Top Banner
www.construction.murrob.com SASOL MAFUTHA Limpopo, Lephalale PROJECT TYPE: OPENCAST MINING CLIENT: Sasol Mining Pty Ltd VALUE: R 134 Million CONSULTANTS: None PROJECT DURATION: 12 Months DATE OF PROJECT: 1 July 2009 PROJECT DESCRIPTION: Coal bulk sample in Lephalale, mined to a depth of 96m. Approximate volumes mined for the project :- Selective Mining of Bulk Coal sample. Total of 1, 500,000 m³ of topsoil and blasted over burden was moved, with a total of 996,000 tons of coal. Coal was crushed down to a <200mm.
1

Sasol mafutha

Jul 03, 2015

Download

Business

Gert Buitendach

Opencast Contract Mining, drill Blast, Load, Haul, Crushing
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Sasol mafutha

www.construction.murrob.com

SASOL MAFUTHA Limpopo, Lephalale

PROJECT TYPE: OPENCAST MINING

CLIENT:

Sasol Mining Pty Ltd

VALUE:

R 134 Million

CONSULTANTS:

None

PROJECT DURATION:

12 Months

DATE OF PROJECT:

1 July 2009

PROJECT DESCRIPTION:

Coal bulk sample in Lephalale, mined to a depth

of 96m.

Approximate volumes mined for the project :-

Selective Mining of Bulk Coal sample. Total of 1,

500,000 m³ of topsoil and blasted over burden

was moved, with a total of 996,000 tons of coal.

Coal was crushed down to a <200mm.