SUPPORTING WIND POWESUPPORTING WIND POWESUPPORTING WIND POWESUPPORTING WIND POWERRRRTAKETAKETAKETAKE----OFF INOFF INOFF INOFF IN THETHETHETHESARI/ENERGY REGIONSARI/ENERGY REGIONSARI/ENERGY REGIONSARI/ENERGY REGION
Energy SecurityEnergy SecurityEnergy SecurityEnergy Security ReportReportReportReport
USAID South Asia Regional Initiative for Energy(USAID SARI/Energy)
Contract Number 386-C-00-07-00033-00; Task Order 2.8
April 7April 7April 7April 7, 2011, 2011, 2011, 2011
This publication was produced for review by the United States AgencyThis publication was produced for review by the United States AgencyThis publication was produced for review by the United States AgencyThis publication was produced for review by the United States Agencyfor International Development.for International Development.for International Development.for International Development. It was prepareIt was prepareIt was prepareIt was prepared by Tetra Tech.d by Tetra Tech.d by Tetra Tech.d by Tetra Tech.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
2/138
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
3/138
SUPPORTING WIND POWER TAKE-OFF IN THE SARI/ENERGY REGION
Energy Security Report
USAID South Asia Regional Initiative for Energy(USAID SARI/Energy)
Contract Number 386-C-00-07-00033-00; Task Order 2.8
April 7, 2011
Pa :
Pa b:
AD/
Aca Eba DLF Cb C
N D 110 021, INDIA B N. 9B, 11
FT: +911124198000 Ga 122 002, INDIA
.a. T: +91 124 473 7400
Fa: +91 124 473 7444
, .
4601 N Faa D
S 601
A, VA 22203, USA
T: + 1 703 3872100
.ac.c
Dca
T a bca ca c
U Sa Ac Iaa D U Sa
G.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
4/138
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
5/138
S W P Ta SARI/E R
EXECUTIVE SUMMARY
W 11,807 MW a (a , c) caac a b
Ia, cb a caac a SARI/E c
Paa, Baa, Aaa, Na, S Laa, Ba a Ma a 40 MW.
T ac a ab c a a ,
ac a b c acc c S Aa ac
c.
A Ia c 3,000 MW,
c cc a b c b a
a ac:
T c c
( c, a, c acc c aa a a
a)
I b
T aaab caa c
W a acc c a c c.
T E Sc R a
a c SARI/E c. I a cc b
USAID/SARI E a a a c c c a
, ab Ma, Na, Paa, a S Laa, a a ac
a. I a, USAID a a , S W P Ta
SARI/E R, Sb 2010 Cb, S Laa, c b
, , a a
c a ac.
1
1T a ca a b a a
a a a c. A aa c a
a aa a. Eac c a c a
aca a a a Aa D Ba
a. T ac a ac a c
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
6/138
S W P Ta SARI/E R
T a c a cca c a
a ac c , c
a a. I a a c a c
SARI aa a cca,
cca a c a a, b ac .
T c c ,
ac a c, a ca a a a c ( ca c a
a ac). T c cc a ac c
a c , b bac a acab a .
T a a b c a c, ac c
ca b a a c b a a b a. T c c c:
A SARI/E A c c cc A b aac a c a, c bac
caca aa
Bac b c a b c A cc , c cca a c
cc a
Saa c a cc aa
Tca aca
U Ca D Mca c .
T a aa a a cc a a c
a ac c.
c a a caac c a a c a a
c a.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
7/138
S W P Ta SARI/E R
ACKNOWLEDGEMENTS
T c , a c aa, a
a a c c a a
c S Aa. T ca c. T a
Ia, c a 1990, b a a a 10,000
MW caac a b a a ac a a
. T c a Aa D Ba cc: Qa La
W P Aa: C, Ba a Obc, Maa J 2010. T
cc a c a c cc
a .
T a a c S. V. Sbaaa (Sca Ga), S Ma K. S
(Sca) a a Ia W E Aca (IWEA); a A Daa,
Aa Ja, Mca Ha, Maa Jaa, a W C (Ta Tc ENE). T
b b b Aa D Ba a, c
Ja Sa a S K, a a Pa Ja Ia W E, Ic.
T a a ac a ca a ac Ta Tc, Ic. a aca, M. A Ab, Vc P Cca
E, a , ca a a a cb
c.
Sca a Saa Paaaba, S A E USAID a Ra
Pa Dc USAID SARI/E Pc.
Fa, a b a M. Ba Naa B
Ta Tc a a cc S W P
Ta SARI/E R, c a Cb, S Laa, Sb 22 24,2010.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
8/138
S W P Ta SARI/E R
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
9/138
S W P Ta SARI/E R
ACRONYMSADB Aa D Ba
AEDB Aa E D Ba (Paa)
AEP aa c
BOO ba
BPTA b a a
CDM Ca D Mca
CDM EB Ca D Mca Ec Ba
CFD caa ac
CER c c
CERC Ca Ecc Ra C Ia
CIGRE C Iaa Ga Ra Ec / Iaa Cc
La Ecc S
CO2 cab
CUF caac a ac
DANIDA Da Iaa D Ac
DFIG Db c a
DNV D N Va
DPR a c
DSCR b c ca a
EIA a ac a
EHV a a
EPC , c a cc
FIT a
GBI aba cGHG a
GZ (Deutsche) Gesellschaft fr Technische Zusammenarbeit; German Socieity
for Technical Cooperation
HV H Va
IEA Iaa E Ac
IEC Iaa Eccca C
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
10/138
S W P Ta SARI/E R
INR Ia R
IPP c c
IRR a a
JI a
V VW Wa
W a ; a a
LDC La ac c
LKR S Laa R
LVRT La
(, )
MEASBET Iaa N Ha a Rc
W E Ma
MIGA Maa I Gaa Ac ( W Ba)
MNRE M N a Rab E Ia
MV M Va
MW Ma Wa
NPV N a
O&M Oa a aac
OEM Oa aac
ONGC O a Naa Ga Ca Ia
NOC N bc cca
PCN Pc Cc N
PDD Pc D Dc
PERT Pc Eaa a R Tc
PLF a a ac
PMG Pa a a
PPA ca a
P, P50, c. Ecac bab
R&D ac a
RCEMH Ra C Ecc McH (Na)RE ab
REC Rab E Cca
ROE
RPS Rab P Saa
R Ia R, a a INR.
SARI/E S Aa Ra Ia E
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
11/138
S W P Ta SARI/E R
SCADA S C a Daa Ac
SIL ac a
SMB ca ca ba
SO2
S3
IDF SaSca Saab Iac D FSWOT S, a, , a a
TSO Ta a
TSP a c
TSU a
U a a WH
UNFCCC U Na Fa C Ca Ca
WAP W Aa Aa a Aca Pa
WEG cc a
WRA c a
WTG b a
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
12/138
S W P Ta SARI/E R
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
13/138
S W P Ta SARI/E R
CONTENTS
1. / 1
1.1 T Ca W E D S Aa / 1
1.2 T B W E D / 3
1.3 T F W E D / 4
1.4 R Oaa / 5
2. A/E C / 7
2.1 Ia Ba a D P / 7
2.2 Pc Sa a T / 9
2.3 Pc Ra Ma / 11
3. / 15
4. A / 19
4.1 Bac Caca D W P / 20
4.2 Ma Acca W S Ma / 21
4.3 Aaab Iac / 26
4.4 Cac a Ea Ca / 28
5. / / 31
5.1 W Tb Tc / 35
5.2 W Tb Sc / 355.3 S Sc / 36
5.4 C M / 36
5.5 Ca / 36
5.6 C, Oa a Maac / 35
5.7 Sc R Oa / 37
5.8 P a Pc Maac / 38
5.9 Ra M / 38
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
14/138
S W P Ta SARI/E R
5.10 T Ecc W P / 39
6. G / 43
6.1 Ta / 44
6.2 S Iac S / 466.3 Fc C / 47
6.4 Rac P Maa / 48
6.5 Hac a Va Fc / 49
6.6 Pc Sc / 49
6.7 M a Cca R / 49
6.8 S C a Daa Ac / 50
6.9 Baac a S C / 50
6.10 Ra R / 51
7. G C C / 55
7.1 C Sc / 55
7.2 Ga Paa a W Faca M / 56
8. F / 67
8.1 Fab R / 67
8.2 Da Pc R / 68
8.3 Pa B Dc / 69
8.4 Eaa B / 71
9. CD 73T CDM Pc Cc / 74
9.2 Ba / 75
9.3 W E a CDM / 75
9.4 C I / 76
9.5 Va E Rc: A Fab Aa / 78
9.6 CDM B Pacc / 79
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
15/138
S W P Ta SARI/E R
A
A. W Pc D Cc / 81
B. T SARI/E Pa / 99C. Ca S / 103D. Offshore Installations / 107
E. Sc Rc / 111
F. V Cac Ia / 115
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
16/138
S W P Ta SARI/E R
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
17/138
S W P Ta SARI/E R 1
Sc 1
INTRODUCTION
T E Sc R a
c a SARI E c. I a cc b USAID/SARI E
a a a c c c a , ab
Ma, Na, Paa, a S Laa, a a ac a. I a,
USAID a a S W P Ta SARI/E R
Sb 2010 Cb, S Laa,2c b c
a a a . T a a a a
a a .
T a a bc c a cca
c a a a ac c ,
c a a. I I a a c a
c SARI aa a cca,
cca a c a a, b a c .
1.1 T Ca W E D S Aa
W 11,807 MW a (c) caac a b
Ia, cb a caac a SARI/E c Paa,
Baa, Aaa, Na, S Laa, Ba a Ma a 40 MW. T ac
a ab c a a , ac
a b c acc c ac .
2T S Laa Saab E A (SEA) c a Aa D Ba
a, c 55 a , a , c
aa, NGO a c c SARI c.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
18/138
S W P Ta SARI/E R 2
SARI/E c c a : a 3a ba
a ca ab c S Aa
a c a ba; a, a ab a ab a
c a4 C Ecc Ba (S Laa). T
a a c ca c a c ba.
T c SARI/E E Sc R a b 2009. I ca a b
aa a aa a c c
ab SARI/E c. T a a
aca a c . T c c
ac c c, a a, a
bac a cc . A a cc
a acab c a aaab, c a b
c a aca c a b c, a
a a b c a.
A cc c ca a c a a
ca a SARI/E c. W a
a a, Ia aa a cc a a a a
c a a a ca c .
T a c ca b c ( , b
aac a ab, , O&M c.) c a
(c aac a aa , a, a , c). A
aa cc 2005 b T C W P, WISE, P, a
a : ac, ac, aac,
ab a c, c a O&M.
T a a c c b a ac:
S b a ac a a c a aac
a
Aac aa a cca c aac a
cca ac ca aac a a acc
c a
W c caaca/ ac a aa ca a a , a a
Acc , ac MW a ab 5.7 c b a 22.9c b, b a O&M b a. T cc a
a aa c b ca a aa a aa
3Policy and Market Options to Increase Adoption of On-Grid Renewable Energy in SARI Countries, the report can be down loadedfrom the SARI/Energy website, http://www.sari-energy.org/PageFiles/EnergyLibrary/SariResources.asp.
