Prepared By: Abdul Noushad H A PUNCH POINTS IN RFE1 SURVEY(TD LTE) Customer : Circle : KERALA
18

SAMSUNG QUALITY PPT

Jan 16, 2017

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SAMSUNG QUALITY PPT

Prepared By: Abdul Noushad H A

PUNCH POINTS IN

RFE1 SURVEY(TD LTE)

Customer : Circle : KERALA

Page 2: SAMSUNG QUALITY PPT

CONTENTS:

1. Punch Points of GBM(Ground Base Mast) site.

2. Punch Points of RP1(shared) site.

3. Punch Points of P1(own) site.

2 RJIL-SAMSUNG Project PP of RFE1 survey

Page 3: SAMSUNG QUALITY PPT

MARAD site (GBM):

1. Lightening Arrester was not properly installed.

RJIL-SAMSUNG Project PP of RFE1 survey 3

Page 4: SAMSUNG QUALITY PPT

2. Ground cable not connected to TGB.

RJIL-SAMSUNG Project PP of RFE1 survey 4

Page 5: SAMSUNG QUALITY PPT

3. Water logged in EB supply pipe.

RJIL-SAMSUNG Project PP of RFE1 survey 5

Page 6: SAMSUNG QUALITY PPT

4.Only Non-critical MCB’s are available.

RJIL-SAMSUNG Project PP of RFE1 survey 6

Page 7: SAMSUNG QUALITY PPT

5. No signage board available.

RJIL-SAMSUNG Project PP of RFE1 survey 7

Page 8: SAMSUNG QUALITY PPT

6.Pole got cracked on the top of tower.

RJIL-SAMSUNG Project PP of RFE1 survey 8

Page 9: SAMSUNG QUALITY PPT

7. Platform got damaged.

RJIL-SAMSUNG Project PP of RFE1 survey 9

Page 10: SAMSUNG QUALITY PPT

7. Cable routing is not proper

RJIL-SAMSUNG Project PP of RFE1 survey 10

Page 11: SAMSUNG QUALITY PPT

LESSI Hospital(RP1):

1. Lightning Arrestor not installed in all sectors.

RJIL-SAMSUNG Project PP of RFE1 survey 11

Page 12: SAMSUNG QUALITY PPT

2. Rusted cable tray.

RJIL-SAMSUNG Project PP of RFE1 survey 12

Page 13: SAMSUNG QUALITY PPT

3. No DANGER and CAUTION signage board.

RJIL-SAMSUNG Project PP of RFE1 survey 13

Page 14: SAMSUNG QUALITY PPT

4. Water leakage inside the shelter.

RJIL-SAMSUNG Project PP of RFE1 survey 14

Page 15: SAMSUNG QUALITY PPT

ASAD ROAD (P1):

1.No TGB installed.

RJIL-SAMSUNG Project PP of RFE1 survey 15

Page 16: SAMSUNG QUALITY PPT

2. L A installed only in Alpha

sector.

RJIL-SAMSUNG Project PP of RFE1 survey 16

Page 17: SAMSUNG QUALITY PPT

3. No signage board.

RJIL-SAMSUNG Project PP of RFE1 survey 17