Top Banner
©Samways Building & Construction Pty Limited SAMWAYS BUILDING & CONSTRUCTION Sub-contractors Manual
13

SAMWAYS BUILDING & CONSTRUCTION Sub-contractors Manual · contractors. You are also responsible for ensuring that whilst you are undertaking the work activity for which you are engaged

Oct 10, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SAMWAYS BUILDING & CONSTRUCTION Sub-contractors Manual · contractors. You are also responsible for ensuring that whilst you are undertaking the work activity for which you are engaged

©SamwaysBuilding&ConstructionPtyLimited

SAMWAYSBUILDING&CONSTRUCTIONSub-contractorsManual

Page 2: SAMWAYS BUILDING & CONSTRUCTION Sub-contractors Manual · contractors. You are also responsible for ensuring that whilst you are undertaking the work activity for which you are engaged

PD-048SubcontractorManual.docx 2Rev627/02/2018

TableofContents1. INTRODUCTION..............................................................................................................................32. SAMWAYSTOTALQUALITYMANAGEMENTPOLICY(TQM)..........................................................33. SITESPECIFICINDUCTIONS............................................................................................................44. SUB-CONTRACTORSRESPONSIBILITIES..........................................................................................55. INSURANCESANDPRE-APPROVAL................................................................................................56. GENERALSITEREQUIREMENTS&CONDITIONS............................................................................57. SITESPECIFICRESPONSIBILITIES....................................................................................................78. OHSTARGETS.................................................................................................................................79. SITERULES.....................................................................................................................................7

A. Amenities&Telecommunications.........................................................................................7B. Alcohol&Drugs.....................................................................................................................7C. ClearancetoWork.................................................................................................................7D. EmergencyProcedures..........................................................................................................8E. Emissions...............................................................................................................................8F. FatigueManagement.............................................................................................................8G. FirstAidandMedicalTreatment...........................................................................................8H. HazardNotification................................................................................................................8I. HazardousSubstancesandMSDS........................................................................................10J. Housekeeping......................................................................................................................10K. LaddersandEWP.................................................................................................................10L. ManualHandling..................................................................................................................10M. Pedestrians..........................................................................................................................10N. PersonalProtectiveEquipment...........................................................................................10O. PowerSupply.......................................................................................................................11P. ReportingIncidentsandInjuries..........................................................................................11Q. SafetySignsandEquipment................................................................................................11R. SecuringWorkAreas............................................................................................................11S. Smoking...............................................................................................................................11T. Tools,EquipmentandPlantSafety......................................................................................11

a. General......................................................................................................................11b. ElectricalEquipmentandElectricalWork..................................................................12c. DangerousTools........................................................................................................12d. MobileEquipment.....................................................................................................12e. CompressedAir.........................................................................................................12

U. VehiclesandPlant(ExternaltoHoardedArea)...................................................................12V. WasteTreatment.................................................................................................................13W. BeforeYouStartWorkEachShift........................................................................................13

Page 3: SAMWAYS BUILDING & CONSTRUCTION Sub-contractors Manual · contractors. You are also responsible for ensuring that whilst you are undertaking the work activity for which you are engaged

PD-048SubcontractorManual.docx 3Rev627/02/2018

1. INTRODUCTION

TheSub-ContractorsManualisintendedforusebySub-Contractors.Thisguideoutlinesourrequirements,conditionsandexpectationsofcontactors.Youmustalsoensurethatthisdocumentanditscontentswillbecommunicatedandunderstoodbyallyouremployeesandsub-contractors.ThisManualisnotintendedtoreplacetheSamwaysSiteSafetyManagementPlan,whichisavailableforyourinspectiononsiteor,byrequest.Acopymaybeforwardedtoyouatthebeginningoftheproject.TheWorkHealthandSafetyAct2011placesaresponsibilityuponanemployertoprovidetrainingtoemployeessufficientforthemtodotheirjobswithoutrisktothehealthandsafetyofthemselvesandothers.Withinthesystem,safeworkmethodstatementsshouldexistdescribingtheaspectsofthetaskthathastobedone.Theyshouldhavebeenread,understoodandsignedbyemployeesbeforecommencingworkonoursite.Aspartofthecontractconditions,sub-contractorsandtheiremployeesarerequiredtoparticipateinasite-specificinduction.