4India Sri Lanka Submarine Cable Interconnection Project, Interconnection Reliability and Stability Study, October 12, 2010,
Chapter 12, Wind Penetration: Study of Frequency and Voltage Control Aspects; the report can be down loaded from theSARI/Energy website, http://www.sari-energy.org/PageFiles/EnergyLibrary/SariResources.asp.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
19/138
S W P Ta SARI/E R 3
a a ab c, b a b
aac/ab ca a a a a aac.
I c a ab aca, bca a
a c ba a bc . T
a a ca a , b a c . F c a
a S Aa, c a b ca
:
Sa C C
?
G
Da
Rab E
W cc
Pc ca
Tc
Ca 1, 2, 3, 8, 10
Ac
P a Pc ac G c a cc
Pc
Ca 4, 5
P c W Rc a
Ic aca
Pc
La ac
W b
Faca
Pc aa
Ca 3, 4, 5,8, 9, 10
Ra c C a a c c/b
Ra a
Ca 5, 9
E S Ma acc
Ic aca
Ta Pc ca
Ca 1, 2
Ac
Pc S M
E a cc
C
Ca 3, 4, 5, 6, 7, 8
T a c aa, a b acc a
ac ab bc a . I a, ccc a
aa b acc c aa a c
a ca.
1.2 T B W E D
W SARI/E c . F S Aa c a
a c c, a cc a a b a aa
, a . T c:
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
20/138
S W P Ta SARI/E R 4
. W c
ca c /a c, c ca cc .
. O, c a ca
a aa. T cc ca cc a
ac aa.
(C2) . F c a a b a
a, a cc c CO2 a
a.
(2) .SO2 a bc b ca
a . I a ac cca c a ca ca
ac a a a a. B ac a 20 MW a, a 20 MW
c ca c SO2 b 120 ac a.
. W a a a a a
c. E Wa a b a ab ca.
.Ab 5% a a b, a
acc a. E a , c a a a a, ca c ac.
Ca cc a a ba (..,
, , a aa) a a cc ( a).
1.3 T F W E D
T ca ba aca c a a
aa 2010 ( F 1). B ca c
a, .., Ca, Ia, N Aca. Gba c
a a c b a a a, ,
ab c a ca ca c a a ca
ca.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
21/138
S W P Ta SARI/E R 5
F 1. A
T SARI/E ca . Ma
SARI/E c a ac
c c cc a
a c c
a c,
c ca aca
a a a a
c. I a,
c a b
ac c
c
(a Paa a S Laa a )
a c
a (a
Na a Baa a ).
1.4 R Oaa
T ba a b S Aa c a
c c c , a a a
c Ia a a. Pa a a b
c c a cca c a.
Eac c aa a a b a. Sc 2
a SARI/E . Sc 3 cb
c cc. Sc 4 a b aac a
c a, c bac caca aa . Sc 5
c b c a b c . Sc 6 a
cc a c cca a c cc
a. Sc 7 cb c a cc aa. Sc 8 cb
ca aca , a Sc 9 cb UN FCCC Ca
D Mca c . T a ca aa a
a cc a a c a ac
c.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
22/138
S W P Ta SARI/E R 6
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
23/138
S W P Ta SARI/E R 7
Sc 2
STATUS OF WIND POWER IN
SARI/ENERGY COUNTRIES
A SARI/E c a a c
a. Ma a c a c (
c a) a a a a ac a ac c
a.
2.1 Ia Ba a D P
Ec Ia, c a a c, Paa
a S Laa a SARI/E c c b a a aac a c. Aaa, Ba, Na, Baa a Ma a
a cc c a a a a c
c .
Tab 1 2009 a caac a a ac
a.
A c S Aa ( Tab 2),
c cc a b c b a
a ac:
T c c
( c, a, c acc c aa a a
a)
I b
T aaab caa c
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
24/138
S W P Ta SARI/E R 8
W a acc a c a c
c .
Tab 1. 2009 Ia W P Caac a Pa
C W P Ia
(MW)
W P Pa
(MW)
Aaa U 1 15,8001
Baa 2 1,0002
Ba U 1 5423
Ia 11,807 48,561
Ma N/A N/A
Na U 2 448
Paa 6 15,2001
S Laa 33 20,00041F ca 7 (>8.5/) a, 2P c a 2020, 3Ma ca,4O
Sc: Ta Tc, Ic, 2010.
Tab 2. Ea S Aa W Pc P (MW)
C
Naa
Ta
Pc
Ac
D
Ia
Aac
D
U
Cc C
Aaa NA 0 0 0 0 0.7Baa NA 23 0 0 0 0
Ba NA 10 50 0 0 0
Ma NA 50 50 0 0 0
Na NA 23 5 0 0 0.3
Paa 5,000 4,850 900 150 50 6
S Laa 34 120 80 43 20 33
Ia* 10,500 3,800 850 600 NA 11,807
C 11
Pa a a c ac a Ia Rab E D Ac,
J 2010 (c Ia a ca a aa ac bc a).Sc: Ia W E Aca a Ta Tc a, 2010.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
25/138
S W P Ta SARI/E R 9
2.2 Pc Sa a T
W a ca cc, a ca ca a a
a. T aca c aa c cc
c, a cc a a . B c a
SARI/E c, c c, a
. G cc a a c a a c
aac a a b, ab a
SARI/E .
I Baa, ab a a b b a/ a,
c ac a a b . T
Rab E Pc 2008 c a a ab c,
b a a ca a
. F, a ca aa b b
. Va a a b cc b Baa PD Ba a a a caa . Ba
, c 80 W a 400 W a b .
I Ma, cc a a 17 US c/W a c c
a 58 US c/W aa a a cca c (c: STELCO).
T c ca, c ca a a c a a 5 US c
a. F, a a a Ma a c, a
a a ca c c, c 100%
. T a bc a a
caba c b 2020. T cc c ac a (a)
cc a (b) ab ba b bca
c.
I Paa, c a a ab a
aca. I Ma 2003, ac a a a a 10% ab
(a 2,700 MW) c b 2015. Paa Aa E
D Ba (AEDB) a a c c 50 MW ac a
a cc a a c (IPP) c
NEPRA ( a) a ac a b 10 a 13 US c/W (c: AEDB).
Ta, a a a ca a
a a, a aca c c b 2010.H, a a Ra P Pa
Pa, c a a a a c aa cc a aa
3,000 MW, c c b 13 a 22 US c/W (c: Aa D
Ba, ADB).
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
26/138
S W P Ta SARI/E R 10
S Laa , c ca a c ca a ca , aa
b aac, 67 c. A c a
ac 1999 a caac 3 MW b. T 10
MW a a a a a b c, a a a
cc ac .
D ca , SARI/E c ac
a a a aac a a a ca
cca . T a a cca c a SARI/E
c a a c, a , c
c a a aa ab a.
I, a c c a b a
ab: ab aa (RPS), ab cca (REC) a
a ba c (GBI).
RPS a c ca ab a b a a cc,
aba aac a aa c. A RPS ba cc a
a cc a c a c a
cc b ab c, c a , a, ba, a
a. T a a RPS a a a c a,
a, ab b cca c ca
cc .
U a c aa ca a ab a c, RPS
a a c c b ab ,
b ca b c b a RPS a. T a RPS ca ca a a a
c, cc a a a ab a b
c, a ab c ca c.
W RPS a aa a ca ab , ab c
(REC) a acc RPS ba. REC a aab cca ac
cc (ca MW) a c ab c. REC a a
ca, b ab a. Tca b
a REC a a a ab RPS ca a
cab . I ca, ca a (PPA) a b c a REC, c ca b cc (
ca, ) REC. I ac RPS aa,
REC a a acc . T c REC a ca a a,
ca ca .
GBI a a c c ab c. GBI
a a a c a c a ac cc c
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
27/138
S W P Ta SARI/E R 11
ab c. W GBI a a c (.., c a c
U.S.), c bc c bca a a a
b a c. D cc , a ab
a ca c, c ca a a ab
c.
I a, F Ta (FT) ba c ab
c bca a aa c a cc .
D FT a ca c cc
a ca. Ma SARI/E c a FT c ac
a.
Ica, c a a a a a ca
aca a aac a a ca ac a a a, b
a ca c aca ca a c, a ca
a ca.
2.3 Pc Ra Ma
T c a, SARI/E a a
a a Sb 2010 cc Cb. T
a ac c :
Da a c c a a
Ra a aa cca c
D a acca aa a.
T a ca a b a
a a a a c. A
aa c a a aa a.
Eac c a c a aca a
a a Aa D Ba a. T
ac a ac a c c
a a caac c a a c a
a c a.
A c a a a a a aca
SARI/E c a a a a
Tab 3.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
28/138
S W P Ta
Tab 3. P
10 Ra Ma E
Iac caCa a a
R c c
Acca ca ca
S a
D a caac
W c
Fa acc
E a
A c
G c a a
USAID a , c
F 2.
SARI/E R
c Ra Ma D Ec Ta
Naa W Pa
Ac I
P
1=
a a aa aa
ADB.
C
12
L (Ra
H a 5=L)
cca
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
29/138
S W P Ta SARI/E R 13
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
30/138
S W P Ta
I a, c
a b
a a cc ,
ac.
SARI/E R
aa a c
a c a c. Iac c
c a a a
14
a
a a
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
31/138
S W P Ta
Sc 3WIND PO
LIFECYCLE
T c
ac a c,
a ac). W
a a
F 3.
Sc: Ta Tc EC, Ic. W E
SARI/E R
ER PROJECT
c (F 3) ,
a ca a a a c ( c
c cc a ac c a
bac 12 F 3.
D
Sc a Ta Tc ENE, 2010.
15
a c a
c ,
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
32/138
S W P Ta SARI/E R 16
W a a a, a b ca a,
c c cc a a .
1: A
T a ac c cc a ac '
c, a a c a. T , , c ab.
2: /
B a c, c c a c,
a a a a
c.
3: E E
A a aca a ac c a c aa
a c c a cc ab.
4: A
La, a bc, c b ca a
a cc a. Ra a a b c,
a a, a , aac ac a
b, a c ca a a , a
ca a a ca, ca c.
5: A
A cca c b a a a
a ac a b a. T, aaab a acc a b a ca c.
6: E A
T a a a b accab, a
a ca b ab b c.
7: C / A
E b a baab c a, a c
a c b a 10 30
a aa . F , a ca a (PPA)a baac a b a a b a.
8: A
Ma ca a a ac b c c .
T b aa a (a ca) a
ca b ac c a c.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
33/138
S W P Ta SARI/E R 17
9: E A C / F
B a a ca. I S Aa, a b a c
a $1.6$2.4 aa (MW) Ia c c baa
c. Acc caa a c caa a ac. Sc 2004,
a a c a ca bca b a ca a
c a . Hc, c , c c ca , ca a c cc. M a
a c c a a a a c.
