  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    1/138

    SUPPORTING WIND POWESUPPORTING WIND POWESUPPORTING WIND POWESUPPORTING WIND POWERRRRTAKETAKETAKETAKE----OFF INOFF INOFF INOFF IN THETHETHETHESARI/ENERGY REGIONSARI/ENERGY REGIONSARI/ENERGY REGIONSARI/ENERGY REGION

    Energy SecurityEnergy SecurityEnergy SecurityEnergy Security ReportReportReportReport

    USAID South Asia Regional Initiative for Energy(USAID SARI/Energy)

    Contract Number 386-C-00-07-00033-00; Task Order 2.8

    April 7April 7April 7April 7, 2011, 2011, 2011, 2011

    This publication was produced for review by the United States AgencyThis publication was produced for review by the United States AgencyThis publication was produced for review by the United States AgencyThis publication was produced for review by the United States Agencyfor International Development.for International Development.for International Development.for International Development. It was prepareIt was prepareIt was prepareIt was prepared by Tetra Tech.d by Tetra Tech.d by Tetra Tech.d by Tetra Tech.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    2/138

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    3/138

    SUPPORTING WIND POWER TAKE-OFF IN THE SARI/ENERGY REGION

    Energy Security Report

    USAID South Asia Regional Initiative for Energy(USAID SARI/Energy)

    Contract Number 386-C-00-07-00033-00; Task Order 2.8

    April 7, 2011

    Pa :

    Pa b:

    AD/

    Aca Eba DLF Cb C

    N D 110 021, INDIA B N. 9B, 11

    FT: +911124198000 Ga 122 002, INDIA

    .a. T: +91 124 473 7400

    Fa: +91 124 473 7444

    , .

    4601 N Faa D

    S 601

    A, VA 22203, USA

    T: + 1 703 3872100

    .ac.c

    Dca

    T a bca ca c

    U Sa Ac Iaa D U Sa

    G.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    4/138

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    5/138

    S W P Ta SARI/E R

    EXECUTIVE SUMMARY

    W 11,807 MW a (a , c) caac a b

    Ia, cb a caac a SARI/E c

    Paa, Baa, Aaa, Na, S Laa, Ba a Ma a 40 MW.

    T ac a ab c a a ,

    ac a b c acc c S Aa ac

    c.

    A Ia c 3,000 MW,

    c cc a b c b a

    a ac:

    T c c

    ( c, a, c acc c aa a a

    a)

    I b

    T aaab caa c

    W a acc c a c c.

    T E Sc R a

    a c SARI/E c. I a cc b

    USAID/SARI E a a a c c c a

    , ab Ma, Na, Paa, a S Laa, a a ac

    a. I a, USAID a a , S W P Ta

    SARI/E R, Sb 2010 Cb, S Laa, c b

    , , a a

    c a ac.

    1

    1T a ca a b a a

    a a a c. A aa c a

    a aa a. Eac c a c a

    aca a a a Aa D Ba

    a. T ac a ac a c

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    6/138

    S W P Ta SARI/E R

    T a c a cca c a

    a ac c , c

    a a. I a a c a c

    SARI aa a cca,

    cca a c a a, b ac .

    T c c ,

    ac a c, a ca a a a c ( ca c a

    a ac). T c cc a ac c

    a c , b bac a acab a .

    T a a b c a c, ac c

    ca b a a c b a a b a. T c c c:

    A SARI/E A c c cc A b aac a c a, c bac

    caca aa

    Bac b c a b c A cc , c cca a c

    cc a

    Saa c a cc aa

    Tca aca

    U Ca D Mca c .

    T a aa a a cc a a c

    a ac c.

    c a a caac c a a c a a

    c a.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    7/138

    S W P Ta SARI/E R

    ACKNOWLEDGEMENTS

    T c , a c aa, a

    a a c c a a

    c S Aa. T ca c. T a

    Ia, c a 1990, b a a a 10,000

    MW caac a b a a ac a a

    . T c a Aa D Ba cc: Qa La

    W P Aa: C, Ba a Obc, Maa J 2010. T

    cc a c a c cc

    a .

    T a a c S. V. Sbaaa (Sca Ga), S Ma K. S

    (Sca) a a Ia W E Aca (IWEA); a A Daa,

    Aa Ja, Mca Ha, Maa Jaa, a W C (Ta Tc ENE). T

    b b b Aa D Ba a, c

    Ja Sa a S K, a a Pa Ja Ia W E, Ic.

    T a a ac a ca a ac Ta Tc, Ic. a aca, M. A Ab, Vc P Cca

    E, a , ca a a a cb

    c.

    Sca a Saa Paaaba, S A E USAID a Ra

    Pa Dc USAID SARI/E Pc.

    Fa, a b a M. Ba Naa B

    Ta Tc a a cc S W P

    Ta SARI/E R, c a Cb, S Laa, Sb 22 24,2010.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    8/138

    S W P Ta SARI/E R

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    9/138

    S W P Ta SARI/E R

    ACRONYMSADB Aa D Ba

    AEDB Aa E D Ba (Paa)

    AEP aa c

    BOO ba

    BPTA b a a

    CDM Ca D Mca

    CDM EB Ca D Mca Ec Ba

    CFD caa ac

    CER c c

    CERC Ca Ecc Ra C Ia

    CIGRE C Iaa Ga Ra Ec / Iaa Cc

    La Ecc S

    CO2 cab

    CUF caac a ac

    DANIDA Da Iaa D Ac

    DFIG Db c a

    DNV D N Va

    DPR a c

    DSCR b c ca a

    EIA a ac a

    EHV a a

    EPC , c a cc

    FIT a

    GBI aba cGHG a

    GZ (Deutsche) Gesellschaft fr Technische Zusammenarbeit; German Socieity

    for Technical Cooperation

    HV H Va

    IEA Iaa E Ac

    IEC Iaa Eccca C

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    10/138

    S W P Ta SARI/E R

    INR Ia R

    IPP c c

    IRR a a

    JI a

    V VW Wa

    W a ; a a

    LDC La ac c

    LKR S Laa R

    LVRT La

    (, )

    MEASBET Iaa N Ha a Rc

    W E Ma

    MIGA Maa I Gaa Ac ( W Ba)

    MNRE M N a Rab E Ia

    MV M Va

    MW Ma Wa

    NPV N a

    O&M Oa a aac

    OEM Oa aac

    ONGC O a Naa Ga Ca Ia

    NOC N bc cca

    PCN Pc Cc N

    PDD Pc D Dc

    PERT Pc Eaa a R Tc

    PLF a a ac

    PMG Pa a a

    PPA ca a

    P, P50, c. Ecac bab

    R&D ac a

    RCEMH Ra C Ecc McH (Na)RE ab

    REC Rab E Cca

    ROE

    RPS Rab P Saa

    R Ia R, a a INR.

    SARI/E S Aa Ra Ia E

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    11/138

    S W P Ta SARI/E R

    SCADA S C a Daa Ac

    SIL ac a

    SMB ca ca ba

    SO2

    S3

    IDF SaSca Saab Iac D FSWOT S, a, , a a

    TSO Ta a

    TSP a c

    TSU a

    U a a WH

    UNFCCC U Na Fa C Ca Ca

    WAP W Aa Aa a Aca Pa

    WEG cc a

    WRA c a

    WTG b a

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    12/138

    S W P Ta SARI/E R

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    13/138

    S W P Ta SARI/E R

    CONTENTS

    1. / 1

    1.1 T Ca W E D S Aa / 1

    1.2 T B W E D / 3

    1.3 T F W E D / 4

    1.4 R Oaa / 5

    2. A/E C / 7

    2.1 Ia Ba a D P / 7

    2.2 Pc Sa a T / 9

    2.3 Pc Ra Ma / 11

    3. / 15

    4. A / 19

    4.1 Bac Caca D W P / 20

    4.2 Ma Acca W S Ma / 21

    4.3 Aaab Iac / 26

    4.4 Cac a Ea Ca / 28

    5. / / 31

    5.1 W Tb Tc / 35

    5.2 W Tb Sc / 355.3 S Sc / 36

    5.4 C M / 36

    5.5 Ca / 36

    5.6 C, Oa a Maac / 35

    5.7 Sc R Oa / 37

    5.8 P a Pc Maac / 38

    5.9 Ra M / 38

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    14/138

    S W P Ta SARI/E R

    5.10 T Ecc W P / 39

    6. G / 43

    6.1 Ta / 44

    6.2 S Iac S / 466.3 Fc C / 47

    6.4 Rac P Maa / 48

    6.5 Hac a Va Fc / 49

    6.6 Pc Sc / 49

    6.7 M a Cca R / 49

    6.8 S C a Daa Ac / 50

    6.9 Baac a S C / 50

    6.10 Ra R / 51

    7. G C C / 55

    7.1 C Sc / 55

    7.2 Ga Paa a W Faca M / 56

    8. F / 67

    8.1 Fab R / 67

    8.2 Da Pc R / 68

    8.3 Pa B Dc / 69

    8.4 Eaa B / 71

    9. CD 73T CDM Pc Cc / 74

    9.2 Ba / 75

    9.3 W E a CDM / 75

    9.4 C I / 76

    9.5 Va E Rc: A Fab Aa / 78

    9.6 CDM B Pacc / 79

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    15/138

    S W P Ta SARI/E R

    A

    A. W Pc D Cc / 81

    B. T SARI/E Pa / 99C. Ca S / 103D. Offshore Installations / 107

    E. Sc Rc / 111

    F. V Cac Ia / 115

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    16/138

    S W P Ta SARI/E R

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    17/138

    S W P Ta SARI/E R 1

    Sc 1

    INTRODUCTION

    T E Sc R a

    c a SARI E c. I a cc b USAID/SARI E

    a a a c c c a , ab

    Ma, Na, Paa, a S Laa, a a ac a. I a,

    USAID a a S W P Ta SARI/E R

    Sb 2010 Cb, S Laa,2c b c

    a a a . T a a a a

    a a .

    T a a bc c a cca

    c a a a ac c ,

    c a a. I I a a c a

    c SARI aa a cca,

    cca a c a a, b a c .

    1.1 T Ca W E D S Aa

    W 11,807 MW a (c) caac a b

    Ia, cb a caac a SARI/E c Paa,

    Baa, Aaa, Na, S Laa, Ba a Ma a 40 MW. T ac

    a ab c a a , ac

    a b c acc c ac .

    2T S Laa Saab E A (SEA) c a Aa D Ba

    a, c 55 a , a , c

    aa, NGO a c c SARI c.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    18/138

    S W P Ta SARI/E R 2

    SARI/E c c a : a 3a ba

    a ca ab c S Aa

    a c a ba; a, a ab a ab a

    c a4 C Ecc Ba (S Laa). T

    a a c ca c a c ba.

    T c SARI/E E Sc R a b 2009. I ca a b

    aa a aa a c c

    ab SARI/E c. T a a

    aca a c . T c c

    ac c c, a a, a

    bac a cc . A a cc

    a acab c a aaab, c a b

    c a aca c a b c, a

    a a b c a.

    A cc c ca a c a a

    ca a SARI/E c. W a

    a a, Ia aa a cc a a a a

    c a a a ca c .

    T a c ca b c ( , b

    aac a ab, , O&M c.) c a

    (c aac a aa , a, a , c). A

    aa cc 2005 b T C W P, WISE, P, a

    a : ac, ac, aac,

    ab a c, c a O&M.

    T a a c c b a ac:

    S b a ac a a c a aac

    a

    Aac aa a cca c aac a

    cca ac ca aac a a acc

    c a

    W c caaca/ ac a aa ca a a , a a

    Acc , ac MW a ab 5.7 c b a 22.9c b, b a O&M b a. T cc a

    a aa c b ca a aa a aa

    3Policy and Market Options to Increase Adoption of On-Grid Renewable Energy in SARI Countries, the report can be down loadedfrom the SARI/Energy website, http://www.sari-energy.org/PageFiles/EnergyLibrary/SariResources.asp.

