2013-02-10 9:00 meeting EBH 1 02:42 stable beams fill 3541 7:45 beam dump by BPMS IP6 after 5 h in stable beams 8:35 re-injecting for LHCb VdM scan 338/338 bunches/beam 10:40 stable beams fill 3542 11:13 ALICE leveling reached head-on: start Van der Meer scan and length scale calibration in LHCb 13:30 VdM scan completed, re-optimize all collisions 15:00-15:19 Adjust: Test for 50Hz noise / instability studies by separating the beams and reducing / switching off the ADT gain 15:19 operator beam dump 16:09 re-injecting 18:31 stable beams fill 3543 Saturday 9.2.2013
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
2013-02-109:00 meeting EBH 1
02:42 stable beams fill 3541 7:45 beam dump by BPMS IP6 after 5 h in stable beams 8:35 re-injecting for LHCb VdM scan 338/338 bunches/beam 10:40 stable beams fill 3542 11:13 ALICE leveling reached head-on: start Van der Meer scan and
length scale calibration in LHCb 13:30 VdM scan completed, re-optimize all collisions 15:00-15:19 Adjust:
Test for 50Hz noise / instability studies by separating the beams and reducing / switching off the ADT gain
3540 Fri 8/2 8.5 1:57 0.5 (VdM) QPS RQX.L8 314/2723541 Sat 9/2 11.6 5:03 1.28 BPMS IP6 338/3383542 Sat 9/2 11.7 3:57 1.17 OP dump 338/3383543 Sat 9/2 12.4 6:34 1.67 OP dump 338/338
2013-02-109:00 meeting EBH 7
Access starts at 7:00 Already done:
- hypercycle change- RF ramp rate back to 40Hz/s- ADT injection gain to 0.08 (to be checked/confirmed)- launched ALICE solenoid/dipole sequences for polarity change- launched RU.L4 reset sequence
Preparations for pp run
2013-02-109:00 meeting EBH 8
Access to set-up for the higher intensity start at 7:00 AM BPMS IP6 (high intensity protons), BBQ, Head-Tail, etc ADT settings for high intensity (HW SR4) and possibly attenuator change
(piquet) Re-activate RF hardware interlock on total voltage (can be done before during
ramp down) Reverting ALICE polarity (LHCb polarity already good) Revert BLM MFs Revert BTVDD delay settings Revert BPMS interlock windows to 70/100 ATLAS, CMS
• Pre-cycle ~ 1 hour
• 1 cycle with probes for checkout, correcting chroma and tune, verify instrumentation and damper set-up 10:00 – 14:00
• Testing of interlock BPMS (~2 hours)
• Loss maps at injection and asynchronous dump (4 hours)
1.38 TeV p-p run
2013-02-109:00 meeting EBH 9
• 1 cycle with 5 bunches 8-9x10^10 p/bunch for collimator setup (TCTs), collision setup, first loss maps & asynch. dump test in collision. (4-5 hours+ RP set-up and 1 hour data taking - if approved)
• BSRT (B2) and beam dump checks with high intensity and LBDS check (B1) in parallel (5 hours)
• 1 cycle to complete off-momentum/betatron loss maps (4 hours).
The hypercycle for 1.38 TeV is : 1.38TeV_2013. Set total RF voltage to 10 MV at flat top for both beams. B1 is at 12 MV now.
1.38 TeV p-p run
2013-02-109:00 meeting EBH 10
Intensity ramp-up 1 fill with ~80 bunches 1 fill with ~500 bunches (including some individual bunches for
VdM scans) 1374 bunches Need to define filling scheme for 500 bunches
1.38 TeV p-p run
2013-02-109:00 meeting EBH 11
Validation
Injection (Inj. Prot. IN)
Injection (Inj. Prot. OUT)
Flat-top separated
Un-Squeezed Collision
Betatronic-H tbd tbd tbd tbd
Betatronic-V tbd tbd tbd tbd
Neg. off-mom tbd -- -- tbd (+500 Hz)
Pos. off-mom tbd -- -- --
Asynch dump tbd -- -- tbd
tbd=to be done
2013-02-109:00 meeting EBH 12
Accesses for quench test: Scope installation in IP6 (12L6). 2 hours. It has priority over Q6L8 scope
installation because we will need it on Monday morning (the first quench test). To be confirmed whether it can be done before high intensity tests/pp physics at intermediate energy
Fast measurement system on RQ6.L8 (30 min in the UA83 by Jaromir Ludwig). Ramp to 300 A afterwards.
LBDS check (E. Carlier – working hours) if in the shadow of another access
Pending
2013-02-109:00 meeting EBH 13
2013-02-109:00 meeting EBH 14
Fills that did not make it into stable beams
Fill Day Dump
3526 Tue 5/2 Switching on OFB after cogging
Losses IP7: Noisy BPM IP8 leads to orbit drift
3528 Tue 5/2 Switching on OFB after cogging Problem diagnosed and BPM disabled
3531 Tue 5/2 Losses at start of ramp, IP3 collimation
Reduce blow-up at injection (from 1.4 to 1.1ns)
3532 Tue 5/2 Same problem with BPM as above – BPM was mysteriously re-enabled
3536 Thu 7/2 After cogging: SIS position interlock
Joerg has increased the limit for the orbit position SW_interlock by 0.2mm and Delphine added +4Hz to the cogging frequency trims to move the p+ beam closer to the center.