Sc a a a b a a
a a, b a c aa
a a bab aca . Ba
c ac b a c b ac c
a (a c ca a) . Ua, a
c ac5, c ca .
10: E
E b a a. S ac a
a c a , a
b .
S b a a . Sa b a ca ,
b a a a ca a a a. A c
a a a ca a ca ac
ac.
11: CW a cc b ca b a c , c a
cc (EPC) a a a c c, cca, ca a
cca . M a 5070 ac c a ca b 250 300
a a .
12: A &
Tb aaab (ab) a a ac c cc, a c
a aa O&M b a. O&M c
a aac (OEM) aa a, b a c
, OEM O&M ca .
5Describing a loan for which there is a co-signer. That is, if the borrower defaults on the loan, the co-signer becomes legally liable for repayment. Thus, in addition to any collateral that may secure the loan;the lender is further protected from default by the existence of the co-signer. No matter what risk eventoccurs, the borrower or its guarantors guarantee to repay the debt.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
34/138
S W P Ta SARI/E R 18
A a bc aa c, a
c a c a c bc
a. Scc a c a b c a
a, aca a a c. T, ca
a c c a cb F 4.
F 4:
Sc: Ta Tc EC, Ic. W E Sc, 2010.
Final Horizontal LayoutFinal Horizontal Layout
Engineering, Constructability,Environmental, Wind, & Land Owner
Review
Constructability Considerations
DevelopmentDevelopment
Operations Ongoing Adaptive Management
Final Construction PlansDrawings/Contracts/Compliance
Plan
Define Constraints: Land,
Environmental, Cultural, Political,
Wind, & Engineering
Development
Initial Regulatory Strategy
Development
Restoration
Monitoring
Construction
FederalPermitting
State/Local Environmental
Review/permitting
Continued
Engineering Support
Land Interconnection Finalize Procurement of Turbinesand Long Lead Time Items
Engineering Fieldwork/Constructability
Considerations
Environmental & Cultural Fieldwork
Conceptual Layout
Select Preferable Turbine
Technology
Potential Wind Site Begin Discussions with TurbineSuppliers
Environmental/Cultural/
Engineering Screening
Public/Government
Acceptability Screening
Land Screening
Wind Transmission Screening
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
35/138
S W P Ta SARI/E R 19
Sc 4
SITE SELECTION AND WIND
RESOURCE ASSESSMENTS
S c cca cc. A c c
aa a a cca cc c b ac a a .
T c b b c a a a a ca. T a
a a b c aa ca c ab b,
b aa Naa Rab E Laba (NREL) US (aaab
a: ://.a./PaF/Wa_W_D/_a
WRcAa.a) U Na E Pa Sa
a W E A Pc (aaab a: ://a..). T a a
b a c a a a ca a ac .
A a , a a a acca cc caca a c b ba c ac.
T a caacc a a , a ,
a c a ca a b aa cc a
a cc .
T cca a a a , c
. T, a ca a c a a
c aca b b a . T, b
a a a, a a aca ca () aa ccac a . I a ca, c a a aa
a a b c . T a
b c c c c .
D c, c a a ca b c c
a W Aa M W Aa Aa a Aca Pa
(WAP), c aa ab ca a. H,
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
36/138
S W P Ta SARI/E R 20
aa ab a a a a (.., 10 ) a a
ca a , c aa a a a a ab
a . I a b a c a a a
ca W Aa M ba a aa c c a aa Nca
Wa M aa . Aa, c aa a a ab a
a aa.
T aa a c a cb c a aaab
a c a a a a a. F 5 a
c.
I a, a b ca a a b c a a
c, ba a c c a cac cca
a b , a cca ca aca
cac b a a b a ca.
4.1 Bac Caca D W P
T aaab a a a cb , c a
a b ca aaab b a ac . Aa,
a a a c ; a a, a, , a
a . S b a a ca a aa a
bc ac ac.
A a a b, a a 6 c (/) a
ca a aca. W c c a b a
S Aa c a .
W , a a a ( aa ca
c ), a a aa c aaab a a
a , a ca c aaab a c b a
b. Ca a 50 ab a Tab 4.
W a ca ab a . Bca a bc a
a ca, aa a , a 1,000
a b 3% a a a a .
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
37/138
S W P Ta SARI/E R 21
Tab 4. Ca W P D a 50 M Ab G
W P Ca (17) W S (/) W P D (W/)
1 < 5.6 < 200
2 5.6 6.4 200 3003 6.4 7.0 300 400
4 7.0 7.5 400 500
5 7.5 8.0 500 600
6 8.0 8.8 600 800
7 > 8.8 > 800
T ca a b :
bgp NNVCArhoP ******5.0
3=
W:
P = a (746 a = 1 ) (1,000 a = 1 a)
= a ( 1.225 /3a a , a ca a a ca)
A = aa, (2)
C = Cc ac (.35 a , .59 B a
ca b)
V = /c
N = a cc (80% b a a a a
cc c a)
Nb = ab/ba cc (a a 95% a ).
T acca c c b aaca aca
c c b aac.
4.2 Ma Acca W S Ma
4.2.1 Paa
A a a, b c
a a aa a ca a . W ca c
ab ( a 1 aa) a a a
a a, a b b ac aa
a a a b a a
a. H, a ca, a
c aab c a a a
a a a caa.
R a
c a
a c a
ba ( a
a), a bc acca a aab
a c
a. I bc
a (Sa) a
ba (La) , a
D S c
a
.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
38/138
S W P Ta SARI/E R 22
F 5. E A
Sc: Gaa Haa
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
39/138
S W P Ta SARI/E R 23
A
A ca a a a b a (c a ) a a
a, a a (c a c).
T b cc a aa , a ba a a, a c cab. T
a b a ba a a ab (RE) (a
a/ ). A a a ab b a. Maca a a a a aa ca b a .
I a ca c a, a
acca a ac , ca a a
c (>20 MW). O , a a, a a a c.
W ca ab , c a a
a c b b a b. W a ab
a aaab, a (c cb
ca a a ) ca b a aa
a. Uca a ca aa ,
b a a b a a b c 25%.
T c a . T a ca b a a a 6080 .
Ab a, ca bc ca a a ca c cab6.
A B
T Iaa N Ha a Rc W E Ma
(MEASNET), Iaa Eccca C (IEC) a Iaa E
Ac (IEA) b a cca a
. T c aab ac c a
baab c a, a a c a
a caba a.
I a a aa, a a a cca,
caba, aa a aac c a a c.
6Met-masts are made of thin aluminum tubes, they are tilted up and use guy wires for support. This is the cheapest configuration.
Taller means risk of bending of these thin towers. Instead of winch, cranes are used.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
40/138
S W P Ta SARI/E R 24
A W R T a b a c
b , a b
a c.
Sc: Oc Wa Sa Ca, 2010
D
W b a a aa a bca
b a ab c a b c (4/ a 26/,
c a ca b) ca b a b a. U
aa b ca b a bca ca a.
Bca bc aa aa, 12 aa a a ab
a aa a a ca. A a a
aca a c (F 6). W a
a . I ca, b a
b c ac ca . H, b
a, b b ac a c.
F 6.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
41/138
S W P Ta SARI/E R 25
W ca a ca a (F 7) a a .
Hc, a aa a a a c
a.
F 7.
T a aa a a a c c ac a. Tca b ba c a :
Scc a
Tac c
Aaab
Aaab b
Saa aa.
4.2.2 Ea P Pc
T a a ca a a aaab a . T W
Aa Aa a Aca Pa (WAP) b RISO ab, Da,
a.
Ia c, a, b ca, cc c, c.
cc a a. T a a ca a
Monthly wind flow pattern
0
0.5
11.5
2
2.5
3
3.5
4
4.5
Janu
ary
Febr
uary
Marc
hAp
rilM
ayJu
ne July
Augu
st
Septe
mbe
r
Octobe
r
Nove
mbe
r
Dece
mbe
r
Months
WindSpeedat10m(m/s)
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
42/138
S W P Ta SARI/E R 26
a, c aaab a c a a c a
a a a ca.
Ta, ca a caa ac (CFD) caca a a
a acca. Sc CFD a a a
c b ca b bc cc aa c.M ca a aa ac ac a
ca. CFD ca cc a ca b b
ca a c a c.
4.2.3 Pbab Aa
Sc ac a a aa aa, ca a
aa a aa c (AEP) . T, ca
ca aa b. Faca ac a c a cba
ac a aa a a ba ca. T a
c AEP ca P50. I aa , bab
ac a aa c 50:50.
A a c aca ccc ca a
a cac bab (P) a aa c. P75
aa c a ac a bab 75% a a
P50 a, acca ca aca a. T
a aa c P90 ac 10%. B a a b
ba a a ba ac c. T a
aca a a b c ca a aa bc
a a a ac c, aa ba a a ca
c.
4.3 Aaab Iac
T ac a a cc c a a ac
c . I a a c ca (a)a c a. Tca a a aaab c
: a a a a. Pa a ca b c a ba
bc c a. Tca, a a b a b a
. G a ca a a a a, c
ca a ca a . Ua a a
a a a c.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
43/138
S W P Ta SARI/E R 27
E
La aaab, a c,
c a ca b a a aca .
Ecc a a b ca b a ba. F ,
a ab a a a a a ; a ba
aa a/c/aa a . T
cc aaab ab aca a cc b
a ab a aca c a ba.
T aca a a c caac a
cca a aca (c a a a
cc). Sc a c cc a, a c
aa c a a ca aa c, aac
c aca , a a .
A
Accb a a ac a a c. A a
ca b c . I a ba a
ca a, a, aac a, a , c., a
ca a. I a a a, a b ca
c ac aaab a ca b a a a a
c c.
Va a a c a; bca a
a c c, ca b a. Tca,
a c c c:
Aa
Caac M E a F
NOC ( bc cca, a ) b a ab a
NOC b a ca
Caac b aa a Sa ca caac ca ca, c, , c.
Pc aa
Cc G cc aa.
I a, c a a a aa c a
aca ca a cca ba ac. W a a c
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
44/138
S W P Ta SARI/E R 28
S Aa a baac ac, a c ac a c .
Hc, a aca a c,
cac ca. T a a c c (P50) a b
c a, b ca a a a a ( a P84
P90) . F 8 ca a b c a
.
4.4 Cac a Ea Ca
T ccc caa b a. Sc a
a a, , a a b c
cca cca WTG a aa c.
Ea (a , ) a b b c cc
a a.
C
T a a a b c a caa b
a a. Aa aa b c cca cca
WTG a ca cca a .
Sa a a a b c c a aa, b a b
caa a a aa, a, c.
E
T a a c aa a caa b a. T ac
b ca WTG a a.
F
T a a caa ac a a ac c
c. T a a a ac Ea c.
T c a a a a caa b
a. T WTG b a a a c
c .