    4India Sri Lanka Submarine Cable Interconnection Project, Interconnection Reliability and Stability Study, October 12, 2010,

    Chapter 12, Wind Penetration: Study of Frequency and Voltage Control Aspects; the report can be down loaded from theSARI/Energy website, http://www.sari-energy.org/PageFiles/EnergyLibrary/SariResources.asp.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    19/138

    S W P Ta SARI/E R 3

    a a ab c, b a b

    aac/ab ca a a a a aac.

    I c a ab aca, bca a

    a c ba a bc . T

    a a ca a , b a c . F c a

    a S Aa, c a b ca

    :

    Sa C C

    ?

    G

    Da

    Rab E

    W cc

    Pc ca

    Tc

    Ca 1, 2, 3, 8, 10

    Ac

    P a Pc ac G c a cc

    Pc

    Ca 4, 5

    P c W Rc a

    Ic aca

    Pc

    La ac

    W b

    Faca

    Pc aa

    Ca 3, 4, 5,8, 9, 10

    Ra c C a a c c/b

    Ra a

    Ca 5, 9

    E S Ma acc

    Ic aca

    Ta Pc ca

    Ca 1, 2

    Ac

    Pc S M

    E a cc

    C

    Ca 3, 4, 5, 6, 7, 8

    T a c aa, a b acc a

    ac ab bc a . I a, ccc a

    aa b acc c aa a c

    a ca.

    1.2 T B W E D

    W SARI/E c . F S Aa c a

    a c c, a cc a a b a aa

    , a . T c:

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    20/138

    S W P Ta SARI/E R 4

    . W c

    ca c /a c, c ca cc .

    . O, c a ca

    a aa. T cc ca cc a

    ac aa.

    (C2) . F c a a b a

    a, a cc c CO2 a

    a.

    (2) .SO2 a bc b ca

    a . I a ac cca c a ca ca

    ac a a a a. B ac a 20 MW a, a 20 MW

    c ca c SO2 b 120 ac a.

    . W a a a a a

    c. E Wa a b a ab ca.

    .Ab 5% a a b, a

    acc a. E a , c a a a a, ca c ac.

    Ca cc a a ba (..,

    , , a aa) a a cc ( a).

    1.3 T F W E D

    T ca ba aca c a a

    aa 2010 ( F 1). B ca c

    a, .., Ca, Ia, N Aca. Gba c

    a a c b a a a, ,

    ab c a ca ca c a a ca

    ca.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    21/138

    S W P Ta SARI/E R 5

    F 1. A

    T SARI/E ca . Ma

    SARI/E c a ac

    c c cc a

    a c c

    a c,

    c ca aca

    a a a a

    c. I a,

    c a b

    ac c

    c

    (a Paa a S Laa a )

    a c

    a (a

    Na a Baa a ).

    1.4 R Oaa

    T ba a b S Aa c a

    c c c , a a a

    c Ia a a. Pa a a b

    c c a cca c a.

    Eac c aa a a b a. Sc 2

    a SARI/E . Sc 3 cb

    c cc. Sc 4 a b aac a

    c a, c bac caca aa . Sc 5

    c b c a b c . Sc 6 a

    cc a c cca a c cc

    a. Sc 7 cb c a cc aa. Sc 8 cb

    ca aca , a Sc 9 cb UN FCCC Ca

    D Mca c . T a ca aa a

    a cc a a c a ac

    c.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    22/138

    S W P Ta SARI/E R 6

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    23/138

    S W P Ta SARI/E R 7

    Sc 2

    STATUS OF WIND POWER IN

    SARI/ENERGY COUNTRIES

    A SARI/E c a a c

    a. Ma a c a c (

    c a) a a a a ac a ac c

    a.

    2.1 Ia Ba a D P

    Ec Ia, c a a c, Paa

    a S Laa a SARI/E c c b a a aac a c. Aaa, Ba, Na, Baa a Ma a

    a cc c a a a a c

    c .

    Tab 1 2009 a caac a a ac

    a.

    A c S Aa ( Tab 2),

    c cc a b c b a

    a ac:

    T c c

    ( c, a, c acc c aa a a

    a)

    I b

    T aaab caa c

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    24/138

    S W P Ta SARI/E R 8

    W a acc a c a c

    c .

    Tab 1. 2009 Ia W P Caac a Pa

    C W P Ia

    (MW)

    W P Pa

    (MW)

    Aaa U 1 15,8001

    Baa 2 1,0002

    Ba U 1 5423

    Ia 11,807 48,561

    Ma N/A N/A

    Na U 2 448

    Paa 6 15,2001

    S Laa 33 20,00041F ca 7 (>8.5/) a, 2P c a 2020, 3Ma ca,4O

    Sc: Ta Tc, Ic, 2010.

    Tab 2. Ea S Aa W Pc P (MW)

    C

    Naa

    Ta

    Pc

    Ac

    D

    Ia

    Aac

    D

    U

    Cc C

    Aaa NA 0 0 0 0 0.7Baa NA 23 0 0 0 0

    Ba NA 10 50 0 0 0

    Ma NA 50 50 0 0 0

    Na NA 23 5 0 0 0.3

    Paa 5,000 4,850 900 150 50 6

    S Laa 34 120 80 43 20 33

    Ia* 10,500 3,800 850 600 NA 11,807

    C 11

    Pa a a c ac a Ia Rab E D Ac,

    J 2010 (c Ia a ca a aa ac bc a).Sc: Ia W E Aca a Ta Tc a, 2010.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    25/138

    S W P Ta SARI/E R 9

    2.2 Pc Sa a T

    W a ca cc, a ca ca a a

    a. T aca c aa c cc

    c, a cc a a . B c a

    SARI/E c, c c, a

    . G cc a a c a a c

    aac a a b, ab a

    SARI/E .

    I Baa, ab a a b b a/ a,

    c ac a a b . T

    Rab E Pc 2008 c a a ab c,

    b a a ca a

    . F, a ca aa b b

    . Va a a b cc b Baa PD Ba a a a caa . Ba

    , c 80 W a 400 W a b .

    I Ma, cc a a 17 US c/W a c c

    a 58 US c/W aa a a cca c (c: STELCO).

    T c ca, c ca a a c a a 5 US c

    a. F, a a a Ma a c, a

    a a ca c c, c 100%

    . T a bc a a

    caba c b 2020. T cc c ac a (a)

    cc a (b) ab ba b bca

    c.

    I Paa, c a a ab a

    aca. I Ma 2003, ac a a a a 10% ab

    (a 2,700 MW) c b 2015. Paa Aa E

    D Ba (AEDB) a a c c 50 MW ac a

    a cc a a c (IPP) c

    NEPRA ( a) a ac a b 10 a 13 US c/W (c: AEDB).

    Ta, a a a ca a

    a a, a aca c c b 2010.H, a a Ra P Pa

    Pa, c a a a a c aa cc a aa

    3,000 MW, c c b 13 a 22 US c/W (c: Aa D

    Ba, ADB).

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    26/138

    S W P Ta SARI/E R 10

    S Laa , c ca a c ca a ca , aa

    b aac, 67 c. A c a

    ac 1999 a caac 3 MW b. T 10

    MW a a a a a b c, a a a

    cc ac .

    D ca , SARI/E c ac

    a a a aac a a a ca

    cca . T a a cca c a SARI/E

    c a a c, a , c

    c a a aa ab a.

    I, a c c a b a

    ab: ab aa (RPS), ab cca (REC) a

    a ba c (GBI).

    RPS a c ca ab a b a a cc,

    aba aac a aa c. A RPS ba cc a

    a cc a c a c a

    cc b ab c, c a , a, ba, a

    a. T a a RPS a a a c a,

    a, ab b cca c ca

    cc .

    U a c aa ca a ab a c, RPS

    a a c c b ab ,

    b ca b c b a RPS a. T a RPS ca ca a a a

    c, cc a a a ab a b

    c, a ab c ca c.

    W RPS a aa a ca ab , ab c

    (REC) a acc RPS ba. REC a aab cca ac

    cc (ca MW) a c ab c. REC a a

    ca, b ab a. Tca b

    a REC a a a ab RPS ca a

    cab . I ca, ca a (PPA) a b c a REC, c ca b cc (

    ca, ) REC. I ac RPS aa,

    REC a a acc . T c REC a ca a a,

    ca ca .

    GBI a a c c ab c. GBI

    a a a c a c a ac cc c

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    27/138

    S W P Ta SARI/E R 11

    ab c. W GBI a a c (.., c a c

    U.S.), c bc c bca a a a

    b a c. D cc , a ab

    a ca c, c ca a a ab

    c.

    I a, F Ta (FT) ba c ab

    c bca a aa c a cc .

    D FT a ca c cc

    a ca. Ma SARI/E c a FT c ac

    a.

    Ica, c a a a a a ca

    aca a aac a a ca ac a a a, b

    a ca c aca ca a c, a ca

    a ca.

    2.3 Pc Ra Ma

    T c a, SARI/E a a

    a a Sb 2010 cc Cb. T

    a ac c :

    Da a c c a a

    Ra a aa cca c

    D a acca aa a.

    T a ca a b a

    a a a a c. A

    aa c a a aa a.

    Eac c a c a aca a

    a a Aa D Ba a. T

    ac a ac a c c

    a a caac c a a c a

    a c a.

    A c a a a a a aca

    SARI/E c a a a a

    Tab 3.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    28/138

    S W P Ta

    Tab 3. P

    10 Ra Ma E

    Iac caCa a a

    R c c

    Acca ca ca

    S a

    D a caac

    W c

    Fa acc

    E a

    A c

    G c a a

    USAID a , c

    F 2.

    SARI/E R

    c Ra Ma D Ec Ta

    Naa W Pa

    Ac I

    P

    1=

    a a aa aa

    ADB.

    C

    12

    L (Ra

    H a 5=L)

    cca

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    29/138

    S W P Ta SARI/E R 13

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    30/138

    S W P Ta

    I a, c

    a b

    a a cc ,

    ac.

    SARI/E R

    aa a c

    a c a c. Iac c

    c a a a

    14

    a

    a a

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    31/138

    S W P Ta

    Sc 3WIND PO

    LIFECYCLE

    T c

    ac a c,

    a ac). W

    a a

    F 3.

    Sc: Ta Tc EC, Ic. W E

    SARI/E R

    ER PROJECT

    c (F 3) ,

    a ca a a a c ( c

    c cc a ac c a

    bac 12 F 3.

    D

    Sc a Ta Tc ENE, 2010.

    15

    a c a

    c ,

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    32/138

    S W P Ta SARI/E R 16

    W a a a, a b ca a,

    c c cc a a .

    1: A

    T a ac c cc a ac '

    c, a a c a. T , , c ab.

    2: /

    B a c, c c a c,

    a a a a

    c.

    3: E E

    A a aca a ac c a c aa

    a c c a cc ab.

    4: A

    La, a bc, c b ca a

    a cc a. Ra a a b c,

    a a, a , aac ac a

    b, a c ca a a , a

    ca a a ca, ca c.

    5: A

    A cca c b a a a

    a ac a b a. T, aaab a acc a b a ca c.

    6: E A

    T a a a b accab, a

    a ca b ab b c.

    7: C / A

    E b a baab c a, a c

    a c b a 10 30

    a aa . F , a ca a (PPA)a baac a b a a b a.

    8: A

    Ma ca a a ac b c c .

    T b aa a (a ca) a

    ca b ac c a c.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    33/138

    S W P Ta SARI/E R 17

    9: E A C / F

    B a a ca. I S Aa, a b a c

    a $1.6$2.4 aa (MW) Ia c c baa

    c. Acc caa a c caa a ac. Sc 2004,

    a a c a ca bca b a ca a

    c a . Hc, c , c c ca , ca a c cc. M a

    a c c a a a a c.

    Sc a a a b a a

    a a, b a c aa

    a a bab aca . Ba

    c ac b a c b ac c

    a (a c ca a) . Ua, a

    c ac5, c ca .

