A 2015.01.12 W.H. JUNG H. LEE D.K. JI FOR APPROVAL Rev Date Prepared Checked Approved Details of Revision Owner Contractor Sub-Supplier Project RUTENBERG POWER STATION UNIT 1 & 2 FGD WASTE WATER TREATMENT SYSTEM PC S09091 UAS Code DD03 Date Name Scale Unit Code 12 Prepared Title PACKING PROCEDURE FOR WWTP KKS Code HTQ Checked Reg. No. 540800 Approved Rev. A Dept. Document No. S09091-DD03-12-HTQ-540800 Page-No. 1 of 28 FOR APPROVAL THE ISRAEL ELECTRIC CORPORATION LTD. SAMYANG ENTECH CO., LTD.