I c ca cc a caa c b a cca
cca WTG a a.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
45/138
S W P Ta SARI/E R 29
F 7: D
Greenfield Activitiesand Pre-projectPlanning
ProjectMonitoring
Wind ResourceAssessment
Procurement
of Manufacturerand EPC
Contractor
SynchronizatGreenfield Activitiesand Pre-projectPlanning
ProjectMonitoring
Wind ResourceAssessment
Procurement
of Manufacturerand EPC
Contractor
Synchronizat
Greenfield Activities and Pre-
project Planning
Identification of proposed potential site
Survey Regarding terrain and topography
Survey of approach road/infrastructure
Policy and Regulatory Study
Wind Resource Assessment
Mast Installation
Measurement and Collection of wind data
Wind data analysis
Selection of appropriate WTG Mode
Micrositing
Wind Flow Modelling
Annual Energy Estimation
Contingency Analysis
Applications for permissions
Procureme
EPC Contr
Technical Du
Commercial
Third party v
Legal Due D
Negotiations
Raising Purc
Project Monitoring
Monitoring delivery schedule
Validation of technical compliance
Monitoring WTG commissioning
Quality CheckSafety
Synchronization
Prestabilization test checks
WTG Grid syncronization
WTG Stabilization
Sale of Elec
Sell Electricity
consumption / E
Monitoring pay
Monitoring rea
and other losse
Payment realiz
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
46/138
S W P Ta SARI/E R 30
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
47/138
S W P Ta SARI/E R 31
Sc 5TECHNOLOGY/TURBINE
SELECTION
Ecc a a b a a a. W , c a , ca a c.
T cc a a . W a
b a b c aca c a a
a. W bac cc a a ca a
aa a a b, b a a
a a a aac ac. I a ab, cca,
a a c cc a aac a aac,
c a c 20 a.
I a bc c, ab, a cca , b a
b , a a 15 1980 a 128
a a b, c a ca a
16,000%. Tb cc a aaca aac
a . F 9 ca .
I 2007, MWca b (caac 1 MW) ca 95% a a, a
a 5% a ac. W MW , b caac 2.5
MW a a a bc ca a, c a . T a
a a b 20 b 2003 a 2007, 0.3% 6%. W
c b a a b , ca a, c a a a ca
1.5 3.0 MW a.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
48/138
S W P Ta SARI/E R 32
F 9. A
Sc: Bba WE .V.
T ba aac b ( 2007 ba a a) a
cc a a Tab 5; Tab 6 caab aa
S Aa.
Tab 5. Fa D La 10 Gba Tb Maac
Maac Ma
Sa
M D
Ta
P
Ra
(W)
Da
()
T
S
(/)
P
C
1 Va 22.8% V90 Ga 3,000 90 87 Ac
2 GE E 16.6% 2.5XL Ga 2,500 100 86 PMG
c
3 Gaa 15.4% G90 Ga 2,000 90 90 DFIG
4 Ec 14.0% E82 Dc 2,000 82 84 Sc
5 S 10.5% S88 Ga 2,100 88 71 Ac
6 S 7.1% 3.6 SWT Ga 3,600 107 73 Ac
7 Acca 4.4% AW
119/3000
Ga 3,000 116 74.7 DFIG
8 G 4.2% RE750 Ga 750 48 58 Ic
9 N 3.4% N100 Ga 2,500 99.8 78 DFIG
10 S 3.4% 1500
(Wc)
Ga 1,500 70 NA NA
Sc: Ia W E Aca, 2009
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
49/138
S W P Ta SARI/E R 33
Tab 6. Fa D La S Aa Tb Maac
Caac
(W)
M R
Da()
Hb H
()
C
WS
C
OW
S
Ra
WS
(/0
(/)
.
1650 V82 82 70 / 78 / 80 3.5
/
20
/
14
/
52.5
E
E
C .
600 T60048 48 50/55/60 3.5
/
22
/
11.5
/
55.3/55.8
/
E ()
.
800 E48 48 75 2.0
/
25
/
14
/
E53 53 73/75 3.0/
25/
12/
57 /
GE E
,
1500 GE 1.5
70.5 64.7/85 4 / 25
/
12
/
.
750 W75548 48 50 4.0
/
25
/
14
/
E
.
1500 S82 V31500 82 78 4.0
/
20
/
14
/
52.5 /
2100 S S88
V3A2100
88 80 4 / 25
/
14
/
59.5 /
.
250 SEPC 250 T 28.5 41.2 4 / 23
/
14
/
58 /
B E . 500 V39500 47 50 4.0
/
25
/
14
/
56 /
600 Paa
Sa 600
47 50 4.0
/
25
/
16
/
70 /
F
225 GWL 225 29.8 45 4.0
/
25
/
15
/
60 /
.
1500 V 77 76.84 80 3 / 22
/
11.8
/
52.5 /
.
2000 K82 82 80 3.5
/
25
/
E
.
1000 WWD 1
MW
60 70 4 / 20
/
11.5
/
G
750 NORWIN 750 47 65 34
/
25
/
60 /
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
50/138
S W P Ta SARI/E R 34
Ta Ia, b ca a 250 W 2100 W; a a
ca cab b. I b
c, Ia a a a aa caac, c:
Ga c, b c a c a
a a a cc
Ca ab c c a; a c a a c c
a c
A a a
Tb a a , c ca a: ca I >
a 10 /; ca II > a b 8.510/, a ca
III > b 7.58.5 / a ca IV > a 6 /.
T c c c ca c cca aa. T
ca a
, c b ca c; ;
a ca a ? T c c ca b a
.
F a, a a aca , c
b aa ba a a (IRR), c a
ca ab c a ba . I
a a, a c, c c b
a a b ac. I a c a a
ca c aa, c a a a c c. H,
a b a c ac a a ac
(PLF) a c a aaab. S a b c
a c caacc ca , aaab a
a 9295% , a a ac .
Tab 6. Fa D La S Aa Tb Maac
.
1350 LTW771.35 77 65 3 / 25
/
10.6
/
.
250 A 250/50 30 50 4 / 25/
14/
Sc: Ia W E Aca, 2010
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
51/138
S W P Ta SARI/E R 35
T a c cb
aac a c a, ca bac, a a a aac
. T a ca ac c aa
aa c a a. B a a, a bc a c
c b a. O a aac a, a a a. T ac
a ca a a.
5.1 W Tb Tc
T b a a cc . I a
20 a, b a ca 250 W 5000 W a b, c
a a b c, a a a ac
ac a ac c a . A a , ba a caa a ac ac a
. T a aab , b a : a cca ca a
a caca ac a .
W b c c ca a a a a
. H aab a b c a a a ca
c b c a a a b a cc a
a ac. T a b a a aa 13 a a a
20 a. B ca, a ca a a 200,000
a a a ab 5 a. T
a c a c a cca
a ac a a.
5.2 W Tb Sc
T c a b a cc ab. W cca
cc c a , c a a a
ac. I a ca, b ba c EPC c,
c c a c a ab
a c b a, ab a a
b.
I S Aa c, a b (a ccaa )
ca b accac c
a (WRA). T WRA ac b ca a a cc a
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
52/138
S W P Ta SARI/E R 36
(a a a ca b c ac a
b). I ca ab, WRA c c a ca.
5.3 S Sc
W a a ca b ac , a
a ca. W b a a cc a
c a aab a aaab c, ca a
c ac a aa . T b acc a
WRA a a a a c a aa, c,
, a c. W , c a ba
a b ba.
5.4 C M
O a ba ca, ca b ca c a, c
cb c c aa a a, a a ac
c. T b a a ca. Ua,
b ca ca a a aa c aa,
ca b ac ca a c , c a b aa
a c.
5.5 Ca
M c a a ca c, c
c ca ca ca. T a
ca a c aa a aca b aaab
. F ac, ca b acaa ca aa, aa
cca ab, aa ab a. T aa
a ab a a aaab aa.
5.6 C, Oa a Maac
Oc cc c, a c b. D caac
b, ac aaab a , a ca, ca a a a
a c a a b. C a
aa cca cca ac a a b, a c
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
53/138
S W P Ta SARI/E R 37
c a c. Ca a a a, a a
a b a aa.
T aaab a b a (WTG) a c 95%. T a a
95% , b b aaab aa . T a
a ca a. I a a a a ac , a, cca a a c,
a , aaab ca a ab 8090% a c
95% .
Oa a aac c c a aac, a, a a a
aa. T O&M c, c b 1 US c , a b
c US c . Maac a a a
c ca b
a c, b c . T a aac a
b a c O&M c W c.
B a a, c aa a aa a a
c. M a a c aac aa,
c c a a a a
aac c ac, b a ac. T aa a c
c. Waa aa c a a.
5.7 Sc R Oa
D cac , a a c a a a b
. T a a aa ac WTG
a SCADA (S C a Daa Ac) a a
c ab a a a acc b, c
c c a. D cac a
, c b a O&M cac a 10 a a ,
a c a ca, a cac a c.
A , aac WTG a aa
acc b a ba . T aa cac a a c
b a a a b c. Tc cac a aa ab WTG a
ac c a aa ac aaab 95%.
D cac ac a
a a WTG c cac. A bac c
b c a a a
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
54/138
S W P Ta SARI/E R 38
a ba a a a aa a. H a b a b
a aaab . H, c b a b a.
5.8 P a Pc Maac
W c a ca c, a a a a a
ca cc. T aa c b a a
a, a a a ca. T ac, c
b' caca a, 200 a a c acc.
Ba a a a, ca , caa
aa ac a a a a. T a
a b ab a caca b ac a ca
a. Hc, b a c a a
aa a b .
T , aa b a
cc b aac aa, c a
ca aac a . T a
aac c a a ba, ba a aa b
aaab aa b a 95%. I aac ,
aa a c cab a a a a c b
aac.
Oa c c a a b a, , cc
a, a a ca, a b cc acc
aac c a b. S bac
a c a a a cc , a a b
. I a a a, c aac c aa
a b a a a .
5.9 Pc E Ra M
W b a a ac a c
. Hc a a a aa . Sc aa c a c b cca a cca
ac ac. T c a c a a
ac cc ca. Ga aa a ca
a a b . T a a WRA a a aca
ac. T a ca b a a a
c a c a c a . Tab 7 a a a
a b .
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
55/138
S W P Ta SARI/E R 39
Tab 7. Ia a Ra M
E
Caac
b
(W)
Aa
Ga b
( 100,000
W)
Ga
I
W
MW
C
b(
R)
PLF
%
C
MW(
R.)
C
INR
W
Ra
A B C D=C/B E F=D*1000/8760 G=E*1000
/B
H=G/D C F
A 600 1.50 2.50 30.50 28.54 50.83 20.33 1 3
B 800 2.00 2.50 42.50 28.54 53.13 21.25 2 3
C 225 0.50 2.22 12.00 25.37 53.33 24.00 3 4
D 250 0.50 2.00 13.20 22.83 52.80 26.40 4 5
E 1000 2.46 2.46 65.60 28.11 65.60 26.64 5 2
F 250 0.45 1.80 12.30 20.55 49.20 27.33 6 6
G 1650 4.20 2.54 117.50 29.06 71.21 28.04 7 1
PLF: Pa a ac
A Tab 7 , WTG A a ca c, G a a
a ac (PLF). T cc c a
/, b a, a a.
