Page 1: SAUSALITO FERRY TERMINAL DESIGN

March 29, 2016

City of Sausalito Joint Planning Commission and Historical Landmarks Board Meeting

SAUSALITO FERRY TERMINAL DESIGN

1

Page 2: SAUSALITO FERRY TERMINAL DESIGN

SINCE THE MARCH 16, 2016 MEETING….

2

• We received questions during the March 16, 2016 Joint

HLB/PC meeting.

• We submitted responses to those questions to the City

on March 25, 2016.

• We are here today to discuss our responses to those

questions as well as the additional questions that we

received from the City yesterday afternoon.

Page 3: SAUSALITO FERRY TERMINAL DESIGN

CAN FLOAT PILES BE REDUCED IN HEIGHT AND SIZE?

3

Could not be reduced:

• Piles socketed into rock to hold float in place during large storms.

• Height accounts for sea level rise & is similar to existing piles.

• Diameter is necessary for heavier float and extreme storms.

Existing – High Tide

Proposed – High Tide – Float in Typical Lowered Position

Page 4: SAUSALITO FERRY TERMINAL DESIGN

CAN FLOAT LIGHTS BE LOWERED?

4

We are investigating lowering the height:

• Overhead lighting is best for worker and passenger safety.

• Overhead lighting provides maximum light coverage area.

• Height must not interfere with both float boarding platform conditions.

Page 5: SAUSALITO FERRY TERMINAL DESIGN

ARE PARKING SPACES BEING ELIMINATED?

5

• No parking spaces will be

permanently removed.

• Some parking spaces close to

the Ferry Landing may be

requested for temporary

contractor use.

• We’ll continue to discuss options

with City.

Page 6: SAUSALITO FERRY TERMINAL DESIGN

EXISTING NW CORNER OF PARKING LOT #1

6

Existing site

for proposed

PG&E utility

boxes for

Project.

Page 7: SAUSALITO FERRY TERMINAL DESIGN

PROPOSED NW CORNER OF PARKING LOT #1

LOCATION FOR PROJECT PG&E UTILITIES

7

Proposed

PG&E utility

boxes for

Project.

Will request

Encroachment

Permit from

City.

Page 8: SAUSALITO FERRY TERMINAL DESIGN

CITY’S 3-28-16 QUESTIONS

8

1. Does the Table on page 8 of the

March 29, 2016 Staff Report

correctly identify and characterize

the features of the current design

mandated by the ADA and those

desired by the District for

operational considerations?

In general, yes. We’ve made a

few clarifications.

utility box, pile collars,

and a clear path for

employees

See next slide

Page 9: SAUSALITO FERRY TERMINAL DESIGN

CITY’S 3-28-16 QUESTIONS

9

2a. Please supply us with the reference

to the applicable regulations and

guidance for accessibility requirements

that apply to the path of travel to and

from the doors.

The proposed design meets the 2013 draft Accessibility Guidelines for Passenger Vessels. Staff Report correctly references this document, but incorrectly cites section V405.

Gangplanks resemble “gangways” – Section V410

Gangplanks are “telescoping” – Section V410.7

“Walking surfaces” – Section V403

Page 10: SAUSALITO FERRY TERMINAL DESIGN

CITY’S 3-28-16 QUESTIONS

10

2b. Can only one of the two doors

meet the applicable accessibility

requirements and the hydraulic

equipment furthest from shore be

eliminated.

We chose to have the paths to both

ferry doors to be ADA accessible

The hydraulic power unit at the end

of the float would remain

regardless if one or two doors are

ADA compliant.

Hydraulic

power unit

Page 11: SAUSALITO FERRY TERMINAL DESIGN

CITY’S 3-28-16 QUESTIONS

11

2c. What amount of either the length

or width of the float and the

gangway is dictated by use of both

doors?

16 feet minimum clear passenger

path from the float, through the

gangway and through the access

pier is based on using the two

ferry doors at the same time.

8’ min door 8’ min door

48’ door spacing 16’ wide

gangway

56’ for both doors

16’ clear 16’ clear

Page 12: SAUSALITO FERRY TERMINAL DESIGN

TWO 8-FOOT DOORS LESS THAN HISTORIC

DOOR WIDTH FOR SAUSALITO FERRIES

12

Page 13: SAUSALITO FERRY TERMINAL DESIGN

CITY’S 3-28-16 QUESTIONS

13

2d. Describe the operational

considerations (positive and

negative) supporting your desire to

use two ferry doors for simultaneous

loading and unloading?

Improvements based on using two doors:

• Speed up boarding and disembarking

process; one door for bicyclists and one

for pedestrians. (we will not load and

unload passengers at the same time)

• Increase number of passengers able to

quickly board ferry and maintain

schedules.

• Reduce crowding and confusion in the

vicinity of the ferry landing.

Passengers with

bicycles tend to stay in

a single file line on

existing ferry landing

Page 14: SAUSALITO FERRY TERMINAL DESIGN

CITY’S 3-28-16 QUESTIONS

14

3. What are the operational considerations

dictating the 15 additional feet of float length to

provide District employees access to mooring

hardware and fender supports located along the

furthest-from-shore end of the float.

Additional 15’ based on a hydraulic

power unit, maintaining a clear

walking path and guide pile collars.

6’ clear walking path allows for safe

working environment.

Hydraulic

power unit

3’-6”

Guide pile

collar

5’-6”

Clear walking

access

6’-0”

15’-0”

Page 15: SAUSALITO FERRY TERMINAL DESIGN

CITY’S 3-28-16 QUESTIONS

15

4. What amount of either the width or length

of the gangway and float are dictated by

any other operational considerations not

addressed above and what negative

consequences, if any, would result from not

installing the design features of the

gangway and float desired for additional

operational considerations?

