Scenario OverviewPurpose and Benefits
Purpose This scenario covers collaboration within a corporate group where the headquarters and the
subsidiaries act as an occasional supplier between each other. Requesting Plant looks for a temporary source of supply due to Material shortage (any
material type) or lack of production capacity (finished or semi-finished product) Buyer from the requesting Plant manually requests a material transfer from another Plant. Each Plant belongs to different organization and different company code.
Benefits Automation of the collaboration between headquarters and its subsidiaries Transactional focus, providing fully integrated business processes Based on existing well-tried Best Practice Scenarios Transparent view of outstanding stock transfers, stock-in-transit Efficient Processing of intercompany stock transfers
Purpose and Benefits:
Scenario Overview Flows and key points
Process Flows and Key points:Process flows covered
Stock overview between Plants Planning overview between Plants Capacity analysis Purchase order (manually) Production Data changes Costing run BOM compare Order BOM Management Order Change Management (OCM)
Key Points Integrated collaboration between headquarters and associated subsidiaries Rapid ROI by reusing existing data exchange capabilities Built upon established SAP Best Practices Baseline package scenarios
SAP Applications Required:
Required Headquarter with SAP ECC 6.0 EhP4 with related country BAiO Baseline
Solution V1.604 installed Purchase Organization (Subsidiary 1 and 2) with the solution SAP BAiO for
Subsidiary Integration V1.604 installed with related country Baseline Solution V1.604 variant files on the same SAP ECC 6.0 EhP4 instance and client as the headquarter
Company roles involved in the process flows Purchaser Production Planner Warehouse Clerk Warehouse Manager Billing Administrator Accounts Payable Accountant
Scenario OverviewRequirements and involved roles
Business Process: Production with Intercompany Replenishment (Variant 1)
Production with Intercompany ReplenishmentStock Availability Process:
Requesting Plant checks Delivering Plant stock availability Requesting Plant creates and prints intercompany purchase order Delivering Plant creates cross company delivery Delivering Plant posts the Goods Issue (GI) and prints delivery note Requesting Plant posts the Goods Receipt (GR) Delivering Plant creates the intercompany billing Requesting Plant processes the intercompany payment
Delivering Plant(Headquarter or
Subsidiary)
Requesting Plant(Headquarter or
Subsidiary)
1Stock availability check
5Intercompany Payment
Billing4
2Intercompany Purchase Order
3aDelivery process GIGR
3b
/ /
Business Process: Production with Intercompany Replenishment (Variant 2)
Production with Intercompany ReplenishmentCapacity analysis and manufacturing Process:
Requesting Plant asks Delivering Plant Capacity Analysis Delivering Plant confirms available Capacity Requesting Plant creates and prints intercompany purchase order Delivering Plant creates and confirms production order Delivering Plant creates cross company delivery Delivering Plant posts the Goods Issue (GI) and prints delivery note Requesting Plant posts the Goods Receipt (GR) Delivering Plant creates the intercompany billing Requesting Plant processes the intercompany payment
Delivering Plant(Headquarter or
Subsidiary)
Requesting Plant(Headquarter or
Subsidiary)
1Capacity check
6Intercompany Payment
Billing5
2Intercompany Purchase Order
4aDelivery process GIGR
4b
/ /
Available Capacity1a
3Production orderand confirmation