    10: E

    E b a a. S ac a

    a c a , a

    b .

    S b a a . Sa b a ca ,

    b a a a ca a a a. A c

    a a a ca a ca ac

    ac.

    11: CW a cc b ca b a c , c a

    cc (EPC) a a a c c, cca, ca a

    cca . M a 5070 ac c a ca b 250 300

    a a .

    12: A &

    Tb aaab (ab) a a ac c cc, a c

    a aa O&M b a. O&M c

    a aac (OEM) aa a, b a c

    , OEM O&M ca .

    5Describing a loan for which there is a co-signer. That is, if the borrower defaults on the loan, the co-signer becomes legally liable for repayment. Thus, in addition to any collateral that may secure the loan;the lender is further protected from default by the existence of the co-signer. No matter what risk eventoccurs, the borrower or its guarantors guarantee to repay the debt.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    34/138

    S W P Ta SARI/E R 18

    A a bc aa c, a

    c a c a c bc

    a. Scc a c a b c a

    a, aca a a c. T, ca

    a c c a cb F 4.

    F 4:

    Sc: Ta Tc EC, Ic. W E Sc, 2010.

    Final Horizontal LayoutFinal Horizontal Layout

    Engineering, Constructability,Environmental, Wind, & Land Owner

    Review

    Constructability Considerations

    DevelopmentDevelopment

    Operations Ongoing Adaptive Management

    Final Construction PlansDrawings/Contracts/Compliance

    Plan

    Define Constraints: Land,

    Environmental, Cultural, Political,

    Wind, & Engineering

    Development

    Initial Regulatory Strategy

    Development

    Restoration

    Monitoring

    Construction

    FederalPermitting

    State/Local Environmental

    Review/permitting

    Continued

    Engineering Support

    Land Interconnection Finalize Procurement of Turbinesand Long Lead Time Items

    Engineering Fieldwork/Constructability

    Considerations

    Environmental & Cultural Fieldwork

    Conceptual Layout

    Select Preferable Turbine

    Technology

    Potential Wind Site Begin Discussions with TurbineSuppliers

    Environmental/Cultural/

    Engineering Screening

    Public/Government

    Acceptability Screening

    Land Screening

    Wind Transmission Screening

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    35/138

    S W P Ta SARI/E R 19

    Sc 4

    SITE SELECTION AND WIND

    RESOURCE ASSESSMENTS

    S c cca cc. A c c

    aa a a cca cc c b ac a a .

    T c b b c a a a a ca. T a

    a a b c aa ca c ab b,

    b aa Naa Rab E Laba (NREL) US (aaab

    a: ://.a./PaF/Wa_W_D/_a

    WRcAa.a) U Na E Pa Sa

    a W E A Pc (aaab a: ://a..). T a a

    b a c a a a ca a ac .

    A a , a a a acca cc caca a c b ba c ac.

    T a caacc a a , a ,

    a c a ca a b aa cc a

    a cc .

    T cca a a a , c

    . T, a ca a c a a

    c aca b b a . T, b

    a a a, a a aca ca () aa ccac a . I a ca, c a a aa

    a a b c . T a

    b c c c c .

    D c, c a a ca b c c

    a W Aa M W Aa Aa a Aca Pa

    (WAP), c aa ab ca a. H,

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    36/138

    S W P Ta SARI/E R 20

    aa ab a a a a (.., 10 ) a a

    ca a , c aa a a a a ab

    a . I a b a c a a a

    ca W Aa M ba a aa c c a aa Nca

    Wa M aa . Aa, c aa a a ab a

    a aa.

    T aa a c a cb c a aaab

    a c a a a a a. F 5 a

    c.

    I a, a b ca a a b c a a

    c, ba a c c a cac cca

    a b , a cca ca aca

    cac b a a b a ca.

    4.1 Bac Caca D W P

    T aaab a a a cb , c a

    a b ca aaab b a ac . Aa,

    a a a c ; a a, a, , a

    a . S b a a ca a aa a

    bc ac ac.

    A a a b, a a 6 c (/) a

    ca a aca. W c c a b a

    S Aa c a .

    W , a a a ( aa ca

    c ), a a aa c aaab a a

    a , a ca c aaab a c b a

    b. Ca a 50 ab a Tab 4.

    W a ca ab a . Bca a bc a

    a ca, aa a , a 1,000

    a b 3% a a a a .

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    37/138

    S W P Ta SARI/E R 21

    Tab 4. Ca W P D a 50 M Ab G

    W P Ca (17) W S (/) W P D (W/)

    1 < 5.6 < 200

    2 5.6 6.4 200 3003 6.4 7.0 300 400

    4 7.0 7.5 400 500

    5 7.5 8.0 500 600

    6 8.0 8.8 600 800

    7 > 8.8 > 800

    T ca a b :

    bgp NNVCArhoP ******5.0

    3=

    W:

    P = a (746 a = 1 ) (1,000 a = 1 a)

    = a ( 1.225 /3a a , a ca a a ca)

    A = aa, (2)

    C = Cc ac (.35 a , .59 B a

    ca b)

    V = /c

    N = a cc (80% b a a a a

    cc c a)

    Nb = ab/ba cc (a a 95% a ).

    T acca c c b aaca aca

    c c b aac.

    4.2 Ma Acca W S Ma

    4.2.1 Paa

    A a a, b c

    a a aa a ca a . W ca c

    ab ( a 1 aa) a a a

    a a, a b b ac aa

    a a a b a a

    a. H, a ca, a

    c aab c a a a

    a a a caa.

    R a

    c a

    a c a

    ba ( a

    a), a bc acca a aab

    a c

    a. I bc

    a (Sa) a

    ba (La) , a

    D S c

    a

    .

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    38/138

    S W P Ta SARI/E R 22

    F 5. E A

    Sc: Gaa Haa

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    39/138

    S W P Ta SARI/E R 23

    A

    A ca a a a b a (c a ) a a

    a, a a (c a c).

    T b cc a aa , a ba a a, a c cab. T

    a b a ba a a ab (RE) (a

    a/ ). A a a ab b a. Maca a a a a aa ca b a .

    I a ca c a, a

    acca a ac , ca a a

    c (>20 MW). O , a a, a a a c.

    W ca ab , c a a

    a c b b a b. W a ab

    a aaab, a (c cb

    ca a a ) ca b a aa

    a. Uca a ca aa ,

    b a a b a a b c 25%.

    T c a . T a ca b a a a 6080 .

    Ab a, ca bc ca a a ca c cab6.

    A B

    T Iaa N Ha a Rc W E Ma

    (MEASNET), Iaa Eccca C (IEC) a Iaa E

    Ac (IEA) b a cca a

    . T c aab ac c a

    baab c a, a a c a

    a caba a.

    I a a aa, a a a cca,

    caba, aa a aac c a a c.

    6Met-masts are made of thin aluminum tubes, they are tilted up and use guy wires for support. This is the cheapest configuration.

    Taller means risk of bending of these thin towers. Instead of winch, cranes are used.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    40/138

    S W P Ta SARI/E R 24

    A W R T a b a c

    b , a b

    a c.

    Sc: Oc Wa Sa Ca, 2010

    D

    W b a a aa a bca

    b a ab c a b c (4/ a 26/,

    c a ca b) ca b a b a. U

    aa b ca b a bca ca a.

    Bca bc aa aa, 12 aa a a ab

    a aa a a ca. A a a

    aca a c (F 6). W a

    a . I ca, b a

    b c ac ca . H, b

    a, b b ac a c.

    F 6.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    41/138

    S W P Ta SARI/E R 25

    W ca a ca a (F 7) a a .

    Hc, a aa a a a c

    a.

    F 7.

    T a aa a a a c c ac a. Tca b ba c a :

    Scc a

    Tac c

    Aaab

    Aaab b

    Saa aa.

    4.2.2 Ea P Pc

    T a a ca a a aaab a . T W

    Aa Aa a Aca Pa (WAP) b RISO ab, Da,

    a.

    Ia c, a, b ca, cc c, c.

    cc a a. T a a ca a

    Monthly wind flow pattern

    0

    0.5

    11.5

    2

    2.5

    3

    3.5

    4

    4.5

    Janu

    ary

    Febr

    uary

    Marc

    hAp

    rilM

    ayJu

    ne July

    Augu

    st

    Septe

    mbe

    r

    Octobe

    r

    Nove

    mbe

    r

    Dece

    mbe

    r

    Months

    WindSpeedat10m(m/s)

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    42/138

    S W P Ta SARI/E R 26

    a, c aaab a c a a c a

    a a a ca.

    Ta, ca a caa ac (CFD) caca a a

    a acca. Sc CFD a a a

    c b ca b bc cc aa c.M ca a aa ac ac a

    ca. CFD ca cc a ca b b

    ca a c a c.

    4.2.3 Pbab Aa

    Sc ac a a aa aa, ca a

    aa a aa c (AEP) . T, ca

    ca aa b. Faca ac a c a cba

    ac a aa a a ba ca. T a

    c AEP ca P50. I aa , bab

    ac a aa c 50:50.

    A a c aca ccc ca a

    a cac bab (P) a aa c. P75

    aa c a ac a bab 75% a a

    P50 a, acca ca aca a. T

    a aa c P90 ac 10%. B a a b

    ba a a ba ac c. T a

    aca a a b c ca a aa bc

    a a a ac c, aa ba a a ca

    c.

    4.3 Aaab Iac

    T ac a a cc c a a ac

    c . I a a c ca (a)a c a. Tca a a aaab c

    : a a a a. Pa a ca b c a ba

    bc c a. Tca, a a b a b a

    . G a ca a a a a, c

    ca a ca a . Ua a a

    a a a c.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    43/138

    S W P Ta SARI/E R 27

    E

    La aaab, a c,

    c a ca b a a aca .

    Ecc a a b ca b a ba. F ,

    a ab a a a a a ; a ba

    aa a/c/aa a . T

    cc aaab ab aca a cc b

    a ab a aca c a ba.

    T aca a a c caac a

    cca a aca (c a a a

    cc). Sc a c cc a, a c

    aa c a a ca aa c, aac

    c aca , a a .

    A

    Accb a a ac a a c. A a

    ca b c . I a ba a

    ca a, a, aac a, a , c., a

    ca a. I a a a, a b ca

    c ac aaab a ca b a a a a

    c c.

    Va a a c a; bca a

    a c c, ca b a. Tca,

    a c c c:

    Aa

    Caac M E a F

    NOC ( bc cca, a ) b a ab a

    NOC b a ca

    Caac b aa a Sa ca caac ca ca, c, , c.

    Pc aa

    Cc G cc aa.

    I a, c a a a aa c a

    aca ca a cca ba ac. W a a c

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    44/138

    S W P Ta SARI/E R 28

    S Aa a baac ac, a c ac a c .

    Hc, a aca a c,

    cac ca. T a a c c (P50) a b

    c a, b ca a a a a ( a P84

    P90) . F 8 ca a b c a

    .

    4.4 Cac a Ea Ca

    T ccc caa b a. Sc a

    a a, , a a b c

    cca cca WTG a aa c.

    Ea (a , ) a b b c cc

    a a.

    C

    T a a a b c a caa b

    a a. Aa aa b c cca cca

    WTG a ca cca a .

    Sa a a a b c c a aa, b a b

    caa a a aa, a, c.

    E

    T a a c aa a caa b a. T ac

    b ca WTG a a.

    F

    T a a caa ac a a ac c

    c. T a a a ac Ea c.

    T c a a a a caa b

    a. T WTG b a a a c

    c .

