SAP OVERVIEW – AT A GLANCE SAP OVERVIEW – AT A GLANCE INTRODUCTION INTRODUCTION
Nov 18, 2014
SAP OVERVIEW – AT A GLANCESAP OVERVIEW – AT A GLANCE
INTRODUCTIONINTRODUCTION
SAPSAP
SAP – SYSTEMS ANALYSIS SAP – SYSTEMS ANALYSIS & PROGRAM & PROGRAM DEVELOPMENTDEVELOPMENT
HIGHLY INTEGRATED HIGHLY INTEGRATED SYSTEMSYSTEM
ON LINE PROCESSINGON LINE PROCESSING
INSTANT AVAILABILITY OF INSTANT AVAILABILITY OF DATASDATAS
SAP – SYSTEM ANALYSIS & SAP – SYSTEM ANALYSIS & PROGRAM DEVELOPMENTPROGRAM DEVELOPMENT
Transaction will happen in R/3 (ver of Transaction will happen in R/3 (ver of SAP). This will replace SAP). This will replace FDM/BCM/FinancialsFDM/BCM/Financials
ICH (Inventory Collaboration Hub) – To ICH (Inventory Collaboration Hub) – To replace RS netreplace RS net
WPC – Websphare Product Centre – To WPC – Websphare Product Centre – To replace MRDR.replace MRDR.
BIW – Business Information Warehouse BIW – Business Information Warehouse (for MIS & Designing your own reports)(for MIS & Designing your own reports)
Present Present Development/Implementation Development/Implementation planned (In HO/Branch/NCSC)planned (In HO/Branch/NCSC)
MM (Materials Management)MM (Materials Management)
SD (Sales & Distribution)SD (Sales & Distribution)
FI (Financials)FI (Financials)
CHANGES AHEADCHANGES AHEAD
EXISTINGEXISTING TO BETO BEBCM/FDM/FinancialsBCM/FDM/Financials Single Database SAPSingle Database SAP
Data Upload/DownloadData Upload/Download Instant updation Instant updation
Planning/SKU CodePlanning/SKU Code Only material codeOnly material code
Lot/Loc/PKMLot/Loc/PKM Batch ManagedBatch Managed
SIP/AIP/MRP etc.SIP/AIP/MRP etc. Input is MRP, calculated Input is MRP, calculated based on customer based on customer criteria.criteria.
BO/IMAGEBO/IMAGE Business Warehouse – Business Warehouse – OLAP (drag & drop)OLAP (drag & drop)
.Prn files.Prn files Design your own report Design your own report structures.structures.
BATCH MANAGEMENTBATCH MANAGEMENT 10 DIGIT FIELD10 DIGIT FIELD
- 2 Dig. Price Lot (41,4A,CA)- 2 Dig. Price Lot (41,4A,CA)- 2 Dig. PKD A6 (A=Jan,6=2006)- 2 Dig. PKD A6 (A=Jan,6=2006)- 4 Dig. Case Config (0144, - 4 Dig. Case Config (0144,
1560)1560)- 2 Mfg Unit – 00, 01 etc.- 2 Mfg Unit – 00, 01 etc.
Material (CBU) 7 Digits = LBYA100Material (CBU) 7 Digits = LBYA100 SKU Code 5 Digits = LBYA1SKU Code 5 Digits = LBYA1 BATCH=BATCH= 41A601440141A6014401
SAP LandscapeSAP Landscape
Controlled Data Import
Responsive Promo Planning
Replenishment
Safety StockPlanning
SalesOrder
Delivery
Truck Planning
Order Confirmation
Suggested Order
SAP ICH SAP R/3
SAP PORTAL
SAP SOLUTION SETRS
Inventory, Sales
Billing Package
Orders
MTOrder Entry
Picking(WMS)
Invoicing(Depot
Commercials)
Project FusionProject Unify
CentralUnify/BIW
Orders
CSD
Orders
Others
Closing Stock
NC RSBranch
DEB
ALLOCATION PROGRAM
Order Entry
MATERIAL (CBU)MATERIAL (CBU)
Material or CBU (Customer Buying Material or CBU (Customer Buying Unit) will be 7 digit code LBYAA00Unit) will be 7 digit code LBYAA00
For CP it will be a different codeFor CP it will be a different code The material code will be same for The material code will be same for
different case configurations.different case configurations. Material code will be different in case Material code will be different in case
of Relaunch or CP.of Relaunch or CP.
