Top Banner
Phone: +91 8080806851 Email: [email protected] Website: www.savictech.com Profit Center Analysis FS for New General Ledger Financial Statement Analysis Manufacturing Order Item Queries Capacity Requirement Manufacturing Order Operation SOLMAN Infrastructure Readiness OS Installation SAP ‐ OS Prerequisite Solution Manager ABAP Installation Solution Manager Java Installation SLD Configuration Solution Manager Configuration Adding Satellite System EWA Configuration Sandbox Creation Infrastructure Readiness OS Installation SAP ‐ OS Prerequisite SAP Installation Patching SAP, DATABASE to that of Production System Production DB Backup Restore on Sandbox System ECC Upgrade on Sandbox Checking the Hardware Requirements Checking the Software Requirements Checking the Source Release of the SAP System Meeting the Operating System‐ Specific Requirements Upgrade of the Operating System and Database System if required Checking the Software Update Manager Version Compatibility Checking the Structural Requirements for ABAP Execution of Software Update Manager Quality Assurance and Testing Downtime Minimization Cutover Planning Go‐Live and Post Go‐Live Support SOH Plan Prerequisites Dual‐Stack Split Unicode Conversion Landscape Designing SAP HANA Appliance Scale‐up Increase the size of the hardware (main memory, number of CPUs) Scale‐out Several nodes (servers) are switched together for one database Data are distributed over the main memories of these different nodes Execution Migration Options In‐place migration Copy, upgrade + migrate Update & Migrate Go‐Live & Post Go‐Live Support SAP S/4HANA Conversion Discover ‐ Understanding current landscape and thrid party integrations Plan ‐ Planning the target landscape and software versions Explore ‐ Documenting, prioritizing, and validating functional gaps between current software and S/4HANA Changes to existing functions Functions no longer supported Functions that are no longer strategic Realize ‐ Implementing Technical & Functional Changes Deploy ‐ finalize the readiness for SAP S/4HANA and business processes for production go‐live Go‐Live & Post Go‐Live Support Project Duration 16‐20 Weeks *SAP Performance Benchmarking » x10 Reduced footprint x7 Increased throughput x1000 Analytics Speed 26% Annual Financial Close Fewer Days SAVIC rUpAntaraNa (S/4 Conversion) SAP S/4HANA CONVERSION Choosing Your Path To SAP S/4hana Types of Migration Path Conversation of an existing SAP Business suite system to SoH with GST SAP S/4HANA Conversion Steps SAVIC migration templates helps clients to select right transition methodologies from current system to SAP S/4HANA in‐memory computing platform Key simplifications and innovations Optimized working capital Increased visibility with real‐time stock Better customer service Reduced manufacturing cycle time Decreased stock buffers Lower procurement costs Realtime monitoring of Prod. orders No aggregates Responsive user experience design Improved operational decisions Real‐time inventory management and material valuation Accelerated material requirements planning Advanced available to promise (aATP) Integrated quality management Industry to core –discrete industries and mill products(DIMP) Effective order management and billing Efficient procurement Entire SAP S/4HANA Finance scope included Consistent SAP Fiori user experience (UX) for SAP S/4HANA SAP HANA Views / CDS & SAP Fiori User Experience Pre‐delivered HANA Views Flexible reporting Quick Start and customizable Easy‐ to‐use interface Balance of General Ledger Account *SAP Performance Benchmarking » *SAP Performance Benchmarking » **This is an indicative pricing. Actual pricing will be calculated on HSAV value starting from 35 lakhs INR ** SAP S/4HANA Licenses Cost Approx. 200 SAP ECC users Phone :+91 22 41312234/35/36 [email protected] www.savictech.com PLEASE CONTACT 40.00 Lakhs Onwards* Above Conversion Service price based on fix scope for customer with Database Size < 1 TB *, Cloud Hosting Charges & Taxes Extra * This is an indicative pricing. Actual price for Migration services will be arrived after detailed study & actual conversion complexity “The license/ implementation service can also be procured separately.”
1

SAVIC rUpAntaraNa SAP S/4HANA CONVERSION · 2020. 10. 15. · SLD Configuration ... Conversation of an existing SAP Business suite system to SoH with GST SAP S/4HANA Conversion Steps

Feb 28, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SAVIC rUpAntaraNa SAP S/4HANA CONVERSION · 2020. 10. 15. · SLD Configuration ... Conversation of an existing SAP Business suite system to SoH with GST SAP S/4HANA Conversion Steps