    I c ca cc a caa c b a cca

    cca WTG a a.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    45/138

    S W P Ta SARI/E R 29

    F 7: D

    Greenfield Activitiesand Pre-projectPlanning

    ProjectMonitoring

    Wind ResourceAssessment

    Procurement

    of Manufacturerand EPC

    Contractor

    SynchronizatGreenfield Activitiesand Pre-projectPlanning

    ProjectMonitoring

    Wind ResourceAssessment

    Procurement

    of Manufacturerand EPC

    Contractor

    Synchronizat

    Greenfield Activities and Pre-

    project Planning

    Identification of proposed potential site

    Survey Regarding terrain and topography

    Survey of approach road/infrastructure

    Policy and Regulatory Study

    Wind Resource Assessment

    Mast Installation

    Measurement and Collection of wind data

    Wind data analysis

    Selection of appropriate WTG Mode

    Micrositing

    Wind Flow Modelling

    Annual Energy Estimation

    Contingency Analysis

    Applications for permissions

    Procureme

    EPC Contr

    Technical Du

    Commercial

    Third party v

    Legal Due D

    Negotiations

    Raising Purc

    Project Monitoring

    Monitoring delivery schedule

    Validation of technical compliance

    Monitoring WTG commissioning

    Quality CheckSafety

    Synchronization

    Prestabilization test checks

    WTG Grid syncronization

    WTG Stabilization

    Sale of Elec

    Sell Electricity

    consumption / E

    Monitoring pay

    Monitoring rea

    and other losse

    Payment realiz

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    46/138

    S W P Ta SARI/E R 30

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    47/138

    S W P Ta SARI/E R 31

    Sc 5TECHNOLOGY/TURBINE

    SELECTION

    Ecc a a b a a a. W , c a , ca a c.

    T cc a a . W a

    b a b c aca c a a

    a. W bac cc a a ca a

    aa a a b, b a a

    a a a aac ac. I a ab, cca,

    a a c cc a aac a aac,

    c a c 20 a.

    I a bc c, ab, a cca , b a

    b , a a 15 1980 a 128

    a a b, c a ca a

    16,000%. Tb cc a aaca aac

    a . F 9 ca .

    I 2007, MWca b (caac 1 MW) ca 95% a a, a

    a 5% a ac. W MW , b caac 2.5

    MW a a a bc ca a, c a . T a

    a a b 20 b 2003 a 2007, 0.3% 6%. W

    c b a a b , ca a, c a a a ca

    1.5 3.0 MW a.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    48/138

    S W P Ta SARI/E R 32

    F 9. A

    Sc: Bba WE .V.

    T ba aac b ( 2007 ba a a) a

    cc a a Tab 5; Tab 6 caab aa

    S Aa.

    Tab 5. Fa D La 10 Gba Tb Maac

    Maac Ma

    Sa

    M D

    Ta

    P

    Ra

    (W)

    Da

    ()

    T

    S

    (/)

    P

    C

    1 Va 22.8% V90 Ga 3,000 90 87 Ac

    2 GE E 16.6% 2.5XL Ga 2,500 100 86 PMG

    c

    3 Gaa 15.4% G90 Ga 2,000 90 90 DFIG

    4 Ec 14.0% E82 Dc 2,000 82 84 Sc

    5 S 10.5% S88 Ga 2,100 88 71 Ac

    6 S 7.1% 3.6 SWT Ga 3,600 107 73 Ac

    7 Acca 4.4% AW

    119/3000

    Ga 3,000 116 74.7 DFIG

    8 G 4.2% RE750 Ga 750 48 58 Ic

    9 N 3.4% N100 Ga 2,500 99.8 78 DFIG

    10 S 3.4% 1500

    (Wc)

    Ga 1,500 70 NA NA

    Sc: Ia W E Aca, 2009

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    49/138

    S W P Ta SARI/E R 33

    Tab 6. Fa D La S Aa Tb Maac

    Caac

    (W)

    M R

    Da()

    Hb H

    ()

    C

    WS

    C

    OW

    S

    Ra

    WS

    (/0

    (/)

    .

    1650 V82 82 70 / 78 / 80 3.5

    /

    20

    /

    14

    /

    52.5

    E

    E

    C .

    600 T60048 48 50/55/60 3.5

    /

    22

    /

    11.5

    /

    55.3/55.8

    /

    E ()

    .

    800 E48 48 75 2.0

    /

    25

    /

    14

    /

    E53 53 73/75 3.0/

    25/

    12/

    57 /

    GE E

    ,

    1500 GE 1.5

    70.5 64.7/85 4 / 25

    /

    12

    /

    .

    750 W75548 48 50 4.0

    /

    25

    /

    14

    /

    E

    .

    1500 S82 V31500 82 78 4.0

    /

    20

    /

    14

    /

    52.5 /

    2100 S S88

    V3A2100

    88 80 4 / 25

    /

    14

    /

    59.5 /

    .

    250 SEPC 250 T 28.5 41.2 4 / 23

    /

    14

    /

    58 /

    B E . 500 V39500 47 50 4.0

    /

    25

    /

    14

    /

    56 /

    600 Paa

    Sa 600

    47 50 4.0

    /

    25

    /

    16

    /

    70 /

    F

    225 GWL 225 29.8 45 4.0

    /

    25

    /

    15

    /

    60 /

    .

    1500 V 77 76.84 80 3 / 22

    /

    11.8

    /

    52.5 /

    .

    2000 K82 82 80 3.5

    /

    25

    /

    E

    .

    1000 WWD 1

    MW

    60 70 4 / 20

    /

    11.5

    /

    G

    750 NORWIN 750 47 65 34

    /

    25

    /

    60 /

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    50/138

    S W P Ta SARI/E R 34

    Ta Ia, b ca a 250 W 2100 W; a a

    ca cab b. I b

    c, Ia a a a aa caac, c:

    Ga c, b c a c a

    a a a cc

    Ca ab c c a; a c a a c c

    a c

    A a a

    Tb a a , c ca a: ca I >

    a 10 /; ca II > a b 8.510/, a ca

    III > b 7.58.5 / a ca IV > a 6 /.

    T c c c ca c cca aa. T

    ca a

    , c b ca c; ;

    a ca a ? T c c ca b a

    .

    F a, a a aca , c

    b aa ba a a (IRR), c a

    ca ab c a ba . I

    a a, a c, c c b

    a a b ac. I a c a a

    ca c aa, c a a a c c. H,

    a b a c ac a a ac

    (PLF) a c a aaab. S a b c

    a c caacc ca , aaab a

    a 9295% , a a ac .

    Tab 6. Fa D La S Aa Tb Maac

    .

    1350 LTW771.35 77 65 3 / 25

    /

    10.6

    /

    .

    250 A 250/50 30 50 4 / 25/

    14/

    Sc: Ia W E Aca, 2010

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    51/138

    S W P Ta SARI/E R 35

    T a c cb

    aac a c a, ca bac, a a a aac

    . T a ca ac c aa

    aa c a a. B a a, a bc a c

    c b a. O a aac a, a a a. T ac

    a ca a a.

    5.1 W Tb Tc

    T b a a cc . I a

    20 a, b a ca 250 W 5000 W a b, c

    a a b c, a a a ac

    ac a ac c a . A a , ba a caa a ac ac a

    . T a aab , b a : a cca ca a

    a caca ac a .

    W b c c ca a a a a

    . H aab a b c a a a ca

    c b c a a a b a cc a

    a ac. T a b a a aa 13 a a a

    20 a. B ca, a ca a a 200,000

    a a a ab 5 a. T

    a c a c a cca

    a ac a a.

    5.2 W Tb Sc

    T c a b a cc ab. W cca

    cc c a , c a a a

    ac. I a ca, b ba c EPC c,

    c c a c a ab

    a c b a, ab a a

    b.

    I S Aa c, a b (a ccaa )

    ca b accac c

    a (WRA). T WRA ac b ca a a cc a

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    52/138

    S W P Ta SARI/E R 36

    (a a a ca b c ac a

    b). I ca ab, WRA c c a ca.

    5.3 S Sc

    W a a ca b ac , a

    a ca. W b a a cc a

    c a aab a aaab c, ca a

    c ac a aa . T b acc a

    WRA a a a a c a aa, c,

    , a c. W , c a ba

    a b ba.

    5.4 C M

    O a ba ca, ca b ca c a, c

    cb c c aa a a, a a ac

    c. T b a a ca. Ua,

    b ca ca a a aa c aa,

    ca b ac ca a c , c a b aa

    a c.

    5.5 Ca

    M c a a ca c, c

    c ca ca ca. T a

    ca a c aa a aca b aaab

    . F ac, ca b acaa ca aa, aa

    cca ab, aa ab a. T aa

    a ab a a aaab aa.

    5.6 C, Oa a Maac

    Oc cc c, a c b. D caac

    b, ac aaab a , a ca, ca a a a

    a c a a b. C a

    aa cca cca ac a a b, a c

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    53/138

    S W P Ta SARI/E R 37

    c a c. Ca a a a, a a

    a b a aa.

    T aaab a b a (WTG) a c 95%. T a a

    95% , b b aaab aa . T a

    a ca a. I a a a a ac , a, cca a a c,

    a , aaab ca a ab 8090% a c

    95% .

    Oa a aac c c a aac, a, a a a

    aa. T O&M c, c b 1 US c , a b

    c US c . Maac a a a

    c ca b

    a c, b c . T a aac a

    b a c O&M c W c.

    B a a, c aa a aa a a

    c. M a a c aac aa,

    c c a a a a

    aac c ac, b a ac. T aa a c

    c. Waa aa c a a.

    5.7 Sc R Oa

    D cac , a a c a a a b

    . T a a aa ac WTG

    a SCADA (S C a Daa Ac) a a

    c ab a a a acc b, c

    c c a. D cac a

    , c b a O&M cac a 10 a a ,

    a c a ca, a cac a c.

    A , aac WTG a aa

    acc b a ba . T aa cac a a c

    b a a a b c. Tc cac a aa ab WTG a

    ac c a aa ac aaab 95%.

    D cac ac a

    a a WTG c cac. A bac c

    b c a a a

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    54/138

    S W P Ta SARI/E R 38

    a ba a a a aa a. H a b a b

    a aaab . H, c b a b a.

    5.8 P a Pc Maac

    W c a ca c, a a a a a

    ca cc. T aa c b a a

    a, a a a ca. T ac, c

    b' caca a, 200 a a c acc.

    Ba a a a, ca , caa

    aa ac a a a a. T a

    a b ab a caca b ac a ca

    a. Hc, b a c a a

    aa a b .

    T , aa b a

    cc b aac aa, c a

    ca aac a . T a

    aac c a a ba, ba a aa b

    aaab aa b a 95%. I aac ,

    aa a c cab a a a a c b

    aac.

    Oa c c a a b a, , cc

    a, a a ca, a b cc acc

    aac c a b. S bac

    a c a a a cc , a a b

    . I a a a, c aac c aa

    a b a a a .

    5.9 Pc E Ra M

    W b a a ac a c

    . Hc a a a aa . Sc aa c a c b cca a cca

    ac ac. T c a c a a

    ac cc ca. Ga aa a ca

    a a b . T a a WRA a a aca

    ac. T a ca b a a a

    c a c a c a . Tab 7 a a a

    a b .

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    55/138

    S W P Ta SARI/E R 39

    Tab 7. Ia a Ra M

    E

    Caac

    b

    (W)

    Aa

    Ga b

    ( 100,000

    W)

    Ga

    I

    W

    MW

    C

    b(

    R)

    PLF

    %

    C

    MW(

    R.)

    C

    INR

    W

    Ra

    A B C D=C/B E F=D*1000/8760 G=E*1000

    /B

    H=G/D C F

    A 600 1.50 2.50 30.50 28.54 50.83 20.33 1 3

    B 800 2.00 2.50 42.50 28.54 53.13 21.25 2 3

    C 225 0.50 2.22 12.00 25.37 53.33 24.00 3 4

    D 250 0.50 2.00 13.20 22.83 52.80 26.40 4 5

    E 1000 2.46 2.46 65.60 28.11 65.60 26.64 5 2

    F 250 0.45 1.80 12.30 20.55 49.20 27.33 6 6

    G 1650 4.20 2.54 117.50 29.06 71.21 28.04 7 1

    PLF: Pa a ac

    A Tab 7 , WTG A a ca c, G a a

    a ac (PLF). T cc c a

    /, b a, a a.