Business Process: Production with Intercompany Replenishment (Variant 3)
Production with Intercompany ReplenishmentManufacturing Process with Production Data Changes:
Delivering Plant changes Production Data Costing Run and dispatched information by the Headquarter to Subsidiaries BOM Comparison and Costing Comparison in the Requesting Plant Requesting Plant asks Delivering Plant Capacity Analysis Delivering Plant confirms available Capacity Requesting Plant creates and prints intercompany purchase order Delivering Plant creates and confirms production order Delivering Plant creates cross company delivery and posts the Goods Issue (GI) Requesting Plant posts the Goods Receipt (GR) Delivering Plant creates the intercompany billing Requesting Plant processes the intercompany payment
Delivering Plant(Headquarter or
Subsidiary)
Requesting Plant(Headquarter or
Subsidiary)
4Capacity check
9Intercompany Payment
Billing8
5Intercompany Purchase Order
7aDelivery process GIGR
7b
/ /
Available Capacity
Production orderand confirmation
1Change Production Data
6
2Costing Run +information spread
4a
3BOM and Costing Comparison
Business Process: Production with Intercompany Replenishment (Variant 4 - Step1)
Production with Intercompany ReplenishmentManufacturing Process with Order Change Management:
Customer Request for Quotation to the Requesting Plant (not demonstrated in this scenario) Quotation Generation and acceptance (not demonstrated in this scenario) Sales Order Generation in the Delivering Plant Delivering Plant creates and releases Production Order Requesting Plant changes the initial Sales Order Delivering Plant changes the Production Order using Order Change Management Delivering Plant creates delivery to Customer and posts the Goods Issue (GI) Delivering Plant creates the intercompany billing Requesting Plant processes the intercompany payment Requesting Plant creates the Customer billing Customer processes the payment
9
Intercompany Payment
Intercompany Billing8
4Sales Order Change
7aDelivery process GIGR
7b
Requesting Plant(Headquarter or
Subsidiary)
/
Delivering Plant(Headquarter or
Subsidiary)
/
Customer
1
Request forQuotation
Sales Order 2 Order Change
Management
ProductionOrder3
5
ChangeProductionOrder and ProductionOrder Confirmation
6
Billin
g
10
11
Paym
ent
Business Process: Production with Intercompany Replenishment (Variant 4 - Step2)
Production with Intercompany ReplenishmentManufacturing Process with Order Change Management:
Customer Request for Quotation to the Requesting Plant (not covered in this scenario) Quotation Generation and acceptance (not covered in this scenario) Sales Order Generation in the Delivering Plant Order BOM Generation in the Delivering Plant Delivering Plant creates and releases Production Order Delivering Plant changes the Order BOM and the Production Order using Order Change Management Delivering Plant creates delivery to Customer and posts the Goods Issue (GI) Delivering Plant creates the intercompany billing Requesting Plant processes the intercompany payment Requesting Plant creates the Customer billing Customer processes the payment
10
8aDelivery process GIGR
8b
Requesting Plant(Headquarter or
Subsidiary)
/
Delivering Plant(Headquarter or
Subsidiary)
/
Customer
1
Request forQuotation
Sales Order 2
3
Order BOMManagement
Order ChangeManagement
ProductionOrder4
5
ChangeOrder BOM
6
ChangeProductionOrder and ProductionOrder Confirmation
7
Billin
g
11
12
Paym
ent
Intercompany Payment
Intercompany Billing9
Process Description in Detail:
Check Material stock availability
Create/Print/Send Intercompany Purchase Order
