SAP IMPLEMENTATIONLIFE CYCLE

PRIYA PANGAM

Page 2: Sap implementation by priya pangam

Enterprise resource planning

Enterprise resource planning (ERP) covers the techniques and the methods employed for the integrated management of businesses as a whole from the viewpoint of the efficient use of the management resources, to improve the efficiency of an enterprise.

ERP packages are integrated software packages that support the above ERP concepts.

Page 3: Sap implementation by priya pangam

ERP LIFE CYCLE

ERP lifecycle highlights the different stages in implementation of an ERP.

The ERP implementation project goes through the different phases of the ERP lifecycle implementation.

Page 4: Sap implementation by priya pangam

Different phases of ERP1. Pre-evaluation Screening2. Package Evaluation3. Project Planning phase4. GAP analysis5. Reengineering6. Configuration7. Implementation Team Training8. Testing9. Going Live10. End-User Training11. Post Implementation

Page 5: Sap implementation by priya pangam

Pre-selection Process

Package Evaluation

Project Planning

Gap Analysis Reengineering Configuration

Implementation Team Training

Testing End- user Training

Going Live

Post – implementation Phase

ERP implementation Life Cycle

Page 6: Sap implementation by priya pangam

Pre evaluation screening and Package Evaluation

Screening eliminates the packages that are not at all suitable for the company’s business processes and selecting package suitable for our business process.

Page 7: Sap implementation by priya pangam

Phase I

Project Preparation

Page 8: Sap implementation by priya pangam

Project Planning In this phase the implementation process is

designed.

In this phase the details of how to go about the implementation are decided.

Time schedules ,deadlines etc for the project are decided.

Roles are identified and the responsibilities are assigned.

Page 9: Sap implementation by priya pangam

Project Planning (cont….)

The implementation team members are selected and the task allocation is done.

This phase decides WHEN to begin the project, HOW to do it, and WHEN it should be completed.

This phase is usually carried out by a committee constituted of the team leaders of each implementation group.

Page 10: Sap implementation by priya pangam

Gap Analysis This is the most crucial phase in the ERP

implementation.

This is the process through which the companies create a complete model of where they are now, and in which direction will they opt in the future.

The model helps the company to anticipate and cover any functional gaps.

Page 11: Sap implementation by priya pangam

Gap Analysis (cont….)

It has been estimated that even a best ERP package, custom tailored to meet the company’s needs, meets only 80 % of the company’s functional requirements. The remaining 20 % of these requirements present problematic issues for the company’s BPR.

Page 12: Sap implementation by priya pangam

Re-engineering One of the tremendous benefits of an ERP

implementation project is that it represents an opportunity to make necessary process or workflow changes. While change is usually hard, keep the big picture in mind and embrace changes that can help you achieve breakthrough improvements.

Page 13: Sap implementation by priya pangam

Phase II

Business Blueprint

Page 14: Sap implementation by priya pangam

Business Blueprint It is detailed document of

company’s requirement along with solutions provided by consultant . As-Is, To-Be and Gap analysis is documented.

Page 15: Sap implementation by priya pangam

Phase III

Realization

Page 16: Sap implementation by priya pangam

Realization Actual customization needs are

chalked out and actual work starts.

Page 17: Sap implementation by priya pangam

Team Training Takes place along with the process of

implementation.

Company trains its employees to implement ERP first and then the smooth functioning of the ERP.

Employee becomes self sufficient to implement the software after the vendors and consultant have finished their role.

Page 18: Sap implementation by priya pangam

Phase IV

Final Preparation

Page 19: Sap implementation by priya pangam

Testing

This phase is performed to find the weak link so that it can be rectified before its implementation.

Page 20: Sap implementation by priya pangam

End User Training

In this phase the actual users of the system are identified and trained on HOW to use the system.

This training is very important because the success of the ERP system lies in the hands of the End-users.

This makes this phase very crucial.

Page 21: Sap implementation by priya pangam

Phase V

Go -Live

Page 22: Sap implementation by priya pangam

Going Live The work is complete, data conversion

is done, databases are up and running, the configuration is complete & testing is done.

The system is officially proclaimed.

Once the system is live the old system is removed and the new system is used for doing the business.

Page 23: Sap implementation by priya pangam

Post Implementation This is the maintenance phase.

Employees who are trained enough to handle problems which crops up time to time.

The post implementation will need a different set of roles and skills than those with less integrated systems.

Page 24: Sap implementation by priya pangam

Post Implementation (Cont….)

An organization can get the maximum value of these inputs if it successfully adopts and effectively uses the system.