Top Banner
Duro Shox Pvt Limited SAP Implementation Project – ‘‘Pragati” USER MANUAL Materials Management DOCUMENT CONTROL SHEET GENERAL INFORMATION Project name Document name Document location Implementation Materials Management DOCUMENT INFORMATION Version Filename Date Author Reviewed by Changes from previous version U S E R M A N U A L
316
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Sap Mm Guide

Duro Shox Pvt Limited

SAP ImplementationProject – ‘‘Pragati”

USER MANUAL Materials Management

DOCUMENT CONTROL SHEET

GENERAL INFORMATION

Project name Document name Document location Implementation Materials Management

DOCUMENT INFORMATION Version Filename Date Author Reviewed

byChanges from previous version

US

ER

MA

NU

AL

Page 2: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

V 1.0 EUT -MM

REFERENCE DOCUMENTS

Document Version R Reference

DOCUMENT APPROVALS

Kedar KulkarniMM ConsultantPrepared by Approved by(KPIT Cummins Infosystems Limited.) (Duro Shox Pvt Limited)

Confidential Page 2 of 316

Page 3: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

USER PROCEDURE MANUAL

TABLE OF CONTENTS

Duro Shox Pvt Limited ________________________________________________ 1

1 Procurement of Stock Materials ............................................................................................................. 10

1.1 Procurement of Stock Materials – Raw Material Local / Return ___________ 10 1.1.1 Purpose ..................................................................................................................................................... 10 1.1.2 Prerequisites ............................................................................................................................................. 10 1.1.3 Material Master Record .............................................................................................................................. 10 1.1.4 Vendor Master Record ............................................................................................................................... 24 1.1.5 Purchasing Info Record ............................................................................................................................. 35 1.1.6 Source List ................................................................................................................................................. 41 1.1.7 CIN Master Data ........................................................................................................................................ 43 1.1.8 Excise Condition Record ............................................................................................................................ 53

1.2 Request for Quotation (RFQ) _______________________________________ 56 1.2.1 Use ............................................................................................................................................................ 56 1.2.2 Procedure .................................................................................................................................................. 56 1.2.3 Result ......................................................................................................................................................... 61 1.2.4 Example .................................................................................................................................................... 61

1.3 Message output: RFQ _____________________________________________ 61 1.3.1 Use ............................................................................................................................................................ 61 1.3.2 Procedure .................................................................................................................................................. 61

1.4 Maintaining Quotation ____________________________________________ 64 1.4.1 Use ............................................................................................................................................................ 64 1.4.2 Procedure .................................................................................................................................................. 64 1.4.3 Result ........................................................................................................................................................ 66 1.4.4 Example .................................................................................................................................................... 66

1.5 Price Comparison ________________________________________________ 67 1.5.1 Use ............................................................................................................................................................ 67 1.5.2 Procedure .................................................................................................................................................. 67 1.5.3 Result ........................................................................................................................................................ 69

1.6 Creating Purchase Requisition _____________________________________ 69 1.6.1 Use ............................................................................................................................................................ 69 1.6.2 Procedure .................................................................................................................................................. 69 1.6.3 Result ........................................................................................................................................................ 70 1.6.4 Example ..................................................................................................................................................... 70

1.7 Release Purchase Requisition ______________________________________ 70 1.7.1 Procedure .................................................................................................................................................. 71

1.8. Assign and Process Purchase Requisition ___________________________ 74 1.8.1 Use ........................................................................................................................................................... 74 1.8.2 Procedure .................................................................................................................................................. 74 1.8.3 Result ........................................................................................................................................................ 76

1.9 Purchase Order __________________________________________________ 77 1.9.1 Use ............................................................................................................................................................ 77 1.9.2 Procedure .................................................................................................................................................. 77 1.9.3 Result ........................................................................................................................................................ 82 1.9.4 Example .................................................................................................................................................... 82

Confidential Page 3 of 316

Page 4: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.10. Release Purchase Order _________________________________________ 83 1.10.1. Procedure ............................................................................................................................................ 83

1.11Message Output _________________________________________________ 87 1.11.1 Use ......................................................................................................................................................... 87 1.11.2 Procedure ................................................................................................................................................ 87

1.12 Goods Receipt for Purchase Order _________________________________ 89 1.12.1 Use .......................................................................................................................................................... 89 1.12.2 Prerequisites ........................................................................................................................................... 89 1.12.3 Procedure ................................................................................................................................................ 89 1.12.4 Result ...................................................................................................................................................... 99 Material document 5000000009 posted ............................................................................................... 99 1.12.5 Example .................................................................................................................................................. 99

1.13 Logistics Invoice Verification ____________________________________ 100 1.13.1 Use ........................................................................................................................................................ 100 1.13.2 Procedure .............................................................................................................................................. 100 1.13.3 Result .................................................................................................................................................... 105 1.13.4 Example ................................................................................................................................................ 105

1.14 Returning Delivery _____________________________________________ 106 1.14.1 Use ........................................................................................................................................................ 106 1.14.2 Procedure .............................................................................................................................................. 106 1.14.3 Result .................................................................................................................................................... 113 Return Delivery document created .................................................................................................................. 113 1.14.4 Example ................................................................................................................................................ 113

1.15 Excise Invoice Other Movements __________________________________ 114 1.15.1 Procedure .............................................................................................................................................. 114 1.15.2 Result .................................................................................................................................................... 116 1.15.3 Example ................................................................................................................................................ 116

1.16 Posting and Printing the Excise Invoice ____________________________ 117 1.16.1 Use ........................................................................................................................................................ 117 1.16.2 Prerequisites ......................................................................................................................................... 117 1.16.3 Procedure .............................................................................................................................................. 117 1.16.4 Result .................................................................................................................................................... 120

1.17 Credit Memo ___________________________________________________ 121 1.17.1 Use ........................................................................................................................................................ 121 1.17.2 Prerequisites ......................................................................................................................................... 121 1.17.3 Procedure .............................................................................................................................................. 121 1.17.4 Result .................................................................................................................................................... 127 1.17.5 Example ................................................................................................................................................ 127

1.18 Reversals / Cancellation of Invoice or Credit Memo __________________ 127 1.18.1 Use ........................................................................................................................................................ 127 1.18.2 Prerequisites .......................................................................................................................................... 128 1.18.3 Procedure .............................................................................................................................................. 128 1.18.4 Result ..................................................................................................................................................... 133 1.18.5 Example ................................................................................................................................................. 133

1.19 Reversals / Cancellation of Goods Receipt (GR) _____________________ 134 1.19.1 Use ........................................................................................................................................................ 134 1.19.2 Prerequisites .......................................................................................................................................... 134 1.19.3 Procedure .............................................................................................................................................. 134 1.19.4 Result .................................................................................................................................................... 139

Confidential Page 4 of 316

Page 5: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.19.5 Example ................................................................................................................................................ 139

1.20 Reversing CENVAT Postings _____________________________________ 140 1.20.1 Purpose ................................................................................................................................................. 140 1.20.2 Prerequisites ......................................................................................................................................... 140 1.20.3 Procedure .............................................................................................................................................. 140 1.20.4 Result ..................................................................................................................................................... 144 1.20.5 Example ................................................................................................................................................. 144

1.21 Canceling Excise Invoices _______________________________________ 145 1.21.1 Purpose ................................................................................................................................................. 145 1.21.2 Prerequisites ......................................................................................................................................... 145 1.21.3 Procedure .............................................................................................................................................. 145 1.21.4 Result ..................................................................................................................................................... 150 1.21.5 Example ................................................................................................................................................. 150

2 Procurement of Imported Materials – Business Process Procedure .................................................... 151

2.1 Procurement of Imported Materials ________________________________ 151 2.1.1 Purpose .................................................................................................................................................. 151 2.1.2 Prerequisites ........................................................................................................................................... 151

2.2 Creating Purchase Order ________________________________________ 152 2.2.1 Use ......................................................................................................................................................... 152 2.2.2 Prerequisites ........................................................................................................................................... 152 2.2.3 Procedure ................................................................................................................................................ 152 2.2.4 Result ...................................................................................................................................................... 158 2.2.5 Example .................................................................................................................................................. 158

2.3 Release Purchase Order __________________________________________ 159 2.3.1 Procedure ................................................................................................................................................ 159

2.4 Message Output _________________________________________________ 162 2.4.1 Use .......................................................................................................................................................... 162 2.4.2 Procedure ................................................................................................................................................ 162

2.5 CAPTURING BILL OF ENTRY _____________________________________ 164 2.5.1 Use .......................................................................................................................................................... 164 2.5.2 Procedure ................................................................................................................................................ 164 2.5.3 Result ...................................................................................................................................................... 171 2.5.4 Example .................................................................................................................................................. 171

2.6 Goods Receipt for Imported Purchase Order _________________________ 172 2.6.1 Use .......................................................................................................................................................... 172 2.6.2 Procedure ................................................................................................................................................ 172 2.6.3 Result ...................................................................................................................................................... 183 2.6.4 Example .................................................................................................................................................. 183

2.7 Logistics Invoice Verification for the Materials _______________________ 184 2.7.1 Use .......................................................................................................................................................... 184 2.7.2 Procedure ................................................................................................................................................ 184 2.7.3 Result ...................................................................................................................................................... 190 2.7.4 Example .................................................................................................................................................. 190

3 Procurement of Subcontracting Materials – Business Process Procedure .......................................... 191

3.1 Procurement of Subcontracting Materials ___________________________ 191 3.1.1 Purpose ................................................................................................................................................... 191 3.1.2 Prerequisites ........................................................................................................................................... 191

Confidential Page 5 of 316

Page 6: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3.2 Creation of Subcontracting Purchase Order __________________________ 192 3.2.1 Use .......................................................................................................................................................... 192 3.2.2 Prerequisites ........................................................................................................................................... 192 3.2.3 Procedure ................................................................................................................................................ 192 3.2.4 Result ...................................................................................................................................................... 196 3.2.5 Example .................................................................................................................................................. 196

3.3 Message Output _________________________________________________ 197 3.3.1 Use .......................................................................................................................................................... 197 3.3.2 Procedure ................................................................................................................................................ 197

3.4 Transfer of Components to Subcontractor ___________________________ 199 3.4.1 Use .......................................................................................................................................................... 199 3.4.2 Prerequisites ........................................................................................................................................... 199 3.4.3 Procedure ................................................................................................................................................ 199 3.4.4 Result ...................................................................................................................................................... 201 3.4.5 Example .................................................................................................................................................. 202

3.5 Creation of Subcontracting Challan _________________________________ 202 3.5.1 Use .......................................................................................................................................................... 202 3.5.2 Prerequisites ............................................................................................................................................ 202 3.5.3 Procedure ................................................................................................................................................ 202 3.5.4 Result ...................................................................................................................................................... 204 3.5.5 Example .................................................................................................................................................. 204

3.6 Printing of Subcontracting Challan ________________________________ 205 3.6.1 Use ......................................................................................................................................................... 205 3.6.2 Procedure ................................................................................................................................................ 205

3.7 Goods Receipt for Purchase Order _________________________________ 209 3.7.1 Use .......................................................................................................................................................... 209 3.7.2 Prerequisites ........................................................................................................................................... 209 3.7.3 Procedure ................................................................................................................................................ 209 3.7.4 Result ...................................................................................................................................................... 217 3.7.5 Example .................................................................................................................................................. 217

3.8 Reconciling Subcontracting Challan ________________________________ 218 3.8.1 Use .......................................................................................................................................................... 218 3.8.2 Procedure ................................................................................................................................................ 218 3.8.3 Result ...................................................................................................................................................... 220 3.8.4 Example .................................................................................................................................................. 220

3.9 Completing/Reversal/Re-credit Subcontracting Challan ________________ 221 3.9.1 Use .......................................................................................................................................................... 221 3.9.2 Procedure ................................................................................................................................................ 221 3.9.3 Result ...................................................................................................................................................... 222 3.9.4 Example .................................................................................................................................................. 222

3.10 Logistics Invoice Verification for Subcontracting Material _____________ 222 3.10.1 Use ........................................................................................................................................................ 222 3.10.2 Procedure .............................................................................................................................................. 222 3.10.3 Result .................................................................................................................................................... 226 3.10.4 Example ................................................................................................................................................ 226

5. Procurement of External Services: Business Process Procedure ....................................................... 227

5.1 Procurement of External Services – Procurement Process _____________ 227 5.1.1 Purpose ................................................................................................................................................... 227 5.1.2 Prerequisites ........................................................................................................................................... 227

Confidential Page 6 of 316

Page 7: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

5.2 Creating Service Master __________________________________________ 228 5.2.1 Use .......................................................................................................................................................... 228 5.2.2 Procedure ................................................................................................................................................ 228 5.2.3 Result ...................................................................................................................................................... 229

5.3 Creating Purchase Requisition ____________________________________ 230 5.3.1 Use .......................................................................................................................................................... 230 5.3.2 Procedure ................................................................................................................................................ 230 5.3.3 Result ...................................................................................................................................................... 235 5.3.4 Example ................................................................................................................................................... 235

5.4 Assign and Process Purchase Requisition ___________________________ 236 5.4.1 Use .......................................................................................................................................................... 236 5.4.2 Procedure ................................................................................................................................................ 236 5.4.3 Result ...................................................................................................................................................... 239

5.6 Purchase Order _________________________________________________ 239 5.6.1 Use ......................................................................................................................................................... 239 5.6.2 Prerequisites ........................................................................................................................................... 240 5.6.3 Procedure ................................................................................................................................................ 240 5.6.4 Result ...................................................................................................................................................... 242 5.6.5 Example .................................................................................................................................................. 243

5.7 For Releasing Purchase Order Refer User Manual of Stock Procurement _ 243

5.8 Message Output _________________________________________________ 243 5.8.1 Use .......................................................................................................................................................... 243 5.8.2 Procedure ................................................................................................................................................ 243

5.9 Creation and Acceptance of Service Entry Sheet _____________________ 245 5.9.1 Use .......................................................................................................................................................... 245 5.9.2 Procedure ................................................................................................................................................ 246 5.9.3 Result ...................................................................................................................................................... 256 5.9.4 Example .................................................................................................................................................. 256

5.10 Logistics Invoice Verification _____________________________________ 257 5.10.1 Use ........................................................................................................................................................ 257 5.10.2 Procedure .............................................................................................................................................. 257 5.10.3 Result .................................................................................................................................................... 261 5.10.4 Example ................................................................................................................................................ 261

6 Asset Procurement – Business Process Procedure. .............................................................................. 262

6.1 Purchase Order _________________________________________________ 262 6.1.1 Use .......................................................................................................................................................... 262 6.1.2 Procedure ................................................................................................................................................ 262 6.1.3 Result ....................................................................................................................................................... 266

6.2 Release of Purchase Order _______________________________________ 266 6.2.1 Procedure ................................................................................................................................................ 266

6.3 Goods Receipt for Purchase Order _________________________________ 267 6.3.2 Use .......................................................................................................................................................... 267 6.3.3 Prerequisites ........................................................................................................................................... 267 6.3.4 Procedure ................................................................................................................................................ 267 6.2.3 Result ....................................................................................................................................................... 269

6.4 Post Excise Invoice ______________________________________________ 269 6.4.1 Procedure ............................................................................................................................................... 269

Confidential Page 7 of 316

Page 8: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

6.4.2 Result ...................................................................................................................................................... 271

6.5 Logistics Invoice Verification ______________________________________ 272 6.5.1 Use .......................................................................................................................................................... 272 6.5.2 Procedure ................................................................................................................................................ 272 6.5.3 Result ....................................................................................................................................................... 275

7 Excise Periodic Processing – Business Process Procedure .................................................................. 276

7.1 Excise Periodic Processing _______________________________________ 276 7.1.1 Purpose ................................................................................................................................................... 276 7.1.2 Prerequisites ............................................................................................................................................ 276

7.2 Excise Report - CENVAT Register __________________________________ 277 7.2.1 Use .......................................................................................................................................................... 277 7.2.2 Prerequisites ............................................................................................................................................ 277 7.2.3 Procedure ................................................................................................................................................ 277 7.2.4 Result ...................................................................................................................................................... 279

7.3 Excise Register Updation .................................................................................................................... 280

7.3Updation of RG1 Register ________________________________________ 280 7.3.1 Use .......................................................................................................................................................... 280 7.3.2 Prerequisites ............................................................................................................................................ 280 7.3.3 Procedure ................................................................................................................................................ 280 7.3.4 Result ...................................................................................................................................................... 287

