www.construction.murrob.com SASOL MAFUTHA Limpopo, Lephalale PROJECT TYPE: OPENCAST MINING CLIENT: Sasol Mining Pty Ltd VALUE: R 134 Million CONSULTANTS: None PROJECT DURATION: 12 Months DATE OF PROJECT: 1 July 2009 PROJECT DESCRIPTION: Coal bulk sample in Lephalale, mined to a depth of 96m. Approximate volumes mined for the project :- Selective Mining of Bulk Coal sample. Total of 1, 500,000 m³ of topsoil and blasted over burden was moved, with a total of 996,000 tons of coal. Coal was crushed down to a <200mm.