Post the Goods Receipt
Verify invoice
Process outgoing payment
RequestingPlant
Material stock available for manufactured product
Create Delivery
Pick Material on stock
Post the Goods Issue and print delivery note
Create/Send/Print Billing Document
Pro
duct
ion
wit
h Inte
rcom
pany
Reple
nis
hm
ent
-Sto
ck A
vaila
bili
ty P
roce
ss
Business Process in Detail: Production with Intercompany Replenishment (Variant 1)
/ /
DeliveringPlant
Process Description in Detail:
Request Capacity Check
Create/Print/Send Intercompany Purchase Order
Post the Goods Receipt
Verify invoice
Process outgoing payment
RequestingPlant
Check potential Capacity
Release Manufacturing Process
Confirm Manufacturing Process
Post Manufacturing Goods Receipt
Post Components Consumption Goods Issue
Create Delivery
Pick Material from stock
Post the Goods Issue and print delivery note
Create/Send/Print Billing Document
Pro
duct
ion
wit
h Inte
rcom
pany
Reple
nis
hm
ent
-M
anufa
cturi
ng P
roce
ss
Business Process in Detail: Production with Intercompany Replenishment (Variant 2)
/ /
DeliveringPlant
Process Description in Detail:
BOM and Costing Comparison
Request Capacity Check
Create/Print/Send Intercompany Purchase Order
Post the Goods Receipt
Verify invoice
Process outgoing payment
RequestingPlant
Change Production Data
Costing Run + information spread
Check potential Capacity
Release Manufacturing Process
Confirm Manufacturing Process
Post Manufacturing Goods Receipt
Post Components Consumption Goods Issue
Create Delivery
Pick Material from stock
Post the Goods Issue and print delivery note
Create/Send/Print Billing Document
Pro
duct
ion
wit
h Inte
rcom
pany
Reple
nis
hm
ent
-M
anufa
cturi
ng P
roce
ss w
ith
Pro
duct
ion
Data
Changes
Business Process in Detail: Production with Intercompany Replenishment (Variant 3)
/ /
DeliveringPlant
Process Description in Detail:
Quotation
Sales Order Creation
Sales Order Change
Verify invoice
Create/Send/Print Billing Document
Process outgoing payment
RequestingPlant
Release Manufacturing Process
Setting Order Change Management
Change Production Order
Post Manufacturing Goods Receipt
Post Components Consumption Goods Issue
Create Delivery
Pick Material from stock
Post the Goods Issue and print delivery note
Create/Send/Print Billing Document
Pro
duct
ion
wit
h Inte
rcom
pany
Reple
nis
hm
ent
-M
anufa
cturi
ng P
roce
ss w
ith
Ord
er
Chan
ge M
anagem
ent
wit
hout
Ord
er
BO
M
Business Process in Detail: Production with Intercompany Replenishment (Variant 4 - Step1)
/ /
DeliveringPlant
Request for Quotation
Requirements Change
Post the Goods Receipt
Verify invoice
Process outgoing payment
Customer
Process Description in Detail:
Quotation
Sales Order Creation
Verify invoice
Create/Send/Print Billing Document
Process outgoing payment
RequestingPlant
Order BOM Management
Release Manufacturing Process
Change Order BOM
Setting Order Change Management
Change Production Order
Post Manufacturing Goods Receipt
Post Components Consumption Goods Issue
Create Delivery
Pick Material from stock
Post the Goods Issue and print delivery note
Create/Send/Print Billing Document
Business Process in Detail: Production with Intercompany Replenishment (Variant 4 - Step2)
/ /
DeliveringPlant
Request for Quotation
Post the Goods Receipt
Verify invoice
Process outgoing payment
Customer
Pro
duct
ion
wit
h Inte
rcom
pany
Reple
nis
hm
ent
-M
anufa
cturi
ng P
roce
ss w
ith
Ord
er
Chan
ge M
anagem
ent
wit
h
Ord
er
BO
M
Process Flow Diagram (Variant 1)Production with Intercompany ReplenishmentStock Availability Process
Pu
rch
aser
Req
ues
tin