7.4 RG1 Register Extraction __________________________________________ 288 7.4.1 Use .......................................................................................................................................................... 288 7.4.2 Prerequisites ............................................................................................................................................ 288 7.4.3 Procedure ................................................................................................................................................ 288 7.4.4 Result ...................................................................................................................................................... 291

7.5 RG1 Register Print Utility _________________________________________ 292 7.5.1 Use .......................................................................................................................................................... 292 7.5.2 Prerequisites ............................................................................................................................................ 292 7.5.3 Procedure ................................................................................................................................................ 292 7.5.4 Result ...................................................................................................................................................... 295

8. PLA Register Extraction ....................................................................................................................... 295

8.1 PLA Register Extraction __________________________________________ 295 8.1.1 Use .......................................................................................................................................................... 295 8.1.2 Prerequisites ............................................................................................................................................ 295 8.1.3 Procedure ................................................................................................................................................ 295 8.1.4 Result ...................................................................................................................................................... 298

8.2 PLA Register Print Utility _________________________________________ 298 8.2.1 Use .......................................................................................................................................................... 298 8.2.2 Prerequisites ............................................................................................................................................ 298 8.2.3 Procedure ................................................................................................................................................ 298 8.2.4 Result ...................................................................................................................................................... 300

9. Reports ................................................................................................................................................. 301

7.1 Purchasing ____________________________________________________ 301 7.1.1 Purchasing Documents per Vendor (ME2L) ............................................................................................ 301 7.1.2 Purchasing Documents per Material (ME2M) .......................................................................................... 302 7.1.3 Source List for Material (ME0M) .............................................................................................................. 303 7.1.4 Purchase Info Record per Material (ME1M) ............................................................................................. 303

Confidential Page 8 of 316

Page 9: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

7.1.5 Purchasing Values(MC$G) ...................................................................................................................... 305

9.2 Inventory _______________________________________________________ 307 9.2.1 Material Document List (MB51) ............................................................................................................... 307 9.2.2 Diplay Warehouse Stock (MB52) ............................................................................................................. 309 9.3.3 Stock on Posting Date (MB5B) ............................................................................................................... 310 9.3.4 Stock Overview (MMBE) ......................................................................................................................... 313 9.3.5 Stock in Transit (MB5T) .......................................................................................................................... 314 9.3.6 Slow Moving Items (MC46) ..................................................................................................................... 314

Icons

Icon Meaning

Caution

Example

Note

Recommendation

Syntax

Abbreviations

R Required entry field (used in the end-user procedures)

O Optional entry field(used in the end-user procedures)

C Conditional field

Confidential Page 9 of 316

Page 10: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

(used in the end-user procedures)

1 Procurement of Stock Materials

1.1 Procurement of Stock Materials – Raw Material Local / Return

1.1.1 Purpose

This process describes the procurement process of raw materials from indigenous source of supply with Country Version India (CIN) relevant process like processing of Excise Duty (ED) and Sales Tax (ST) process.

1.1.2 Prerequisites

The following scenario specific master data must be created for operation of this building block.

1. Material Master Record2. Vendor Master Record3. Purchase Info Record (Optional)4. Source List (Optional)5. CIN Master Data6. Excise Condition Record (if Tax applicable for the Vendor-Material Combination)

1.1.3 Material Master Record

Menu Path Logistics Materials Management Material Master Material Create (General)

T CodeMM01 – CreateMM02 – ChangeMM03 – Display

Confidential Page 10 of 316

Page 11: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Press Enter to see the pop-up window.

Confidential Page 11 of 316

Enter the Industry Sector

Enter the Material Type

Internal Number assignment .

Page 12: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Select the required views and press Enter to input the organizational levels.

Confidential Page 12 of 316

Page 13: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Press Enter to input the details of the Material.

1.1.3.1 Basic Data Views

Confidential Page 13 of 316

Enter the Material Description Enter the Unit of Measure and material Group

Enter the division if Stock Transfer will happen for this materialBlocking for Procurement or BOM enter here

Enter the Gross and Net Weight for the Finished Goods

Enter here if the material is returnable packing as VERP and non returnable packing as LEIH

Page 14: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Press Additional Data to maintain the Alternate Unit of Measures (for e.g. 1000G= 20Nos for the Semi finished goods)

Confidential Page 14 of 316

Enter any Basic Material is there

Press Additional Data to maintain Alternate Unit of Measures

Page 15: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 15 of 316

Press Main data to go to the next view

Page 16: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.1.3.2 Purchasing Views

Confidential Page 16 of 316

If the Ordering Unit is other than the Base UoM, enter the Unit and make VAR. OUn as 1

Enter the Purchasing Value Key as G1 (5% Delivery Tolerance) or G2 (10% Delivery Tolerance)

Enter the Purchasing Group – Person/Group responsible to procure this material

Select if QM is not active and want to post to Inspection Stock (Mainly used for Spares)Source list should be maintained for this material select the box.

Enter the No. of Days required for GR Processing once the material is arrived at factory.

Page 17: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 17 of 316

Enter the PO Text normally specification is maintained

Page 18: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.1.3.3 MRP Views

Confidential Page 18 of 316

Enter the appropriate MRP Type)

Page 19: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 19 of 316

Page 20: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Work Scheduling View:

Confidential Page 20 of 316

Page 21: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.1.3.4 Quality Management View

Confidential Page 21 of 316

Page 22: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.1.3.5 Accounting Views

Confidential Page 22 of 316

Enter the appropriate Valuation Class (Various Valuation Classes given below)

If Price Control is V enter the Moving Average price, S enter the Standard Price

Enter the Price Control as V-Moving Average and S-Standard

Page 23: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.1.3.6 Costing Views

After entering all the details, press to save the Material.

Confidential Page 23 of 316

Enter Respective Profit Centre of Plant/Depot

Page 24: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.1.4 Vendor Master Record

Menu Path Logistics Materials Management Purchasing Master Data Vendor Central

T CodeXK01 – CreateXK02 – ChangeXK03 – Display

Press Enter to input the details of the vendor.Vendor Account Groups:VDOM Domestic VendorsVIMP Import VendorsVSRV Service Vendors

Confidential Page 24 of 316

Vendor Number to be put manually

Enter Company Code

Enter Account Group (Various Group given below)

Enter Purchasing Organisation

Page 25: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.1.4.1 General Data

Confidential Page 25 of 316

Page 26: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 26 of 316

Click on the CIN Details to enter the Vendor Excise and Sales Tax details

Page 27: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 27 of 316

Enter all the details in the respective fields

Excise Indicator for Vendor as 1 – 100% Taxable

Page 28: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 28 of 316

Enter all the details in the respective fields

Page 29: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Enter whether this vendor is approved or on Probation

Confidential Page 29 of 316

Enter the detail in the respective field

Page 30: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

No need to enter in the below screen.

Confidential Page 30 of 316

Page 31: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.1.4.2 Accounting Data

Reconciliation Accounts:

Confidential Page 31 of 316

Enter the appropriate Reconciliation Accounts (Various Accounts given below)

Page 32: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

The below screen is explained in detail in FI User Manual:

Confidential Page 32 of 316

Enter the appropriate Payment Terms and Select the Chk double inv

Enter the appropriate Payment Methods C – Cheque, E – Cash Payment, T – Bank Transfer

Page 33: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.1.4.3 Purchasing Data

Schema group, Vendor:

DM Domestic Schema IM Import Schema

Confidential Page 33 of 316

Enter the Order Currency, Terms of Payment and Incoterms

Enter the appropriate Schema group, Vendor (Various groups given below)

1. Select GR-based Inv. Verf if Invoice verification is done after GR2.. Select the Srv-based Inv. Verf if Invoice Verification is done after Service Entry sheet.

Page 34: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Press to save the Vendor master and the no is generated automatically.

Confidential Page 34 of 316

Enter the Partner for the appropriate Partner Functions

Page 35: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.1.5 Purchasing Info Record

Menu PathSAP Easy Access Logistics Materials Management Purchasing Master Data Info Record Create

T CodeME11 – CreateME12 – ChangeME13 - Display

You use this component if you wish to store information on a vendor and a material as master data at purchasing organization or plant level. You can create purchasing info records for different procurement types (standard, subcontracting, pipeline, consignment).

Press enter the details in the Purchasing Info Record.

Confidential Page 35 of 316

Enter the Info Category as1. Standard – For normal Procurement (Domestic, Import, etc)2. Sub-Contracting – For Sub-Contracting

Page 36: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 36 of 316

If the message is displayed like this, intimate the Quality Person to maintain the QM Info Record (TCode: QI01)

Page 37: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

No need to enter anything in the below screen as it copies all the data from the Vendor Master.

Confidential Page 37 of 316

Page 38: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 38 of 316

It is defaulted from the Material Master but change for this Vendor-Material combination if different.

Enter the Standard Quantity

Enter the appropriate Tax Code

It is defaulted from the Material Master but change for this Vendor-Material combination if different.

Enter the Net Price

Page 39: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 39 of 316

It is defaulted from the Material Master but change for this Vendor-Material combination if different.

Page 40: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.1.5.1 Result

Purchasing Info Record is created

1.1.5.2 Example

Purchasing Info Record 5300000384 is created.

Confidential Page 40 of 316

Page 41: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.1.6 Source List

Menu PathSAP Easy Access Logistics Materials Management Purchasing Master Data Source List Maintain

T CodeME01 – MaintainME03 – DisplayME04 - Changes

Confidential Page 41 of 316

Enter the Material No. and Plant

Page 42: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Result: Source List changed.

Confidential Page 42 of 316

Maintain the Validity Period till until which you will procure this material from this vendor

Enter the Vendor and Purchasing Organisation

Select if the Vendor is fixed

Select if the Vendor is blocked for Procurement for this particular material alone

Enter 1 to be included in MRP Run

Page 43: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.1.7 CIN Master Data

Menu Path J1ILN SAP Menu Indirect Taxes Master Data Excise Rate Maintenance

T Code J1ID

1.1.7.1 Chapter IDs

Select Chapter ID and Press

Confidential Page 43 of 316

Page 44: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Press New Entries to go to the next screen.

Confidential Page 44 of 316

Press New Entries to Create New Chapter ID

Page 45: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Press to save the data.

Confidential Page 45 of 316

Enter the Chapter ID

Enter the Description as per law

Page 46: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.1.7.2 Material ID and chapter ID combination

Select Material and Chapter ID Combination and Press

Confidential Page 46 of 316

Select the Material and Chapter-Id Combination

Page 47: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 47 of 316

Press New Entries to Create New Material Number and Chapter ID Combination

Page 48: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Press to save the data.

Confidential Page 48 of 316

Enter the Material No. and Chapter ID Combination

Enter the material type based on the Material Nature

Page 49: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.1.7.3 Vendor Excise Details

Either you can maintain here or else in Vendor Master.

Confidential Page 49 of 316

Select the Vendor Excise Details

Page 50: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Press to save the data.

Confidential Page 50 of 316

Press New Entries to Create Vendor Master Excise Details

Page 51: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.1.7.4 Excise Indicator for Plants

Select Excise Indicator for Plant and Press

Confidential Page 51 of 316

Select the Excise Indicator for Plant

Page 52: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Press to save the data.

Confidential Page 52 of 316

Press New Entries to Create Plant Excise Details

Page 53: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.1.8 Excise Condition Record

1.1.8.1 Use

When you enter a purchasing document, for example, a purchase order, the R/3 System automatically calculates the applicable excise duties using the condition technique.

1.1.8.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu No Menu path available for this transaction

Transaction code FV11

2. Enter the appropriate Condition type (various condition types given in next page) and maintain the respective values.

Confidential Page 53 of 316

Enter the appropriate condition type

Page 54: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

For Raw Material / Packing Material maintain the Plant/Vendor/Material Combination.For Service Tax /Assets maintain the Plant/Material Group Combination..

Confidential Page 54 of 316

Various combinations to maintain the condition record

Page 55: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3. Press Ctrl+S or

4.

1.1.8.3 Result

Condition records saved.

Confidential Page 55 of 316

Enter the Plant and Vendor

Enter the Material No. Enter the Value / amount

Page 56: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.2 Request for Quotation (RFQ)

1.2.1 Use

Request for Quotation is used to float enquiries in market to obtain quotations from prospective vendors.This transaction is optional for the process.

1.2.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Material Management Purchasing RFQ/quotation Request for Quotation Create

Transaction code ME41

2. RFQ can be created with reference to Purchase Requisition, Outline Agreement (Contract) and another RFQ.

3. On the Create RFQ: Initial Screen, make the following entries:

Confidential Page 56 of 316

1. Enter the RFQ type as “AN”2. Enter the Quotation Deadline3. Enter Purch. Organisation as 11014. Enter the respective Purchasing group

Page 57: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

4. Choose (header details icon) on the toolbar, then on screen Create RFQ: Header Data, enter information in the fields as specified in the table below:

Confidential Page 57 of 316

Enter the Submission date

Enter the appropriate Item category for Sub-Contracting & Service

Press this button to enter the Collective No and Vendor Reference

1. Enter the Material No2. Enter the RFQ Quantity3. Enter the Deliv. Date4. Enter the Plant if it is Plant specific

Page 58: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 58 of 316

Enter the Collective No to have a track of all RFQs related to particular instance

Enter the Your Reference if any reference given by the vendor

Press this button to enter the vendor code for which it has to be sent?

Page 59: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

5. Choose (vendor address button) on the toolbar, then on screen Create RFQ: Vendor Address, enter information in the fields as specified below:

After entering the vendor code and pressing enter the details of vendor will be displayed automatically.

Confidential Page 59 of 316

Page 60: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

6. Press to Save the RFQ. This will refresh the Create RFQ: Vendor Address screen to allow creation of the same RFQ data to a new vendor by following the steps outlined above.

Confidential Page 60 of 316

Page 61: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.2.3 Result

RFQ created

Similarly create for other vendor in the same screen and various RFQ Nos will be generated

1.2.4 Example

RFQ created under the number 6000000000.

1.3 Message output: RFQ

1.3.1 Use

A RFQ needs to be printed for transmitting to vendor. This transaction is optional for the process.

1.3.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Purchasing RFQ/Quotation Request for Quotation Messages Print/Transmit

Transaction code ME9A

2. On the Message Output screen, make the following entries:

Confidential Page 61 of 316

Page 62: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 62 of 316

Enter the RFQ Nos to be printed and Execute (F8)

Press this button to Execute

Select the check box For Printout click this button which will create Spool Request.

For Direct Printout click this button

For Print Preview click this button

Page 63: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

You will see out put as

Confidential Page 63 of 316

Page 64: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.4 Maintaining Quotation

1.4.1 Use

This transaction is used to maintain the quotation, which is submitted by vendors. Vendor communicates price for material and as a result the RFQ (Request for Quotation) needs to be updated.

This transaction is optional for the process.

1.4.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Purchasing RFQ/quotation Quotation Maintain

Transaction code ME47

2. On the Maintain Quotation: Initial Screen, make the following entries:

3. Choose the Enter key, or choose green Enter icon to proceed.

4. View the screen “Maintain Quotation: Header Data” by Choosing on the Header data icon in the toolbar.

Confidential Page 64 of 316

Page 65: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

5. Enter information in the fields as specified in the table below. Some fields will not be available for input, as they are reference fields only.

6. Once all necessary header data has been maintained, the user can then enter the price information in one of two fashions:

a. Enter the price in the Net Price field on the Maintain Quotation: Item Overview screen by Choosing overview icon on toolbar.

Confidential Page 65 of 316

1. Press to select the line

2. Press to enter the conditions

Enter the Conditions given by vendor.

Page 66: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

b. To enter more detailed information in addition to the net price, select the line item and choose the Item Details icon. Choose the green Back arrow to return to the ‘Overview’ screen once data has been maintained.

i. A vendor’s quoted price can be entered in one of two ways.

ii. Enter the net price per unit in the Net price field. This price includes the vendor's normal discounts and surcharges only. Cash discounts (for prompt payment) and taxes are calculated separately.

iii. Enter the gross price in the Net price field, and maintain the conditions for the item. Then the system automatically replaces the entered gross price with the calculated net price. If the net price for an item is entered for which pricing conditions have been maintained, the system always replaces the price entered with the calculated net price.

iv. Enter the Tax Code for any relevant taxes (for example, Excise Duty, Sales Taxes etc.) in the Tax code field. If a purchase order is created by referencing an RFQ, this code facilitates the determination of the tax amount when the invoice is entered in the system.

v. After entering tax code, after choosing this system may give an information message showing the effective price, Choose Enter to continue.