2. SAMWAYSTOTALQUALITYMANAGEMENTPOLICY(TQM)

Samwaysiscommittedtounderstandingtheneedsandexpectationsofitskeyinterestedpartiesincluding:management,employees,contractors,clientsandthecommunity,inrelationtohealth,safetyandqualitymanagement.Samwaysdoesthisthroughcommitmenttosatisfyingallapplicablerequirementsincludingrelevantlegislationandtothecontinualdevelopmentandimprovementofitsmanagementsystem.

Samwaysmanagementsystemaddressescontrolofoperationalactivitiesandincludesmechanismsforhigh-levelreviewtoensurethesystemremainseffective.TopmanagementisaccountabletoensurethatSamwayshasadequateresourcestomeetitsobligationsandensuresustainablebusinesssuccess.ThisapproachenablesSamwaystominimiseriskandmaximiseopportunities,whilestrivingtoachieveandmaintainsustainableindustrybestpracticeintheareasofquality,health,safetyandenvironment.

Page 4: SAMWAYS BUILDING & CONSTRUCTION Sub-contractors Manual · contractors. You are also responsible for ensuring that whilst you are undertaking the work activity for which you are engaged

PD-048SubcontractorManual.docx 4Rev627/02/2018

AllemployeesandotherrelevantinterestedpartiesareexpectedtounderstandthispolicyandsupportitsimplementationandapplicationthroughoutallofSamwaysactivities.

• Theinterestsofallstakeholdersneedtobeconsidered.• Integrityandqualityarebasicfundamentalrequirementsofourbusiness.• Effectivehealth,safetyandenvironmentalpoliciesareacriticaltosustainablemanagement.• Noactivityperformedissoimportantthatriskofinjurytopeopleordamagetotheenvironmentis

justified.• Allreasonablyforeseeableaccidentsandincidentsarepreventable.

SamwaysValues

• OpennessandRespect–Wevalueourclientsandstaffandaimtobuildtrustandlong–termrelationships.

• Integrity–Wemakedependablechoicesanddecisions,whicharesoundandconsistentwithyethicalpractices.Wedeliveronourcommitmentsandhaveatrustworthyreputation.

• ResultsDrivenandEfficient–WearepersonallyaccountableforourindividualandcollectivecontributionstothesuccessofSamways.Weaimtoachieveourclient'spurpose/missionandstrategicplansbyfocusingontheprioritiesandactionsthatdeliverthedesiredresults.

• Service-Wetreateveryoneaswewishtobetreatedandfocusatalltimeonanticipatingthefuturetrendsandneedsofourclients.WeprovidequalityservicesthatcanonlybeachievedthroughSamwaysteamwork.

SamwaysObjectives

SamwayssetsWHSandqualitymanagementsystemobjectivesusingthefollowingframework:

• ClientServices:toprovidequality,costeffectiveservicetomeettheexpectationsofourstakeholders.

• OurPeople:ToattractandretainemployeeswhoarecompetentandmotivatedtodeliverourservicesToincreasetheskilllevelofstaffandalsoensuretheyareadequatelyremunerated.

• Operations&Administration:Toensurethatweprovidethemosteffectivefacilitiesandsystemsfortheprovisionofservicestoourclients,

• FinanceandBusinessPerformance:Toremainfinanciallyviableandtoensuretheachievementofourclientandbusinessgoals.

DetailedobjectivesaresetoutinDocumentAD-059,whichcanbeobtainedfromSeniorManagement.

John SamwaysJuly2017

3. SITESPECIFICINDUCTIONS

Siteinductionswillbecarriedoutbythenominatedsitesupervisor.TheaimofasiteinductionistoprovideparticipantswithknowledgeofQHSEissuesandsafeworkpracticesspecifictothisparticular

Page 5: SAMWAYS BUILDING & CONSTRUCTION Sub-contractors Manual · contractors. You are also responsible for ensuring that whilst you are undertaking the work activity for which you are engaged

PD-048SubcontractorManual.docx 5Rev627/02/2018

site.ItwillalsofamiliarisepersonsonthissitewithrulesandproceduresforQHSEandemergencymanagement.Yourinductionwillcover:• Anysitespecifichazardsandriskcontrolmeasuresinvolvedincarryingouttheworksidentifiedby

theriskassessmentprocess.• AnyregulatoryrequirementsorCodesofpracticerelevanttoanysitespecifichazards• Siteorientation,includingsafeaccess/egress,locationofamenities,firstaid&security

requirements.• Sitespecificsafetyrulesorproceduresincludingnotificationofchangestotheworksite.• Onsiteconsultationandreportingarrangementsanddetailsofauthorisedpersonnel.• Accidentemergencyandevacuationproceduresandassociatedequipmentonsite.