5.10 T Ecc W P
O b cc a c,
bc cca c ca a. A
a, c b cca ab.
T ca a baca a b ab:
b c ca a (DSCR)7a c a a (IRR) ,
a IRR . T c a a a
a c c a b c ca a (DSCR) aa 1.30 a
1 a a.
Tab 8 a a b c ca a
a a c a c .
7T DSCR a a aa a b a ca b b ca a
c. Ia, a b a a b a aa
b.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
56/138
S W P Ta SARI/E R 40
5
Methodology
Tab 8. Sa Pc Ecc Caca a 18.75 MW W Fa
A C C ( )1 Pc c MW 50.00
2 T c c a 18.75 MW c 937.50
3 I cc @ 1% c c 9.375
4Pa a a , c , c. @
1% c c
9.375
C 956.25
C 1250 62.50
B F C ( )
1 E a a 30% 286.907
2 T a ba a 70% 669.343
956.250
3 I a: 11.60%
C D ()
1 Pc caac 18.75 MW
2 Tb caac 1.250 MW
3 Nb b 15
4 Ga MW 2.24 MU5 N a a (a Ia @ 2.5%) 2.80 MU
6 Ta a c 42.00 MU
7 Pa a ac 25.57 %
8 P c (Ta Na) 3.39
9 GBI @ 6.2 M MW aa 0.50 a U
10 CDM / CER c ( FY 202021) 0.50
11 Ta caa 0.00
D F ()
1 C MW 51.00
2 C W 22.773 A. DSCR 1.49
4 Db : a 2.33 : 1
5 O&M ( c c) 1.50%
6 Ecaa O&M 5.00%
7 Iac 0.25%
8 Ra a 20% a 15
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
57/138
S W P Ta SARI/E R 41
9 Pc IRR 12.96 %
10 E IRR 18.13 %
GBI = aba c, MU = , MW = Maa, PU =
INR = Ia R
T c c a ac, a c a:
W a ab a c a a , ?
Wa a caac a a a?
Wa ac ?
Ha a b aac? Ha a a
b c ac, O&M, c.?
Oc c c, c a
a b c a. Wa c cc ca
a , a c a
c, caca a cca a. F 10 a a c
a ca.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
58/138
S W P Ta SARI/E R 42
F 10. F C
Control Room
Ready for Erection
R.C.C.
Excavation
Civil Work
Commissioning
Pre-commissioning
Termination
Control Panel Erection
Cabling Works
WEG Erection
Nacelle & Blade at Site
Tower Assembly
Tower Materials at Site
Mechanical Work
Cabling & Termination
Transformer Erection
Earthing
D.P. Erection
Unit Substation
Earthing
D.P. Erection
CTs, PTs Testing
Metering Point
Conductor Stringing
Erection on Poles
Line Survey
OHT line
Electrical Work
EB Officials Inspection at Site
Registration of NOC
Land Procurement
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
59/138
S W P Ta SARI/E R 43
Sc 6GRID INTERCONNECTION
T a ab a c cc c, b
a, c a a c. G cc aa, a a
ca, a c ac a a .
W a c a b aaab. Ecc
a ca b aab , a, a aa. B
a, a a a aab c; a a
a a, a ca a a a ac a a c a
(a , a a a ac a ac ca).
A a a , a
c c. W a a cca
ab, c a a. T c b cb ca
a a .
Cc a a c ba (C: PPM E / Ta Tc)
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
60/138
S W P Ta SARI/E R 44
6.1 Ta
T cc a b a, ( F 11 a 12) a a
c a . T a , a a (HV) a a (EHV) a . Va a
a a ac a. Paa a
a ca ab a a .
Sba, c a baca c a c a, a c
a a aac. M ba a a a ac.
S acc a c a a ca b c a, a
a, a, , c. Cc ba, a, a c, a,
a , c. a a ba . T c ab a,
aac a c b a a b .
T a a, a c , aac a
cca a a ca. I ca, ab
a bac a a aca . T a b a
a c a aca a b ca
, a a c ca
aca c.
F a a cc a ba a ,
a a ca ca b a aca c. N
ac a (SIL) a a b a, a acc ac b
a ba a a . I a, a N1
c ca b a a cabca ba.
T SIL a a MW a a c a aa ac baac
cc. Ta c ac (Ma) aa caacac.
T a Ma c a caac acac (XC)
a a (V) a c . A a SIL MW
a (a a ac) a c Ma a a Ma
c. T a ac SIL ac caca.
T, SIL a a a a a caab, a a acc , c ca
. T a SIL a a a a a a ab
SIL, ac a ac abb Ma a a a
b SIL, ac a caac, Ma .
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
61/138
S W P Ta
F 11. D
F 12. D
SIL c a
ca b a a 2.5
a 100 . T, c
c.
SARI/E R
EG, G C
EG
a . H, (
SIL. W aca a b
b SIL, c
45
a 100 )
a
c
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
62/138
S W P Ta SARI/E R 46
T N1 c (a U Ca Ta Ecc G
C)
a a a a a a a a
(c a a a , a a , ca ac a
b ba) b caab acca ca ca b a
a.
T c, ca ab, a a ca
aca . C caac a ac (CUF)
ca , N1 c a b a c c.
A N1 ca a a aac ca. Ta ,
(a ab) a a a c aac. T c
, a , a c a aac
cca .
T N1 ca ca b a aa a a cc : ca
cc cc, ba, a a aca .
F a, a b a a c a , b a b
a ba a ca b aa a a.
A a a cca a a
. T a c c aca c
aa a a . T b
cc a a ca a a cc a ca a a b ca. Ga ac a c
a a ba aca c caa c , b a,
a , caa, O&M ca, a ca c.
6.2 S Iac S
A ca a caac a a ca ca
a, cc a a b a.
W a a a , aa ca (.., aca ac ac, c c abab ca
c, ac aca c a c c, ca a
) a . T b a c ac a
a , a , a c, a , a a
aca c. D a cc ca b a a a a a. F 13
a a Ea c.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
63/138
S W P Ta SARI/E R 47
T ab, c a , a ac aa
ac ca ( c ). A, a
aba a , a a b a
ac ca ca b a c .
T aa a a (LVRT) a a
c b c . H, c a
c LVRT. T a LVRT ac, ac
ca, a b a ca abab
a a aa a ac .
F 13. E E 2007
6.3 Fc C
F
T c a ac c b c a
ab a ac a b a c a a
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
64/138
S W P Ta SARI/E R 48
. H, a a aca c , WTG
b a a a ca a c. I Ia, WTG a
a c ca ca a 1 Jaa 2011.
A 8
F aca a WTG cc a a,
aab a a b b aca c. W
WTG aab , a a a a
a. Aca c ca bac a a
a abb c a.
P a c a. I ca, a ac c (LDC)
a a aca c .
D C
T a a a aca aaab a a
a a a. H, a a c a bac
a a c a a a
a. A aa ac b a a
cc LDC.
6.4 Rac P Maa
F D
Ca c a cab ac , a
c a c b a ca
ac a a c. W a a a
a c ac a baac ac
a . La a aa a ac a 0.95,
a 0.95 a b a a a a ba
a. W a a caab c ac a
cc a , ac a
ac caab ca ab. Dac ac caab ca b
ac b a cba ac caab c
caac a ac.
8T a c (a , ) a, c aa
a, ab a c (.., ac a , ac , bac
a, a c aaab).
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
65/138
S W P Ta SARI/E R 49
C
T LDC a c a a ca ac a c ca
c a a a. D
a a , a a ac a (
c ca c a) ac ac.
I a aba , ac ab b WEG b a
b c. L, ac a a a a a
a a a , b ca. Ra a
a a a ca LDC a a c .
6.5 Hac a Va FcHac c a a b a accac IEC 6140021
IEEE STD 5191992 . A a a c, IEC61000415 (IEC, 1997)
a IEC 61000 415 (IEC, 2003) aa b .
6.6 Pc Sc
W a cc a a a cc
a c . Rac ca aa cc a.
W a cc a a b LVRT caab.
H, a b c b aa ac a acc
a . T c a b a aa a a.
A cc WTG a a c c a
a a , a a c a. T
c c b ca c c c. A
WTG b c aa cc a a a a.
6.7 M a Cca R
T aa a cca a aa ca b
c a a, a c a aa ac (SCADA)
b ac. F , a ca
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
66/138
S W P Ta SARI/E R 50
aa a ac a b , a c b
ac. T aa a a c,
c aa, a b ac a ac ca. I
ca acc aac, a c a
a ca a c b a ac.
T b a a a b
ca, a, cc, c ,
a a . T b ab a
, c a a a a a
a b . A, a a a c cac (a
cac) ac a a b .
6.8 S C a Daa Ac
Ta a a a SCADA
caab bca a a a c a .
H, ca b a a cc a ,
SCADA caab ac a a aa a a a
ab a a, c, a
cc c.
6.9 Baac a S C
T b ca b () a ca
a a , a c b a ac. A,
a b a a (BPTA) a c
a . A c a b a
LDC.
E c aa a baac a ca.9 T ca ac
a b a a c b ba
ca a. Ta a a a ca b
acc ba BPTA. T baac a a
a a a c a (TSU,
a b a a caac acc a aa
a a a BPTA, c a a acc
9A c aa a cca b b cc ( ), a , c
a a/ a aa ca c c aa
a cb c a c a .
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
67/138
S W P Ta SARI/E R 51
a). Ba a, a a a
a c b a ac.
6.10 Ra R
Ra ac c cc ac a
a a c (.., 5, 10 20 MW), ba caac. W a
, ac a ca c a cca c
a a caacc a c,
a c, a ab.
T cca c a WTG . T a b
a ca:
Ca c a (ca )
Db ac a (aab ) Ga c a a bacbac c c
Aac a a a a.
W ac, a c, a
c a a . 1) I , a a a ac
a aa a bac a c .
2) La a , , a cca ca ac
a ca a a ac. 3) S
c a aa ac (SCADA), , b aa
a cca a aa ca b c a
a. T ca b b c ba
ac a a b a a cca c a c.
C G
Ta c a cc a ccc
a ac.
T aca WEG cc a c
a b.
A Ga1 Na a ca
2 Na a, b , , ca
3 Ga ca cca ca
a a a
4 P cc aa a ,
aa cc b
5 Na a c cc
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
68/138
S W P Ta SARI/E R 52
a cc b
6 Eaca ca b a a
B Cc Sc P SbSa
1 Na a
2 G a 3 Cc
4 C
5 Da ba c
6 Da cca a
C ICc
1 Ga a, a cc
2 Da c b cc
a c aca
3 Sa a baca c a c
4 R cc a a
D Ga
1 M ca a
b a, a a caba, c. a
c
2 Da c
C ca a /a
a ca a a c
a a aca b a c
3 Ca c a a c cc a b c a b
c b a a cc
ca a cc
4 Da a aa (a a ba) cac
c a cc. F a, a
ac a a, a ac,
ac a a caab.