7. Once all quotation information has been successfully entered, save the data by Choosing on the Save button, or Choose the <Ctrl + S> keys. A message will be displayed that the data has been saved.

1.4.3 Result

Quotation is maintained.

Maintain the same for other RFQs.

1.4.4 Example

Quotation for RFQ 6000000000 maintained.

Confidential Page 66 of 316

Page 67: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.5 Price Comparison

1.5.1 Use

Required to compare prices from all quotations received as a result of a competitive bidding process.

This transaction is optional for the process.

1.5.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Purchasing RFQ/Quotation Quotation Price Comparison

Transaction code ME49

2. On the Price Comparison List screen, make the following entries:

a. Choose the comparison values to be used:

i. Reference quotation: You can compare the quotations within the list with a sample quotation. The system displays the percentage deviation between each quotation in the list and the sample quotation.

ii. Mean/minimum value quotation: The price comparison list can also display a "fictitious" quotation reflecting the average or minimum value of all quotations. Select either the "Mean value" or "Minimum value" quotation field to choose the type of fictitious quotation.

iii. Percentage basis: The price comparison list displays the percentage of each item in relation to the maximum, minimum, or average price. To determine the display type, enter one of the following:

Confidential Page 67 of 316

Parameters included for Comparison

Enter the Purchasing Organisation

Enter the Quotations to be compared or the Collective RFQ

Page 68: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

+: The highest value for each item is the 100% value-: The lowest value for each item is the 100% value_: The mean value for each item is the 100% value

b. Select the desired price computations:

i. Select the appropriate field to determine which of the following should be included in the determination of the comparison price:

i. Include cash discounts

ii. Include delivery costs

iii. Determine effective price

3. Once all entries have been made, Choose the Execute.

4. On screen “Price Comparison List in Currency INR”, view the Price Comparison list.

5. To view any of the following information for a particular quote included in the comparison, Choose the RFQ number with the mouse to select it, then Choose the appropriate icon/button on the menu toolbar:

6. Display Material: Allows the user to view the purchasing data in the material master record.

7. Display Vendor: Allows the user to view the vendor master record.

8. Additional Info: Allows the user to view payment terms, bid dates, currency information for all the vendor quotations in the list.

9. If any information has been modified through the comparison list, save the RFQ before exiting. If changes have been made and the user attempts to exit without saving, the system will return a message to verify action.

10. To exit the transaction, choose the green Back arrow, the yellow Exit arrow, or Choose the F3 button.

Confidential Page 68 of 316

Rank is generated automatically

Mean and Effective Price is highlighted

Page 69: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.5.3 Result

Price Comparison List in Currency INR is displayed on the screen.

1.6 Creating Purchase Requisition

1.6.1 Use

A Purchase Requisition is created to indicate purchase department to procure materials or services with details like how much quantity is required, when required. Generally it is created automatically for Raw materials and Packing Materials through MRP Run and Spares and Service related to Plant Maintenance Purchase Requisition is generated automatically from Plant maintenance Order.

This transaction is optional for the process.

1.6.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Purchasing Purchase Requisition Create

Transaction code ME51N

Confidential Page 69 of 316

Page 70: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

2. On the Create Purchase Requisition screen, make the following entries:

Press or Ctrl+S to Save the Purchase Requisition.

1.6.3 Result

1.6.4 Example

Purchase requisition number 0010000000 created.

1.7 Release Purchase Requisition

Confidential Page 70 of 316

Enter Material No. Enter required Quantity

Enter the Desired Vendor if Vendor is known to the person who is creating PR

Page 71: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.7.1 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Purchasing Purchase Requisition Release Individual Release

Transaction code ME51N

Confidential Page 71 of 316

Click Other Purchase Requisition

Enter PR No.

Page 72: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 72 of 316

Click This Icon to Release PR

Click This Icon to Release

Page 73: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 73 of 316

Click This Icon to Save

Page 74: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.8. Assign and Process Purchase Requisition

1.8.1 Use

a) This section explains the functions provided by the SAP System for converting requisitions into external purchasing documents (purchase orders, contract release orders, scheduling agreement delivery schedules, RFQs), and the processing options thereby available to you:

• Assigning means defining the desired source for each purchase requisition item o Further processing involves generating lists of requisitions that have been assigned or flagged as

outlined above, and the subsequent creation of RFQs, purchase orders, or lines of delivery schedules under scheduling agreements.

1.8.2 Procedure

2. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Purchasing Purchase Requisition Follow-On Functions Assign and Process

Transaction code ME57

Confidential Page 74 of 316

Page 75: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3. The assignment of sources to and further processing of purchase requisitions are two distinct functions. You can choose whether you wish to perform the functions in two separate steps or in just one.

4. Below are the Selection Parameters to restrict the process of PO from PR

5. Press or F8 to enter into the next screen.

Confidential Page 75 of 316

1. Enter the appropriate Purchasing Group2. Enter the Scope of List as B1 for PR generated through MRP Run and A for remaining PR3. Enter the appropriate Plant

1. Select the Assigned Purchase Requisition (For Spares PR normally the End User may have entered the Vendor in the PR)2. Select the appropriate Check boxes for Processing the PR

Page 76: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

6. O is explained in next chapter.

1.8.3 Result

The source is assigned to PR and can be processed for PO.

Confidential Page 76 of 316

1. Select the check boxes required PR which are to be converted in to Pos.

1. If Source List is available click this button

1. Since only one source is assigned in Source list system assigns the source automatically or else if more than one source available a Pop-up window will be coming where one vendor has to be selected.

After assigning the source click on to this button to process the PO or else save for the assignment of source

Page 77: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.9 Purchase Order

1.9.1 Use

A purchase order is a legal document used to record an individual purchase with the vendor. It also provides the vendor with a reference document to link to shipping (goods receipt) and invoicing (invoice verification) processes. The purchase order is a commitment to a vendor for a given material, in a specified quantity at a predetermined price and delivery date.

This transaction is mandatory for the process.

Please ensure that Purchase Order Value does not exceed specified value and if the purchase order value crosses this limit a release procedure is applied on this purchase order. To release the Purchase Order go to ME28 for collective release and ME29N for individual release.

1.9.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Purchasing Purchase Order CreateVendor/Supplying Plant Known

Transaction code ME21N

Confidential Page 77 of 316

Page 78: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

2. If you want create purchase order with reference to the purchase requisition, on item details screen enter the purchase requisition number and item number at Purch. Req. field. System will automatically adopt all the data from requisition.

Confidential Page 78 of 316

Click the Purchasing Requisitions and Press Adopt

Press this button to view the Tax Calculation

Page 79: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 79 of 316

Page 80: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 80 of 316

Press this button to view the message

Page 81: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 81 of 316

Check the PO before Saving

Page 82: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.9.3 Result

Purchase Order is created.

1.9.4 Example

Standard PO created under the number 210000000.

Confidential Page 82 of 316

Page 83: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.10. Release Purchase Order

1.10.1. Procedure

Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Purchasing Purchase Order Release Individual Release

Transaction code ME29N

Confidential Page 83 of 316

Click Other Purchase Order

Enter PO No.

Page 84: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 84 of 316

Click This Icon to Release PR

Page 85: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 85 of 316

Click This Icon to Release

Click This Icon to Save

Page 86: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 86 of 316

Page 87: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.11Message Output

1.11.1 Use

A Purchase Order needs to be printed for transmitting to vendor.

1.11.2 Procedure

2. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Purchasing Purchase Order Messages Print/Transmit

Transaction code ME9F

3. On the Message Output screen, make the following entries

4. Choose to Execute.

Confidential Page 87 of 316

Page 88: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

5. On screen Message Output select the appropriate Document number and perform the following:

Choose Output Message and/orChoose Display Message and/orChoose Message Detail and/orChoose Trial Printout.

Confidential Page 88 of 316

Page 89: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.12 Goods Receipt for Purchase Order

1.12.1 Use

Goods are received from the Vendor as a result of a Purchase Order at the receiving plant. A goods movement is entered into the system referencing this PO and a goods receipt material document is posted. Appropriate general ledger accounts are also posted and stocks are updated.

1.12.2 Prerequisites

Purchase Order

1.12.3 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Inventory Management Goods Movement Goods Receipt For Purchase Order PO Number Known

Transaction code MIGO

2. On the Goods Receipt Purchase Order screen, make the following entries:

Confidential Page 89 of 316

Enter the Purchase Order No and Press Enter

Check for correct movement type whenever doing goods movement

Page 90: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3. After pressing Enter system will fetch all the data from the Purchase Order as shown below:

Confidential Page 90 of 316

Whichever material is in Blue those detail will be seen in the Item detail

Page 91: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

4. System defaults the balance quantity in PO, change the quantity to the received quantity:

Confidential Page 91 of 316

Page 92: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 92 of 316

Enter the Storage Location in which the material to be placed.

Page 93: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 93 of 316

Select Item Ok and Press Enter and the Excise tab will appear both in Header and Item Level

Enter the Delivery Note details of the vendor

Page 94: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Field name Description R/O/C User action and values Comment

Goods Receipt

Goods Receipt R Select from drop down list for action

Purchase Order

Purchase Order R input the PO number which generated above

4500000277

Movement Type

101

Enter

Document Date

Document Date R Enter document date

Delivery Note in Header O Delivery Number from Vendor

Vendor Vendor R Defaulted from purchase order

Grayed out

Posting Date Posting date R Enter posting date

Bill of lading Bill of lading O Enter bill of lading

Header text Header text O Enter header text

Close Header Detail data to enlarge the Detail data.

Select Material tab at Detailed Data.

Material Material tab R Defaulted from Purchase Order

Grayed out

Select Quantity tab in Detail data.

Qty in unit of entry

Quantity in unit of entry

R Enter the quantity you have received from vendor. As a default system will give purchase order quantity

Quantity defaulted from Purchase Order

Qty in delivery note

Quantity in delivery note

O Enter the quantity as per vendor delivery challan

Select Where tab in Detail data.

Movement type

Movement type R Defaulted from header screen

Stock type Stock type R Defaulted from material master or purchase order

Plant Plant R Defaulted from purchase order1000

Storage location

Storage location R Defaulted from purchase order if entered1010

Goods Recipient

Goods Recipient O Enter the name of person who received goods

Confidential Page 94 of 316

Page 95: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Unloading point

Unloading point O

Text Text O Enter the text if required

Select Purchase Order tab in Detail data.

Purchase Order

Purchase Order R Defaulted from header data Grayed out

Del. completed ind.

Delivery completion indicator

O Defaulted by system if PO Qty = GR Qty

Select Partner tab in Detail data.

Vendor Vendor name O Grayed out

For this material batch management is not active. Just for reference purpose the following data is given.

Select Batch tab in Detail data.

This tab will come only if material is managed in batches.

Proceed with the following steps if material is batch managed only.

Batch Batch number R Enter batch number as date for batch managed materials

Vendor batch Vendor batch O Enter vendor batch number for reference

5. Select the Check box Item OK, after entering all the data.

You will get Excise Invoice tab at Header Data for capturing vendor excise invoice details and for posting Part I and Part II.

6. On the Excise Invoice tab at Header Data make the following entries.

Confidential Page 95 of 316

Page 96: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Field name Description R/O/C User action and values Comment

Capture & Post Excise invoice

Capture & Post Excise Invoice on Excise Action

R Choose Capture & Post Excise Invoice from drop down list

Defaulted

Excise Group Excise Group R Defaulted by the system

Excise Invoice

Excise invoice R Enter the vendor Excise Invoice number

For example:

D013

Excise Inv. Date

Excise Invoice Date R Enter the excise invoice date of vendor

BED Basic Excise Duty R Defaulted from purchase order

Grayed out

AED Additional Excise Duty R Defaulted form purchase order

Grayed out

SED Special Excise Duty R Defaulted from purchase order

Grayed out

NCCD NCCD R Defaulted from purchase order

Grayed out

ECS Education Cess R Defaulted from purchase Grayed out

Confidential Page 96 of 316

System defaults the Excise Duty (BED & ECS) and in case

Select Appropriate Excise settingsWhile posting in Case of dealer only

Page 97: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

order

MRP Indicator

MRP Indicator O Tick the check box

Note: If the Base Price in PO is the inclusive of both the Material Cost and Excise Value choose the check box

Close Header Detail data to enlarge the Detail data.

Select Excise Item tab at Detailed Data (at the last).

Chapter ID Chapter ID of material R Defaulted by the system

No action required

EI Quantity Excise Invoice Quantity

R Defaulted by the system from Goods Receipt quantity

Base Value Base value of material R Defaulted by the system

BED Basic Excise Duty R Defaulted by the system

AED Additional Excise Duty O Defaulted by the system

NCCD NCCD O Defaulted by the system

SED Special Excise Duty O Defaulted by the system

ECS Education Cess O Defaulted by the system

Please cross check the BED, AED, SED, NCCD and ECS amount of item as per the Vendor Excise Invoice, legally you cannot avail more than what mentioned in Vendor Excise Invoice. All other information is defaulted by the system. Hence, no action required by the user.

6. Choose Check at the top of screen.

7. Choose Post to post the document.

Confidential Page 97 of 316

Page 98: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Also See the account postings

Confidential Page 98 of 316

Enter Excise Invoice No. and Date vendor

Page 99: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.12.4 Result

Material document 5000000009 posted

1.12.5 Example

Material document 5000000009 posted

Confidential Page 99 of 316

Page 100: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.13 Logistics Invoice Verification

1.13.1 Use

In this process of Logistics Invoice Verification all the Incoming Invoices are verified in terms of their content, prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The system updates the data saved in the invoice documents in Materials Management and Financial Accounting.

1.13.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Logistics invoice Verification Document Entry Enter Invoice

Transaction code MIRO

2. If you are opening for the first time this transaction, system will ask for Company Code, please give 1000 to go in side the transaction.

3. On the Enter Incoming Invoice: Company Code 1000 screen, make the following entries:

Confidential Page 100 of 316

Enter Invoice Date

Change Defaulted V0 Tax code and tick Calculate tax tab

Enter the PO No.

Page 101: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

If Part II entry is not done then system will not allow you to POST Invoice

Unless and until you post part2 system will not allow invoice verification

Confidential Page 101 of 316

Enter the amount

Page 102: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Field name Description R/O/C User action and values Comment

Transaction Invoice R Select Invoice from drop down list

Header Data Header data of Invoice R Defaulted by system

Basic tab Basic information tab R Select basic information tab to give initial information

Invoice Date Invoice Date R Enter the Vendor invoice date

Reference Invoice reference O Enter the vendor invoice reference

For Example

USERMANUAL

Posting date Posting Date R Enter the posting date of document

System will give current date as default

Amount Invoice Amount R Enter invoice gross amount including taxes and duties

299,960.20

Amount mentioned is only an example

Currency R Enter the currency in which the bill is presented by vendor, if not entered by user system will default the document currency from purchase order

INR

Calculate tax Check box calculate tax

O Check this tick box, system will calculate tax amount

Tax code R Select the tax code from drop down list

V1

Bus.place/sectn

Business place or section code

R Enter section code if Tax deduction for source is active for this vendor

Leave blank for this process

Text Text O Enter text if required for reference

Payment tab Payment tab R Select payment details tab

BaselineDt Base line date for payment

R Enter the base line date for payment

Will be defaulted if payment terms entered in PO

Pmnt terms Payment terms O Payment terms of document, if entered will be defaulted from purchase order

Due on Payment due on O Will be calculated by Grayed out

Confidential Page 102 of 316

Page 103: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

system

Discount Cash discount O Enter if cash discount is offered by vendor

Hide Header data for getting full screen of items if required.

Purchase order / Schedule Agreement

R Select Purchase order / Schedule Agreement in the reference document category from drop down list

Defaulted for user

Purchase order number

R Enter the first purchase order number generated above

Goods / service items R Select Goods / Service items in indicator from drop down list

Defaulted

Layout Layout of invoice verification

R Select All information from drop down list

Choose Enter

4. Choose Enter to complete the document feeding part.

5. To check the document credit and debit is balanced on the top right corner of your screen a traffic light is displayed. Beside that Balance of the document is displayed.

Ensure that the Balance is ZERO before posting the document and the traffic light is green or yellow color.

6. If you want to see the accounting postings in simulation mode, Choose Simulation on middle of fourth row of your screen.