Width and length of float and gangway

based on ADA and operational

requirements.

All possible size reductions have been

made.

Page 16: SAUSALITO FERRY TERMINAL DESIGN

PROPOSED FACILITY WILL IMPROVE OPERATIONS

16

• Two wider access doors to the ferry vessel instead of one

• Wider facility to move passengers more efficiently and faster – Ferries

leave fuller and on time

• More area for staging – Move people off of Sausalito streets

Existing Proposed

Page 17: SAUSALITO FERRY TERMINAL DESIGN

PROPOSED DESIGN – MARCH 2016

17

Page 18: SAUSALITO FERRY TERMINAL DESIGN

PROPOSED DESIGN – MARCH 2016

SIMPLE STEEL GIRDER GANGWAY

18

Page 19: SAUSALITO FERRY TERMINAL DESIGN

19

PROPOSED DESIGN – MARCH 2016

SIMPLE TRANSPARENT SWING GATE

Page 20: SAUSALITO FERRY TERMINAL DESIGN

20

PROPOSED DESIGN – MARCH 2016

SIMPLE TRANSPARENT SWING GATE

Page 21: SAUSALITO FERRY TERMINAL DESIGN

21

PROPOSED DESIGN – MARCH 2016

COLOR – GRAY (GALVANIZED STEEL)

Page 22: SAUSALITO FERRY TERMINAL DESIGN

22

FLOAT – LOWERED FOR ARRIVAL OF SPAULDING CLASS

Page 23: SAUSALITO FERRY TERMINAL DESIGN

23

FLOAT – RAISED FOR ARRIVAL OF CATAMARAN CLASS

Page 24: SAUSALITO FERRY TERMINAL DESIGN

PROPOSED DESIGN – MARCH 2016

LIGHTING – WARM TONE WITH SPOT LIGHTING ALONG RAILS

24

Page 25: SAUSALITO FERRY TERMINAL DESIGN

PROPOSED LIGHTING – EYE LEVEL: DOORS OPEN

25

Page 26: SAUSALITO FERRY TERMINAL DESIGN

PROPOSED LIGHTING – EYE LEVEL: DOORS CLOSED & LIGHTS OFF

26

Page 27: SAUSALITO FERRY TERMINAL DESIGN

PROPOSED LIGHTING OVERVIEW WITH NO BELVEDERES – DOORS CLOSED

27

Page 28: SAUSALITO FERRY TERMINAL DESIGN

PROPOSED LIGHTING – NO BELVEDERES: DOORS OPEN

28

Page 29: SAUSALITO FERRY TERMINAL DESIGN

PROPOSED LIGHTING – NO BELVEDERES: DOORS CLOSED & LIGHTS OFF

29

Page 30: SAUSALITO FERRY TERMINAL DESIGN

SUMMARY OF PROPOSED DESIGN

PROPOSED DESIGN

MARCH 2016

FLOAT 145.5’ long x 53’ wide

GANGWAY 90’ long x 16’ wide x 6.7’ high

ACCESS PIER 96’ long x 21’ wide

LANDSIDE PIER No change to existing

BELVEDERES per BCDC will include in application

but with recommendation to delete

GATE Simple transparent swing gate

COLOR Gray

30

Page 31: SAUSALITO FERRY TERMINAL DESIGN

GUIDE TO RENDERINGS:

VIEW POINTS REQUESTED

BY COMMUNITY

31

Page 32: SAUSALITO FERRY TERMINAL DESIGN

VIEW 1- EXISTING (EDGE OF GABRIELSON PARK)

32

Page 33: SAUSALITO FERRY TERMINAL DESIGN

VIEW 1 – PROPOSED (EDGE OF GABRIELSON PARK)

33

Page 34: SAUSALITO FERRY TERMINAL DESIGN

VIEW 2 – EXISTING & PROPOSED (GABRIELSON PARK)

34

Page 35: SAUSALITO FERRY TERMINAL DESIGN

VIEW 3 – EXISTING (YACHT CLUB)

35

Page 36: SAUSALITO FERRY TERMINAL DESIGN

VIEW 3 – PROPOSED (YACHT CLUB)

36

Page 37: SAUSALITO FERRY TERMINAL DESIGN

VIEW 4 – EXISTING (YACHT CLUB PARKING LOT)

37

Page 38: SAUSALITO FERRY TERMINAL DESIGN

VIEW 4 – PROPOSED (YACHT CLUB PARKING LOT)

38

Page 39: SAUSALITO FERRY TERMINAL DESIGN

VIEW 5 – EXISTING (PLAZA NORTH END)

39

Page 40: SAUSALITO FERRY TERMINAL DESIGN

VIEW 5 – PROPOSED (PLAZA NORTH END)

40

Page 41: SAUSALITO FERRY TERMINAL DESIGN

VIEW 6 – EXISTING (MID PLAZA)

41

Page 42: SAUSALITO FERRY TERMINAL DESIGN

VIEW 6 – PROPOSED (MID PLAZA)

42

Page 43: SAUSALITO FERRY TERMINAL DESIGN

VIEW 7 – EXISTING (PLAZA SOUTH END)

43

Page 44: SAUSALITO FERRY TERMINAL DESIGN

VIEW 7 – PROPOSED (PLAZA SOUTH END)

44

Page 45: SAUSALITO FERRY TERMINAL DESIGN

VIEW 8 – EXISTING (BRIDGEWAY)

45

Page 46: SAUSALITO FERRY TERMINAL DESIGN

VIEW 8 – PROPOSED (BRIDGEWAY)

46

Page 47: SAUSALITO FERRY TERMINAL DESIGN

Creating a better tomorrow, together.

SAUSALITO FERRY TERMINAL DESIGN