5 Da a c a c,
a a c a aa a
c.
6 Da aa ac a c bcc.
7 Ca c a aa a aa (a)
a cac c a cc
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
69/138
S W P Ta SARI/E R 53
B A
T a c (TSP) a a a b a
a ccc a ac. T BPTA b WEG a TSP
a :
1. Ba aa a c 2. Eab c
3. F a ca a ac c
4. B a a a, c a aa aca a
5. Baac c
6. A aaab a caac
7. Dca a
8. Na acc caac
9. A a caac
10. S a caac
11. M
12. E
13. Ta ca
14. Cac c
15. Ta ac aa
16. Rb a a VAT.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
70/138
S W P Ta SARI/E R 54
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
71/138
S W P Ta SARI/E R 55
Sc 7
GRID CODE AND CONNECTIVITYSTANDARDS
A aca b a c aa
a c a, ca c, a b , a ac .
L a aca , bac ca a c a a ca a b
. Ia aca a a c, a a acc a baac
a c. T, a aca b cc b c
a b a c ac aa ca.
7.1 C Sc
T a c a cc c:
I c caa a aa c c a a a
cc
Oa a aac c
Aa aa cc c, c a
Tb Dc a
Ta a VAT
Ic.
T a c ca b ab c b (
). F 14 c c a ca 2 MW b a E
2006.
T ba c ca a cab b a c aa. T, ca F 14 b a a
c.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
72/138
S W P Ta SARI/E R 56
F 14.
7.2 Ga Paa a W Faca M
Tca, bca b a a 20 a, ca ca a a
20 a. D , a ca c b .W b , a c c
c c. T aca c b b a , a aa
ba. T, ca b ca , a a
c. A aa a a c a c ab,
a a a b acca a a a aa. O
a, a a c bc c a a c
a aa.
T aca b a a aa a a ab
c; ca b a aa a . T a aa a a cca a ca. T aa a
a b c a cca cc c a c b
( a PPA, ca a, ca c, c.) cca a c
a a a, a a a aca aa c a b
a a.
Wind Turbine Investment Cost Structure
1.5%
0.9%1.2%
3.9%0.3%
75.6%
6.5%
8.9%
1.2%
Turbine
Foundations
Electric installation
Grid connection
Control systems
Consultancy
Land
Financial costs
Road
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
73/138
S W P Ta SARI/E R 57
T, a b a a a a aa a
b aca . T c a aa .
7.2.1 B M
A c ca b a a b b . T
b a aa cc a, a
ca, c , a ac a b c. T
c b a c .
A
A a ca c a cac a cc a
a, a a c. Sc a cac ca a ca
a (PPA) ca a. T a b cc aa a a a c cac. Ua, a
ca a a ba a a a
a.
U aa, a baa a b c a a
a (ca Ecc Ba). T c a a a a
a c b a. T a a a c ac a
a a, a a b .
C C
H, a cc c. T
cc c c b a abb
a a ( aac a a ). I ca, c
a c , c ca a c a
b a cc . I a a a
Ecc Ba, a a b a a c a a ( c
Sa c c a). I Ia, ca
c a , a ca a Ecc Ba bca.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
74/138
S W P Ta SARI/E R 58
7.2.2 Caa E
Caa a a c c a a a ac,
c , c a c, aca ac, a c a a
aca ac c a acc a. Ia Ca Ecc Ra
C (CERC), a caca Rab E Ta, a acaa c aa US$ MW, c a ab
ac.
F aca , caa (.., b
b a a a a) b c acab. I
c a c O&M cac, a b
caa a c a a c ba .
H, ca c caa c a b aab ba
b b .
7.2.3 Ecc Ga
Ea cc a a c cca a
aca . T a a a ba aa b a a
b c a bab c a P50, P75, P90 a P95. T P50
a b a a cc a a a a 50% bab
b ac. D bab a ca ca ca.
Va ac ca ac a a a WTG. T ac a
c b.
G E 50/90
Aa cc c (AEP) a a c ac a c ab. Sc
aab a a aa aa, ca a
aa a AEP . Hc, ca ca
ca ca. T aca P50 a a
a a ca ca ba. M ca
a a a .
E
W c a (WRA) c aa aa c. A
cb a WRA ba : a) a aa, b) aa a
aa (a) ba a a ca , c) aa a aa (a) ba
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
75/138
S W P Ta SARI/E R 59
c aa, a ) c aa b b
aac c aa aa c.
A, c a a PLF CUF c
a a b. A a a, Ia, MW CUF a ca b a
aaab c a CERC a . T a a aac a a, c a CUF . T
a ( a MW ba):
Aa W P D (W/2) CUF
200250 20%
250300 23%
300400 27%
>400 30%
I b a aa c c ca b
ab CUF. N a aa a c
ab a a a a a 50 b.
D G
E aa c b b
ac b c. O a, b a a b
c a. T c a a , a ab a
ac ca b aca . Ua, a a a 1012 a
a. T a b (P50) a b c b 12 % ab
a. H, aca a aca ac a aac b.
G
A b c a ca a a. F
a, Ia, ab 60% aa a a b ac
a , a 5% aa a b ac
.
I aca a a a ba, aa aa a b a acc. I a a aa ba, aa
a b .
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
76/138
S W P Ta SARI/E R 60
7.2.4 R M
T a c a a a c aa
a cc, cab c, a c, c. T a a a
aca ca a cac a c c. I
ca ca c, a c a b b ; b a a a c c
.
T cca ac ca a a a (P50, P75, P90, c.),
aa a, b cc a c . Tca, cc b a
caca a aca a c 15 a 3 ,
ca a. T, ca a b
acc.
A a a a c, c a ca Iac a c b:
GB
D Dcb 2009, Ia M N a Rab E (MNRE) ac
aba c (GBI) c, c a ca a a
c Ia ab a, c
a b a c a a . T a c
a:
GBI b aaab a c acca cab c
T c a INR 0.50 W
T c b acab c a a a cc
ca c b. F ca c, GBI b
aaab a a a a Ecc Ba c
T acab ca Ia R (INR) 6.2 MW (aa US$
141,000 MW);
T GBI c acca ca b
ac a a c, a Dc Ta C,
c a a (E F Ya Pa, 20072012), c a.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
77/138
S W P Ta SARI/E R 61
T, GBI ca b a INR 0.50 W a a c.
T a b a a ca b
acc.
E CTaab Rab E Cca (REC) c c Ia a.
T REC a b c a b Rab P
Oba b Ia a a a c.
U a REC, REC b a
a a ca a a a. T
a aac a c c aa cca. H,
aa aa a b a, CERC a ac a a a
baac c cca. F a, c REC a b a
INR 1.50/ a baac c INR 3.9 / ( 1 REC = 1 MW).
T REC b b c. D
ca a c, , c c ca b
a b b . H, c REC c a
c, b b cc ca c, a ca aac
a c c.
C C
W c a b cab c Ca D Mca (CDM)
K Pc. I a c c a CDM a, ca ca CDM b c c (CER) c
a. H, a REC, c CER a a c ca a
cc c. M, CDM a c a a
c. CDM a aa a c.
F, a c a PPA, a CDM a
b a cc a. I acab, c aca
a a . A CERC, 100% c CDM b a
b a b a a aa c cca
a a b. H, b c a, a 10%a bca, a 20% a, a ac 50%, a c
c a a a b a.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
78/138
S W P Ta SARI/E R 62
7.2.5 Pc E (O a Caa C)
Aa caa , c, a c, a a
aa aca a. T a c b.
C
A c a c a a aac a a a
c . W O&M c, a
O&M cac. O&M ca ac a b aac;
ca a a ca a c, b ac (..,
a). H, c c ca O&M c a a a
a ( a). A c CERC a
(CERC T a C Ta a Rab E Sc
Ra, 2009), O&M c a b a a INR 0.66 MW a aa caa ca 5.72% a .
C
I O&M cac c a c a a a ac a
c, aa b b. H, cac
c, aa aac a a a b b.
C
I c, c a a a aa a ca
c. Tca, ca a a c, a ca,
c. A acab ca a c a b a a ca
aca .
D
I cc ac a a a a a, ca
aac a acca c c. A CERC, c ca,
aa a a b 10% a ca a 90% a caa
c. T ca a 10 a a a 7% a a a ca b a a c.
Dca caab a a.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
79/138
S W P Ta SARI/E R 63
7.2.6 Pc Fac
A c a c a a b ba c cc a
a aca a c. W c ca b
ba baac baac . T ac ca(), b, a c, c. ac
c a. T aa c ac c a c b.
D/E
I baac , a c ca ba 70% c c
b. T a a b baac
a . I ca baac , aca b
c ca . Tca, c b c ca a
(DSCR) P50, P75 P90 a , a b acc. T, c ac, b b ba
ca ca .
F
A ab, c a baac , c b
a a b aca . T a a c Ia a b
baac , ba ac.
A a 710 a ca b a b a aab aa aca a
c a a c. CERC, a a, a a a a
10 a.
Ga c ac b, a a ca c
b a. T a c c c a
. Ua, a a caa a a
aab a .
T aab a c a a c ac
c. Baac a a a, a baac
a c. F, c b aab ,
a, aa aa.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
80/138
S W P Ta SARI/E R 64
F a, Ia CERC a aa a
Sa Ba Ia a a 150 ba .
F a, aa , c a a a ac c c a
c a b. Tca, c a b 12% b a a bc a b a a b acc.
D DC C
A b a , b a b. Ua, ba a
ac a a a caa. T b c
ca a a a a b c c ca baac
ac, a ac c. T, ca
DSCR a a b c. F, DSCR b
c ac a b a a a a aa DSCR. T a
ca :
DSCR = Ca aaab b c ca/(Caa a + I
)
W ca aaab b c = + ca + ( a
a).
7.2.7 Taa
A
Ta b c acc acab a a a acc
a a a b aaab c. F, a ca a a
c a c a a ba. F a aa
c a b c a a ca b
aa a c ca a a a b a c
a a. F a a aa, a ca b ca .
A CI a c, ca a c a aaab c. I Ia,
c a b acca ca (80% c c) a a 10
a a a. I c, c a c a aaab. T aca
ca acab a c c c a
c.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
81/138
S W P Ta SARI/E R 65
7.2.8 Pab a K Ra
A ca ca , a baac ca b c a ca aca . Sa a a a a b c
aa, a . S a a a
c b.
,
T c IRR c aa . M a a a
c IRR b c a a. T, c c IRR
a c / c c. F a a aa, ,
a (NPV) a b c ca . T NPVca c a. H, b b a a
c a a c c a c b (a
c c a).
T c abac ca b c a:
S Pabac = Pc c / N aa ca
H, c, aa ca a a a
ca b a a c baac. I c a ca, aca a
aa ca ac c c. T
a a a b abac . A ca a a
c ac ba a aa ca b ca
c c.
E , E
E IRR ca b c ba ca , a c IRR.