Confidential Page 103 of 316

Page 104: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

7. Choose Save / Post, for posting the document.

Confidential Page 104 of 316

Check Simulate Tab

Page 105: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.13.3 Result

Logistics Invoice verification document is posted.

1.13.4 Example

Document no. 5105600102 created

Confidential Page 105 of 316

Page 106: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.14 Returning Delivery

1.14.1 Use

A material has been received and it needs to be returned for various reasons (i.e. poor quality, incomplete, damaged). The user can use this transaction to return the material to the vendor via the original GR document.

This transaction itself is an independent transaction and it is not mandatory in J81 process. This Return Delivery transaction is used only when material is rejected and needs to be returned to vendor.

If material is rejected by using QM process there is no need to this transaction. This transaction can be used only without QM process materials.

This transaction is used basically when purchased material is needs to be sent back to vendor because of various reasons like poor quality, incomplete items, damaged etc.

b)

Bore proceeding with return delivery to vendor please ensure that sufficient stock is available in storage location and if batch managed in particular batch stocks also. Other wise system will give error message.

Before doing Return Delivery to vendor, check if you have already done Invoice Verification to that Goods Receipt. If you have already done invoice verification please raise Credit Memo to the extent of Returns quantity and then proceed with this process. Other wise system will give an error message.How to create Credit Memo transaction is explained in the chapter mentioned 1.17 below.

1.14.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Inventory Management Goods Movement Goods Receipt For Purchase Order PO Number Known

Transaction code MIGO

2. Select Return Delivery from drop down list to make Return Delivery to vendor.

3. On the Return Delivery Material Document screen, make the following entries:

Confidential Page 106 of 316

Page 107: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 107 of 316

Enter the appropriate Reason for Movement

Enter the quantity to be returned to vendor

Page 108: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Field name Description R/O/C User action and values Comment

Return Delivery

Return Delivery R You have already selected in above step 2

Material Document

Material Document number

R Select from drop down list

5000000189

Enter the material document number which you have made at the time of Goods Receipt for purchase order

Enter

Document Date

Document Date R Enter document date

Delivery Note in Header O Delivery Number. Will be defaulted if you have already entered in original document

Posting Date Posting date R Enter posting date

Confidential Page 108 of 316

Enter the appropriate Reason for Movement

Select Blocked Stock toReturn the rejected Material

Page 109: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Bill of lading Bill of lading O Enter bill of lading.

Header text Header text O Enter header text

Via Delivery Via Delivery R Tick the check box

Close Header Detail data to enlarge the Detail data.

Select Material tab at Detailed Data.

Material Material tab R Defaulted from Purchase Order

Grayed out

Select Quantity tab in Detail data.

Qty in unit of entry

Quantity in unit of entry

R Enter the quantity you want to return to vendor. As a default system will give original Goods Receipt quantity5000

You can not return more than what you have in stock

Qty in delivery note

Quantity in delivery note

O Enter the quantity 100000

Select Where tab in Detail data.

Movement type

Movement type R Defaulted by the system with 122 movement

Stock type Stock type R Enter stock type from drop down list

Plant Plant R Defaulted from original Goods Receipt1000

Grayed out

Storage location

Storage location R Enter the store location from which you want to return to vendor

Goods Recipient

Goods Recipient O Enter the name of person who received goods

Unloading point

Unloading point O

Reason for Movement

Reason for Movement R Select from the drop down list the reason for this movement of material0001

Text Text O Enter the text if required

Select Purchase Order tab in Detail data.

Purchase Order

Purchase Order R Defaulted from header data Grayed out

Confidential Page 109 of 316

Page 110: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Del. completed ind.

Delivery completion indicator

R Defaulted from purchase order

Select Partner tab in Detail data.

Vendor Vendor name O Grayed out

Select Batch tab in Detail data.

This tab will come only if material is managed in batches.

Proceed with the following steps if material is batch managed only.

Batch Batch number R Enter batch number if externally maintained by you or system will allocate batch number

Vendor batch Vendor batch O Enter vendor batch number for reference

Confidential Page 110 of 316

Enter the Goods Issue Indicator as IPD

Page 111: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Field name Description R/O/C User action and values Comment

Select Create Excise Invoice

Select Create Excise Invoice

R Choose Create Excise Invoice from drop down list

Select from drop down list

Excise Group Excise Group R Defaulted by the system

Series Group Excise Series group R Defaulted by the system

Removal time Removal time of goods

R System defaults current time, change if required

BED Basic Excise Duty R Defaulted from purchase order

Grayed out

AED Additional Excise Duty R Defaulted form purchase order

Grayed out

SED Special Excise Duty R Defaulted from purchase order

Grayed out

Close Header Detail data to enlarge the Detail data.

Select Excise Item tab at Detailed Data (at the last).

Confidential Page 111 of 316

Enter the Sub type as PR for Vendor Returns

Page 112: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Chapter ID Chapter ID of material R Defaulted by the system

No action required

EI Quantity Excise Invoice Quantity

R Defaulted by the system from return delivery document

2

Base Value Base value of material R Defaulted by the system

BED Basic Excise Duty R Defaulted by the system

Goods Issue Indicator

Goods Issue Indicator R Select from drop down list

IPD for this process

Please cross check the BED, AED, SED, NCCD and ECS amount of item as per the Vendor Excise Invoice, legally you cannot avail more than what mentioned in Vendor Excise Invoice. All other information is defaulted by the system. Hence, no action required by the user.

4. Choose Check at the top of screen.

5. Choose Post to post the document.

Confidential Page 112 of 316

Page 113: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.14.3 Result

Return Delivery document created

1.14.4 Example

Return Delivery Document No. 50000000011 created.

Note: Excise Invoice for Return delivery also will be generated in the back ground for this transaction

Confidential Page 113 of 316

Page 114: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.15 Excise Invoice Other Movements

1.15.1 Procedure

1. Access the activity choosing one of the following navigation options:

SAP CIN R/3User menu

Indirect taxes Sales / Outbound Movements Excise Invoice For Other Movements Excise Invoice for Other Movements

Transaction Code J1IS

2. On the Excise Invoice Other Movements – Main Menu screen, make the following entries:

3. Choose Display Excise Invoice icon to start the transaction

Confidential Page 114 of 316

Enter the Sub type as PR for Vendor Returns

Page 115: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Field name Description R/O/C User action and values CommentReferenceDoc Number Document Number R Enter the return delivery

document number which you have created in above step0000000126

Doc Year Document year R Enter the year of document createdExample: 2006

Enter

Confidential Page 115 of 316

Page 116: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.15.2 Result

Excise invoice generated is displayed.

1.15.3 Example

Excise invoice 0000000014 generated and displayed.

Confidential Page 116 of 316

Page 117: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.16 Posting and Printing the Excise Invoice

1.16.1 Use

Excise Invoice has to be printed and sent along with the material. This is legal requirement in India.

1.16.2 Prerequisites

Excise Invoice Document is generated and posted.

1.16.3 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP CIN R/3

User menuIndirect taxes Sales / Outbound Movements Excise Invoice For Other Movements Post and Print

Transaction code J1IV

2. On the SAP screen, make the following entries:

3. If the document is not posted in step mentioned above, Choose Release to Accounting to post Financial Accounting document.

This transaction is used to just printing of excise invoice.

4. Follow the steps mentioned below for taking print of Excise Invoice.

Field name Description R/O/C User action and values Comment

Excise internal reference

Select internal excise invoice number from drop down list, you can find it with reference to the Excise Invoice number generated in above step 1100400070 for example with the combination of Excise Group 10 and vendor code 10006.

Document No.

Document Number R Enter the Excise Invoice Document Number generated in above step

For example: 127

Document year

Document Year R Enter the document year

2006

Confidential Page 117 of 316

Page 118: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

5. To take printout, select Goto from the top main menu and select Print Document from the list. Or Choose Control + P to get the access of Excise Invoice Printing screen.

6. Choose Execute icon to get list of excise invoice ready to be printed.

Confidential Page 118 of 316

Page 119: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

7. From the list select the excise invoice number by choosing the check box left side of number.

8. To take printout on printer Choose the Printer icon or Choose F8.

Confidential Page 119 of 316

Page 120: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

9. To display excise invoice on screen Choose Display icon or Choose F9.

10. System will give popup asking for pre-printed invoice serial number, Enter pre-printed excise invoice number. In this process Choose 99 for testing purpose (since it is not expected to have pre-printed invoice for testing purpose).

11. Select printer from the drop down list. Check box for Print Immediately and New spool request.

12. Choose Print Preview or Print icons to display on screen or to print on printer mentioned above.

13. If printer is connected system will print the document on printer.

1.16.4 Result

Excise Invoice is printed.

Confidential Page 120 of 316

Page 121: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.17 Credit Memo

1.17.1 Use

In this process of Logistics Invoice Verification a credit memo is generated on vendor. Please be careful that during the total process after making logistics invoice verification you have made return delivery to vendor. To recover that money you need to do this credit memo transaction.

1.17.2 Prerequisites

• Logistic Invoice Verification is already made

1.17.3 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Logistics invoice Verification Document Entry Enter Invoice

Transaction code MIRO

2. If you are opening for the first time this transaction, system will ask for Company Code, please give 1000 to go in side the transaction.

Confidential Page 121 of 316

Page 122: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3. On the Enter Incoming Invoice: Company Code 1000 screen, make the following entries:

Confidential Page 122 of 316

Put the Qty and Price to be returned

Select Credit Memo in this tab

Page 123: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 123 of 316

Page 124: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Field name Description R/O/C User action and values Comment

Confidential Page 124 of 316

Page 125: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Transaction Credit memo R Select Credit memo from drop down list

Header Data Header data of Invoice R Defaulted by system

Basic tab Basic information tab R Select basic information tab to give initial information

Invoice Date Invoice Date R Enter the Vendor invoice date

Reference Invoice reference O Enter the vendor invoice reference

Posting date Posting Date R Enter the posting date of document

System will give current date as default

Amount Credit memo Amount R Enter invoice (credit memo) gross amount including taxes and duties

Currency R Enter the currency in which the bill is presented by vendor, if not entered by user system will default the document currency from purchase order

Calculate tax Check box calculate tax

O Check this tick box, system will calculate tax amount

Tax code R Select the tax code from drop down list

Bus.place/sectn

Business place or section code

R Enter section code if Tax deduction for source is active for this vendor

Leave blank for this process

Text Text O Enter text if required for reference

Payment tab Payment tab R Select payment details tab

BaselineDt Base line date for payment

R Enter the base line date for payment

Will be defaulted if payment terms entered in PO

Pmnt terms Payment terms O Payment terms of document, if entered will be defaulted from purchase order

Due on Payment due on O Will be calculated by system

Grayed out

Discount Cash discount O Enter if cash discount is offered by vendor

Hide Header data for getting full screen of items if required.

Confidential Page 125 of 316

Page 126: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Purchase order / Schedule Agreement

R Select Purchase order / Schedule Agreement in the reference document category from drop down list

Defaulted for user

Purchase order number

R Enter the purchase order number

Goods / service items R Select Goods / Service items in indicator from drop down list

Defaulted

Layout Layout of invoice verification

R Select All information from drop down list

Choose Enter

4. Choose Enter to complete the document feeding part.

5. To check the document credit and debit is balanced on the top right corner of your screen a traffic light is displayed. Beside that Balance of the document is displayed.

Ensure that the Balance is ZERO before posting the document and the traffic light is green or yellow color.

6. If you want to see the accounting postings in simulation mode, Choose Simulation on middle of fourth row of your screen.

7. Choose Save posting the document.

Confidential Page 126 of 316

Page 127: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.17.4 Result

Logistics Invoice verification document is posted.

1.17.5 Example

Document no. 5105600791 created

1.18 Reversals / Cancellation of Invoice or Credit Memo

1.18.1 Use

Invoice documents in Invoice Verification are either invoices or credit memos. These documents can be cancelled. There are two different cases:

Confidential Page 127 of 316

Page 128: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

• If an invoice is cancelled, the system automatically creates a credit memo. • If a credit memo is cancelled, the system automatically creates an invoice.

The system takes the amount and quantity for the credit memo or invoice from the invoice or credit memo to be cancelled, thus avoiding any differences between the invoice and the credit memo or the credit memo and the invoice.

1.18.2 Prerequisites

An invoice document can only be cancelled if:

• it was posted in Logistics Invoice Verification • It has not already been cancelled • It is not a cancellation document for another document

When you cancel documents in Logistics Invoice Verification, the document line items are not automatically cleared in Financial Accounting. We recommend that you periodically clear such items (using daily background jobs, for example).

1.18.3 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Logistics invoice Verification Further Processing Cancel Invoice Document

Transaction code MR8M

2. The initial screen for reversal appears.

Confidential Page 128 of 316

Page 129: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3. In the fields Invoice doc. number and Fiscal year, enter the data for the invoice document you want to cancel.

4. In the Reversal reason field, select the reason for cancelling the invoice. This allows you to differentiate between different types of cancellations.

Confidential Page 129 of 316

Page 130: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

5. You can display the document to check. Choose Display document to do this. You can look at the items of the document to be cancelled. Return to the initial screen by choosing Back.

Confidential Page 130 of 316

Enter the reversal reason

Page 131: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

6. Choose Invoice document and reverse or Press Ctrl+S or .

Confidential Page 131 of 316

Page 132: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 132 of 316

Page 133: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.18.4 Result

Document Reversed and Clear FI Documents Manually.

1.18.5 Example

Document Reversed with no. 5105600114.

Confidential Page 133 of 316

Page 134: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.19 Reversals / Cancellation of Goods Receipt (GR)

1.19.1 Use

When any data entered incorrect during GR posting it has to be reversed. To do the cancellation of GR, all the follow on documents should be reversed.

1.19.2 Prerequisites

A GR can only be cancelled if:

• Invoice Verification posted if any should be reversed. 1.19.3 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Inventory Management Goods Movement Goods Receipt For Purchase Order PO Number Known

Transaction code MIGO

Confidential Page 134 of 316

Page 135: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

2. Choose Cancellation and enter the respective Material Document No. (GR No.)

Confidential Page 135 of 316

Page 136: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3. Press enter so that all the data will be captured automatically by the system. If any comment is there to mention it can be mentioned in the Head Text and Text which is available at the Item level.

Confidential Page 136 of 316

Page 137: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

4. Press Enter to continue and check all the details

5. Select the Check box Item OK, after entering all the data.

You will get Excise Invoice tab at Header Data and Item Details.

6. Choose Check at the top of screen.

Confidential Page 137 of 316

Page 138: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

7. Press Ctrl+S or to post the document

Confidential Page 138 of 316

Page 139: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.19.4 Result

Material document posted, please note the document number.

1.19.5 Example

Material document 5000000020 posted

Confidential Page 139 of 316

Page 140: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.20 Reversing CENVAT Postings

1.20.1 Purpose

When the Material Document is cancelled the CENVAT Posting should also be reversed or cancelled.

1.20.2 Prerequisites

Material Document (GR) should be reversed.

1.20.3 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Country India User Menu → Indirect Taxes → Procurement → Excise Invoice → Incoming Excise Invoice → Central Processing → Capture / Change / Cancel / Display / Post

Transaction code J1IEX

Confidential Page 140 of 316

Page 141: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

2. Select Post CENVAT.

3. Select Vendor Excise Invoice.

4. Enter the excise invoice number.

5. Press Enter to continue

Confidential Page 141 of 316

Page 142: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

6. Choose Simulate CENVAT

7. A dialog box appears, showing which postings the system will make to reverse the CENVAT.

Confidential Page 142 of 316

Page 143: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

8. Choose Post CENVAT.

Confidential Page 143 of 316

Page 144: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.20.4 Result

CENVAT Posting Reversed.

1.20.5 Example

CENVAT Posting Reversed with document no. 0000000008.

Confidential Page 144 of 316

Page 145: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.21 Canceling Excise Invoices

1.21.1 Purpose

When the Material Document is cancelled the CENVAT Posting should also be reversed or cancelled.

1.21.2 Prerequisites

• Material Document (GR) should be reversed.• CENVAT Posting should be Reversed.

