Satellite Training Actions From Proving Ground/User Readiness Workshop – June 2015 1. The SURT will reconvene for a short period of time to identify the user readiness performance objectives. Performance objectives will be delivered to the OCLO and NOAT (July 10) 2. The OCLO will derive learning objectives from the performance objectives (July 31) 3. The OCLO will map existing training, available both internally and externally, to the NWS to the learning objectives (July 31) 4. The OCLO will identify additional training needing development to achieve learning objectives and will specify instructional design approach and delivery mode (July 31) 5. The OCLO and NOAT will collaborate on identifying personnel to assist in training development (due date: August 14, 2015)
4

Satellite Training Actions From Proving Ground/User Readiness Workshop – June 2015 1. The SURT will reconvene for a short period of time to identify the.

Dec 27, 2015

Download

Documents

Jocelyn Wilson
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Satellite Training Actions From Proving Ground/User Readiness Workshop – June 2015 1. The SURT will reconvene for a short period of time to identify the.

Satellite Training Actions

From Proving Ground/User Readiness Workshop – June 2015

1. The SURT will reconvene for a short period of time to identify the user readiness performance objectives. Performance objectives will be delivered to the OCLO and NOAT (July 10) 2. The OCLO will derive learning objectives from the performance objectives (July 31) 3. The OCLO will map existing training, available both internally and externally, to the NWS to the learning objectives (July 31) 4. The OCLO will identify additional training needing development to achieve learning objectives and will specify instructional design approach and delivery mode (July 31) 5. The OCLO and NOAT will collaborate on identifying personnel to assist in training development (due date: August 14, 2015)

Page 2: Satellite Training Actions From Proving Ground/User Readiness Workshop – June 2015 1. The SURT will reconvene for a short period of time to identify the.

Satellite Training Actions

6. The OCLO will meet with OCONUS Regional personnel to determine how OCLO personnel can best assist the development of training for Himawari and also have that training infrastructure be applicable to GOES-R training (due date: August 14, 2015) 7. The OCLO meet with COMET to develop a user readiness pre-test to be used by the SOOs (October 2015) 8. The OCLO announces availability of foundational training (due date: day after GOES-R launch)

9. OPG will load the Sport EDPT on their AWIPS system and evaluate as a potential framework tool to share “just in time” training 10. NOAT will work with Sport and AWIPS to get the Sport EDPT implemented in time for the Oct/Nov DOE4 GOES-R readiness test.

Page 3: Satellite Training Actions From Proving Ground/User Readiness Workshop – June 2015 1. The SURT will reconvene for a short period of time to identify the.

8 June 2015 - - -> 3

Satellite (GOESR) Training Timeline

FY15FY17 & Beyond

FY16Launch

ApplicationPrerequisitesMaking

it Stick

Data?

Foundation Exercise Continuous Learning

Training stages Prerequisites – overall basics

Foundation – satellite specifics

Application – operational setting

Exercise – simulations, practice

Making it Stick – multi-situational, sharing

Continuous Learning – evolve and update

Page 4: Satellite Training Actions From Proving Ground/User Readiness Workshop – June 2015 1. The SURT will reconvene for a short period of time to identify the.

Foundational

TrainingWSR-88D

AWIPS-2

MRMS Satellite

DLOC WOCCore WDM

ApplicationsTraining

WOCSevere

WOCFlash Flood

WOCWinter Wx

OfficeSatellite

Facilitator

Satellite TrainingDesign Approach

Learning Objectives

Performance Objectives