STRUCTURESTRUCTUREPlant :- 3 Dig for Depot Code + 1 Dig Plant :- 3 Dig for Depot Code + 1 Dig for Companyfor Company
VICH,VICKVICH,VICK
PATH,SHAHPATH,SHAH
Storage Location :- Physical godown Storage Location :- Physical godown assigned to Plantassigned to Plant
BAN1,NBLO,9999BAN1,NBLO,9999,CRD1,CRD1
Warehouse :- 3 Dig code used earlier is Warehouse :- 3 Dig code used earlier is called Warehouse in SAPcalled Warehouse in SAP
VIC,PAT,GAU,CTKVIC,PAT,GAU,CTK
Storage Types :- Group of Bins with Storage Types :- Group of Bins with similar properties.similar properties.
RCK,OPN,SHF,DMRCK,OPN,SHF,DMG,OP1,902,916,9G,OP1,902,916,99999
Storage Section :- Fast Moving, Slow Storage Section :- Fast Moving, Slow moving, very slow moving group of moving, very slow moving group of baysbays
DT+,DTA,DTB,PP+,DT+,DTA,DTB,PP+,PPA,PPB,PPC,FBA,FPPA,PPB,PPC,FBA,FBBBB
Storage Bin/BaysStorage Bin/Bays A25-01-1, A25-01-1, A01,A05A01,A05
Organisation LevelsOrganisation Levels
WH = BANCO = H
DIFFERENT TYPE OF STOCKSDIFFERENT TYPE OF STOCKS
Blank – For unrestricted use (good Blank – For unrestricted use (good stocks)stocks)
S – For blocked stocks (damaged S – For blocked stocks (damaged stocks)stocks)
Q – For frozen stocks/Quality STocksQ – For frozen stocks/Quality STocks
FDM/SAP – Comparison at a GlanceFDM/SAP – Comparison at a Glance
FDMFDM SAPSAP
BayBay BinBin
Truck PlanningTruck Planning Create ShipementCreate Shipement
Loading SlipLoading Slip Transfer Order (TO)Transfer Order (TO)
Menu No/OptionMenu No/Option T-Code (Transaction)T-Code (Transaction)
F1 for HelpF1 for Help F4 for HelpF4 for Help
5 Digit SKU5 Digit SKU 7 Digit CBU7 Digit CBU
2 Dig Lot, 6 Dig 2 Dig Lot, 6 Dig PKM,4 Dig Loc, No PKM,4 Dig Loc, No place fac.place fac.
10 Character Batch10 Character Batch
BOM (BILL OF MATERIAL)BOM (BILL OF MATERIAL)
BOM (Bill of material) will be in place BOM (Bill of material) will be in place of Plan Code (7 Digit)of Plan Code (7 Digit)
Low BOM – This is a CP with Mother + Low BOM – This is a CP with Mother + Child combination which are not Child combination which are not packed togethr. There will be no packed togethr. There will be no inventory under Low BOMinventory under Low BOM
High BOM – This is a CP which is High BOM – This is a CP which is packed together (i.e. 3+1 offer)packed together (i.e. 3+1 offer)
WMS Structure – IM Linkage With WMWMS Structure – IM Linkage With WM
CHNH CHNK CHNI
Warehouse # CHN
Storage Bin
Storage sectionA+, A, B, C for
Dets, PP, Foods
A23-15-3 ORA01, A02 etc
rackrack shelfshelf openopen damagedamage resolutionresolution