1.21.3 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Country India User Menu → Indirect Taxes → Procurement → Excise Invoice → Incoming Excise Invoice → Central Processing → Capture / Change / Cancel / Display / Post

Transaction code J1IEX

2. Select Cancel.

3. Select Vendor Excise Invoice.

Confidential Page 145 of 316

Page 146: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

4. Enter the excise invoice number.

Confidential Page 146 of 316

Page 147: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

5. Enter the Rejection Code.

Confidential Page 147 of 316

Page 148: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

6. Save the excise invoice.

Confidential Page 148 of 316

Enter the Rejection Code

Page 149: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

7. Press Yes to Cancel the Excise Invoice.

Confidential Page 149 of 316

Page 150: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1.21.4 Result

Excise Invoice has been successfully cancelled.

1.21.5 Example

Excise Invoice 0000000008 / 2008 ( 1234 ) has been successfully cancelled.

Confidential Page 150 of 316

Page 151: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

2 Procurement of Imported Materials – Business Process Procedure2.1 Procurement of Imported Materials

2.1.1 Purpose

This process Procurement of Imported Materials shows you how to handle the Countervailing duty (CVD) on imports, which is levied in place of excise duty. Unlike other forms of customs duties, such as basic customs duty or special customs duty, you can credit CVD paid on imports to your CENVAT account.

2.1.2 Prerequisites

The following scenario specific master data must be created for operation of this building block and subsequent dependent building blocks.

• Material Master record (Refer User Manual – Procurement of Stock Materials (Domestic)

• Vendor Master recordEnsure that GR based IV is not selected in Purchasing Data.(Refer User Manual – Procurement of Stock Materials (Domestic)

• CIN Master Data(Refer User Manual – Procurement of Stock Materials (Domestic)

Confidential Page 151 of 316

Page 152: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

2.2 Creating Purchase Order

2.2.1 Use

A purchase order is a legal document used to record an individual purchase with the vendor. It also provides the vendor with a reference document to link to goods receipt and invoice verification processes. The purchase order is a commitment to a vendor for a given material, in a specified quantity at a predetermined price and delivery date.

2.2.2 Prerequisites

Before starting the process, please ensure the following information:

•Commissioner of Customs is created as domestic vendor, for example: vendor code 600000 - RBI Commissioner in this process.•In master record of main imported vendor GR-based invoice verification tick should not be there on Purchasing Data screen of vendor master. And Schema group, Vendor is filled with schema group ZI. For example vendor code 200000 in this process.•These are basic master data changes with respect to this process only.

For all purchase order a release procedure is applied.

2.2.3 Procedure

5. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Purchasing Purchase Order CreateVendor/Supplying Plant Known

Transaction code ME21N

6. On the Create Purchase Order screen, make the following entries:

Confidential Page 152 of 316

Page 153: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

7. For Basic Customs Duty(JCDB),CVD(JCV1),Addition Customs Duty(JADC),E-cess on CVD(JECV)E-Cess (JEDB)

Confidential Page 153 of 316

Don’t Put Tick in GR Based Mention Tax code as V0

Put Doc Type as Import

Page 154: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 154 of 316

Enter the Customs Duties in respective Condition type fields

Page 155: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

.

8. To change the vendor for condition type select JCDB condition type and Choose on Condition detail icon located at left bottom side of your screen.

9. System will take to new Item – Conditions – Detail: screen. In this screen at right bottom of screen you can find the vendor code 60000 the main imported vendor is defaulted here. You have to replace this vendor

Confidential Page 155 of 316

Select Each Condition Type related to Customs and click this Details Button

Page 156: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

code with respective vendors and Choose enter and green arrow to come back (F3) to condition tab of purchase order.

Confidential Page 156 of 316

Page 157: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

10. Repeat the same for other condition types such as JCV1, JECV, JADC, and JEDB etc.

11. Purchase Order may be posted by Choosing on the Save icon.

Confidential Page 157 of 316

Change DS200 to DS250(appropriate vendor) for each condition types

Page 158: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

2.2.4 Result

A message will be displayed stating that the purchase order was saved, with the purchase order number, please note the purchase order number.

2.2.5 Example

Standard PO created under the number 3100000000.

Confidential Page 158 of 316

Page 159: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

2.3 Release Purchase Order

2.3.1 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Purchasing Purchase Order Release Individual Release

Transaction code ME29N

Confidential Page 159 of 316

Click Other Purchase Order

Enter PO No

Page 160: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 160 of 316

Click This Icon to Release PR

Page 161: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 161 of 316

Click This Icon to Release

Click This Icon to Save

Page 162: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

2.4Message Output

2.4.1 Use

A Purchase Order needs to be printed for transmitting to vendor.

2.4.2 Procedure

8. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Purchasing Purchase Order Messages Print/Transmit

Transaction code ME9F

9. On the Message Output screen, make the following entries

10. Choose to Execute.

Confidential Page 162 of 316

Page 163: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

11. On screen Message Output select the appropriate Document number and perform the following:

Choose Output Message and/orChoose Display Message and/orChoose Message Detail and/orChoose Trial Printout.

Confidential Page 163 of 316

Page 164: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

2.5 CAPTURING BILL OF ENTRY

2.5.1 Use

In this process of Logistics Invoice Verification all the Incoming Invoices are verified in terms of their content, prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The system updates the data saved in the invoice documents in Materials Management and Financial Accounting.

2.5.2 Procedure

7. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Logistics invoice Verification Document Entry Enter Invoice

Transaction code MIRO

8. If you are opening for the first time this transaction, system will ask for Company Code, please give 1000 to go in side the transaction.

9. On the Enter Incoming Invoice: Company Code 1000 screen, make the following entries:

Confidential Page 164 of 316

Choose Planned Delivery Costs

Page 165: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Enter the Amounts of the Customs Duties Manually in the Amount Column with referring to PO.

Confidential Page 165 of 316

Page 166: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Field name Description R/O/C User action and values Comment

Transaction Invoice R Select Invoice from drop down list

Header Data Header data of Invoice R Defaulted by system

Basic tab Basic information tab R Select basic information tab to give initial information

Invoice Date Invoice Date R Enter the Vendor invoice date

Reference Invoice reference O Enter the vendor invoice reference

For Example

USERMANUAL

Posting date Posting Date R Enter the posting date of document

System will give current date as default

Amount Invoice Amount R Enter invoice gross amount including taxes and duties

39.80

Amount mentioned is only an example

Currency R Enter the currency in which the bill is presented by vendor, if not entered by user system will default the document currency from purchase order

USD

Calculate tax Check box calculate tax

O Check this tick box, system will calculate tax amount

Tax code R Select the tax code from drop down list

V0

Bus.place/sectn

Business place or section code

R Enter section code if Tax deduction for source is active for this vendor

Leave blank for this process

Text Text O Enter text if required for reference

Payment tab Payment tab R Select payment details tab

BaselineDt Base line date for payment

R Enter the base line date for payment

Will be defaulted if payment terms entered in PO

Pmnt terms Payment terms O Payment terms of document, if entered will be defaulted from purchase order

Due on Payment due on O Will be calculated by Grayed out

Confidential Page 166 of 316

Page 167: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

system

Discount Cash discount O Enter if cash discount is offered by vendor

Purchase order / Schedule Agreement

R Select Purchase order / Schedule Agreement in the reference document category from drop down list

Defaulted for user

Purchase order number

R Enter the first purchase order number generated above

Planned Delivery Costs

R Select Planned Delivery Costs in indicator from drop down list

Layout Layout of invoice verification

R Select All information from drop down list

Choose Enter

10. Choose Enter to complete the document feeding part.

11. To check the document credit and debit is balanced on the top right corner of your screen a traffic light is displayed. Beside that Balance of the document is displayed.

Ensure that the Balance is ZERO before posting the document and the traffic light is green or yellow color.

12. If you want to see the accounting postings in simulation mode, Choose Simulation on middle of fourth row of your screen.

Confidential Page 167 of 316

Page 168: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

13. Choose Display Currency which will lead to small pop-up window having the company code currency and Document Currency, position the cursor on the INR to convert to Document Currency and press the details button.

Confidential Page 168 of 316

Page 169: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 169 of 316

Page 170: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 170 of 316

Page 171: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

8. Choose Save / Post, for posting the document.

2.5.3 Result

Logistics Invoice verification document is posted.

2.5.4 Example

Document no. 5105600121created

Confidential Page 171 of 316

Page 172: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

2.6 Goods Receipt for Imported Purchase Order

2.6.1 Use

Goods are received from the Vendor as a result of a Purchase Order at the receiving plant. A goods movement is entered into the system referencing this PO and a goods receipt material document is posted. Appropriate general ledger accounts are also posted and stocks are updated.

2.6.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Inventory Management Goods Movement Goods Receipt For Purchase Order PO Number Known

Transaction code MIGO

2. On the Goods Receipt Purchase Order screen, make the following entries:

Field name Description R/O/C User action and values Comment

Goods Receipt

Goods Receipt R Select from drop down list for action

Inbound Delivery

Purchase Order R Enter the Purchase Order No.generated above

3100000000

Movement Type

101

Enter

Since this is imported purchase order and you have already done invoice verification for planned delivery cost. System will give a new popup Excise Invoice item number screen (which is not there in normal other process) asking for Commercial invoice number and year.

Please enter the invoice verification document number which you have done in above 5105600792 and year 2006.

Confidential Page 172 of 316

Page 173: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 173 of 316

Page 174: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3. Choose Enter where a small pop-up window will prompt to enter the Commercial Invoice No. and Year (i.e., the Invoice Verification posted for Bill of Entry)

4. After pressing Enter system will fetch all the data from the Purchase Order as shown below:

Confidential Page 174 of 316

Enter the No generated for the posting of Bill of Entry

Page 175: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

5. System defaults the balance quantity in Purchase Order.

Confidential Page 175 of 316

Whichever material is in Blue those detail will be seen in the Item detail

Page 176: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 176 of 316

Page 177: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 177 of 316

Enter the storage location

Page 178: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Field name Description R/O/C User action and values Comment

Goods Receipt

Goods Receipt R Select from drop down list for action

Inbound Delivery

Purchase Order R input the Purchase Order number which generated above

4500000059

Movement Type

101

Enter

Document Date

Document Date R Enter document date

Delivery Note in Header O Delivery Number from Vendor

Vendor Vendor R Defaulted from purchase order

Grayed out

Posting Date Posting date R Enter posting date

Bill of lading Bill of lading O Enter bill of lading

Confidential Page 178 of 316

Select Item Ok and Press Enter and the Excise tab will appear both in Header and Item Level

Page 179: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Header text Header text O Enter header text

Close Header Detail data to enlarge the Detail data.

Select Material tab at Detailed Data.

Material Material tab R Defaulted from Inbound Delivery

Grayed out

Select Quantity tab in Detail data.

Qty in unit of entry

Quantity in unit of entry

R Enter the quantity you have received from vendor. As a default system will give purchase order quantity

Quantity defaulted from Purchase Order

Qty in delivery note

Quantity in delivery note

O Enter the quantity as per vendor delivery challan

Select Where tab in Detail data.

Movement type

Movement type R Defaulted from header screen

Stock type Stock type R Defaulted from material master or purchase order

Plant Plant R Defaulted from purchase order1000

Storage location

Storage location R Defaulted from Inbound delivery if entered1010

Goods Recipient

Goods Recipient O Enter the name of person who received goods

Unloading point

Unloading point O

Text Text O Enter the text if required

Select Purchase Order tab in Detail data.

Purchase Order

Purchase Order R Defaulted from header data Grayed out

Del. completed ind.

Delivery completion indicator

O Defaulted by system if PO Qty = GR Qty

Select Partner tab in Detail data.

Vendor Vendor name O Grayed out

For this material batch management is not active. Just for reference purpose the following data is given.

Select Batch tab in Detail data.

Confidential Page 179 of 316

Page 180: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

This tab will come only if material is managed in batches.

Proceed with the following steps if material is batch managed only.

Batch Batch number R Enter batch number as date for batch managed materials

Vendor batch Vendor batch O Enter vendor batch number for reference

7. Select the Check box Item OK, after entering all the data.

You will get Excise Invoice tab at Header Data for capturing vendor excise invoice details and for posting Part I and Part II.

8. On the Excise Invoice tab at Header Data make the following entries.

Confidential Page 180 of 316

Page 181: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Field name Description R/O/C User action and values Comment

Capture & Post Excise invoice

Capture & Post Excise Invoice on Excise Action

R Choose Capture & Post Excise Invoice from drop down list

Defaulted

Excise Group Excise Group R Defaulted by the system

Excise Invoice

Excise invoice R Enter the vendor Excise Invoice number

For example:

4500000059

Excise Inv. Date

Excise Invoice Date R Enter the excise invoice date of vendor

BED Basic Excise Duty R Defaulted from purchase order

Grayed out

AED Additional Excise Duty R Defaulted form purchase order

Grayed out

SED Special Excise Duty R Defaulted from purchase order

Grayed out

NCCD NCCD R Defaulted from purchase order

Grayed out

ECS Education Cess R Defaulted from purchase order

Grayed out

Close Header Detail data to enlarge the Detail data.

Select Excise Item tab at Detailed Data (at the last).

Chapter ID Chapter ID of material R Defaulted by the system

No action required

EI Quantity Excise Invoice Quantity

R Defaulted by the system from Goods Receipt quantity

Base Value Base value of material R Defaulted by the system

BED Basic Excise Duty R Defaulted by the system

AED Additional Excise Duty O Defaulted by the system

NCCD NCCD O Defaulted by the system

SED Special Excise Duty O Defaulted by the system

ECS Education Cess O Defaulted by the system

Please cross check the BED, ECS (CVD in this case) amount of item as per the bill of lading, legally you can not avail more than what mentioned in Vendor Excise Invoice.

In case of imported purchase order in normal case system will default CVD and ECess (invoice verification made on commissioner of customs) amount as BED and ECS i.e. CENVAT amount.

Confidential Page 181 of 316

Page 182: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

12. Choose Check at the top of screen.

13. Choose Post to post the document.

Confidential Page 182 of 316

Page 183: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

2.6.3 Result

Material document posted.

2.6.4 Example

Material document 5000000021 posted

You can see account posting here

Confidential Page 183 of 316

Page 184: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

2.7 Logistics Invoice Verification for the Materials

2.7.1 Use

In this process of Logistics Invoice Verification all the Incoming Invoices are verified in terms of their content, prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The system updates the data saved in the invoice documents in Materials Management and Financial Accounting.

2.7.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Logistics invoice Verification Document Entry Enter Invoice

Transaction code MIRO

2. If you are opening for the first time this transaction, system will ask for Company Code, please give 1000 to go in side the transaction.

3. On the Enter Incoming Invoice: Company Code 1000 screen, make the following entries:

Confidential Page 184 of 316

Page 185: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Field name Description R/O/C User action and values Comment

Transaction Invoice R Select Invoice from drop down list

Header Data Header data of Invoice R Defaulted by system

Basic tab Basic information tab R Select basic information tab to give initial information

Invoice Date Invoice Date R Enter the Vendor invoice date

Reference Invoice reference O Enter the vendor invoice reference

For Example

1000

Posting date Posting Date R Enter the posting date of document

System will give current date as default

Confidential Page 185 of 316

Select Goods /Service Items

Page 186: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Amount Invoice Amount R Enter invoice gross amount including taxes and duties

100

Amount mentioned is only an example

Currency R Enter the currency in which the bill is presented by vendor, if not entered by user system will default the document currency from purchase order

USD

Calculate tax Check box calculate tax

O Check this tick box, system will calculate tax amount

Tax code R Select the tax code from drop down list

V0

Bus.place/sectn

Business place or section code

R Enter section code if Tax deduction for source is active for this vendor

Leave blank for this process

Text Text O Enter text if required for reference

Payment tab Payment tab R Select payment details tab

BaselineDt Base line date for payment

R Enter the base line date for payment

Will be defaulted if payment terms entered in PO

Pmnt terms Payment terms O Payment terms of document, if entered will be defaulted from purchase order

Due on Payment due on O Will be calculated by system

Grayed out

Discount Cash discount O Enter if cash discount is offered by vendor

Hide Header data for getting full screen of items if required.

Purchase order / Schedule Agreement

R Select Purchase order / Schedule Agreement in the reference document category from drop down list

Defaulted for user

Purchase order number

R Enter the first purchase order number generated above

Goods / service items R Select Goods / Service items in indicator from drop down list

Defaulted

Confidential Page 186 of 316

Page 187: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Layout Layout of invoice verification

R Select All information from drop down list

Choose Enter

4. Choose Enter to complete the document feeding part.

5. To check the document credit and debit is balanced on the top right corner of your screen a traffic light is displayed. Beside that Balance of the document is displayed.