g P
lan
t
War
eho
use
C
lerk
D
eliv
erin
g
Pla
nt
Create/Print/Send Intercompany
Purchase Order
Requesting Plant Receives
Purchase Order
Pick Material
from Stock
Ship Material to Requesting
Plant
Requesting Delivering
Plant Invoice
Missing Parts in Requesting Plant
Manufacturing
Acc
ou
nts
P
aya
ble
A
cco
un
tan
t
Eve
nt
Invoice Receipt and Payment
Sales from local stock
(B22)
Informs the Warehouse
Manager
Pro
du
ctio
n
Su
per
viso
rR
equ
esti
ng
Pla
nt
Check Stock availability in
Delivering Plant
War
eho
use
C
lerk
R
equ
esti
ng
P
lan
t
War
eho
use
M
anag
er
Del
iver
ing
P
lan
t
Create Delivery Note from
Intercompany PO
Goods Receiptand StockMaterial
Informs the Warehouse
Clerk
Process Flow Diagram (Variant 2)Production with Intercompany ReplenishmentManufacturing Process
Pu
rch
aser
R
equ
esti
ng
Pla
nt
War
eho
use
C
lerk
D
eliv
erin
g
Pla
nt
Create/Print/Send Intercompany
Purchase Order
Requesting Plant Receives
Purchase Order
Pick Material
from Stock
Ship Material to Requesting
Plant
Requesting Delivering
Plant Invoice
Missing Parts or lack of
Production in Requesting Plant
Manufacturing
Acc
ou
nts
P
aya
ble
A
cco
un
tan
t
Eve
nt
Invoice Receipt and Payment
Sales from local stock
(B22)
Informs the Production Supervisor
Pro
du
ctio
n
Su
per
viso
rD
eliv
erin
g
Pla
nt Check Potential
Capacity in Delivering Plant
War
eho
use
C
lerk
R
equ
esti
ng
P
lan
t
War
eho
use
M
anag
er
Del
iver
ing
P
lan
t
Create Delivery Note from
Intercompany PO
Goods Receiptand StockMaterial
Informs the Warehouse
Manager
Release Manufacturing
Process in Delivering Plant
Informs the Warehouse
Clerk
Confirm Manufacturing
Process + Goods Receipt
Process Flow Diagram (Variant 3) - (I)Production with Intercompany ReplenishmentManufacturing Process with Production Data Change
En
terp
rise
C
on
tro
ller
Del
iver
ing
P
lan
t
Costing Run
Enterprise Controller
Information
New Product Introduction
Eve
nt
En
gin
eeri
ng
S
pec
ialis
tD
eliv
erin
g
Pla
nt
Change Production Data
Headquarter Information
Asynchronous Flow Prerequisite
Hea
dq
uar
ter
New Validated Manufacturing
Reference
Process Flow Diagram (Variant 3) - (II)Production with Intercompany ReplenishmentManufacturing Process with Production Data Change
Pu
rch
aser
R
equ
esti
ng
Pla
nt
War
eho
use
C
lerk
D
eliv
erin
g
Pla
nt
Create/Print/Send Intercompany
Purchase Order
Requesting Plant Receives
Purchase Order
Pick Material
from Stock
Ship Material to Requesting
Plant
Requesting Delivering
Plant Invoice
Missing Parts or lack of
Production in Requesting Plant
Manufacturing
Acc
ou
nts
P
aya
ble
A
cco
un
tan
t
Eve
nt
Invoice Receipt and Payment
Sales from local stock
(B22)
Informs the Production Supervisor
Pro
du
ctio
n
Su
per
viso
rD
eliv
erin
g
Pla
nt Check Potential
Capacity in Delivering Plant
War
eho
use
C
lerk
R
equ
esti
ng
P
lan
t
War
eho
use
M
anag
er
Del
iver
ing
P
lan
t
Create Delivery Note from
Intercompany PO
Goods Receiptand StockMaterial
Informs the Warehouse
Manager
Release Manufacturing
Process in Delivering Plant
Informs the Warehouse
Clerk
Confirm Manufacturing
Process + Goods Receipt
Process Flow Diagram (Variant 4 - Option1) - (I)Production with Intercompany ReplenishmentManufacturing Process with Order Change Management without Order BOM
Cu
sto
mer
Requesting Plant Receives
Request for QuotationE
ven
t Informs the Production Supervisor
Pro
du
ctio
n
Su
per
viso
rD
eliv
erin
g
Pla
nt
Informs the Warehouse Department
Release Manufacturing
Process in Delivering Plant
Sal
es
Dep
artm
en
t
Request for Quotation
After Approval Sales Order
Creation
En
gin
eeri
ng
S
pec
ialis
tD
eliv
erin
g
Pla
nt