4. SUB-CONTRACTORSRESPONSIBILITIES

Asasub-contractoryouareresponsibleforyoursafetyandthatofyouremployeesandsub-contractors.Youarealsoresponsibleforensuringthatwhilstyouareundertakingtheworkactivityforwhichyouareengagedyoudonotexposeanyotherpersonstounacceptablelevelsofrisk.

Additionally,you,youremployeesandsub-contractorsmustensure:

• TheyunderstandandcomplywiththerequirementsofthisManual.• ThatGeneralInductionCardsareavailableforinspectionatalltimeswhilstworkingonsite.• Thatthesafetyinformationisreceivedandunderstood.• Allstaffsaretrainedfortheactivitytheyundertakeandhavehadtaskspecificinduction.• Theyareappropriatelyqualified,competentorlicensedtocarryouttheactivities.• SafeWorkMethodStatementsandMaterialSafetyDataSheetsaresuppliedtothesitesupervisor.• Allstaffsigninandsignouttheregistersprovidedatthebeginningandattheendofeveryshift.• Compliancewithall‘clientspecific’requirements.

5. INSURANCESANDPRE-APPROVAL

Youandyouremployeeswillonlybepermittedtocarryoutworkwhenyouhavecompletedthepre-approvalprocesswhichincludesprovidingevidenceofspecificinsurancesandlicences.Youwillhavereceivedwrittenconfirmationofthisapproval.Ifyouarenotpre-approvedpleasenotifyusimmediately.

6. GENERALSITEREQUIREMENTS&CONDITIONS

• Children,visitorsandanimalsarestrictlynotpermitted.• ONLYusedesignated‘Entry’and‘Exit’points.• Allemployeesmustsigninandoutoftheattendanceregister.• Allcontractorsaretousethedesignatedamenities.• Client’sequipment,fixtures,fittingsorproductpackagingmustnotbeusedunderany

circumstances.

Page 6: SAMWAYS BUILDING & CONSTRUCTION Sub-contractors Manual · contractors. You are also responsible for ensuring that whilst you are undertaking the work activity for which you are engaged

PD-048SubcontractorManual.docx 6Rev627/02/2018

Page 7: SAMWAYS BUILDING & CONSTRUCTION Sub-contractors Manual · contractors. You are also responsible for ensuring that whilst you are undertaking the work activity for which you are engaged

PD-048SubcontractorManual.docx 7Rev627/02/2018

7. SITESPECIFICRESPONSIBILITIES

SAMWAYSAlllevelsofmanagementarerequiredtoensurethatcompanypoliciesandtheOH&SMSareeffectivelyimplementedintheirareaofcontrol.Eachmanager,associateandteammembermustdischargeresponsibilityinacoordinatedmanner.CONTRACTORSContractors&Sub-contractorsengagedtoworkforusarerequiredaspartoftheircontract,tocomplywithourTQMpolicy;procedures;thesitesafetymanagementplanandthismanual.Allworksaretobecarriedoutinaccordancewithapplicablelegislation,observingdirectionsonhealthandsafetymattersfromsupervisors,employeesorofficers.Failuretocomplywiththesedirectionswouldresultindisciplinaryactionandcouldbeconsideredabreachofthecontractandsufficientgroundstoterminatethecontract.

8. OHSTARGETS

• LessthanthreelosttimeInjuriesperannum.• Lessthantennon-conformancesperannum.• Monitorthepre-selectionchecklistcriteriaforemployeesandsub-contractorstoensure

compliancewithchangestoWHSLegislation.• Monitorriskassessmentsandsafeworkmethodstatementsandactivitiesonsiteandensurethat

allhazardsarebeingidentified.

9. SITERULES

A. Amenities&TelecommunicationsRefertothenominatedSiteManagerregardingtheuseofsiteamenitiesincludingStafflunchroom,toilet/showerfacilitiesetc.