Ensure that the Balance is ZERO before posting the document and the traffic light is green or yellow color.

6. If you want to see the accounting postings in simulation mode, Choose Simulation on middle of fourth row of your screen.

Confidential Page 187 of 316

Choose Display Currency to change in INR

Page 188: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

7. Choose Display Currency which will lead to small pop-up window having the company code currency and Document Currency, position the cursor on the INR to convert to Document Currency and press the details button.

Confidential Page 188 of 316

Page 189: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 189 of 316

Page 190: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

9. Choose Save / Post, for posting the document.

2.7.3 Result

Logistics Invoice verification document is posted.

2.7.4 Example

Document no. 5105600122 created

Confidential Page 190 of 316

Page 191: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3 Procurement of Subcontracting Materials – Business Process Procedure3.1Procurement of Subcontracting Materials

3.1.1 Purpose

In Indian subcontracting process when you issue materials to a subcontractor, you need to keep track of what materials you have issued and when they have to be returned by subcontractor. The reason for this close monitoring has to do with Indian tax law. Under excise law 57AC, when you send materials to a subcontractor for processing, you are not required to pay any excise duty, even though the materials have left your premises. However, if the materials have not been returned to you within 180 days specified by the law, you will have to reverse any excise credit that you posted when you have purchased the materials. When you send material out of your factory premises you need to send with 57F4 Challan. In this process you are going to do the same.

3.1.2 Prerequisites

The following scenario specific master data must be created for operation of this building block and subsequent dependent building blocks.

• Material Master record (Refer User Manual – Procurement of Stock Materials (Domestic))

• Vendor Master record (Refer User Manual – Procurement of Stock Materials (Domestic))

• Purchasing Info Record (Optional)

Ensure that Sub-Contracting as Info Category.(Refer User Manual – Procurement of Stock Materials (Domestic))

• CIN Master Data (Refer User Manual – Procurement of Stock Materials (Domestic))

o Chapter IDso Material ID and chapter ID combination (Ensure Sub-Contract check box is selected for

the Materials that provided to vendor)o CENVAT Determinationo Vendor Excise Detailso Excise Indicator for Plantso Excise Indicator for Plant and Vendoro Excise Tax Rates

Confidential Page 191 of 316

Page 192: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3.2Creation of Subcontracting Purchase Order

3.2.1 Use

A purchase order is a legal document used to record an individual purchase with the vendor. It also provides the vendor with a reference document to link to goods receipt and invoice verification processes. The purchase order is a commitment to a vendor for a given subcontracting activity, in a specified quantity at a predetermined price and delivery date.

3.2.2 Prerequisites

Components stock should be available for providing to subcontracting vendor.

3.2.3 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Purchasing Purchase Order CreateVendor/Supplying Plant Known

Transaction code ME21N

Confidential Page 192 of 316

Page 193: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

2. On the Create Purchase Order screen, make the following entries:

Confidential Page 193 of 316

Click here to enter Bill of components that are supplying to Subcontractor

Enter L as Item Category for Sub-Contracting Procurement

Select ZSC Document Type forSubcontracting Order

Page 194: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

After filling the above data, choose on Material Data tab at item Details screen. There you will find a new icon called Components, you have to choose on that icon to give the components list which you are likely to transfer post to vendors and give the flowing inputs.

3. Click on the Components or Explode BOM and enter the materials that had to be sent:

4. Choose on Green Arrow or F3 to come back to main purchase order screen.

5. Ensure appropriate tax code have been entered for both the line items (V0 – Nil Tax for Sub-Contracting Item)

Confidential Page 194 of 316

Page 195: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 195 of 316

Ensure Taxcode V0 for Sub-Contracting Item and click on the Taxes to view the tax calculation

Page 196: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

6. The Purchase Order may be posted by choosing on the Save icon.

3.2.4 Result

A message will be displayed stating that the purchase order was saved, with the purchase order number.

3.2.5 Example

Standard PO created under the number 2400000000

Confidential Page 196 of 316

Page 197: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3.3Message Output

3.3.1 Use

A Purchase Order needs to be printed for transmitting to vendor.

3.3.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Purchasing Purchase Order Messages Print/Transmit

Transaction code ME9F

2. On the Message Output screen, make the following entries

3. Choose to Execute.

4. On screen Message Output select the appropriate Document number and perform the following:

Confidential Page 197 of 316

Page 198: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Choose Output Message and/orChoose Display Message and/orChoose Message Detail and/orChoose Trial Printout.

Confidential Page 198 of 316

Page 199: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3.4Transfer of Components to Subcontractor

3.4.1 Use

The Nature of subcontracting purchase order is that company will provide components to subcontractor. This process describes how to transfer post materials to subcontractor.

3.4.2 Prerequisites

Sufficient stocks of components should be available for making transfer posting.

3.4.3 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Inventory Management Goods Movement Transfer posting

Transaction code MB1B

2. On the Enter Transfer Posting: Initial Screen, make the following entries:

Field name Description R/O/C User action and values Comment

Document Date

Document Date R Input date

Posting Date Posting Date R Input dateMovement Type

Movement Type R 541

Plant Plant R 1000Storage Location

Storage location R 1010

Confidential Page 199 of 316

Press To Purchase Order

Page 200: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3. Choose on To Purchase Order icon on the top of the screen or choose F9 on key board. System will give new popup screen asking for purchase order number. Give the 45000000## purchase order number and choose enter to continue.

4. System will display components from purchase order with quantities

5. Choose only the Material that you are sending and enter the Storage Location from which it has to be issued.

Confidential Page 200 of 316

Page 201: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

6. Choose on Adopt + Details icon or F6.

7. Choose Enter if required the quantity of components can be changed.

8. Choose Save icon or Control + S to post the document.

3.4.4 Result

A message will be displayed stating that the document posted.

Confidential Page 201 of 316

Page 202: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3.4.5 Example

Material document 4900000039 posted.

3.5Creation of Subcontracting Challan

3.5.1 Use

It is statutory requirement to send the components to subcontractor with 57F4 Challan.

3.5.2 Prerequisites

• Select the Sub-Contracting Material in Material and Chapter ID Combination of the Excise Master (J1ID) for the sending Material.

• Ensure that the details of the receiving Material maintained in the Excise Master (J1ID).• CENVAT Determination of the Excise Master (J1ID) Maintained for the both sending and

receiving Material.• Ensure that the Assessable value for the sending material is maintained in the Excise Master

(J1ID)

3.5.3 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP User menuCIN Menu

Indirect Taxes Procurement Subcontracting Subcontracting Challans Create

Transaction code J1IF01

Confidential Page 202 of 316

Page 203: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

2. On the Subcontracting Challan - Create, make the following entries:

Field name Description R/O/C User action and values Comment

Material Doc. Material document number R 4900000039Mat. Doc. Year Material document year R 2006 AppropriateExcise Group Excise Group R 10 AppropriateSeries Group Series Group R W3 Appropriate

3. Choose Enter to continue, system will take new Subcontracting Challan – Create screen, make the following entries:

Field name Description R/O/C User action and values Comment

Select Posting tabPosting date & time Posting date and

timeR Input date and time of

material removalPrint Immediately Print Immediately O Check this box if you want

challan printout immediately. Select Overview TabPreprinted no Preprinted number O Enter pre-printed number if

you have

Confidential Page 203 of 316

Page 204: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

4. Save challan by choosing on Save icon or Control + S.

3.5.4 Result

A message will be displayed stating that the document posted.

3.5.5 Example

Subcontracting Challan 000010001 2008; Series Group B1 successfully created.

Confidential Page 204 of 316

Page 205: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3.6 Printing of Subcontracting Challan

3.6.1 Use

It is statutory requirement to send the components to subcontractor with 57F4 Challan.

3.6.2 Procedure

Access the transaction choosing one of the following navigation options:

SAP User menuCIN Menu

Indirect Taxes Procurement Subcontracting Subcontracting Challans Change

Transaction code J1IF11

Confidential Page 205 of 316

Page 206: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Press Save Icon

Confidential Page 206 of 316

Click the Print Immediately Tab

Page 207: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Press Enter

Confidential Page 207 of 316

Click the Print Immediately Tab

Page 208: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Click the Icon to be the Print Preview of the Challan

Execute the Print to Get Print Out.

Confidential Page 208 of 316

Page 209: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3.7 Goods Receipt for Purchase Order

3.7.1 Use

Normally Goods are received from the Vendor as a result of a Purchase Order at the receiving plant

3.7.2 Prerequisites

Purchase Order

3.7.3 Procedure

9. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Inventory Management Goods Movement Goods Receipt For Purchase Order PO Number Known

Transaction code MIGO

10. On the Goods Receipt Purchase Order screen, make the following entries:

11. After pressing Enter system will fetch all the data from the Purchase Order as shown below:

Confidential Page 209 of 316

Enter the Purchase Order No and Press Enter

Page 210: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

12. First do the posting for the Sub-Contracting Material.

13. System defaults the balance quantity in PO, change the quantity to the received quantity if it is different from defaulted quantity:

Confidential Page 210 of 316

Whichever material is in Blue those detail will be seen in the Item detail

Page 211: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

14. Ensure that the Movement Type is 101.

Confidential Page 211 of 316

Page 212: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 212 of 316

Page 213: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 213 of 316

Select Item Ok and

Page 214: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Field name Description R/O/C User action and values Comment

Goods Receipt

Goods Receipt R Select from drop down list for action

Purchase Order

Purchase Order R input the PO number which generated above

4500000054

Movement Type

101

Enter

Document Date

Document Date R Enter document date

Delivery Note in Header O Delivery Number from Vendor

Vendor Vendor R Defaulted from purchase order

Grayed out

Posting Date Posting date R Enter posting date

Bill of lading Bill of lading O Enter bill of lading

Header text Header text O Enter header text

Confidential Page 214 of 316

Page 215: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Close Header Detail data to enlarge the Detail data.

Select Material tab at Detailed Data.

Material Material tab R Defaulted from Purchase Order

Grayed out

Select Quantity tab in Detail data.

Qty in unit of entry

Quantity in unit of entry

R Enter the quantity you have received from vendor. As a default system will give purchase order quantity

Quantity defaulted from Purchase Order

Qty in delivery note

Quantity in delivery note

O Enter the quantity as per vendor delivery challan

Select Where tab in Detail data.

Movement type

Movement type R Defaulted from header screen

Stock type Stock type R Defaulted from material master or purchase order

Plant Plant R Defaulted from purchase order1000

Goods Recipient

Goods Recipient O Enter the name of person who received goods

Unloading point

Unloading point O

Text Text O Enter the text if required

Select Purchase Order tab in Detail data.

Purchase Order

Purchase Order R Defaulted from header data Grayed out

Del. completed ind.

Delivery completion indicator

O Defaulted by system if PO Qty = GR Qty

Select Partner tab in Detail data.

Vendor Vendor name O Grayed out

For this material batch management is not active. Just for reference purpose the following data is given.

Select Batch tab in Detail data.

This tab will come only if material is managed in batches.

Proceed with the following steps if material is batch managed only.

Confidential Page 215 of 316

Page 216: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Batch Batch number R Enter batch number as date for batch managed materials

Vendor batch Vendor batch O Enter vendor batch number for reference

15. Select the Check box Item OK, after entering all the data.

NCCD NCCD O Defaulted by the system

SED Special Excise Duty O Defaulted by the system

ECS Education Cess O Defaulted by the system

Please cross check the BED, AED, SED, NCCD and ECS amount of item as per the Vendor Excise Invoice, legally you cannot avail more than what mentioned in Vendor Excise Invoice. All other information is defaulted by the system. Hence, no action required by the user.

5. Choose Check at the top of screen.

6. Choose Post to post the document.

Confidential Page 216 of 316

Page 217: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3.7.4 Result

Material document posted.

3.7.5 Example

Material document 5000000028 posted, You can see accounting Entries

Confidential Page 217 of 316

Page 218: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3.8 Reconciling Subcontracting Challan

3.8.1 Use

After making Goods Receipt the GR has to be reconciled with the challan sent to subcontractor.

3.8.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP User menuCIN Menu

Indirect Taxes Procurement Subcontracting Subcontracting Challans Reconcile Quantity

Transaction code J1IFQ

As we have refered challan During Goods receipt here we are getting following message, If you have not refred challan during Gr following is the Process

Confidential Page 218 of 316

Page 219: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

2. On the Quantity reconciliation for Subcontracting Challan screen, make the following entriees.

Field name Description R/O/C User action and values

Comment

Material Document Goods Receipt document number

R 5000000344

Mat. Doc. Year Year of document R 2006

Year Subcontacting challan year R 2006

Chalan No Subcontacting challan No R 000000031

Choose on Reconcile icon or F8 to go reconciliation screen.

3. System will take you to new Quantity reconciliation for Subcontracting Challans.

4. Here on this you can see system display items from Goods Receipt at top and items from challan at bottom of screen.

5. Here you need to allocate the components consumed in GR stage are reconciled with challan to do this, choose on Allocate based on FIFO icon in the middle of screen with calculator icon.

6. Or you can do allocation by entering manually also in respective line items at bottom, where Assigned quantity filed is located in white color.

Confidential Page 219 of 316

Page 220: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

7. After assignment save the document by choosing Save icon or choose Control + S

3.8.3 Result

Material document was successfully reconciled.

3.8.4 Example

Material Document 5000000028, 2008 was successfully reconciled.

Confidential Page 220 of 316

Page 221: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3.9 Completing/Reversal/Re-credit Subcontracting Challan

3.9.1 Use

This transaction is basically used to complete the challan if you have reconciled as stated above step. There may be cases subcontractor may not able to supply within stipulated 180 days limit then in this case also same transaction is used for reversal of challan or re-crediting the amount.

3.9.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP User menuCIN Menu

Indirect Taxes Procurement Subcontracting Subcontracting Challans Complete/Reverse/Recredit

Transaction code J1IF13

2. On the Subcontracting Challan – Complete/Reverse/Recredit screen, make the following entries:

Field name Description R/O/C User action and values Comment

Chalan No Subcontacting challan No R 0000000031

Excise year Document year R 2006

3. Choose enter to go to inside the challan document.

4. Select the radio button Complete Challan and.

5. Save the document by choosing Save icon or choose Control + S.

Confidential Page 221 of 316

Page 222: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3.9.3 Result

Subcontracting challan successfully completed.

3.9.4 Example

Subcontracting Challan 0000001 2008; Series Group B1 successfully completed.

3.10 Logistics Invoice Verification for Subcontracting Material

3.10.1 Use

In this process of Logistics Invoice Verification all the Incoming Invoices are verified in terms of their content, prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The system updates the data saved in the invoice documents in Materials Management and Financial Accounting.

3.10.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Logistics invoice Verification Document Entry Enter Invoice

Transaction code MIRO

2. If you are opening for the first time this transaction, system will ask for Company Code, please give 1000 to go in side the transaction.

3. On the Enter Incoming Invoice: Company Code 1000 screen, make the following entries:

4. Choose only the Subcontracting material to post the document:

Confidential Page 222 of 316

Page 223: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Field name Description R/O/C User action and values Comment

Transaction Invoice R Select Invoice from drop down list

Header Data Header data of Invoice R Defaulted by system

Basic tab Basic information tab R Select basic information tab to give initial information

Invoice Date Invoice Date R Enter the Vendor invoice date

Reference Invoice reference O Enter the vendor invoice reference

For Example

USERMANUAL

Posting date Posting Date R Enter the posting date of document

System will give current date as default

Amount Invoice Amount R Enter invoice gross amount including taxes and duties

19.50

Amount mentioned is only an example

Currency R Enter the currency in which the bill is presented by vendor, if not entered by

Confidential Page 223 of 316

Page 224: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

user system will default the document currency from purchase order

INR

Calculate tax Check box calculate tax

O Check this tick box, system will calculate tax amount

Tax code R Select the tax code from drop down list

V0

Bus.place/sectn

Business place or section code

R Enter section code if Tax deduction for source is active for this vendor

Leave blank for this process

Text Text O Enter text if required for reference

Payment tab Payment tab R Select payment details tab

BaselineDt Base line date for payment

R Enter the base line date for payment

Will be defaulted if payment terms entered in PO

Pmnt terms Payment terms O Payment terms of document, if entered will be defaulted from purchase order

Due on Payment due on O Will be calculated by system

Grayed out

Discount Cash discount O Enter if cash discount is offered by vendor

Hide Header data for getting full screen of items if required.