R (ROE) ca b c a:
ROE = N Ic / Sa
T ab = P a ca / Ia ca a.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
82/138
S W P Ta SARI/E R 66
C G
T c a ca b a a ab
c . I a b a a a.
L c ca b c b caca a c W a a
c ba NPV. T NPV a c a a
ca c a ba c a W. Ec PMT c
ca b c c a:
L c = PMT (c a, , NPV) *
* T c PMT c Ec c a a a
a a a ca a.
Tab 9 Ia a a a .
Tab 9. Ia Sa W E Ta
N. Sa
Ta F b
C (U.S. c
(INR)/ W) Ra
1 Ta Na 7.25 (3.39) F
2 Maaaa 10.85 (5.07)I CERC
3 Kaaaa 7.92 (3.70) Acab 10 a
4 Aa Pa 7.49 (3.50)
5 Gaa 7.62 (3.56)
6 Raaa 8.20 (3.83)
F Jaa, Ba,
J
8.62 (4.03) F c
7
Maa
Pa 9.31 (4.35)
8 Kaa 6.72 (3.14)
9 W Ba 8.56 (4.00) F, b a a ca
Sc: Ia W E Aca, 2010.
Eca a ab 46.7 INR 1 USD
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
83/138
S W P Ta SARI/E R 67
Sc 8
FINANCIAL MODEL FOR WINDPOWER PROJECTS
T a b c a b c a a
aac a a c a . I
ca, b c aca , a c c c,
a cac b . Hc, a
a b c.
B c a cac a a a
a ac c. I E, a, c
b ca a , a ac, c,
c b aac, c a c b, a
a ac (.., a, aca ac). I Ia,
b aac a ac a c a ,
c a c c a O&M. T ca
a aa a a a a a b a cc b.
8.1 Fab R
Ic a , ab a a
. T c a
a acc c c. O c ,
a a ca aaab b. I a a c bac
ac a b , aaab ac c aa, b
a, a aaab ac. F, ab a a
a c , c , a ac aaab c (.., c, a a cc aa).
T, a ab a a c a
c.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
84/138
S W P Ta SARI/E R 68
8.2 Da Pc R
Bca a c a a , c.
Paa c a caac ac, a, caa c (CAPEX), O&M c (OPEX), a a
a c c ca a a ac c ab. I a ca,
c a a ac b ba , a , a
caa, b a c c ac, a c
a ccca ac. A, a
c a ab b cac
c, a c cc a aca ab. A a
c (DPR) bac ca a ac
a a c a c.
Tca, c DPR ca a a ccca
ac a c:
1. B : T c ca bac c:
ca, , ac (), b , a MW
caac a, c.
2. D : T c a a ac ca
a ca a a, aac (a a , a, a
a a, c.), a a aa c, c.
3. E : T bab ac a
c a cb c.
4. D : H, caab aac
c, ca c a aca aac, c., a a.
5. : I c a a
b c c, c, a cca
a c, a a cca aa aa.
6. : T c a a, ,
ab c b aaab c, aa
c a, c.
7. : H, a a
c, a aaab (.., a aaab
c aa a ( a),
ca a, c.).
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
85/138
S W P Ta SARI/E R 69
8. : Da a ac ca
b (.., UTM ca, , a).
9. : T c c a aa,
ba caac a a, ca ba a
a, a aca , aa, a a( b ).
10. : Da c a a a
c. I ba a c, a cc,
c ab, c, a b, c a cc, CDM
aca, c. T c a a a aa
a c a a ca, a
a c a a c .
11.
C : T c a ac c b
c. I a Ga PERT ca.
12. F : T ccca ac c a a
ab. T c CAPEX, OPEX, caa, b/
a, a, caac ac, a, a c, a c. T
aa a a ca IRR, NPV, a/ DSCR.
13. : T c a a a a
, a, a a a (SWOT) c.
14. C : T c a c a aac aca aa. Va b cba
aa a c ab a ac a ac
cc cc .
15. C : T c cc DPR, aaa a aaa c a a a a .
T aaab a DPR a cca a cca a c a
, a aca a a aa c.
8.3 Pa B Dc
T b c a cac a c ca a
a . I a a b c a cac
c c, c b c a:
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
86/138
S W P Ta SARI/E R 70
1. . T a a
, a a a a c, c ac a. I
a a b a a , c a
aa aa, c b a aa a
c.
2. E . T cca aa b a b
a c b. T c c b a
cca c c a a, a, c.
3. . A c a
ac c b, a a a
a aca b a
. F caac c, a ca c c
b a b . T ac ba a
aa c a cc a cc acc
a; b c b c.
4. E . T b b c
acc c ca, a a
b b b c. F, c
c b a a acc a c a
ca .
5. . I b
a a aac c a , b c c a O&M . T c a b a
a a aa ca c.
I ca b a b c c a a a
ca , b a a b b a a c a
a b . I S Aa, b aac a c
, b a. I c ca, b aac a
c a a b c. T ca a ,
ac a a ca , ac, a
a c b.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
87/138
S W P Ta SARI/E R 71
8.4 Eaa B
W c b a a aa a: cca a aca. D
cca aa, b a a b a ca a a a. T
b a a cca aa a aa a aca
ba.
Tcca EaaI aa a a b, aa ca a a. T ca ca b
c a aa b c. T ca b ba
ca (aa c ac):
E G
T a aa aa a c.T bca a aa a MW.
T aa a : 1) a b c c
a cca, a 2) a a a (cca, caca, a,
c.).
T c aa b c c b ac
a c a b a c b.
T a a a b c aa ca a:
T b a a ca cca
aa a c. I a c a c a cca
c, a aa cca ca b c.
Hcaac b a a O&M c, a
c a .
Sc a a aaa cc a a
.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
88/138
S W P Ta SARI/E R 72
T a ac a ca a a a .
Mac a a ca b c
b a cc a c a .
Tb aca a c a , a
a b ac c a caca c c .
T ca ac a ca b
a a aca . T b ca
IEC a aa IEC 61400. T ca b aa aa
a b :
WTG ca I II II IV
Aa a. (/) 10 8.5 7.5 6
D c a , b ca b
aa a b aa c.
T ac c c c a b c
b a .
B E
B c a a c a a O&M caab ca
b c a aa ca.
Faca EaaA cca aa, aca aa a. I a
b a c cca aa. T b c aca
aa a ca c a c.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
89/138
S W P Ta SARI/E R 73
Sc 9CDM FOR WIND PROJECTS
T U Na Fa C Ca Ca (UNFCCC) a 1992
a ca ca a ca. D c,
a A I c C, c a. T
Ca D Mca (CDM), 1997 a Cc Pa
UNFCCC, a a ca ca aab
c, a NA I c, a a a c a (GHG)
.
T CDM, a Ac 12 K Pc, a a c a
c a c K Pc (A I UNFCCC)
c c c. T CDM ba,
a a c c , a aa
ca a C E Rc (CER).
I aca CDM, a ca b ca a c .A a bac : a aca CDM,
ab a aa CDM a, a aca K Pc.
T CDM b CDM Ec Ba (CDM EB) a ac
Cc Pa UNFCCC. T Ec Ba a
CDM a a a a a c a . I a a c
a CDM. T b c a cc
CDM c.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
90/138
S W P Ta SARI/E R 74
F 15. CD C
9.1 T CDM Pc Cc
T CDM c cc a Pc Cc N (PCN), c
b aa CDM a. Ba PCN, a a
c ( a a c CDM EB). A ca
CDM PCN ca bac a ab c, c a caac a a ca
a.
T a CDM c aa Pc D
Dc (PDD), c a a ab c. I a ca a
c ba a c a aa ca.
(Aa a a c aa a a a
a c c a a cca ;
a c a b CDM b.)
C A CD C
Pc P
Da Oaa
E
Ec Ba
Pc P
Da Oaa
E
Ec Ba
C E
Rc
Aca E
Ec Ba
& COP/MOP
Da Naa
A
D
/
/
C
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
91/138
S W P Ta SARI/E R 75
9.2 Ba
T ba a cc abc CDM c,
a b c. A b ba a aa
b a b CDM EB; ca b c a c c
ba a b a. T a a a (ACM 002)
a aca ( a 15 MW) c ca . W ACM 002 a
b ba , c ba aa a
a c, a a a, a
a aa.
T CDM c a cc ca cc aa. T b
a CDM c a c ccaa a ca
b c. Tab 10 aa
CDM c , ac CER.
8: A CD C
. CD C
1. Paa c a a c cc 2
2. Paa c c 8
3. H c aa 6
4. Pbc b 4
5. S aa 1
6. A a aa 20
7. R a 4 8
8. Wb a UNFCCC 4
9. Ra 2
10. M 52
11. Paa 1
12. S ca 1
13. Wb ca 2
14. R ac CER 2
15. Iac CER 2
Ta T c CDM 110
9.3 W E a CDM
I ab c, a bca CDM ,
ca c Ia a Ca. B 2010, c a 31,000
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
92/138
S W P Ta SARI/E R 76
MW a caac a a CDM a. O , 1,665 c
a b . I SARI/E , Ia a c a
104 c .
W c, a ab c, a a
abac , c ca c . Va a c c . R a c a a CDM
c a aa a CER a c.
A b aca aa a a CDM caab a
a c b 34%.10
T, CDM c a a b ab
bca IRR, bc ab.
9.4 C I
O a, c a c b CDM Ec Ba. T a a a b c ca a a c Ba a
a a ab. T aa
c CDM a a a . A a , a ca a
a a CDM c.
F 16 a ca b c CDM . W
c Ia, ab 755 MW c a ac a. T
c a b c b Ec Ba, b a b ,
a a aa b c Da E,
a a c . O , c c a
600 MW a a aa c 20062008. Ca, a ac
ca b ab a a ac c .
10://c4c./Pbca/WCDM.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
93/138
S W P Ta SARI/E R 77
F 16. CD A11
C CD
Rc, CDM Ec Ba a a ab a c
c CDM a cca c b
c. T , c a a c a, a ac
c a a CDM c c a b ab c
aa. T ac a c a aa aac
a aa. A a a ac, aa
c a a a aa. T a b a b ca a
b b ca c; c a b ab
cc Da E c. T a aa b a c c a a c c.
C A
T c acc aa a aa a aca c (ab 15 MW)
c aca aa c. T baca ab
ac a c CDM a a c acc a aca
aa a c, .., a Sa c. F CDM c, bc a
b, ca Ia a Ta Na, Kaaaa a Maaaa, c a
a b c aa. H, b a a b S Aa c, c c a aa. A a
aa b aa CDM a ca a a CDM
a, aa aa b b a a.
W CDM Ba ca aa cac, aa aa
b cca.
11UNFCC, CDM Pc Sac, ://c.ccc./Pc/ac., CDM c , 2010.
0
10
20
30
40
5060
70
80
90
Q1-04
Q3-04
Q1-05
Q3-05
Q1-06
Q3-06
Q1-07
Q3-07
Q1-08
Q3-08
Q1-09
Q3-09
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
94/138
S W P Ta SARI/E R 78
C
T aac c a c a a . T ca b
ab ca b a a CDM, a a
b CDM c. T ca ca aa ca , c a ca b a a 50% a a. T
a bca ac a CER c a b a. I c,
aca c ca a CDM a a.