B. Alcohol&DrugsDonotbringalcoholandnon-prescriptiondrugson-siteDonotenterthesitewhilstundertheinfluenceofalcoholordrugs.

C. ClearancetoWorkCertainworkactivitywillnormallyrequirespecialauthorizationandClearanceprocedurestobefollowedbeforeworkcommences,thismayinclude:

Page 8: SAMWAYS BUILDING & CONSTRUCTION Sub-contractors Manual · contractors. You are also responsible for ensuring that whilst you are undertaking the work activity for which you are engaged

PD-048SubcontractorManual.docx 8Rev627/02/2018

a) Workinvolving,gas,electricalormechanicalenergy,requiringIsolation/lockoutequipment,taggingandisolationdevices.

b) Hotworkinvolvingwelding,grinding,cuttingortheintroductionofignitionsources.c) Confinedspaceentryincludingentryintovessels,silos,pits,trenches,pipes,etc.d) Workataheightabove2metres,onroofs,scaffoldingorladders.e) Workwiththepotentialtoadverselyimpactonnormaloperationalactivities.

D. EmergencyProcedures

Intheeventofanemergency,suchasfire,contractorsandsubcontractorsmust:• Upontheevacuationsignal,stopworkimmediately,shutdownanyequipmentyouare

usingandwalktotheappropriateassemblyarea;• Ifafirestartsinyourworkarea,immediatelyaskournominatedsupervisortoraisethe

alarm(ifnotsafetouseanapprovedextinguisher);• ComplywithanyinstructionsgivenbythenominatedSiteManager;• Donotreturntoworkuntiladvisedtodoso;• Theemergencyproceduresincorporateanyoftheclient’sproceduresdisclosedinthesite

specificinformationattachedtotheSiteSafetyManagementPlan;• Ensureyouarefamiliarwiththespecificsiteemergencyexits.

E. EmissionsSub-Contractorsmust:• ReportaccidentalspillsimmediatelytothenominatedSiteManager.• Containandcleanupallliquidspillsusingsuitablemethods,andreporttothenominated

SiteManager.• Alwaysminimisenoiselevels,andobeystatutoryrequirementsfornoiseemissions.

F. FatigueManagement

Shiftwork,especiallythatinvolvingnightshift,canaffectthehumanbody.Fatiguecanresult.SubcontractorsareadvisedtoreportfatiguetotheSiteSupervisorwhetherornotsuchfatiguehasoccurredasaresultofworkingonthisspecificsite.TheSiteSupervisorwillthenarrangeforthefatiguedworkertoberelievedofhis/herduties.

G. FirstAidandMedicalTreatment

• RefertothenominatedSiteManagerforpermissiontouseon-sitefirstaidproviderandfacilitiesfortreatmentofminorinjuries.

• RefertothenominatedSiteManagerforanappropriatecontactintheeventthatmedicaltreatmentisrequired,orusephonecontactnumberprovidedontheemergencycontactslistinthesiteoffice.

H. HazardNotification

• Priortoworkcommencing,identifyallhazards(potentialforharmorunsafeconditions)relatingtoworkyouwillbeundertaking.Ensurethatadequatecontrolsareappliedto

Page 9: SAMWAYS BUILDING & CONSTRUCTION Sub-contractors Manual · contractors. You are also responsible for ensuring that whilst you are undertaking the work activity for which you are engaged

PD-048SubcontractorManual.docx 9Rev627/02/2018

ensurethatyou,youremployees,orotherpersonsonsiteareprotectedfrominjury,damagetopropertyisprevented.

• NotifythenominatedSiteManagerimmediatelyofanyhazards/potentialhazardsthatyouencounterwhilstworkingonsite.

• Remove/protectyourself/youremployeesfromsuchhazards,anddonotre-startworkuntilactionhasbeentakentocorrecttheunsafesituation.

Page 10: SAMWAYS BUILDING & CONSTRUCTION Sub-contractors Manual · contractors. You are also responsible for ensuring that whilst you are undertaking the work activity for which you are engaged

PD-048SubcontractorManual.docx 10Rev627/02/2018

I. HazardousSubstancesandMSDS• AuthorisationmustbeobtainedfromthenominatedSiteManager,priortobringingany

hazardoussubstances(includingflammables)ontothesite.• Sub-Contractorsmustensuretheavailabilityofallcurrent(nomorethan5yrsold)MSDS

relevanttoHazardousSubstances(includingaregisterofhazardoussubstancesusedandarecordoftrainingprovided).