Purchase order / Schedule Agreement

R Select Purchase order / Schedule Agreement in the reference document category from drop down list

Defaulted for user

Purchase order number

R Enter the first purchase order number generated above

Goods / service items R Select Goods / Service items in indicator from drop down list

Defaulted

Layout Layout of invoice verification

R Select All information from drop down list

Choose Enter

5. Choose Enter to complete the document feeding part.

Confidential Page 224 of 316

Page 225: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

6. To check the document credit and debit is balanced on the top right corner of your screen a traffic light is displayed. Beside that Balance of the document is displayed.

Ensure that the Balance is ZERO before posting the document and the traffic light is green or yellow color.

7. If you want to see the accounting postings in simulation mode, Choose Simulation on middle of fourth row of your screen.

10. Choose Save / Post, for posting the document.

Confidential Page 225 of 316

Page 226: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3.10.3 Result

Logistics Invoice verification document is posted.

3.10.4 Example

Document no. 5105600132 created, Account postings are following

Confidential Page 226 of 316

Page 227: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

5. Procurement of External Services: Business Process Procedure

5.1Procurement of External Services – Procurement Process

5.1.1 Purpose

External Services Management is an application component within Materials Management Module. It covers from creation of service master, bid invitation, order placements process, entering and accepting services and finally invoice verification process.

5.1.2 Prerequisites

The following scenario specific master data must be created for operation of this building block and subsequent dependent building blocks.

• Service Master record

o AMC Charges for Testing Machine

• Vendor Master record

Refer the document of “Procurement of Stock Materials”

Confidential Page 227 of 316

Page 228: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

5.2Creating Service Master

5.2.1 Use

The service master record counts as part of the master data within External Services Management and serves as a source of data for you to draw upon when creating services. This enables you to save time and reduces the frequency of errors, since you need only enter the complete service descriptions in the service master record once.

5.2.2 Procedure

8. Access the transaction choosing one of the following navigation options:

SAP R/3 Menu Logistics Materials Management Service Master Service Service Master

Transaction code AC03

9. On the Display Service screen, make the following entries:

10. Click on Create new service icon or press F5 (white paper icon) to create new service master.

11. Then you will get Create Service Master Record screen, make the following entries:

Confidential Page 228 of 316

Enter the Service Category and Base Unit of Measure accordingly

No Need to Enter as Internal No will be generated and Enter the Short Text only

Page 229: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Field name Description R/O/C User action and values Comment

Service Number

Service master record (internally assigned)

R You can see %_1 will be displayed on this field, leave it as blank. System will assign internal service number

Leave blank

Service description R Annual Mait. Contract for Testing M/C.

Input the value

Service Category

Service Category R Service:ALL complete Select from drop down

Base unit of Measurement

Base unit of Measurement

R AU for Activity Unit

Basic Data

Mat/srv.grp Material Group or Service Group

R 91

Division Division O

Valuation class

Valuation class R 3200

Long Text

This is free input place. You can fully input the service specification.

O Annual Maintenance Contract for Testing Machine.

12. Press enter to complete the entries.

13. Press Save icon or Control + S to save the entries.

5.2.3 Result

Service Master Record is created.

Confidential Page 229 of 316

Blocking of service procurement can be done by entering appropriately here

Conversion can be maintained here

Page 230: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

5.3 Creating Purchase Requisition

5.3.1 Use

A Purchase Requisition is created to indicate purchase department to procure materials or services with details like how much quantity is required, when required. Generally it is created automatically for Raw materials and Packing Materials through MRP Run and Spares and Service related to Plant Maintenance Purchase Requisition is generated automatically from Plant maintenance Order. In this process Purchase Requisition is created against Quantity Contract created in above step 1.1.4 with exact delivery / requirement date.

This transaction is optional for the process.

5.3.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Purchasing Purchase Requisition Create

Transaction code ME51N

3. On the Create Purchase Requisition screen, make the following entries:

Confidential Page 230 of 316

Page 231: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 231 of 316

Enter the A/c Assignment Category as K for Cost center and Item Category D for Services

Enter the Short Text

Enter the appropriate Material Group Plant and Purchasing Group

When Item Category D is enterer one new tab in the Item Detail Services is generated to enter the Service No.

Page 232: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

4. After pressing enter system shows a small pop-up window where respective G/L Account and Cost Center to be entered.

Confidential Page 232 of 316

Enter the Service No, Quantity and Gross Price and press Enter

Page 233: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 233 of 316

Enter the appropriate G/L Account and Cost Center

Page 234: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

5. Press or Ctrl+S to Save the Purchase Requisition.

Confidential Page 234 of 316

Enter the Desired Vendor if Vendor is known to the person who is creating PR

Page 235: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

5.3.3 Result

Purchase Requisition is created,

5.3.4 Example

Purchase requisition number 0010000180 created.

Confidential Page 235 of 316

Page 236: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

5.4 Assign and Process Purchase Requisition

5.4.1 Use

c) This section explains the functions provided by the SAP System for converting requisitions into external purchasing documents (purchase orders, contract release orders, scheduling agreement delivery schedules, RFQs), and the processing options thereby available to you:

• Assigning means defining the desired source for each purchase requisition item o Further processing involves generating lists of requisitions that have been assigned or flagged as

outlined above, and the subsequent creation of RFQs, purchase orders, or lines of delivery schedules under scheduling agreements.

5.4.2 Procedure

6. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Purchasing Purchase Requisition Follow-On Functions Assign and Process

Transaction code ME57

7. The assignment of sources to and further processing of purchase requisitions are two distinct functions. You can choose whether you wish to perform the functions in two separate steps or in just one.

Confidential Page 236 of 316

Page 237: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

8. Below are the Selection Parameters to restrict the process of PO from PR

9. Press or F8 to enter into the next screen.

Confidential Page 237 of 316

1. Enter the appropriate Purchasing Group2. Enter the Scope of List as B1 for PR generated through MRP Run and A for remaining PR3. Enter the appropriate Plant4. Enter the Item category as D

1. Select the Assigned Purchase Requisition (For Spares PR normally the End User may have entered the Vendor in the PR)2. Select the appropriate Check boxes for Processing the PR

1. If Source List is available click this button

For Manual Assignment of source click this Icon

Page 238: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 238 of 316

1. Select the check boxes required PR which are to be converted in to Pos.

Page 239: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Click SAVE Icon.

Source has been assigned for this Requisition

5.4.3 Result

The source is assigned to PR and can be processed for PO.

5.5. For Releasing Purchase Requisition Refer User Manual for Stock Procurement

5.6 Purchase Order

5.6.1 Use

A purchase order is a legal document used to record an individual purchase with the vendor. It also provides the vendor with a reference document to link to shipping (goods receipt) and invoicing (invoice verification) processes. The purchase order is a commitment to a vendor for a given material, in a specified quantity at a predetermined price and delivery date.

This transaction is mandatory for the process.

Confidential Page 239 of 316

Page 240: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Please ensure that Purchase Order Value does not exceed specified value and if the purchase order value crosses this limit a release procedure is applied on this purchase order. To release the Purchase Order go to ME28 for collective release and ME29N for individual release.

5.6.2 Prerequisites

1. Before creating purchase order if this vendor is subject to Tax Deduction at Source (TDS) or with holding tax please ensures that necessary entries in vendor master is updated.

5.6.3 Procedure

6. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Purchasing Purchase Order CreateVendor/Supplying Plant Known

Transaction code ME21N

7. If you want create purchase order with reference to the purchase requisition, on item details screen enter the purchase requisition number and item number at Purch. Req. field. System will automatically adopt all the data from requisition.

Confidential Page 240 of 316

Click the Purchasing Requisitions and Press Adopt

Press this button to view the Tax CalculationSelect this check box if Invoice

Verification is done after Service Entry Sheet

Page 241: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Condition Record for JSVD and JEC4 should be Maintained in FV11 with Material Group/Plant Combination.

Select Invoice tab

Tax code Enter Tax code R S1 Select S1 tax code

Since the procurement services covered with service tax of 10% (for example only, check for legal requirement), it is advised to select V1 tax code.

Jurisdiction Jurisdiction code R Will be defaulted from plant

Confidential Page 241 of 316

Page 242: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

code parameters

Depending on for which plant you are procuring the services system will select Jurisdiction code. In system the following Jurisdiction codes were configured IN00 – Central

GR-based IV Goods Receipt based invoice verification

O Tick this check box

Srv.-based IV Service based invoice verification

O Tick this check box If Invoice Verification will be done after the Service Entry sheet

8. The Purchase Order may be posted by Choosing on the Save button or Choose Control + S for saving.

5.6.4 Result

Purchase Order is created.

Confidential Page 242 of 316

Page 243: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

5.6.5 Example

Standard PO created under the number 4500000062.

5.7 For Releasing Purchase Order Refer User Manual of Stock Procurement

5.8Message Output

5.8.1 Use

A Purchase Order needs to be printed for transmitting to vendor.

5.8.2 Procedure

14. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Purchasing Purchase Order Messages Print/Transmit

Transaction code ME9F

15. On the Message Output screen, make the following entries

Confidential Page 243 of 316

Page 244: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

16. Choose to Execute.

17. On screen Message Output select the appropriate Document number and perform the following:

Confidential Page 244 of 316

Page 245: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Choose Output Message and/orChoose Display Message and/orChoose Message Detail and/orChoose Trial Printout.

5.9 Creation and Acceptance of Service Entry Sheet

5.9.1 Use

Confidential Page 245 of 316

Page 246: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

The services actually performed (work actually done) by a service vendor are recorded in a Service Entry Sheet with reference to the purchase order.

5.9.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 Menu Logistics Materials Management Service Entry Sheet Maintain

Transaction code ML81N

2. On the Service Entry Sheet screen, make the following entries:

3. Click on Other Purch. Orders icon or Shift + F5, system will popup new screen.

Confidential Page 246 of 316

Page 247: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

4. In this screen against Purchase Order field give the purchase order number which is created in above steps and press enter to continue.

Confidential Page 247 of 316

Page 248: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

5. You will get new Service Entry Against Purchase Order

6. Here on this screen click Create Entry Sheet (white paper icon) or Shift + F1 to get new entry sheet.

7. System allocates service entry sheet number internally and you will get the number on screen.

Confidential Page 248 of 316

Page 249: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

8. System will give a popup screen with purchase order number on that, press enter to continue.

Confidential Page 249 of 316

Press Service Selection and a dialog box appears

Page 250: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

9. Select the line item 10 and click on Services or F9 (Adopt services) icon on top of screen.

Confidential Page 250 of 316

Page 251: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

10. For example the following screen name will come:

Confidential Page 251 of 316

Page 252: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

11. You can observe the system copied the service line item from purchase order with open item quantity i.e. 1 AU.

12. Change the quantity as per your requirement

Confidential Page 252 of 316

Page 253: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 253 of 316

Page 254: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

13. With this the basic information of service entry sheet is fully completed. As per the requirement you can fill other fields also if required.

14. To accept the service click on Accept icon or Control + F1 (Green flag icon).

15. You can see the traffic light is become Yellow color. That means it is ready to save the service entry sheet.

Confidential Page 254 of 316

Press Green Colour Flag Button

Page 255: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

16. Press or Ctrl+S to save the document.

Confidential Page 255 of 316

The colour changes from red to yellow and Press Save

Page 256: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

5.9.3 Result

A message indicates that the service entry sheet saved, acceptance document posted.

5.9.4 Example

Service entry sheet saved, acceptance document 5000000134 posted.

Confidential Page 256 of 316

Page 257: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

5.10 Logistics Invoice Verification

5.10.1 Use

In this process of Logistics Invoice Verification all the Incoming Invoices are verified in terms of their content, prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The system updates the data saved in the invoice documents in Materials Management and Financial Accounting.

5.10.2 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Logistics invoice Verification Document Entry Enter Invoice

Transaction code MIRO

2. If you are opening for the first time this transaction, system will ask for Company Code, please give 1000 to go in side the transaction.

3. On the Enter Incoming Invoice: Company Code 1000 screen, make the following entries:

Confidential Page 257 of 316

Page 258: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Field name Description R/O/C User action and values Comment

Transaction Invoice R Select Invoice from drop down list

Header Data Header data of Invoice R Defaulted by system

Basic tab Basic information tab R Select basic information tab to give initial information

Invoice Date Invoice Date R Enter the Vendor invoice date

Reference Invoice reference O Enter the vendor invoice reference

For Example

USERMANUAL

Posting date Posting Date R Enter the posting date of document

System will give current date as default

Amount Invoice Amount R Enter invoice gross amount Amount

Confidential Page 258 of 316

Page 259: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

including taxes and duties

1122.40

mentioned is only an example

Currency R Enter the currency in which the bill is presented by vendor, if not entered by user system will default the document currency from purchase order

INR

Calculate tax Check box calculate tax

O Check this tick box, system will calculate tax amount

Tax code R Select the tax code from drop down list

S1

Bus.place/sectn

Business place or section code

R Enter section code if Tax deduction for source is active for this vendor

Leave blank for this process

Text Text O Enter text if required for reference

Payment tab Payment tab R Select payment details tab

BaselineDt Base line date for payment

R Enter the base line date for payment

Will be defaulted if payment terms entered in PO

Pmnt terms Payment terms O Payment terms of document, if entered will be defaulted from purchase order

Due on Payment due on O Will be calculated by system

Grayed out

Discount Cash discount O Enter if cash discount is offered by vendor

Hide Header data for getting full screen of items if required.

Purchase order / Schedule Agreement

R Select Purchase order / Schedule Agreement in the reference document category from drop down list

Defaulted for user

Purchase order number

R Enter the first purchase order number generated above

Goods / service items R Select Goods / Service items in indicator from drop down list

Defaulted

Layout Layout of invoice R Select All information from

Confidential Page 259 of 316

Page 260: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

verification drop down list

Choose Enter

4. Choose Enter to complete the document feeding part.

5. To check the document credit and debit is balanced on the top right corner of your screen a traffic light is displayed. Beside that Balance of the document is displayed.

Ensure that the Balance is ZERO before posting the document and the traffic light is green or yellow color.

6. If you want to see the accounting postings in simulation mode, Choose Simulation on middle of fourth row of your screen.

Confidential Page 260 of 316

Page 261: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

11. Choose Save / Post, for posting the document.

5.10.3 Result

Logistics Invoice verification document is posted.

5.10.4 Example

Document no. 5105600795 created

Confidential Page 261 of 316

Page 262: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

6 Asset Procurement – Business Process Procedure.6.1Purchase Order

6.1.1 Use

A purchase order is a legal document used to record an individual purchase with the vendor. It also provides the vendor with a reference document to link to shipping (goods receipt) and invoicing (invoice verification) processes. The purchase order is a commitment to a vendor for a given material, in a specified quantity at a predetermined price and delivery date.

This transaction is mandatory for the process.

Prerequisites

1. Before creating purchase order if this vendor is subject to Tax Deduction at Source (TDS) or with holding tax please ensures that necessary entries in vendor master is updated.

2. Asset Management Module Active.

6.1.2 Procedure

7. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Purchasing Purchase Order CreateVendor/Supplying Plant Known

Transaction code ME21N

Confidential Page 262 of 316

Page 263: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 263 of 316

Enter Account Assignment ‘A’ and Short text of the Assest

Enter PO Qty,Net Price,Currency,Material Group

Enter Code V1

Page 264: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

1. Enter the respective Asset No.

Confidential Page 264 of 316

Enter the Asset No.

Page 265: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3. Click Taxes Tab to View the Tax Details

IIN FV11 maintain Condition record for respective Tax Conditions with Material Group/Plant combination.

3.Click Save Button to Save the PO.

Confidential Page 265 of 316

Page 266: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

6.1.3 Result

Purchase Order Created with No. 230000000.

6.2 Release of Purchase Order

6.2.1 Procedure

For Release of Purchase order Please refer Stock Procurement Manual.

Confidential Page 266 of 316

Page 267: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

6.3 Goods Receipt for Purchase Order

6.3.2 Use

Goods are received from the Vendor as a result of a Purchase Order at the receiving plant. A goods movement is entered into the system referencing this PO and a goods receipt material document is posted. Appropriate general ledger accounts are also posted and stocks are updated.

6.3.3 Prerequisites

Purchase Order

6.3.4 Procedure

16. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Inventory Management Goods Movement Goods Receipt For Purchase Order PO Number Known

Transaction code MIGO

Confidential Page 267 of 316

Page 268: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Save the Document.