    5.10 T Ecc W P

    O b cc a c,

    bc cca c ca a. A

    a, c b cca ab.

    T ca a baca a b ab:

    b c ca a (DSCR)7a c a a (IRR) ,

    a IRR . T c a a a

    a c c a b c ca a (DSCR) aa 1.30 a

    1 a a.

    Tab 8 a a b c ca a

    a a c a c .

    7T DSCR a a aa a b a ca b b ca a

    c. Ia, a b a a b a aa

    b.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    56/138

    S W P Ta SARI/E R 40

    5

    Methodology

    Tab 8. Sa Pc Ecc Caca a 18.75 MW W Fa

    A C C ( )1 Pc c MW 50.00

    2 T c c a 18.75 MW c 937.50

    3 I cc @ 1% c c 9.375

    4Pa a a , c , c. @

    1% c c

    9.375

    C 956.25

    C 1250 62.50

    B F C ( )

    1 E a a 30% 286.907

    2 T a ba a 70% 669.343

    956.250

    3 I a: 11.60%

    C D ()

    1 Pc caac 18.75 MW

    2 Tb caac 1.250 MW

    3 Nb b 15

    4 Ga MW 2.24 MU5 N a a (a Ia @ 2.5%) 2.80 MU

    6 Ta a c 42.00 MU

    7 Pa a ac 25.57 %

    8 P c (Ta Na) 3.39

    9 GBI @ 6.2 M MW aa 0.50 a U

    10 CDM / CER c ( FY 202021) 0.50

    11 Ta caa 0.00

    D F ()

    1 C MW 51.00

    2 C W 22.773 A. DSCR 1.49

    4 Db : a 2.33 : 1

    5 O&M ( c c) 1.50%

    6 Ecaa O&M 5.00%

    7 Iac 0.25%

    8 Ra a 20% a 15

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    57/138

    S W P Ta SARI/E R 41

    9 Pc IRR 12.96 %

    10 E IRR 18.13 %

    GBI = aba c, MU = , MW = Maa, PU =

    INR = Ia R

    T c c a ac, a c a:

    W a ab a c a a , ?

    Wa a caac a a a?

    Wa ac ?

    Ha a b aac? Ha a a

    b c ac, O&M, c.?

    Oc c c, c a

    a b c a. Wa c cc ca

    a , a c a

    c, caca a cca a. F 10 a a c

    a ca.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    58/138

    S W P Ta SARI/E R 42

    F 10. F C

    Control Room

    Ready for Erection

    R.C.C.

    Excavation

    Civil Work

    Commissioning

    Pre-commissioning

    Termination

    Control Panel Erection

    Cabling Works

    WEG Erection

    Nacelle & Blade at Site

    Tower Assembly

    Tower Materials at Site

    Mechanical Work

    Cabling & Termination

    Transformer Erection

    Earthing

    D.P. Erection

    Unit Substation

    Earthing

    D.P. Erection

    CTs, PTs Testing

    Metering Point

    Conductor Stringing

    Erection on Poles

    Line Survey

    OHT line

    Electrical Work

    EB Officials Inspection at Site

    Registration of NOC

    Land Procurement

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    59/138

    S W P Ta SARI/E R 43

    Sc 6GRID INTERCONNECTION

    T a ab a c cc c, b

    a, c a a c. G cc aa, a a

    ca, a c ac a a .

    W a c a b aaab. Ecc

    a ca b aab , a, a aa. B

    a, a a a aab c; a a

    a a, a ca a a a ac a a c a

    (a , a a a ac a ac ca).

    A a a , a

    c c. W a a cca

    ab, c a a. T c b cb ca

    a a .

    Cc a a c ba (C: PPM E / Ta Tc)

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    60/138

    S W P Ta SARI/E R 44

    6.1 Ta

    T cc a b a, ( F 11 a 12) a a

    c a . T a , a a (HV) a a (EHV) a . Va a

    a a ac a. Paa a

    a ca ab a a .

    Sba, c a baca c a c a, a c

    a a aac. M ba a a a ac.

    S acc a c a a ca b c a, a

    a, a, , c. Cc ba, a, a c, a,

    a , c. a a ba . T c ab a,

    aac a c b a a b .

    T a a, a c , aac a

    cca a a ca. I ca, ab

    a bac a a aca . T a b a

    a c a aca a b ca

    , a a c ca

    aca c.

    F a a cc a ba a ,

    a a ca ca b a aca c. N

    ac a (SIL) a a b a, a acc ac b

    a ba a a . I a, a N1

    c ca b a a cabca ba.

    T SIL a a MW a a c a aa ac baac

    cc. Ta c ac (Ma) aa caacac.

    T a Ma c a caac acac (XC)

    a a (V) a c . A a SIL MW

    a (a a ac) a c Ma a a Ma

    c. T a ac SIL ac caca.

    T, SIL a a a a a caab, a a acc , c ca

    . T a SIL a a a a a a ab

    SIL, ac a ac abb Ma a a a

    b SIL, ac a caac, Ma .

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    61/138

    S W P Ta

    F 11. D

    F 12. D

    SIL c a

    ca b a a 2.5

    a 100 . T, c

    c.

    SARI/E R

    EG, G C

    EG

    a . H, (

    SIL. W aca a b

    b SIL, c

    45

    a 100 )

    a

    c

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    62/138

    S W P Ta SARI/E R 46

    T N1 c (a U Ca Ta Ecc G

    C)

    a a a a a a a a

    (c a a a , a a , ca ac a

    b ba) b caab acca ca ca b a

    a.

    T c, ca ab, a a ca

    aca . C caac a ac (CUF)

    ca , N1 c a b a c c.

    A N1 ca a a aac ca. Ta ,

    (a ab) a a a c aac. T c

    , a , a c a aac

    cca .

    T N1 ca ca b a aa a a cc : ca

    cc cc, ba, a a aca .

    F a, a b a a c a , b a b

    a ba a ca b aa a a.

    A a a cca a a

    . T a c c aca c

    aa a a . T b

    cc a a ca a a cc a ca a a b ca. Ga ac a c

    a a ba aca c caa c , b a,

    a , caa, O&M ca, a ca c.

    6.2 S Iac S

    A ca a caac a a ca ca

    a, cc a a b a.

    W a a a , aa ca (.., aca ac ac, c c abab ca

    c, ac aca c a c c, ca a

    ) a . T b a c ac a

    a , a , a c, a , a a

    aca c. D a cc ca b a a a a a. F 13

    a a Ea c.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    63/138

    S W P Ta SARI/E R 47

    T ab, c a , a ac aa

    ac ca ( c ). A, a

    aba a , a a b a

    ac ca ca b a c .

    T aa a a (LVRT) a a

    c b c . H, c a

    c LVRT. T a LVRT ac, ac

    ca, a b a ca abab

    a a aa a ac .

    F 13. E E 2007

    6.3 Fc C

    F

    T c a ac c b c a

    ab a ac a b a c a a

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    64/138

    S W P Ta SARI/E R 48

    . H, a a aca c , WTG

    b a a a ca a c. I Ia, WTG a

    a c ca ca a 1 Jaa 2011.

    A 8

    F aca a WTG cc a a,

    aab a a b b aca c. W

    WTG aab , a a a a

    a. Aca c ca bac a a

    a abb c a.

    P a c a. I ca, a ac c (LDC)

    a a aca c .

    D C

    T a a a aca aaab a a

    a a a. H, a a c a bac

    a a c a a a

    a. A aa ac b a a

    cc LDC.

    6.4 Rac P Maa

    F D

    Ca c a cab ac , a

    c a c b a ca

    ac a a c. W a a a

    a c ac a baac ac

    a . La a aa a ac a 0.95,

    a 0.95 a b a a a a ba

    a. W a a caab c ac a

    cc a , ac a

    ac caab ca ab. Dac ac caab ca b

    ac b a cba ac caab c

    caac a ac.

    8T a c (a , ) a, c aa

    a, ab a c (.., ac a , ac , bac

    a, a c aaab).

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    65/138

    S W P Ta SARI/E R 49

    C

    T LDC a c a a ca ac a c ca

    c a a a. D

    a a , a a ac a (

    c ca c a) ac ac.

    I a aba , ac ab b WEG b a

    b c. L, ac a a a a a

    a a a , b ca. Ra a

    a a a ca LDC a a c .

    6.5 Hac a Va FcHac c a a b a accac IEC 6140021

    IEEE STD 5191992 . A a a c, IEC61000415 (IEC, 1997)

    a IEC 61000 415 (IEC, 2003) aa b .

    6.6 Pc Sc

    W a cc a a a cc

    a c . Rac ca aa cc a.

    W a cc a a b LVRT caab.

    H, a b c b aa ac a acc

    a . T c a b a aa a a.

    A cc WTG a a c c a

    a a , a a c a. T

    c c b ca c c c. A

    WTG b c aa cc a a a a.

    6.7 M a Cca R

    T aa a cca a aa ca b

    c a a, a c a aa ac (SCADA)

    b ac. F , a ca

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    66/138

    S W P Ta SARI/E R 50

    aa a ac a b , a c b

    ac. T aa a a c,

    c aa, a b ac a ac ca. I

    ca acc aac, a c a

    a ca a c b a ac.

    T b a a a b

    ca, a, cc, c ,

    a a . T b ab a

    , c a a a a a

    a b . A, a a a c cac (a

    cac) ac a a b .

    6.8 S C a Daa Ac

    Ta a a a SCADA

    caab bca a a a c a .

    H, ca b a a cc a ,

    SCADA caab ac a a aa a a a

    ab a a, c, a

    cc c.

    6.9 Baac a S C

    T b ca b () a ca

    a a , a c b a ac. A,

    a b a a (BPTA) a c

    a . A c a b a

    LDC.

    E c aa a baac a ca.9 T ca ac

    a b a a c b ba

    ca a. Ta a a a ca b

    acc ba BPTA. T baac a a

    a a a c a (TSU,

    a b a a caac acc a aa

    a a a BPTA, c a a acc

    9A c aa a cca b b cc ( ), a , c

    a a/ a aa ca c c aa

    a cb c a c a .

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    67/138

    S W P Ta SARI/E R 51

    a). Ba a, a a a

    a c b a ac.

    6.10 Ra R

    Ra ac c cc ac a

    a a c (.., 5, 10 20 MW), ba caac. W a

    , ac a ca c a cca c

    a a caacc a c,

    a c, a ab.

    T cca c a WTG . T a b

    a ca:

    Ca c a (ca )

    Db ac a (aab ) Ga c a a bacbac c c

    Aac a a a a.

    W ac, a c, a

    c a a . 1) I , a a a ac

    a aa a bac a c .

    2) La a , , a cca ca ac

    a ca a a ac. 3) S

    c a aa ac (SCADA), , b aa

    a cca a aa ca b c a

    a. T ca b b c ba

    ac a a b a a cca c a c.

    C G

    Ta c a cc a ccc

    a ac.

    T aca WEG cc a c

    a b.

    A Ga1 Na a ca

    2 Na a, b , , ca

    3 Ga ca cca ca

    a a a

    4 P cc aa a ,

    aa cc b

    5 Na a c cc

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    68/138

    S W P Ta SARI/E R 52

    a cc b

    6 Eaca ca b a a

    B Cc Sc P SbSa

    1 Na a

    2 G a 3 Cc

    4 C

    5 Da ba c

    6 Da cca a

    C ICc

    1 Ga a, a cc

    2 Da c b cc

    a c aca

    3 Sa a baca c a c

    4 R cc a a

    D Ga

    1 M ca a

    b a, a a caba, c. a

    c

    2 Da c

    C ca a /a

    a ca a a c

    a a aca b a c

    3 Ca c a a c cc a b c a b

    c b a a cc

    ca a cc

    4 Da a aa (a a ba) cac

    c a cc. F a, a

    ac a a, a ac,

    ac a a caab.

