

    Production Planning And Control

    Production PlanningEstimatingRouting

    SchedulingLoading

    Production Control

    ispatchingProgressingInspection

    Evaluating andCorrective action

  • 8/7/2019 SAYLESH DEOGAM

    10/16

    10

    PRODUCTION PLANNING

    FUNCTION:- Estimating- Quantity of product

    Manpower

    Machine capacityMaterial required

    Production budget

    Material budget

    Equipment budget

    Manpower buget

  • 8/7/2019 SAYLESH DEOGAM

    11/16

    11

    Continue

    Routing-Determining the sequence of

    operation.

    Route sheet:-Machine &Equipment

    Time set up

    Quality standard

    Specification of raw materialCutting speed

    Inspection procedure

  • 8/7/2019 SAYLESH DEOGAM

    12/16

    12

    Continue

    Scheduling:- Fixing priorities

    Starting & finishing time

    Total timePrevent unbalance

    Utilize labour

    Product delivery

    Minimise total costMinimise production time

  • 8/7/2019 SAYLESH DEOGAM

    13/16

    13

    Continue.

    Loading:- Loading is the process of convertingoperation schedules into practice.

    Loading of facility means which job to beassigned to which work centre or machine.

    Loading ensure maximum possible utilization of

    productive facilities.

    Avoid bottlenecks in production

  • 8/7/2019 SAYLESH DEOGAM

    14/16

    14

    PRODUCTION CONTROL

    FUNCTION:- Dispatching:- Send away towards

    designated goal-

    Raw material

    Tools

    Machine loading chart

    Route card

    Returning tools to store after use

  • 8/7/2019 SAYLESH DEOGAM

    15/16

    15

    Continue

    Expediting/Follow up/Progressing:-Expediting ensure that, the work is carried outas per the plan and delivery schedules are met.

    Needofexpediting-

    1- Delay in supply

    2- Absenteeism

    3- Change and errors in design4- Break down of machines & tools