Phone: +91 8080806851

Email: [email protected]

Website: www.savictech.com

Profit Center Analysis

FS for New General Ledger

Financial Statement Analysis

Manufacturing Order Item Queries

Capacity Requirement

Manufacturing Order Operation

SOLMAN

Infrastructure Readiness

OS Installation

SAP ‐ OS Prerequisite

Solution Manager ABAP Installation

Solution Manager Java Installation

SLD Configuration

Solution Manager Configuration

Adding Satellite System

EWA Configuration

Sandbox Creation

Infrastructure Readiness

OS Installation

SAP ‐ OS Prerequisite

SAP Installation

Patching SAP, DATABASE to that of Production System

Production DB Backup

Restore on Sandbox System

ECC Upgrade on Sandbox

Checking the Hardware Requirements

Checking the Software Requirements

Checking the Source Release of the SAP System

Meeting the Operating System‐Specific Requirements

Upgrade of the Operating System and Database System if required

Checking the Software Update Manager Version Compatibility

Checking the Structural Requirements for ABAP

Execution of Software Update Manager

Quality Assurance and Testing

Downtime Minimization

Cutover Planning

Go‐Live and Post Go‐Live Support

SOH

Plan

Prerequisites

Dual‐Stack Split

Unicode Conversion

Landscape Designing

SAP HANA Appliance

Scale‐up

Increase the size of the hardware (main memory, number of CPUs)

Scale‐out

Several nodes (servers) are switched together for one database

Data are distributed over the main memories of these different nodes

Execution

Migration Options

In‐place migration

Copy, upgrade + migrate

Update & Migrate

Go‐Live & Post Go‐Live Support

SAP S/4HANA Conversion

Discover ‐ Understanding current landscape and thrid party integrations

Plan ‐ Planning the target landscape and software versions

Explore ‐ Documenting, prioritizing, and validating functional gaps between current software and S/4HANA

Changes to existing functions

Functions no longer supported

Functions that are no longer strategic

Realize ‐ Implementing Technical & Functional Changes

Deploy ‐ finalize the readiness for SAP S/4HANA and business processes for production go‐live

Go‐Live & Post Go‐Live Support

Project Duration

16‐20Weeks

*SAP Performance Benchmarking »

x10 Reduced

footprint

x7Increased

throughput

x1000Analytics

Speed

26%Annual Financial

Close Fewer Days

SAVIC rUpAntaraNa (S/4 Conversion)

SAP S/4HANA CONVERSION Choosing Your Path To SAP S/4hana

Types of Migration Path

Conversation of an existing SAP Business suite system to SoH with GST

SAP S/4HANA Conversion Steps

SAVIC migration templates helps clients to select right transition methodologies from current system to SAP S/4HANA in‐memory computing platform

Key simplifications and innovations

Optimized working capital

Increased visibility with real‐time stock

Better customer service

Reduced manufacturing cycle time

Decreased stock buffers

Lower procurement costs

Realtime monitoring of Prod. orders

No aggregates

Responsive user experience design

Improved operational decisions

Real‐time inventory management and material valuation

Accelerated material requirements planning

Advanced available to promise (aATP)

Integrated quality management

Industry to core –discrete industries and mill products(DIMP)

Effective order management and billing

Efficient procurement

Entire SAP S/4HANA Finance scope included

Consistent SAP Fiori user experience (UX) for SAP S/4HANA

SAP HANA Views / CDS & SAP Fiori User Experience

Pre‐delivered HANA Views

Flexible reporting

Quick Start and customizable

Easy‐ to‐use interface

Balance of General Ledger Account

*SAP Performance Benchmarking »*SAP Performance Benchmarking »

**This is an indicative pricing. Actual pricing will be calculated on HSAV value

starting from

35 lakhs INR **SAP S/4HANA Licenses Cost Approx. 200 SAP ECC users

Phone :+91 22 41312234/35/[email protected]

PLEASE CONTACT

40.00Lakhs Onwards*

Above Conversion Service price based on fix scope for customer with Database Size < 1 TB *, Cloud Hosting Charges & Taxes Extra

* This is an indicative pricing. Actual price for Migration services will be arrived after detailed study & actual conversion complexity

“The license/ implementation service can also be procured separately.”