Terminal 3 West Modernization Project March 4 , 2019 SAN FRANCISCO INTERNATIONAL AIRPORT CIVIC DESIGN REVIEW - CONCEPT PHASE
Terminal 3 West Modernization Project
March 4 , 2019
SAN FRANCISCO INTERNATIONAL AIRPORT
CIVIC DESIGN REVIEW - CONCEPT PHASE
SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN
March 4, 2019 2
TERMINAL 3 WEST
US 101
INTERNATIONALTERMINAL
TERMINAL 1
TERMINAL 2
TERMINAL 3
Project SiteTerminal 3 West
SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN
March 4, 2019 3
Project Site + Airside Context
A. INTERNATIONAL TERMINAL ‘G’
B. BOARDING AREA ‘E’
C. EXISTING FACADE
INTERNATIONAL TERMINAL
BOARDING AREA F
BOARDING AREA E
TERMINAL 3 EAST
TERMINAL 3 WEST
B
A
C
SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN
March 4, 2019 4
Terminal 3 East / Boarding Area ‘E’ Airside Architecture
TERMINAL 3 EAST TYPICAL WINDOW WALL DETAIL / DELUGE CONCEALMENT
MECHANICAL PENTHOUSE CLADDING BOARDING AREA ‘E’
SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN
March 4, 2019 5
Project Goals
Seismic Retrofit Upgrade Systems International Operations
• Increase international operational flexibility by providing 3 wide-body and 4 narrow-body swing gates and creating an FIS connection to the customs inspection area in the International Terminal.
• Implement a world-class concessions program and increase revenue generation.
• Complement the exceptional Boarding Area E and Terminal 3 East passenger experience and create unique moments of surprise and delight.
• Upgrade and/or replace building systems deemed to be at the end of their life in order to improve operational functionality, reliability, and efficiency.
• Mostly in Pre Security Area (Landside)
• Provide seismic retrofit to Terminal 3 West and F-Connector.
1 2 3 4Passenger Experience and Revenue Generation
SCOPE AREA
SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN
March 4, 2019 6
Existing Condition
International Terminal - Boarding Area G (ITB - BAG)
Boarding Area E (BAE)
Terminal 3 East (T3E)
International Terminal (ITB) Secure Connector
LANDSIDE
AIRSIDE
Boarding Area F
Terminal 3 West (T3W)
NEW SCOPE AREA
NEW GATEHOUSES
T3 WEST GATE TABULATION
EXISTING GATES
PROPOSED GATES
NARROW WIDE
5 0
4 3
SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN
March 4, 2019 7
Aircraft Parking / Gates
International Terminal - Boarding Area G (ITB - BAG)
Boarding Area E (BAE)
LANDSIDE
AIRSIDE
Terminal 3 East (T3E)
Boarding Area F
Terminal 3 West (T3W)
Federal Inspection Services (FIS) Bridge
International Terminal (ITB) Secure Connector
SCOPE AREA
NEW GATEHOUSES
SECURITY (NOT IN SCOPE)
GATE LOUNGE
CONCOURSE
NOT IN SCOPE
SECURITY LINE
SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN
March 4, 2019 8
Proposed Plan
Boarding Area F
International Terminal - Boarding Area G (ITB - BAG)
Boarding Area E (BAE)
Terminal 3 East (T3E)
Federal Inspection Services (FIS) Bridge
International Terminal (ITB) Secure Connector
LANDSIDE
SECURITY
SEC
UR
ITY
AIRSIDE
Terminal 3 West (T3W)
NEW GATEHOUSES
SCOPE AREA
STRUCTURAL BUTTRESS
TERMINAL 3 EAST SEISMIC SUPPORT
The new structural addition ties directly to the existing structure, providing seismic strengthen-ing and contributing significantly to the seismic retrofit of the existing Terminal 3 West structure.
This is similar to the structural strategy executed in Terminal 3 East.
SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN
March 4, 2019 9
STRU
CTU
RAL
CO
NC
EPT
DIA
GRA
M
Seismic Support
International Terminal - Boarding Area G (ITB - BAG)
Boarding Area E (BAE)
Terminal 3 East (T3E)
AIRSIDE
LANDSIDE
Boarding Area F
Federal Inspection Services (FIS) Bridge
International Terminal (ITB) Connector
Terminal 3 West (T3W)
14'-0
"4'
-0"
10'-0
"3'
-6"
FISCORRIDOR
GATELOUNGE
36'-8"21'-0"18'-0"4'-0"
MAT
CH
T3
EAST
23'-4
"
FISRESTROOM
SEISMIC SUPPORT
Conceptual Section
FIS CORRIDOR
GATE LOUNGE DEPARTURES LEVEL
SUPPORT
SECURITY CHECK-IN
MEZZANINE
MECH PENTHOUSE
SUPPORT
LANDSIDEAIRSIDE
EXISTING CONSTRUCTION
NEW CONSTRUCTION
ARRIVALS LEVEL
EXISTING TO BE DEMOLISHED
SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN
March 4, 2019 10
Existing Mechanical Penthouses
SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN
March 4, 2019 11
Existing Massing
Boarding Area F
Terminal 3 East
Existing Mechanical Penthouse
AIRSIDE
LANDSIDE
TERMINAL 3 WEST
Existing Mechanical Penthouse
New Mechanical Penthouses
SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN
March 4, 2019 12
Proposed Massing
AIRSIDE
LANDSIDE
(N) Gatehouse
(N) Gatehouse
(N) Gatehouse
TERMINAL 3 WEST
Boarding Area F
SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN
March 4, 2019 13
Mechanical Penthouse
New Mechanical Penthouses
NEW FACADE SURFACE
PERIOD OF DAY W/ DIRECT SUN
SAN FRANCISCO INTERNATIONAL AIRPORT TERMINAL 3 WEST | Turner | Gensler | TEF CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN
March 4, 2019 14
6:19 PM March 206:14 AM
4:30 PM
W
S
E
N
4:52 PM
December 21
7:22 AM
4:00 PM
W
S
E
N
• Maximum period of time with direct sun• Sun impacts area for most of the afternoon
7:32 PM
June 21
4:49 AM
2:30 PM
W
S
E
N
7:32 PM (SUNSET)4:49 AM (SUNRISE)
7 PM
12 PM
9 AM
3 PM
1 PM
Altitude: 16 deg.
Altitude: 68 deg.
4:52 PM (SUNSET)
4:00 PM
12 PM
9 AM
7:22 AM(SUNRISE)
2:45 PM
Altitude: 8 deg.
• Minimal period of time with direct sun• Sun mainly impacts area during late afternoon
Altitude: 32 deg.
12 PM
3 PM
4:30 PM
6:19 PM (SUNSET)
9 AM
6:14 AM (SUNRISE)
• Sun impacts area from mid-afternoon to early evening
WINTER SOLSTICEDECEMBER 21
WEST FACADE SOLAR EXPOSURE 2:45 PM - 4:52 PM
EAST FACADE SOLAR EXPOSURENONE
SUMMER SOLSTICEJUNE 21
WEST FACADE SOLAR EXPOSURE 1 PM - 7:32 PM
EAST FACADE SOLAR EXPOSURE4:49 AM - 9 AM
SPRING / FALL EQUINOXMARCH 20 / SEPTEMBER 23
WEST FACADE SOLAR EXPOSURE 2 PM - 6:19 PM
EAST FACADE SOLAR EXPOSURE6:14 AM - 8 AM
Solar Analysis