• Unidentifiedcontainersofchemicalsmustnotbeusedonsite,withoutpriorapproval.• Personsnottoremove,deface,modifyoralteracorrectlabelofanysubstanceusedfor

work.J. Housekeeping

• Workingareasmustbekeptcleanandtidy.• Suitablearrangementsmustbemadefordeliveryandstorageofmaterialsand/or

substances.• Allsub-contractorownedorleasedtools/equipmentmustbestowedappropriatelyfrom

thesiteattheendofthejob.• Allspillagesmustbecleanedupimmediately,usingtherecommendedcleanupand

disposalmethods.• Worklikelytogeneratedustmustbeproperlycontrolled.Thenominatedsupervisorwill

adviseonnecessarycontrolsthatcanbeused.• ProceduresmustbeinplacetoprotectClient’spropertyorproducts(includingallfood

products)fromcontaminationofphysical,chemicalorbiologicalcontaminants.• Allwalkways/drivewaysmustbekeptclearofobstructions,includingelectricalleads.

K. LaddersandEWP

• Onlynon-conductiveladders(suchasfibreglass)maybeusedforelectricalwork.• Inallcircumstances,theheadandbaseofaladdermustbesecuredtopreventslipping.• EWPcanbeusedbyexperiencedoperatorsandbypermissionwiththesitesupervisors.Log

booksmustbemaintained.L. ManualHandling

Manualhandlingmeansanyactivityrequiringforcetolift,push,pull,carryorotherwisemoveanyload.Subcontractor’ssafeworkmethodstatementsmustdisclosetrainingintheprinciplesofcorrectmanualhandlingandlifting,togetherwithrecognitionofmanualhandlingrisks.

M. Pedestrians.

• Ensuremarked/recognisedwalkwaysareused(noshortcuts);• Walk,donotrun;• Watchoutforandgivewaytovehicleson-site,includingforktrucksanddeliveryvehicles.

N. PersonalProtectiveEquipment

PPEmustbesuppliedandworntotherecognisedstatutorystandardfortheworktobeundertaken.Thisincludeswearingsuitableclothing,safetyfootwear,eyeprotection,hearingprotections,hardhats,breathingapparatus,dustmasks,safetyharnessesandfallprotection

Page 11: SAMWAYS BUILDING & CONSTRUCTION Sub-contractors Manual · contractors. You are also responsible for ensuring that whilst you are undertaking the work activity for which you are engaged

PD-048SubcontractorManual.docx 11Rev627/02/2018

equipment,visibilityvestsorshirtsetc.SomeSamwayssiteswillrequiretheuseofMandatoryPPE.PPEshouldfitproperlyanditisyourresponsibilitytoprovidePPEforyouremployees.

O. PowerSupply

Ensurearrangementsaremadefortheuseofpowersuppliesbeforeworkcommences.P. ReportingIncidentsandInjuries

Youmustreportallinjuries(includingminorones),propertydamage,chemicalspillagesand‘nearmiss’typeincidentstotheNominatedSiteManagerornominee.Reportingofsmalloccurrenceshelpstoreducethechanceofamoreseriousincidentsoccurringinthefuture.

Q. SafetySignsandEquipment

• Obeyallsafetysigns.• Donottamperwithormisuseanysafetyequipment.

R. SecuringWorkAreas

Allworkareasmustbesecuredatalltimes,usingapprovedsafetybarriersandwarningsignals(asperstatutoryorsiterequirements).

S. Smoking

Onlysmokeindesignatedoutdoorsmokingareas.T. Tools,EquipmentandPlantSafety

a. General

• ThenominatedSiteManagermayarrangeforinspectionofsub-contractorsuppliedtools/equipment/plantbyanappropriateperson,whowillprohibittheuseofanyitemswhichappeartobefaultyordangerous.

• Alltools/equipment/plantsuppliedmustbeinasafeconditionandmayonlybeusedinamannerandforthepurposeintendedbythemanufacturer.

• ToolsorequipmentbelongingtoSamwaysmaynotbeusedwithoutpermissionofthenominatedSiteManager.

• Alltools/equipment/plantmustbetestedandproperlycertified/licensedasrequiredunderrelevantstatutoryrequirements(e.g.powertools,cranes,liftinggear,etc).