    5 Da a c a c,

    a a c a aa a

    c.

    6 Da aa ac a c bcc.

    7 Ca c a aa a aa (a)

    a cac c a cc

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    69/138

    S W P Ta SARI/E R 53

    B A

    T a c (TSP) a a a b a

    a ccc a ac. T BPTA b WEG a TSP

    a :

    1. Ba aa a c 2. Eab c

    3. F a ca a ac c

    4. B a a a, c a aa aca a

    5. Baac c

    6. A aaab a caac

    7. Dca a

    8. Na acc caac

    9. A a caac

    10. S a caac

    11. M

    12. E

    13. Ta ca

    14. Cac c

    15. Ta ac aa

    16. Rb a a VAT.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    70/138

    S W P Ta SARI/E R 54

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    71/138

    S W P Ta SARI/E R 55

    Sc 7

    GRID CODE AND CONNECTIVITYSTANDARDS

    A aca b a c aa

    a c a, ca c, a b , a ac .

    L a aca , bac ca a c a a ca a b

    . Ia aca a a c, a a acc a baac

    a c. T, a aca b cc b c

    a b a c ac aa ca.

    7.1 C Sc

    T a c a cc c:

    I c caa a aa c c a a a

    cc

    Oa a aac c

    Aa aa cc c, c a

    Tb Dc a

    Ta a VAT

    Ic.

    T a c ca b ab c b (

    ). F 14 c c a ca 2 MW b a E

    2006.

    T ba c ca a cab b a c aa. T, ca F 14 b a a

    c.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    72/138

    S W P Ta SARI/E R 56

    F 14.

    7.2 Ga Paa a W Faca M

    Tca, bca b a a 20 a, ca ca a a

    20 a. D , a ca c b .W b , a c c

    c c. T aca c b b a , a aa

    ba. T, ca b ca , a a

    c. A aa a a c a c ab,

    a a a b acca a a a aa. O

    a, a a c bc c a a c

    a aa.

    T aca b a a aa a a ab

    c; ca b a aa a . T a aa a a cca a ca. T aa a

    a b c a cca cc c a c b

    ( a PPA, ca a, ca c, c.) cca a c

    a a a, a a a aca aa c a b

    a a.

    Wind Turbine Investment Cost Structure

    1.5%

    0.9%1.2%

    3.9%0.3%

    75.6%

    6.5%

    8.9%

    1.2%

    Turbine

    Foundations

    Electric installation

    Grid connection

    Control systems

    Consultancy

    Land

    Financial costs

    Road

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    73/138

    S W P Ta SARI/E R 57

    T, a b a a a a aa a

    b aca . T c a aa .

    7.2.1 B M

    A c ca b a a b b . T

    b a aa cc a, a

    ca, c , a ac a b c. T

    c b a c .

    A

    A a ca c a cac a cc a

    a, a a c. Sc a cac ca a ca

    a (PPA) ca a. T a b cc aa a a a c cac. Ua, a

    ca a a ba a a a

    a.

    U aa, a baa a b c a a

    a (ca Ecc Ba). T c a a a a

    a c b a. T a a a c ac a

    a a, a a b .

    C C

    H, a cc c. T

    cc c c b a abb

    a a ( aac a a ). I ca, c

    a c , c ca a c a

    b a cc . I a a a

    Ecc Ba, a a b a a c a a ( c

    Sa c c a). I Ia, ca

    c a , a ca a Ecc Ba bca.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    74/138

    S W P Ta SARI/E R 58

    7.2.2 Caa E

    Caa a a c c a a a ac,

    c , c a c, aca ac, a c a a

    aca ac c a acc a. Ia Ca Ecc Ra

    C (CERC), a caca Rab E Ta, a acaa c aa US$ MW, c a ab

    ac.

    F aca , caa (.., b

    b a a a a) b c acab. I

    c a c O&M cac, a b

    caa a c a a c ba .

    H, ca c caa c a b aab ba

    b b .

    7.2.3 Ecc Ga

    Ea cc a a c cca a

    aca . T a a a ba aa b a a

    b c a bab c a P50, P75, P90 a P95. T P50

    a b a a cc a a a a 50% bab

    b ac. D bab a ca ca ca.

    Va ac ca ac a a a WTG. T ac a

    c b.

    G E 50/90

    Aa cc c (AEP) a a c ac a c ab. Sc

    aab a a aa aa, ca a

    aa a AEP . Hc, ca ca

    ca ca. T aca P50 a a

    a a ca ca ba. M ca

    a a a .

    E

    W c a (WRA) c aa aa c. A

    cb a WRA ba : a) a aa, b) aa a

    aa (a) ba a a ca , c) aa a aa (a) ba

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    75/138

    S W P Ta SARI/E R 59

    c aa, a ) c aa b b

    aac c aa aa c.

    A, c a a PLF CUF c

    a a b. A a a, Ia, MW CUF a ca b a

    aaab c a CERC a . T a a aac a a, c a CUF . T

    a ( a MW ba):

    Aa W P D (W/2) CUF

    200250 20%

    250300 23%

    300400 27%

    >400 30%

    I b a aa c c ca b

    ab CUF. N a aa a c

    ab a a a a a 50 b.

    D G

    E aa c b b

    ac b c. O a, b a a b

    c a. T c a a , a ab a

    ac ca b aca . Ua, a a a 1012 a

    a. T a b (P50) a b c b 12 % ab

    a. H, aca a aca ac a aac b.

    G

    A b c a ca a a. F

    a, Ia, ab 60% aa a a b ac

    a , a 5% aa a b ac

    .

    I aca a a a ba, aa aa a b a acc. I a a aa ba, aa

    a b .

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    76/138

    S W P Ta SARI/E R 60

    7.2.4 R M

    T a c a a a c aa

    a cc, cab c, a c, c. T a a a

    aca ca a cac a c c. I

    ca ca c, a c a b b ; b a a a c c

    .

    T cca ac ca a a a (P50, P75, P90, c.),

    aa a, b cc a c . Tca, cc b a

    caca a aca a c 15 a 3 ,

    ca a. T, ca a b

    acc.

    A a a a c, c a ca Iac a c b:

    GB

    D Dcb 2009, Ia M N a Rab E (MNRE) ac

    aba c (GBI) c, c a ca a a

    c Ia ab a, c

    a b a c a a . T a c

    a:

    GBI b aaab a c acca cab c

    T c a INR 0.50 W

    T c b acab c a a a cc

    ca c b. F ca c, GBI b

    aaab a a a a Ecc Ba c

    T acab ca Ia R (INR) 6.2 MW (aa US$

    141,000 MW);

    T GBI c acca ca b

    ac a a c, a Dc Ta C,

    c a a (E F Ya Pa, 20072012), c a.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    77/138

    S W P Ta SARI/E R 61

    T, GBI ca b a INR 0.50 W a a c.

    T a b a a ca b

    acc.

    E CTaab Rab E Cca (REC) c c Ia a.

    T REC a b c a b Rab P

    Oba b Ia a a a c.

    U a REC, REC b a

    a a ca a a a. T

    a aac a c c aa cca. H,

    aa aa a b a, CERC a ac a a a

    baac c cca. F a, c REC a b a

    INR 1.50/ a baac c INR 3.9 / ( 1 REC = 1 MW).

    T REC b b c. D

    ca a c, , c c ca b

    a b b . H, c REC c a

    c, b b cc ca c, a ca aac

    a c c.

    C C

    W c a b cab c Ca D Mca (CDM)

    K Pc. I a c c a CDM a, ca ca CDM b c c (CER) c

    a. H, a REC, c CER a a c ca a

    cc c. M, CDM a c a a

    c. CDM a aa a c.

    F, a c a PPA, a CDM a

    b a cc a. I acab, c aca

    a a . A CERC, 100% c CDM b a

    b a b a a aa c cca

    a a b. H, b c a, a 10%a bca, a 20% a, a ac 50%, a c

    c a a a b a.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    78/138

    S W P Ta SARI/E R 62

    7.2.5 Pc E (O a Caa C)

    Aa caa , c, a c, a a

    aa aca a. T a c b.

    C

    A c a c a a aac a a a

    c . W O&M c, a

    O&M cac. O&M ca ac a b aac;

    ca a a ca a c, b ac (..,

    a). H, c c ca O&M c a a a

    a ( a). A c CERC a

    (CERC T a C Ta a Rab E Sc

    Ra, 2009), O&M c a b a a INR 0.66 MW a aa caa ca 5.72% a .

    C

    I O&M cac c a c a a a ac a

    c, aa b b. H, cac

    c, aa aac a a a b b.

    C

    I c, c a a a aa a ca

    c. Tca, ca a a c, a ca,

    c. A acab ca a c a b a a ca

    aca .

    D

    I cc ac a a a a a, ca

    aac a acca c c. A CERC, c ca,

    aa a a b 10% a ca a 90% a caa

    c. T ca a 10 a a a 7% a a a ca b a a c.

    Dca caab a a.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    79/138

    S W P Ta SARI/E R 63

    7.2.6 Pc Fac

    A c a c a a b ba c cc a

    a aca a c. W c ca b

    ba baac baac . T ac ca(), b, a c, c. ac

    c a. T aa c ac c a c b.

    D/E

    I baac , a c ca ba 70% c c

    b. T a a b baac

    a . I ca baac , aca b

    c ca . Tca, c b c ca a

    (DSCR) P50, P75 P90 a , a b acc. T, c ac, b b ba

    ca ca .

    F

    A ab, c a baac , c b

    a a b aca . T a a c Ia a b

    baac , ba ac.

    A a 710 a ca b a b a aab aa aca a

    c a a c. CERC, a a, a a a a

    10 a.

    Ga c ac b, a a ca c

    b a. T a c c c a

    . Ua, a a caa a a

    aab a .

    T aab a c a a c ac

    c. Baac a a a, a baac

    a c. F, c b aab ,

    a, aa aa.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    80/138

    S W P Ta SARI/E R 64

    F a, Ia CERC a aa a

    Sa Ba Ia a a 150 ba .

    F a, aa , c a a a ac c c a

    c a b. Tca, c a b 12% b a a bc a b a a b acc.

    D DC C

    A b a , b a b. Ua, ba a

    ac a a a caa. T b c

    ca a a a a b c c ca baac

    ac, a ac c. T, ca

    DSCR a a b c. F, DSCR b

    c ac a b a a a a aa DSCR. T a

    ca :

    DSCR = Ca aaab b c ca/(Caa a + I

    )

    W ca aaab b c = + ca + ( a

    a).

    7.2.7 Taa

    A

    Ta b c acc acab a a a acc

    a a a b aaab c. F, a ca a a

    c a c a a ba. F a aa

    c a b c a a ca b

    aa a c ca a a a b a c

    a a. F a a aa, a ca b ca .

    A CI a c, ca a c a aaab c. I Ia,

    c a b acca ca (80% c c) a a 10

    a a a. I c, c a c a aaab. T aca

    ca acab a c c c a

    c.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    81/138

    S W P Ta SARI/E R 65

    7.2.8 Pab a K Ra

    A ca ca , a baac ca b c a ca aca . Sa a a a a b c

    aa, a . S a a a

    c b.

    ,

    T c IRR c aa . M a a a

    c IRR b c a a. T, c c IRR

    a c / c c. F a a aa, ,

    a (NPV) a b c ca . T NPVca c a. H, b b a a

    c a a c c a c b (a

    c c a).

    T c abac ca b c a:

    S Pabac = Pc c / N aa ca

    H, c, aa ca a a a

    ca b a a c baac. I c a ca, aca a

    aa ca ac c c. T

    a a a b abac . A ca a a

    c ac ba a aa ca b ca

    c c.

    E , E

    E IRR ca b c ba ca , a c IRR.

    R (ROE) ca b c a:

    ROE = N Ic / Sa

    T ab = P a ca / Ia ca a.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    82/138

    S W P Ta SARI/E R 66

    C G

    T c a ca b a a ab

    c . I a b a a a.