Tab 11. Tca C a CDM Pc
S. N Dc C
1 Pc ca US$ 10,000 15,000 + Scc F 0.55%2 Vaa ca US$ 13,000 20,000 ( )
3 M a ca
ca
US $ 8,500 10,000 (E Ya)
4 UNFCCC a ca 0.1 US$/CER 15,000 CER, 0.2 US$/CER a
15,000 CER
N ca aa aa a 15,000
CER
5 Aaa UNFCCC 2% CER a
6 Cab ca (I CER
aac a ca)
2 5 % CER aac
9.5 Va E Rc: A Fab Aa
D ca a cca aca CDM, a c ,
ca aa, a a a a aa.
Ma aa a aa CDM a
a, a a c b a a
CDM. Ia, a a a a a c c
c b CDM. N, a ca b a a a cc c
aa a cab a c.
C, aa a a a a: T Va Cab
Saa a Cca Ca Eca. T aa a a aaa,
: bca a a a CDM, c a a
c c a ca CER. A , a Va Cab
U ( Va Cab Saa) a a Cab Faca I (
Cca Ca Eca) a b a a aa 4 a $2 ,
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
95/138
S W P Ta SARI/E R 79
c, a ca a CER, c b a a a 14 ( a c
5 Sb 2010).
O a, c a c, a c b,
c b b CDM. P2012, c c a
b c. I a, CDM G Saa aa c aa a c aab . A G Saa c
a a a a 34/ CER ab a CER c.
W ca CDM c baa ca a
a a 5,500 MW c b
CDM a b b a c
a. CDM a a a a c
a P M c a.
9.6 CDM B Pacc
B a c b aa, ca acc ca aca a a
CDM c. F a, CDM Ec Ba a Naa CDM
A a ab b a c ( a a cca
a) c a c a cc CDM a a a.
F, ca a, a ac a
CDM PDD a c . La, a
ca a a aa ac ca bab a c b
cc.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
96/138
S W P Ta SARI/E R 80
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
97/138
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
98/138
S W P Ta SARI/E R 82
I a Caac B,
F P / Da Pc
Ba Pb S
2 I c ca
c a a
a c .
T c ab c a ca b a
IPP/BOO c aa, a aa a
, a b cac. I a, .., cc ca b cc a a a
c b a a.
3 G
IPP/BOO c ca
c a
.
T a a a a
c a a a ca ac a
a b c b b a . O,
b a b bc b, .., a .
Fa a a c b a
.
4 I cca a
a b cc a
accac IECaa a
MEASNET a
caba a
.
W a c a
a a ca: A 1%
a a aa a 3% a. T a c b
a b c aa a ca,
a ca a b a c a aa a (
, a c, a aa cc). Lca
ca a c cac a a a ca
b a .
5 Tcca b O&M
a aaab.
Fa b a ca a O&M
. Ec a
aa a c caa
.
6 Pc
a IPP/BOO
c .
Ta a a . Bca a c a
cca a cca c (
c b a c a ca
), cc
a a a b.
Ecc Ba W a P Ga Pa Sa
Ba Pb S
1 Ma a c
a acaaa c
G a c a
aa cc a a ba ca c a.
2 C b
ca a
T cc aa a c c ca
ca c c a
( ca b c, a a b a
b)
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
99/138
S W P Ta SARI/E R 83
Ecc Ba W a P Ga Pa Sa
Ba Pb S
3 I acc
c
a a
c c ,c
a .
P a c a WASP ( b c
c aa , WAP) aca
c c , aa
a aaab a a c ca.S aa ba a a c
a a .
M caca ca a b c
a a a
a. (T W Ba ESMAP a
c a bc a. M
c a aaab, b c aa
a.)
4 Dac ca
a a c b a
c ac abb
b bc b
O aaa , a a c a
, a a cc a ca 20a c cac cc .
5 Ecc a a
Ga c cc a (.., a
a b b
a cc a a a
b ) a b b
ca. Ga c b
a cca ca aca ac.
E Ta & PPA I
Ba Pb S
1 20a aa PPA
aaab a
W caa, (baca)
c PPA a a c ba a aab c
W, a a b a
b a c. Sc cca a a
b acc IEC aa 20 a, c ca b
ba ca a PPA c cca
a.
Ca a ba a a
c, a a.
2 F a a b
ca a a
3 N aab a
c
T c ca b a
cc a ba, ac a a, a ab
, a ca
c a a.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
100/138
S W P Ta SARI/E R 84
E Ta & PPA I
Ba Pb S
4 C
cc a
aa
Pc a b bac b aa aa
(ca a a a ) MIGA c
ac aa.
5 T a REb W aa
ab
c
I c aa a a a a, .., a a a aa,
c b . S a ca b
ba a, c a a b c
ab ( Da, Ga Fc ). T b
a a cca ab a a a
IPP/BOO a c a a a
ba W c c a c.
6 W ca c
aca b
a
I b ca b c, ca ca ca
b cc a (, .., ca
c a) a a b a
b a.
7 Ecc c a
aa, (aa, c.)
Baca a a aa a b
a c a (FIT). Sca c
c a a c a a
aa.
P a Lc I
Ba Pb S
1 Uc a
c ac a
c
P a c b b
BOO c, a b aa cac ba
a c.
F cba a c (FIT) a aac (a
ac a ca a
) . T a b
cc Da a ,
aa ac aa a.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
101/138
S W P Ta SARI/E R 85
Pbc La U Pc
Ba Pb S
1 Ec aa
( a
ca) c aab c a,
c a .
I c FIT , b a c a
(ac ba MW), aa a b a
a ca, c c. I ca a a a a a b
c cc. Pb a a b ba
Ia' a .
F BOO/IPP c b b ,
c a a ca
a c b b a. (A
a G Qbc.)
F BOO/IPP c ,
a ( b ).
La ca a b c b a
ab c. I a ca, acc bc a
b a, ba ,
c cca a cc aca. (T a
a IPP/BOO c.)
2 La I a a b cc, b (bca
a a accab a)
aa ba aca c, .., a
a MW.
I aba ( IPP/BOO c) a b c b c, c bc a
a b a c c. I a ca
c a b MW aca a aa
c aab c. (T
b MW a a ac ,
a a ca, a ac.)
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
102/138
S W P Ta SARI/E R 86
A.2 W Pc D
T ab b ca ba c b a b . S
a c ba a IPP/BOO c ( ba
W c), a a a (FIT); b.
W Rc & OS Ma
Ba Pb S
1 Lac aa
c a bab
a c
D a ca aa ba a aa, a
aa aa, a .
Pab a a aa ba a
a a . T ca b
a a ba a a a
a . W Ba (ESMAP)
c a aaab ca aa a.
D a ca a a b
(a a a a) c
c a a , c a
a a a a c a
ca c b a c.
2 Lac ab
aa a
c a ca.
A a a ac
a a b . G a a DANIDA
a GZac a E, c a b a
>15 a, a a GZac a 12 Sa, ca b a > 5 a. (P a a
aa a a ab a c
a c.)
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
103/138
S W P Ta SARI/E R 87
W Rc & OS Ma
Ba Pb S
3 T
a , a
a a .
P
c, acc a accb a
a c (b b a MW c). I
c, a a a a c c
b a MW c. P a
ac a, c a ca. T a
a b c c;
b a b ab b a b cac. (S Sc
A.1.)
I a , ca
' b, a,
a cac FIT . I ca, , ca a
a a a a a b ab,a a ab (a ).
4 Ma aa b
cc a
( ) a
a a
b
a a IPP/BOO
c: T a c
aa
c, a a
a a bc, a
ac.
B , cc a, a
IPP/BOO c, c
a c . A aa a a
a a a b a b
E 2,500 MW IPP/BOO a. T
a b c Sa.
5 L a
a a c
c
IPP/BOO cac ca
c .
T a a ac a
ac a c cc. Hc,
ab a aa c ba
. T ba aa a
Ea IPP/BOO
ab. L, c WAP
aa baab a b . O
c ac a b b ba.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
104/138
S W P Ta SARI/E R 88
W Rc & OS Ma
Ba Pb S
6 P a
aca
a a aaab
b a IPP/BOOc. T ca
c a
c b c.
T Ea c aac aa a ca
. T a c ca a, ,
a c a a a a
IPP/BOO c. T a a
a a, c aca
a a ca b , a
c a ca b a a a
b b.
7 N cca a
ca b
(a c).
T Ea ab c cca
a.
Ea a Sca Iac
Ba Pb S
1 W c
a
c
A a a c a
a a ca (.., b, cca,
acca , aa), a a a
a ac a ca a ,
c. Ma a ca b cb aa
a c c c a ab
aa.
2 Pc a
a a ca
ac a b
F IPP/BOO c a ,
a a ac a ca a
, a aca aa c.
3 Pa a : P
'
A a a a a b
aa . Sca b ca a
a cc a. T a
bc aaab W Ba (a c
bca b acc a a a ca
a a) a c.
4 Pa a : La
ac c
I a a a a a
c ca b a ca acc a. I c a
a ca ca b a a . E a
b a c ()
ca a ca bca c
ca a. G aba
Oa, Caaa.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
105/138
S W P Ta SARI/E R 89
Ea a Sca Iac
Ba Pb S
6 La ac aa
a b a
a
La b ca a, b ca b a
a PPA, a a a a
a . C 98% a aa a aab a a
a a b a.7 Lca ac c
ac a
aca
C c a c a b
a c. B acc ca
a a a acc ca b ba , .., ADB,
IFC W Ba aa .
8 Cc ab a
b a
A b a c b b
c a cca a a a a
PPA b a acc accac
c IEC 61400 aa a
.
9 Oca cc ab
b ba a
Oca (1 a) a b a a
a ac a (EIA) cca aa. Ma
a a b (.., a a
a, a ac a a b
a a). T a a aa
aa b a c
a ( 1 ab), a b ab a
(b), (b ), ( b
).
Pbc Saa Pa (Z)
Ba Pb S
1 P aa a a
c ( a)
b a c
ca b ca
a c c
( a c b
ac a)
W a a bc a, a b
ca b c. I a a
a b ca a a a.
A a a c c a
b 1020% bc a a ac
. P a a a a
c b , b a 1520%
a c a. Aac
a b c a c,
b a . B c a b a, ab
a. A a a b a
a a aa b.
7/26/2019 SARIE Wind ESQ Report 07 April 2011 v01
106/138
S W P Ta SARI/E R 90
Pbc Saa Pa (Z)
Ba Pb S
2 P a a
a a c
a ca b
b a ca a.
T c a a (.., WP, W
Fa) a ca b aa ac b
b a c a a a
ca c, a, ca 40 B(A) (a b a). L,
a c a a b a a a
a a ac b ( N
ab c cac), a a a ac
b b a a c cac. Ec ca
b a aa a. (Aa, accab
a b a c b
a).
3 Ma c aa
a a bc