• Certificates/licencesmustbeproducedwhenrequestedbythenominatedSiteManager.• PermissionmustbeobtainedfromthenominatedSiteManagerpriortostorageofany

sub-contractorownedequipment/tools/materialsonsite.• TheSub-Contractoracceptsfullresponsibilityforthelossofordamagetoanyplant,

equipment,toolsormaterials.• Nokeysaretobeleftinoronanyplantand/orequipmentwhennotinuse.• BarricadesandwarningsignsMUSTbeusedaroundallplantandequipment.

Page 12: SAMWAYS BUILDING & CONSTRUCTION Sub-contractors Manual · contractors. You are also responsible for ensuring that whilst you are undertaking the work activity for which you are engaged

PD-048SubcontractorManual.docx 12Rev627/02/2018

b. ElectricalEquipmentandElectricalWork

• Allportableelectricalappliances/equipmentmustbefittedwithearthleakageprotectiondevices(ResidualCurrentDevice)andshoulddisplayacurrentinspection/safetytag.

• Allelectricaltools/equipment/leadsmustbeelectricallytestedandtaggedbyanapprovedcertifier.

• Electricalleadsmustnotbedrapedacrossfloors.• Workon‘live’electricalequipmentisnotrecommended,unlessfortestingor

decommissioning,andonlyifadocumentedriskassessmentprocedurecanbeprovidedforthetask.

• Circuitbreakersshouldbelocked‘OFF’withasinglekeyandretainedonlybytheoperator;ifthisisimpracticalCircuitBreakerswitchesshouldbe‘tagged’‘Danger’-Outofservice.

• Usesuitableinsulatingmaterialsandequipment.• Whenworkingwithelectricitydonotworkalone.• UsePPEsuchasinsulatedglovesandfootwear.

c. DangerousTools

• Sub-Contractorsmustonlypermitproperlytrained,licensed,authorisedandprotectedpersonneltooperateDangeroustools.

• Sub-ContractorsmustobtainapprovalfortheuseofsuchtoolsfromthenominatedSiteManagerbeforestartingwork,asClearancerequirementsmayapply.

d. MobileEquipment

• Sub-ContractorsmustprovideevidencethatemployeeswhowillbeoperatingascissorliftorsimilarareappropriatelylicensedortrainedasperStateregulations.

• Sub-Contractorsmustnotallowemployeestorideonmobileequipmentnotspecificallydesignedforthepurpose.

e. CompressedAir

Sub-contractorsmustobtainpermissionfromthenominatedSiteManagerbeforeconnectingtoorusinganycompressedairdevicesonsite.

U. VehiclesandPlant(ExternaltoHoardedArea)

• OnlyparkinareasspecifiedbythenominatedSiteManager.Driversparkedinunauthorizedareaswillbeaskedtoremovetheirvehicles;

• Vehicles&plantmustbeparkedinamannerthatdoesnotcreateahazardordangertoothers.Vehicles&plantneedtobesecured;

• Obeypublicroadrulesandsitetrafficsignsatalltimes;• Keepwithinsitespeedlimits;• Searchesofsub-contractor’svehiclesuponenteringorexitingthesitemaybeauthorisedby

thenominatedSiteManager.

Page 13: SAMWAYS BUILDING & CONSTRUCTION Sub-contractors Manual · contractors. You are also responsible for ensuring that whilst you are undertaking the work activity for which you are engaged

PD-048SubcontractorManual.docx 13Rev627/02/2018

V. WasteTreatment• Onlylicensedtransporters/depotsmaybeused(asperstatutoryrequirements)foroff-site

disposalofallwastes;• AuthorisationmustbeobtainedfromthenominatedSiteManagerbeforedisposingof

wastesonpremises.

W. BeforeYouStartWorkEachShift

Youmustbeabletoanswer“YES”tothefollowing:

• HaveyouSignedIn?• HaveyoucompletedyourSiteInduction?• HaveyoureadandsignedcurrentWorkMethodStatement?• Doyouneedaspecialpermittoworktoday?• Haveyouread&understoodyourMSDSsheets?• DoyouunderstandyourPPErequirements?• HaveyouthecorrectPPE&apparelforthejobtype?• Areyourrequiredtrainingcertificatesandlicencesuptodate?• HAVEYOUASSESSEDYOURWORKSITETODAY?