    L c ca b c b caca a c W a a

    c ba NPV. T NPV a c a a

    ca c a ba c a W. Ec PMT c

    ca b c c a:

    L c = PMT (c a, , NPV) *

    * T c PMT c Ec c a a a

    a a a ca a.

    Tab 9 Ia a a a .

    Tab 9. Ia Sa W E Ta

    N. Sa

    Ta F b

    C (U.S. c

    (INR)/ W) Ra

    1 Ta Na 7.25 (3.39) F

    2 Maaaa 10.85 (5.07)I CERC

    3 Kaaaa 7.92 (3.70) Acab 10 a

    4 Aa Pa 7.49 (3.50)

    5 Gaa 7.62 (3.56)

    6 Raaa 8.20 (3.83)

    F Jaa, Ba,

    J

    8.62 (4.03) F c

    7

    Maa

    Pa 9.31 (4.35)

    8 Kaa 6.72 (3.14)

    9 W Ba 8.56 (4.00) F, b a a ca

    Sc: Ia W E Aca, 2010.

    Eca a ab 46.7 INR 1 USD

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    83/138

    S W P Ta SARI/E R 67

    Sc 8

    FINANCIAL MODEL FOR WINDPOWER PROJECTS

    T a b c a b c a a

    aac a a c a . I

    ca, b c aca , a c c c,

    a cac b . Hc, a

    a b c.

    B c a cac a a a

    a ac c. I E, a, c

    b ca a , a ac, c,

    c b aac, c a c b, a

    a ac (.., a, aca ac). I Ia,

    b aac a ac a c a ,

    c a c c a O&M. T ca

    a aa a a a a a b a cc b.

    8.1 Fab R

    Ic a , ab a a

    . T c a

    a acc c c. O c ,

    a a ca aaab b. I a a c bac

    ac a b , aaab ac c aa, b

    a, a aaab ac. F, ab a a

    a c , c , a ac aaab c (.., c, a a cc aa).

    T, a ab a a c a

    c.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    84/138

    S W P Ta SARI/E R 68

    8.2 Da Pc R

    Bca a c a a , c.

    Paa c a caac ac, a, caa c (CAPEX), O&M c (OPEX), a a

    a c c ca a a ac c ab. I a ca,

    c a a ac b ba , a , a

    caa, b a c c ac, a c

    a ccca ac. A, a

    c a ab b cac

    c, a c cc a aca ab. A a

    c (DPR) bac ca a ac

    a a c a c.

    Tca, c DPR ca a a ccca

    ac a c:

    1. B : T c ca bac c:

    ca, , ac (), b , a MW

    caac a, c.

    2. D : T c a a ac ca

    a ca a a, aac (a a , a, a

    a a, c.), a a aa c, c.

    3. E : T bab ac a

    c a cb c.

    4. D : H, caab aac

    c, ca c a aca aac, c., a a.

    5. : I c a a

    b c c, c, a cca

    a c, a a cca aa aa.

    6. : T c a a, ,

    ab c b aaab c, aa

    c a, c.

    7. : H, a a

    c, a aaab (.., a aaab

    c aa a ( a),

    ca a, c.).

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    85/138

    S W P Ta SARI/E R 69

    8. : Da a ac ca

    b (.., UTM ca, , a).

    9. : T c c a aa,

    ba caac a a, ca ba a

    a, a aca , aa, a a( b ).

    10. : Da c a a a

    c. I ba a c, a cc,

    c ab, c, a b, c a cc, CDM

    aca, c. T c a a a aa

    a c a a ca, a

    a c a a c .

    11.

    C : T c a ac c b

    c. I a Ga PERT ca.

    12. F : T ccca ac c a a

    ab. T c CAPEX, OPEX, caa, b/

    a, a, caac ac, a, a c, a c. T

    aa a a ca IRR, NPV, a/ DSCR.

    13. : T c a a a a

    , a, a a a (SWOT) c.

    14. C : T c a c a aac aca aa. Va b cba

    aa a c ab a ac a ac

    cc cc .

    15. C : T c cc DPR, aaa a aaa c a a a a .

    T aaab a DPR a cca a cca a c a

    , a aca a a aa c.

    8.3 Pa B Dc

    T b c a cac a c ca a

    a . I a a b c a cac

    c c, c b c a:

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    86/138

    S W P Ta SARI/E R 70

    1. . T a a

    , a a a a c, c ac a. I

    a a b a a , c a

    aa aa, c b a aa a

    c.

    2. E . T cca aa b a b

    a c b. T c c b a

    cca c c a a, a, c.

    3. . A c a

    ac c b, a a a

    a aca b a

    . F caac c, a ca c c

    b a b . T ac ba a

    aa c a cc a cc acc

    a; b c b c.

    4. E . T b b c

    acc c ca, a a

    b b b c. F, c

    c b a a acc a c a

    ca .

    5. . I b

    a a aac c a , b c c a O&M . T c a b a

    a a aa ca c.

    I ca b a b c c a a a

    ca , b a a b b a a c a

    a b . I S Aa, b aac a c

    , b a. I c ca, b aac a

    c a a b c. T ca a ,

    ac a a ca , ac, a

    a c b.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    87/138

    S W P Ta SARI/E R 71

    8.4 Eaa B

    W c b a a aa a: cca a aca. D

    cca aa, b a a b a ca a a a. T

    b a a cca aa a aa a aca

    ba.

    Tcca EaaI aa a a b, aa ca a a. T ca ca b

    c a aa b c. T ca b ba

    ca (aa c ac):

    E G

    T a aa aa a c.T bca a aa a MW.

    T aa a : 1) a b c c

    a cca, a 2) a a a (cca, caca, a,

    c.).

    T c aa b c c b ac

    a c a b a c b.

    T a a a b c aa ca a:

    T b a a ca cca

    aa a c. I a c a c a cca

    c, a aa cca ca b c.

    Hcaac b a a O&M c, a

    c a .

    Sc a a aaa cc a a

    .

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    88/138

    S W P Ta SARI/E R 72

    T a ac a ca a a a .

    Mac a a ca b c

    b a cc a c a .

    Tb aca a c a , a

    a b ac c a caca c c .

    T ca ac a ca b

    a a aca . T b ca

    IEC a aa IEC 61400. T ca b aa aa

    a b :

    WTG ca I II II IV

    Aa a. (/) 10 8.5 7.5 6

    D c a , b ca b

    aa a b aa c.

    T ac c c c a b c

    b a .

    B E

    B c a a c a a O&M caab ca

    b c a aa ca.

    Faca EaaA cca aa, aca aa a. I a

    b a c cca aa. T b c aca

    aa a ca c a c.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    89/138

    S W P Ta SARI/E R 73

    Sc 9CDM FOR WIND PROJECTS

    T U Na Fa C Ca Ca (UNFCCC) a 1992

    a ca ca a ca. D c,

    a A I c C, c a. T

    Ca D Mca (CDM), 1997 a Cc Pa

    UNFCCC, a a ca ca aab

    c, a NA I c, a a a c a (GHG)

    .

    T CDM, a Ac 12 K Pc, a a c a

    c a c K Pc (A I UNFCCC)

    c c c. T CDM ba,

    a a c c , a aa

    ca a C E Rc (CER).

    I aca CDM, a ca b ca a c .A a bac : a aca CDM,

    ab a aa CDM a, a aca K Pc.

    T CDM b CDM Ec Ba (CDM EB) a ac

    Cc Pa UNFCCC. T Ec Ba a

    CDM a a a a a c a . I a a c

    a CDM. T b c a cc

    CDM c.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    90/138

    S W P Ta SARI/E R 74

    F 15. CD C

    9.1 T CDM Pc Cc

    T CDM c cc a Pc Cc N (PCN), c

    b aa CDM a. Ba PCN, a a

    c ( a a c CDM EB). A ca

    CDM PCN ca bac a ab c, c a caac a a ca

    a.

    T a CDM c aa Pc D

    Dc (PDD), c a a ab c. I a ca a

    c ba a c a aa ca.

    (Aa a a c aa a a a

    a c c a a cca ;

    a c a b CDM b.)

    C A CD C

    Pc P

    Da Oaa

    E

    Ec Ba

    Pc P

    Da Oaa

    E

    Ec Ba

    C E

    Rc

    Aca E

    Ec Ba

    & COP/MOP

    Da Naa

    A

    D

    /

    /

    C

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    91/138

    S W P Ta SARI/E R 75

    9.2 Ba

    T ba a cc abc CDM c,

    a b c. A b ba a aa

    b a b CDM EB; ca b c a c c

    ba a b a. T a a a (ACM 002)

    a aca ( a 15 MW) c ca . W ACM 002 a

    b ba , c ba aa a

    a c, a a a, a

    a aa.

    T CDM c a cc ca cc aa. T b

    a CDM c a c ccaa a ca

    b c. Tab 10 aa

    CDM c , ac CER.

    8: A CD C

    . CD C

    1. Paa c a a c cc 2

    2. Paa c c 8

    3. H c aa 6

    4. Pbc b 4

    5. S aa 1

    6. A a aa 20

    7. R a 4 8

    8. Wb a UNFCCC 4

    9. Ra 2

    10. M 52

    11. Paa 1

    12. S ca 1

    13. Wb ca 2

    14. R ac CER 2

    15. Iac CER 2

    Ta T c CDM 110

    9.3 W E a CDM

    I ab c, a bca CDM ,

    ca c Ia a Ca. B 2010, c a 31,000

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    92/138

    S W P Ta SARI/E R 76

    MW a caac a a CDM a. O , 1,665 c

    a b . I SARI/E , Ia a c a

    104 c .

    W c, a ab c, a a

    abac , c ca c . Va a c c . R a c a a CDM

    c a aa a CER a c.

    A b aca aa a a CDM caab a

    a c b 34%.10

    T, CDM c a a b ab

    bca IRR, bc ab.

    9.4 C I

    O a, c a c b CDM Ec Ba. T a a a b c ca a a c Ba a

    a a ab. T aa

    c CDM a a a . A a , a ca a

    a a CDM c.

    F 16 a ca b c CDM . W

    c Ia, ab 755 MW c a ac a. T

    c a b c b Ec Ba, b a b ,

    a a aa b c Da E,

    a a c . O , c c a

    600 MW a a aa c 20062008. Ca, a ac

    ca b ab a a ac c .

    10://c4c./Pbca/WCDM.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    93/138

    S W P Ta SARI/E R 77

    F 16. CD A11

    C CD

    Rc, CDM Ec Ba a a ab a c

    c CDM a cca c b

    c. T , c a a c a, a ac

    c a a CDM c c a b ab c

    aa. T ac a c a aa aac

    a aa. A a a ac, aa

    c a a a aa. T a b a b ca a

    b b ca c; c a b ab

    cc Da E c. T a aa b a c c a a c c.

    C A

    T c acc aa a aa a aca c (ab 15 MW)

    c aca aa c. T baca ab

    ac a c CDM a a c acc a aca

    aa a c, .., a Sa c. F CDM c, bc a

    b, ca Ia a Ta Na, Kaaaa a Maaaa, c a

    a b c aa. H, b a a b S Aa c, c c a aa. A a

    aa b aa CDM a ca a a CDM

    a, aa aa b b a a.

    W CDM Ba ca aa cac, aa aa

    b cca.

    11UNFCC, CDM Pc Sac, ://c.ccc./Pc/ac., CDM c , 2010.

    0

    10

    20

    30

    40

    5060

    70

    80

    90

    Q1-04

    Q3-04

    Q1-05

    Q3-05

    Q1-06

    Q3-06

    Q1-07

    Q3-07

    Q1-08

    Q3-08

    Q1-09

    Q3-09

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    94/138

    S W P Ta SARI/E R 78

    C

    T aac c a c a a . T ca b

    ab ca b a a CDM, a a

    b CDM c. T ca ca aa ca , c a ca b a a 50% a a. T

    a bca ac a CER c a b a. I c,

    aca c ca a CDM a a.

