Page 1
Manatee C
ounty Utilities D
epartment
Manatee C
ounty Public Works
Sarasota- ManateeTraffic Management Center
Coordination with Partnering Agencies
TRANSPO 2012
Presented by:SAGE KAMIYA, P.E., PTOE
DEPUTY DIRECTOR, TRAFFIC MANAGEMENTPUBLIC WORKS DEPARTMENT
Page 2
Manatee C
ounty Utilities D
epartment
Manatee C
ounty Public Works
Traffic Management Center
SARASOTA-MANATEE
TMC
Page 3
Manatee C
ounty Utilities D
epartment
Manatee C
ounty Public Works
INTELLIGENT TRANSPORTATIONSYSTEMS
ARTERIALMANAGEMENT
FREEWAYMANAGEMENT
CRASHPREVENTION
ROAD WEATHERMANAGEMENT
TRANSITMANAGEMENT
EMERGENCYMANAGEMENT
TRAVELERINFORMATION
TRAFFIC INCIDENTMANAGEMENT
Page 4
Manatee C
ounty Utilities D
epartment
Manatee C
ounty Public Works
PHASE II88 SIGNALS
MANATEE ATMS PROJECTS
PHASE I143 SIGNALS
• 231 Signal Cabinet Upgrades
• 58 CCTV Monitoring Cameras
• 60 Vehicle Detection System Devices
• Includes Cities of Bradenton and Palmetto
• Includes communication hub for Sarasota County ATMS
Page 5
Manatee C
ounty Utilities D
epartment
Manatee C
ounty Public Works
• 365 Signal Cabinet Upgrades
• ~100 CCTV Monitoring Cameras
• 26 Vehicle Detection System Devices
• Includes Cities of Sarasota, Venice, and North Port
Page 6
Manatee C
ounty Utilities D
epartment
Manatee C
ounty Public Works
TMC CONTROL ROOM
Page 7
Manatee C
ounty Utilities D
epartment
Manatee C
ounty Public Works
BACKGROUND• Sarasota Manatee MPO lead
• Identified stakeholders
• Outlined an ITS framework for the logical and physical architectural of regional ATMS
• Included high level design and implementation plan
• 2004 FDOT Concept of Operations
• 2005 Interlocal Agreement - Unified Regional Intelligent Transportation System
Page 8
Manatee C
ounty Utilities D
epartment
Manatee C
ounty Public Works
IMPLEMENTATION
• Intelligent Transportation Systems Management Team
• Proportionate cost share based on population
• Defined responsibilities
• Shared training
• Technical integration meetings
Page 9
Manatee C
ounty Utilities D
epartment
Manatee C
ounty Public Works
FUNDING
• Manatee County – Work Program Funds/ ARRA
• Sarasota County – Local and TRIP funds
• Operations – Congestion Management Funds?
• FDOT Support
Page 10
Manatee C
ounty Utilities D
epartment
Manatee C
ounty Public Works
GOALS• Fewer stops and less stop time at traffic signals
• Respond to traffic disruptions immediately
• Improve response time for Emergency vehicles and improve bus service reliability
• Improve emergency evacuations
• Improve safety by providing real time traffic information
Page 11
Manatee C
ounty Utilities D
epartment
Manatee C
ounty Public Works
ARTERIALMANAGEMENT
TRAFFIC INCIDENTMANAGEMENT
TRAFFIC SIGNALMAINTENANCE
Operations Performance Measures• Travel time reliability/consistency
• Travel time (before and after improvements)
• Reduction in delay
• Vehicle Throughput
PERFORMANCE MEASURES
Page 12
Manatee C
ounty Utilities D
epartment
Manatee C
ounty Public Works
ARTERIALMANAGEMENT
TRAFFIC INCIDENTMANAGEMENT
TRAFFIC SIGNALMAINTENANCE
Maintenance Performance Measures
• Percentage of operational vehicle detection devices
• Percentage of operational pedestrian detection devices
• Proactive identification of malfunctions (percentage)
PERFORMANCE MEASURES
Page 13
Manatee C
ounty Utilities D
epartment
Manatee C
ounty Public Works
LESSONS LEARNED• Clearly Defined Goals
• Staff Continuity
• Communication
• Funding Sources
Page 14
Manatee C
ounty Utilities D
epartment
Manatee C
ounty Public Works
THANK YOU
14
SAGE KAMIYA, P.E., PTOEDEPUTY DIRECTOR, TRAFFIC MANAGEMENT
MANATEE COUNTY PUBLIC WORKS DEPARTMENT
E-Mail: [email protected]