Confidential Page 268 of 316

Select Only Capture Excise Invoice

Page 269: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

6.2.3 Result

Material Document 500000029 Posted.

6.4 Post Excise Invoice

6.4.1 Procedure

Access the transaction choosing one of the following navigation options:

SAP R/3 menu CIN Easy Screen(J1ILN) Indirect Taxes Procurement Incoming Invoice Central Processing ->Post Excise Invoice

Transaction code J1IEX

Confidential Page 269 of 316

Page 270: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Click Simulate Cenvat.

Confidential Page 270 of 316

Page 271: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Click Post Cenvat.

Click Continue

6.4.2 Result

Excise Invoice Posted.

Confidential Page 271 of 316

Page 272: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

6.5 Logistics Invoice Verification

6.5.1 Use

In this process of Logistics Invoice Verification all the Incoming Invoices are verified in terms of their content, prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The system updates the data saved in the invoice documents in Materials Management and Financial Accounting.

6.5.2 Procedure

4. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Logistics Materials Management Logistics invoice Verification Document Entry Enter Invoice

Transaction code MIRO

Confidential Page 272 of 316

Page 273: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Click Simulate

Confidential Page 273 of 316

Page 274: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Click Save.

Confidential Page 274 of 316

Page 275: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

6.5.3 Result

Invoice Document 5105600133 Posted.

Confidential Page 275 of 316

Page 276: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

7 Excise Periodic Processing – Business Process Procedure

7.1Excise Periodic Processing

7.1.1 Purpose

Excise Periodic Processing’s that are to be carried out at end of a period. Excise Periodic Processing helps you prepare and carry out the activities required for day-end or month-end and year-end closing.

• TR6 Challan Posting with PLA Register Updation

• Utilization of CENVAT

• RG1 Register updation

• Proforma for Monthly Return under Rule 7 of the Cenvat Credit Rules, 2001

7.1.2 Prerequisites

Before execute business scenarios, you need to post the business processes transactions from other scenarios.

As part of the integrated scenario, this scenario needs several User Manuals as prerequisites to demonstrate these include:

• Production Planning and Discrete Manufacturing

• Procurement of Stock Materials

• Sales and Distribution

Confidential Page 276 of 316

Page 277: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

7.2Excise Report - CENVAT Register

7.2.1 Use

Details to submit an Annexure to the Excise Authorities as a Monthly Return Under Rule 57AE of the Central Excise Rules, 2001. CENVAT Register displays input credit details for Raw materials or Capital Goods. This report can be generated detailed as Annexure or summary as Abstract.

7.2.2 Prerequisites

User must be assigned the Indian Localization menu.

7.2.3 Procedure

9. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Country India User Menu → Indirect Taxes → Registers → Excise Tax → CENVAT Register

Transaction code J2I9

10. On the Proforma for Monthly Return Under Rule 57AE of the Central Excise Rule screen, make the following entries:

Confidential Page 277 of 316

Select the Radio Button for Capital Goods / Inputs to display Annexure / Abstract

Page 278: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Field name Description R/O/C User action and values Comment

Company Code

Company code R 1000

Excise Group Excise Group for which ID for which CENVAT Register is being generated

R 10

Posting Date Posting date range R The date from the beginning of the month to end of the month

Annexure Output to be generated Annexure or Abstract

C Select this radio button if the out put is being generated for Annexure

At time you can generate an Annexure or Abstract

Abstract Output to be generated Annexure or Abstract

C Select this radio button if the out put is being generated for Abstract

At time you can generate an Annexure or Abstract

Inputs Annexure to be generated for Input materials or Capital Goods

C Select this radio button if the out put Annexure is being generated for Input Materials

At time you can generate an Annexure for Input materials or Capital Goods

Capital Goods

Annexure to be generated for Input materials or Capital Goods

C Select this radio button if the out put Annexure is being generated for Capital Goods

At time you can generate an Annexure for Input materials or Capital Goods

Confidential Page 278 of 316

Page 279: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

11. The out put can be saved into a local file or printed by using the print options.

7.2.4 Result

You are able to generate Proforma for Monthly Return Under Rule 57AE of the Central Excise Rule.

Confidential Page 279 of 316

Page 280: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

7.3 Excise Register Updation

7.3Updation of RG1 Register

7.3.1 Use

RG1 register maintained at Manufacturing Plants for excisable finished goods. The register shows goods movements from the factory to a store and stores to customer, specifically for excisable finished goods. The R/3 System generates all the necessary entries in the register.

This report only creates register entries for goods movements that have not already been entered. It does not create duplicate entries.

Using this activity, you can also update the goods issue into RG23A Part I and RG23C Part I, Register by select the radio button option in the Registers.

7.3.2 Prerequisites

To extract the data to RG1 Register, Material numbers has to be maintained in the table J_2IRG1BAL - Opening/Closing balance table for RG1.

7.3.3 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Country India User Menu → Indirect Taxes → Registers → Excise Tax → Update RG23A/C Issues and RG1

Transaction code J1I5

Confidential Page 280 of 316

Page 281: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

2. On the Update of Registers RG1 and RG23(Part1) screen, make the following entries:

Field name Description R/O/C User action and Comment

Confidential Page 281 of 316

Select the Radio Button for RG1 / RG23A Part 1 / RG23C Part 1 Updation

Select appropriate Classification

Page 282: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

values

Company Code

Company Code R 1000

Plant Plant – for which RG1 Register is being maintained

R 1000

Excise Group Excise Group for which RG1 register is being maintained

R 10

Material Document Number

Material document number

O Based on the updation criteria enter values

Document Year

Material document year

O Material document year

Posting Date Date of Material document Posted

R Enter the Material Document Posting Date

Movement Type

Movement Type used for posting the materials

O

Storage Location

Storage location used for posting the material movements

O

Material Material number to update the RG1 Register

O

Document Date

Document date of the material document

O

Batch Batch number of the materials

O

Stock Type Stock Type declared O

Rule Excise Classification Rule

O

Classification Pre-defined Classifications

R IIM

For updating of goods receipts from Manufacturing plant use RMA

For updating of Goods issue, i.e. Removal from factory on payment of duty for home use –

ReceiptsRMA- Receipt from manufacture

ROP-Receipt from outside under any other provision

Issues

IDH-Removal from factory on payment of duty for Home use

IDE-Removal on payment of duty for

Confidential Page 282 of 316

Page 283: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

IDH export under no bond

IWE-Removal without payment of duty for export under bond

IWT-Removal without payment of duty for transfers

IWO-Removal without payment of duty for other purpose

RG23/ RG1 RG23 / RG1 updation date

R Select the appropriate radio button to update the RG1 Register. Please select the document entry date radio button

Date to be considered by the system for updation of RG1 Register

Document Entry date

Document posting date

System date

Registers Register to update R Select the RG23A radio button to update the RG1 Register,

By using this Transaction you can update the following Registers

RG23A Part1

RG23C Pat1

RG1

Please press enter and ignore any messages.

Update the Receipts to RG1 Register and then update the issue to RG1 Registers. Follow the sequence of transactions.

You can update the RG1 Register by selecting material document header values or Material document line item level details or both together.

The following Classification codes need to be used while updating the Excise Registers:

Register Type Goods issues Goods receipts

RG 23A IIM ROP

IPD

IWD

RG23C IIM ROP

IPD

IWD

RG1 IDH RMA

IDE ROP

Confidential Page 283 of 316

Page 284: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

IWE

IWT

IWO

3. System will display the ‘Update of Registers RG1 and RG23 (Part1’) screen:

Displays all the line items to meet the selection criteria to update the RG1 Register.

4. Select the line items which needs to be updated to RG1 Register by selecting the check box at the beginning of the each line item

Confidential Page 284 of 316

Select Check Boxes for which Updation to be

Page 285: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

5. Simulate the selection by using the Simulate function or use Shift+F10 to simulate the selection

Confidential Page 285 of 316

Press Simulate

Page 286: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

6. System will display the selection Green or Red Traffic lights. The line items which can be updated will be displayed with Green Traffic Lights and the line items which can not be updated will be displayed with Red Traffic Lights.

7. After selecting the right documents select the line item and use the Create button to update the RG1 Register or use CTRL+Shit+F11 to make register entry.

Confidential Page 286 of 316

Page 287: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

7.3.4 Result

Processing over for <number of records selected> records

Confidential Page 287 of 316

Processing over for 3 records

Page 288: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

7.4RG1 Register Extraction

7.4.1 Use

This step needs to be performed in order to create the RG1 details into the respective tables.

7.4.2 Prerequisites

You have to complete the update of RG1 Register before performing this step.

7.4.3 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Country India User Menu → Indirect Taxes → Registers → Excise Tax → Extract

Transaction code J2I5

2. On the Excise Registers Extraction screen, make the following entries:

Confidential Page 288 of 316

Choose Execute

Page 289: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Field name Description R/O/C User action and values Comment

Excise Group Excise group for which RG1 Register being generated

R 10

State Date Starting date of Extraction

R Starting date of data to be extracted for RG1 registers

End Date Ending date of Extraction

R Ending date of data to be extracted for RG1 registers

Selection Registers

Mass extraction of data to all registers

R Select the radio button Select Any Register option

User can generate all the registers together or individual register wise

Select individual Registers

Selection of individual register

R Activate the RG1 Check box to extract the RG1 Register

Display Last Extracted dates

Displays the previously upto what date the register has been extracted for information

O

Confidential Page 289 of 316

Page 290: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3. Click on execute icon or Press F8 or Program Execute

4. If the RG1 Register is being generated for the Period First Time, system will execute the report and display the pop-screen with Register name and Green Tick mark, if it is successfully extracted, otherwise it will show the Red Cross.

Confidential Page 290 of 316

Press Yes which appears in the Dialog

Page 291: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

7.4.4 Result

RG1 data has been extracted

Using this activity, you can also extract the following Excise Registers in addition to RG1.• RG23A Part I• RG23A Part II• RG23C Part I

• RG23C Part II• PLA

In the Registers select option, if you select All registers, the system will create an extract for all registers. If you only want to create an extract for specific registers, select Select any register and then the registers that you want to extract.

Confidential Page 291 of 316

Page 292: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

7.5RG1 Register Print Utility

7.5.1 Use

The objective of this process is to print the RG1 Register or to display on the screen.

7.5.2 Prerequisites

The data must be extracted to the RG1 Register for the period to which RG1 Register need to be printed.

7.5.3 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Country India User Menu → Indirect Taxes → Registers → Excise Tax → Print Utility program

Transaction code J2I6

2. On the Print Excise Registers screen, select the RG1 Radio button to print the RG1 Register.

Confidential Page 292 of 316

Choose

Page 293: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3. Click on Execute icon or Press F8 or Program Execute

4. On the Print RG1 Register screen, make the following entries:

Field name Description R/O/C User action and values Comment

Excise Group Excise group for which RG1 Register is being generated

R 10 Enter the Excise Group

Start Date Starting date of the period for which currently RG1Register is being generated

R For example

01.09.2005

Starting Date

End Date Ending date of the period for which currently RG1Register is being generated

R For example:

29.09.2005

Ending Date

5. Click on Execute icon or Press F8 or Program Execute

6. System will display the Print parameters maintenance screen assign the out put device name and select the Print Preview option. System will display the output on the screen.

Confidential Page 293 of 316

Choose

Page 294: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

7. See the output on the screen and based on the requirement print the output using Ctrl + P option or through menu Text Print.

Confidential Page 294 of 316

Page 295: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

7.5.4 Result

RG1 Register ready to print or you can see on the screen.

Using this activity, you can also view or print the following Excise Registers in addition to RG1• RG23A Part I• RG23A Part II• RG23C Part I• RG23C Part II• PLA

You have to print or see the registers one after another.

8. PLA Register Extraction

8.1PLA Register Extraction

8.1.1 Use

This step needs to be performed in order to extract the data relating to PLA Register to respective tables.

8.1.2 Prerequisites

The following process has been executed, if any transactions took place during the period of PLA register extraction for payment of CENVAT and Sale of goods

• TR6 Challan Updation• Utilization of CENVAT

8.1.3 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Country India User Menu → Indirect Taxes → Registers → Excise Tax → Extract

Transaction code J2I5

Confidential Page 295 of 316

Page 296: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

2. On the Excise Registers Extraction screen, make the following entries:

Field name Description R/O/C User action and values Comment

Excise Group Excise group for which PLA Register being generated

R 10

State Date Starting date of Extraction

R Starting date of data to be extracted for PLA registers

End Date Ending date of Extraction

R Ending date of data to be extracted for PLA registers

Selection Registers

Mass extraction of data to all registers

R Select the radio button Select Any Register option

User can generate all the registers together or individual register wise

Select individual Registers

Selection of individual register

R Activate the PLA Check box to extract the PLA Register

Display Last Displays the O System will

Confidential Page 296 of 316

Choose

Page 297: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Extracted dates

previously upto what date the register has been extracted for information

display the last extraction date on the screen

3. Click on execute icon or Press F8 or Program Execute

4. If the PLA Register is being extract for the Period First Time, system will execute the report and display the pop-screen with Register name and Green Tick mark, if it is successfully extracted, otherwise it will show the Red Cross.

Confidential Page 297 of 316

Page 298: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

8.1.4 Result

PLA data has been extracted

8.2PLA Register Print Utility

8.2.1 Use

The objective of this process is to print the PLA Register or to display on the screen.

8.2.2 Prerequisites

The data must be extracted to the PLA Register for the period to which PLA Register need to be printed.

8.2.3 Procedure

1. Access the transaction choosing one of the following navigation options:

SAP R/3 menu Country India User Menu → Indirect Taxes → Registers → Excise Tax → Print Utility program

Transaction code J2I6

2. On the Print Excise Registers screen, select the PLA Radio button to print the PLA Register.

Confidential Page 298 of 316

Page 299: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

3. Click on Execute icon or Press F8 or Program Execute

4. On the Print PLA Register screen, make the following entries:

Field name Description R/O/C User action and values Comment

Excise Group Excise group for which PLA Register is being generated

R 10 Enter the Excise Group

Start Date Starting date of the period for which currently PLA Register is being generated

R For example

01.09.2005

Starting Date

End Date Ending date of the period for which currently PLA Register is being generated

R For example

30.09.2005

Ending Date

5. Click on Execute icon or Press F8 or Program Execute

Confidential Page 299 of 316

Choose

Choose

Page 300: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

6. System will display the Print parameters maintenance screen assign the out put device name and select the Print Preview option. System will display the output on the screen.

7. See the output on the screen and based on the requirement print the output using Ctrl + P option or through menu Text Print.

8.2.4 Result

PLA register displayed on screen or printed.

Confidential Page 300 of 316

Page 301: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

9. Reports

7.1 Purchasing

7.1.1 Purchasing Documents per Vendor (ME2L)

Chose Execute Icon

Confidential Page 301 of 316

Page 302: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

7.1.2 Purchasing Documents per Material (ME2M)

Choose Execute

Confidential Page 302 of 316

Page 303: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

7.1.3 Source List for Material (ME0M)

7.1.4 Purchase Info Record per Material (ME1M)

Confidential Page 303 of 316

Page 304: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 304 of 316

Page 305: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

7.1.5 Purchasing Values(MC$G)

Choose Execute

Click Switch Drill Down Icon

Confidential Page 305 of 316

Page 306: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 306 of 316

Page 307: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

9.2 Inventory

9.2.1 Material Document List (MB51)

Choose Execute

Confidential Page 307 of 316

Page 308: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 308 of 316

Click this Icon to haveDetail View.

Page 309: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

9.2.2 Diplay Warehouse Stock (MB52)

Choose Execute or Press F8.

Confidential Page 309 of 316

Choose Appropriate Input for your selection.

Page 310: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

9.3.3 Stock on Posting Date (MB5B)

Choose Execute or Press F8

Confidential Page 310 of 316

Select Apropriate EntriesFor your selection

Page 311: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 311 of 316

Page 312: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 312 of 316

Page 313: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

9.3.4 Stock Overview (MMBE)

Choose Execute or Press F8

Confidential Page 313 of 316

Page 314: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

9.3.5 Stock in Transit (MB5T)

Choose Execute or Press F8.

This means no stock in transit

9.3.6 Slow Moving Items (MC46)

Confidential Page 314 of 316

Page 315: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Choose Execute and Press F8.

Confidential Page 315 of 316

Select Appropriate Input Entries

Page 316: Sap Mm Guide

Materials Management User Manual For Duro Shox Pvt Limited Version 1.0

Confidential Page 316 of 316