Sales Order Change
Set Order Change Management
Change Production Order
Customer Request for
Change
Confirm Manufacturing
Process + Goods Receipt
Manufacturing Flow with OCM …
Process Flow Diagram (Variant 4 - Option1) - (II)Production with Intercompany ReplenishmentManufacturing Process with Order Change Management without Order BOM
Pick Material
from Stock
Acc
ou
nts
P
aya
ble
A
cco
un
tan
t
Eve
nt
Invoice Receipt and
Intercompany Payment
Sales from central stock
(B21)
War
eho
use
C
lerk
R
equ
esti
ng
P
lan
t
War
eho
use
D
epar
tmen
t D
eliv
erin
g
Pla
nt
Create Delivery Note from
IntercompanySales Order
Informs the Warehouse
Manager
Informs the Warehouse
Clerk
Cu
sto
mer
Goods Receiptand StockMaterial
Ship Material to Customer
Requesting Delivering
Plant Invoice
Requesting Customer
Invoice
Invoice Receipt and Customer
Payment
… Delivery Flow
Process Flow Diagram (Variant 4 - Option2) - (I)Production with Intercompany ReplenishmentManufacturing Process with Order Change Management with Order BOM
Cu
sto
mer
Requesting Plant Receives
Request for QuotationE
ven
t Informs the Production Supervisor
Pro
du
ctio
n
Su
per
viso
rD
eliv
erin
g
Pla
nt
Informs the Engineering
Specialist
Informs the Warehouse Department
Release Manufacturing
Process in Delivering Plant
Sal
es
Dep
artm
en
t
Request for Quotation
After Approval Sales Order
Creation
En
gin
eeri
ng
S
pec
ialis
tD
eliv
erin
g
Pla
nt
Order BOM Creation
Set Order Change Management
Change Production Order
Order BOM Change
Engineering Specialist
Request for Change
Confirm Manufacturing
Process + Goods Receipt
Manufacturing Flow with OCM …
Process Flow Diagram (Variant 4 - Option2) - (II)Production with Intercompany ReplenishmentManufacturing Process with Order Change Management with Order BOM
Pick Material
from Stock
Acc
ou
nts
P
aya
ble
A
cco
un
tan
t
Eve
nt
Invoice Receipt and
Intercompany Payment
Sales from central stock
(B21)
War
eho
use
C
lerk
R
equ
esti
ng
P
lan
t
War
eho
use
D
epar
tmen
t D
eliv
erin
g
Pla
nt
Create Delivery Note from
IntercompanySales Order
Informs the Warehouse
Manager
Informs the Warehouse
Clerk
Cu
sto
mer
Goods Receiptand StockMaterial
Ship Material to Customer
Requesting Delivering
Plant Invoice
Requesting Customer
Invoice
Invoice Receipt and Customer
Payment
… Delivery Flow
© SAP 2009 / Page 23
Legend
Symbol Description Usage Comments
Band: Identifies a user role, such as Accounts Payable Clerk or Sales Representative. This band can also identify an organization unit or group, rather than a specific role.
The other process flow symbols in this table go into these rows. You have as many rows as required to cover all of the roles in the scenario.
Role band contains tasks common to that role.
External Events: Contains events that start or end the scenario, or influence the course of events in the scenario.
Flow line (solid): Line indicates the normal sequence of steps and direction of flow in the scenario.Flow line (dashed): Line indicates flow to infrequently-used or conditional tasks in a scenario. Line can also lead to documents involved in the process flow.
Connects two tasks in a scenario process or a non-step event
Business Activity / Event: Identifies an action that either leads into or out of the scenario, or an outside Process that happens during the scenario
Does not correspond to a task step in the document
Unit Process: Identifies a task that is covered in a step-by-step manner in the scenario
Corresponds to a task step in the document
Process Reference: If the scenario references another scenario in total, put the scenario number and name here.