    Tab 11. Tca C a CDM Pc

    S. N Dc C

    1 Pc ca US$ 10,000 15,000 + Scc F 0.55%2 Vaa ca US$ 13,000 20,000 ( )

    3 M a ca

    ca

    US $ 8,500 10,000 (E Ya)

    4 UNFCCC a ca 0.1 US$/CER 15,000 CER, 0.2 US$/CER a

    15,000 CER

    N ca aa aa a 15,000

    CER

    5 Aaa UNFCCC 2% CER a

    6 Cab ca (I CER

    aac a ca)

    2 5 % CER aac

    9.5 Va E Rc: A Fab Aa

    D ca a cca aca CDM, a c ,

    ca aa, a a a a aa.

    Ma aa a aa CDM a

    a, a a c b a a

    CDM. Ia, a a a a a c c

    c b CDM. N, a ca b a a a cc c

    aa a cab a c.

    C, aa a a a a: T Va Cab

    Saa a Cca Ca Eca. T aa a a aaa,

    : bca a a a CDM, c a a

    c c a ca CER. A , a Va Cab

    U ( Va Cab Saa) a a Cab Faca I (

    Cca Ca Eca) a b a a aa 4 a $2 ,

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    95/138

    S W P Ta SARI/E R 79

    c, a ca a CER, c b a a a 14 ( a c

    5 Sb 2010).

    O a, c a c, a c b,

    c b b CDM. P2012, c c a

    b c. I a, CDM G Saa aa c aa a c aab . A G Saa c

    a a a a 34/ CER ab a CER c.

    W ca CDM c baa ca a

    a a 5,500 MW c b

    CDM a b b a c

    a. CDM a a a a c

    a P M c a.

    9.6 CDM B Pacc

    B a c b aa, ca acc ca aca a a

    CDM c. F a, CDM Ec Ba a Naa CDM

    A a ab b a c ( a a cca

    a) c a c a cc CDM a a a.

    F, ca a, a ac a

    CDM PDD a c . La, a

    ca a a aa ac ca bab a c b

    cc.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    96/138

    S W P Ta SARI/E R 80

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    97/138

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    98/138

    S W P Ta SARI/E R 82

    I a Caac B,

    F P / Da Pc

    Ba Pb S

    2 I c ca

    c a a

    a c .

    T c ab c a ca b a

    IPP/BOO c aa, a aa a

    , a b cac. I a, .., cc ca b cc a a a

    c b a a.

    3 G

    IPP/BOO c ca

    c a

    .

    T a a a a

    c a a a ca ac a

    a b c b b a . O,

    b a b bc b, .., a .

    Fa a a c b a

    .

    4 I cca a

    a b cc a

    accac IECaa a

    MEASNET a

    caba a

    .

    W a c a

    a a ca: A 1%

    a a aa a 3% a. T a c b

    a b c aa a ca,

    a ca a b a c a aa a (

    , a c, a aa cc). Lca

    ca a c cac a a a ca

    b a .

    5 Tcca b O&M

    a aaab.

    Fa b a ca a O&M

    . Ec a

    aa a c caa

    .

    6 Pc

    a IPP/BOO

    c .

    Ta a a . Bca a c a

    cca a cca c (

    c b a c a ca

    ), cc

    a a a b.

    Ecc Ba W a P Ga Pa Sa

    Ba Pb S

    1 Ma a c

    a acaaa c

    G a c a

    aa cc a a ba ca c a.

    2 C b

    ca a

    T cc aa a c c ca

    ca c c a

    ( ca b c, a a b a

    b)

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    99/138

    S W P Ta SARI/E R 83

    Ecc Ba W a P Ga Pa Sa

    Ba Pb S

    3 I acc

    c

    a a

    c c ,c

    a .

    P a c a WASP ( b c

    c aa , WAP) aca

    c c , aa

    a aaab a a c ca.S aa ba a a c

    a a .

    M caca ca a b c

    a a a

    a. (T W Ba ESMAP a

    c a bc a. M

    c a aaab, b c aa

    a.)

    4 Dac ca

    a a c b a

    c ac abb

    b bc b

    O aaa , a a c a

    , a a cc a ca 20a c cac cc .

    5 Ecc a a

    Ga c cc a (.., a

    a b b

    a cc a a a

    b ) a b b

    ca. Ga c b

    a cca ca aca ac.

    E Ta & PPA I

    Ba Pb S

    1 20a aa PPA

    aaab a

    W caa, (baca)

    c PPA a a c ba a aab c

    W, a a b a

    b a c. Sc cca a a

    b acc IEC aa 20 a, c ca b

    ba ca a PPA c cca

    a.

    Ca a ba a a

    c, a a.

    2 F a a b

    ca a a

    3 N aab a

    c

    T c ca b a

    cc a ba, ac a a, a ab

    , a ca

    c a a.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    100/138

    S W P Ta SARI/E R 84

    E Ta & PPA I

    Ba Pb S

    4 C

    cc a

    aa

    Pc a b bac b aa aa

    (ca a a a ) MIGA c

    ac aa.

    5 T a REb W aa

    ab

    c

    I c aa a a a a, .., a a a aa,

    c b . S a ca b

    ba a, c a a b c

    ab ( Da, Ga Fc ). T b

    a a cca ab a a a

    IPP/BOO a c a a a

    ba W c c a c.

    6 W ca c

    aca b

    a

    I b ca b c, ca ca ca

    b cc a (, .., ca

    c a) a a b a

    b a.

    7 Ecc c a

    aa, (aa, c.)

    Baca a a aa a b

    a c a (FIT). Sca c

    c a a c a a

    aa.

    P a Lc I

    Ba Pb S

    1 Uc a

    c ac a

    c

    P a c b b

    BOO c, a b aa cac ba

    a c.

    F cba a c (FIT) a aac (a

    ac a ca a

    ) . T a b

    cc Da a ,

    aa ac aa a.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    101/138

    S W P Ta SARI/E R 85

    Pbc La U Pc

    Ba Pb S

    1 Ec aa

    ( a

    ca) c aab c a,

    c a .

    I c FIT , b a c a

    (ac ba MW), aa a b a

    a ca, c c. I ca a a a a a b

    c cc. Pb a a b ba

    Ia' a .

    F BOO/IPP c b b ,

    c a a ca

    a c b b a. (A

    a G Qbc.)

    F BOO/IPP c ,

    a ( b ).

    La ca a b c b a

    ab c. I a ca, acc bc a

    b a, ba ,

    c cca a cc aca. (T a

    a IPP/BOO c.)

    2 La I a a b cc, b (bca

    a a accab a)

    aa ba aca c, .., a

    a MW.

    I aba ( IPP/BOO c) a b c b c, c bc a

    a b a c c. I a ca

    c a b MW aca a aa

    c aab c. (T

    b MW a a ac ,

    a a ca, a ac.)

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    102/138

    S W P Ta SARI/E R 86

    A.2 W Pc D

    T ab b ca ba c b a b . S

    a c ba a IPP/BOO c ( ba

    W c), a a a (FIT); b.

    W Rc & OS Ma

    Ba Pb S

    1 Lac aa

    c a bab

    a c

    D a ca aa ba a aa, a

    aa aa, a .

    Pab a a aa ba a

    a a . T ca b

    a a ba a a a

    a . W Ba (ESMAP)

    c a aaab ca aa a.

    D a ca a a b

    (a a a a) c

    c a a , c a

    a a a a c a

    ca c b a c.

    2 Lac ab

    aa a

    c a ca.

    A a a ac

    a a b . G a a DANIDA

    a GZac a E, c a b a

    >15 a, a a GZac a 12 Sa, ca b a > 5 a. (P a a

    aa a a ab a c

    a c.)

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    103/138

    S W P Ta SARI/E R 87

    W Rc & OS Ma

    Ba Pb S

    3 T

    a , a

    a a .

    P

    c, acc a accb a

    a c (b b a MW c). I

    c, a a a a c c

    b a MW c. P a

    ac a, c a ca. T a

    a b c c;

    b a b ab b a b cac. (S Sc

    A.1.)

    I a , ca

    ' b, a,

    a cac FIT . I ca, , ca a

    a a a a a b ab,a a ab (a ).

    4 Ma aa b

    cc a

    ( ) a

    a a

    b

    a a IPP/BOO

    c: T a c

    aa

    c, a a

    a a bc, a

    ac.

    B , cc a, a

    IPP/BOO c, c

    a c . A aa a a

    a a a b a b

    E 2,500 MW IPP/BOO a. T

    a b c Sa.

    5 L a

    a a c

    c

    IPP/BOO cac ca

    c .

    T a a ac a

    ac a c cc. Hc,

    ab a aa c ba

    . T ba aa a

    Ea IPP/BOO

    ab. L, c WAP

    aa baab a b . O

    c ac a b b ba.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    104/138

    S W P Ta SARI/E R 88

    W Rc & OS Ma

    Ba Pb S

    6 P a

    aca

    a a aaab

    b a IPP/BOOc. T ca

    c a

    c b c.

    T Ea c aac aa a ca

    . T a c ca a, ,

    a c a a a a

    IPP/BOO c. T a a

    a a, c aca

    a a ca b , a

    c a ca b a a a

    b b.

    7 N cca a

    ca b

    (a c).

    T Ea ab c cca

    a.

    Ea a Sca Iac

    Ba Pb S

    1 W c

    a

    c

    A a a c a

    a a ca (.., b, cca,

    acca , aa), a a a

    a ac a ca a ,

    c. Ma a ca b cb aa

    a c c c a ab

    aa.

    2 Pc a

    a a ca

    ac a b

    F IPP/BOO c a ,

    a a ac a ca a

    , a aca aa c.

    3 Pa a : P

    '

    A a a a a b

    aa . Sca b ca a

    a cc a. T a

    bc aaab W Ba (a c

    bca b acc a a a ca

    a a) a c.

    4 Pa a : La

    ac c

    I a a a a a

    c ca b a ca acc a. I c a

    a ca ca b a a . E a

    b a c ()

    ca a ca bca c

    ca a. G aba

    Oa, Caaa.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    105/138

    S W P Ta SARI/E R 89

    Ea a Sca Iac

    Ba Pb S

    6 La ac aa

    a b a

    a

    La b ca a, b ca b a

    a PPA, a a a a

    a . C 98% a aa a aab a a

    a a b a.7 Lca ac c

    ac a

    aca

    C c a c a b

    a c. B acc ca

    a a a acc ca b ba , .., ADB,

    IFC W Ba aa .

    8 Cc ab a

    b a

    A b a c b b

    c a cca a a a a

    PPA b a acc accac

    c IEC 61400 aa a

    .

    9 Oca cc ab

    b ba a

    Oca (1 a) a b a a

    a ac a (EIA) cca aa. Ma

    a a b (.., a a

    a, a ac a a b

    a a). T a a aa

    aa b a c

    a ( 1 ab), a b ab a

    (b), (b ), ( b

    ).

    Pbc Saa Pa (Z)

    Ba Pb S

    1 P aa a a

    c ( a)

    b a c

    ca b ca

    a c c

    ( a c b

    ac a)

    W a a bc a, a b

    ca b c. I a a

    a b ca a a a.

    A a a c c a

    b 1020% bc a a ac

    . P a a a a

    c b , b a 1520%

    a c a. Aac

    a b c a c,

    b a . B c a b a, ab

    a. A a a b a

    a a aa b.

  • 7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01

    106/138

    S W P Ta SARI/E R 90

    Pbc Saa Pa (Z)

    Ba Pb S

    2 P a a

    a a c

    a ca b

    b a ca a.

    T c a a (.., WP, W

    Fa) a ca b aa ac b

    b a c a a a

    ca c, a, ca 40 B(A) (a b a). L,

    a c a a b a a a

    a a ac b ( N

    ab c cac), a a a ac

    b b a a c cac. Ec ca

    b a aa a. (Aa, accab

    a b a c b

    a).

    3 Ma c aa

    a a bc