Corresponds to a task step in the document
Sub-Process Reference: If the scenario references another scenario in part, put the scenario number, name, and the step numbers from that scenario here
Corresponds to a task step in the document
Process Decision: Identifies a decision / branching point, signifying a choice to be made by the end user. Lines represent different choices emerging from different parts of the diamond.
Does not usually correspond to a task step in the document; Reflects a choice to be made after step execution
Symbol Description Usage Comments
To next / From last Diagram: Leads to the next / previous page of the Diagram
Flow chart continues on the next / previous page
Hardcopy / Document: Identifies a printed document, report, or form
Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines
Financial Actuals: Indicates a financial posting document
Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines
Budget Planning: Indicates a budget planning document
Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines
Manual Process: Covers a task that is manually done
Does not generally correspond to a task step in a document; instead, it is used to reflect a task that is manually performed, such as unloading a truck in the warehouse, which affects the process flow.
Existing Version / Data: This block covers data that feeds in from an external process
Does not generally correspond to a task step in a document; instead, this shape reflects data coming from an external source; this step does not have any incoming flow lines
System Pass / Fail Decision: This block covers an automatic decision made by the software
Does not generally correspond to a task step in the document; instead it is used to reflect an automatic decision by the system that is made after a step has been executed.
<F
unct
ion>
Ext
erna
l to
SA
P
Business Activity /
Event
Unit Process
Process Reference
Sub-Process
Reference
Process
Decision
Diagram Connection
Hardcopy / Document
Financial Actuals
Budget Planning
Manual Proces
s
Existing Version /
Data
System Pass/F
ail Decisio
n
© 2010 SAP AG. All rights reserved.
No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice.
Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.
Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.
IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, System z10, System z9, z10, z9, iSeries, pSeries, xSeries, zSeries, eServer, z/VM, z/OS, i5/OS, S/390, OS/390, OS/400, AS/400, S/390 Parallel Enterprise Server, PowerVM, Power Architecture, POWER6+, POWER6, POWER5+, POWER5, POWER, OpenPower, PowerPC, BatchPipes, BladeCenter, System Storage, GPFS, HACMP, RETAIN, DB2 Connect, RACF, Redbooks, OS/2, Parallel Sysplex, MVS/ESA, AIX, Intelligent Miner, WebSphere, Netfinity, Tivoli and Informix are trademarks or registered trademarks of IBM Corporation.
Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or other countries.
Oracle is a registered trademark of Oracle Corporation.
UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.
Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc.
HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology.
Java is a registered trademark of Sun Microsystems, Inc.
JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.
SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, Clear Enterprise, SAP BusinessObjects Explorer, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries.
Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP France in the United States and in other countries.
All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.
The information in this document is proprietary to SAP. No part of this document may be reproduced, copied, or transmitted in any form or for any purpose without the express prior written permission of SAP AG.
This document is a preliminary version and not subject to your license agreement or any other agreement with SAP. This document contains only intended strategies, developments, and functionalities of the SAP® product and is not intended to be binding upon SAP to any particular course of business, product strategy, and/or development. Please note that this document is subject to change and may be changed by SAP at any time without notice.
SAP assumes no responsibility for errors or omissions in this document. SAP does not warrant the accuracy or completeness of the information, text, graphics, links, or other items contained within this material. This document is provided without a warranty of any kind, either express or implied, including but not limited to the implied warranties of merchantability, fitness for a particular purpose, or non-infringement.
SAP shall have no liability for damages of any kind including without limitation direct, special, indirect, or consequential damages that may result from the use of these materials. This limitation shall not apply in cases of intent or gross negligence.
The statutory liability for personal injury and defective products is not affected. SAP has no control over the information that you may access through the use of hot links contained in these materials and does not endorse your use of third-party Web pages nor provide any warranty whatsoever relating to third-party Web pages.