Asphalt Binder Sampling and Material Quality Issues
50

Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Aug 06, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Asphalt BinderSampling and

Material Quality Issues

Page 2: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Presentation Overview

•• IDOTIDOT’’S Material PolicyS Material Policy•• AASHTO AccreditationAASHTO Accreditation•• SamplingSampling•• Failing TestsFailing Tests•• 2005 Material Failures2005 Material Failures•• SuggestionsSuggestions•• SummarySummary

Page 3: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

IDOT Material PolicyIDOT Material Policy

Page 4: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Binders Required to Meet Binders Required to Meet AASHTO M 320AASHTO M 320

•• Polymer modified binders Polymer modified binders require PG plus tests: require PG plus tests: –– Separation of PolymerSeparation of Polymer–– Force RatioForce Ratio–– Elastic RecoveryElastic Recovery

Page 5: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified
Page 6: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

http://www.dot.il.gov/materials/03http://www.dot.il.gov/materials/03--05pgbn.pdf05pgbn.pdf

Page 7: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

http://www.dot.il.gov/materials/asphaltbinder.pdfhttp://www.dot.il.gov/materials/asphaltbinder.pdf

Page 8: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

66

12 127

3 0.20

10

20

30

40

50

60

70

(%)

PG 64-22 PG 70-22Mod

PG 58-22 PG 76-22Mod

Other PG 76-28Mod

Binder Grades used in Illinois

Page 9: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified
Page 10: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified
Page 11: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

AASHTO AccreditationAASHTO Accreditation

Page 12: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Asphalt Lab Asphalt Lab AASHTO AccreditedAASHTO Accredited

Periodic On-site Lab Inspection by AMRL PersonnelParticipate in Round Robin Testing, Sponsored by AMRLPeriodic Calibration of All Test Equipment

Page 13: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Do you always run it that way?

Page 14: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Note: ±5 Best Possible Rating

Page 15: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified
Page 16: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

IDOT Testing ProficiencyIDOT Testing Proficiency

VeryVery confidentconfident that what we test is that what we test is representative of the actual representative of the actual properties of the sample provided.properties of the sample provided.

Page 17: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Illinois Asphalt SupplierIllinois Asphalt Supplier’’s s Certification RequirementsCertification Requirements

Annual Quality Control PlanAnnual Qualification Samples

Product acceptabilityTest results correlation

Have source primary lab AMRL inspected

Page 18: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Illinois Asphalt SupplierIllinois Asphalt Supplier’’s s Certification Requirements Certification Requirements (cont.)(cont.)

Test and certify that each tank meets Illinois specificationsSubmit test resultsMaintain records of test results and bills of lading for 3 years

Page 19: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

SupplierSupplier’’s annual notarized s annual notarized certification statementcertification statement

“ A routine procedure will be followed that makes a reasonable attempt to prevent the contamination of the material to be loaded into tank trucks or cars by the material previously carried.”

Page 20: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Bills of LadingBills of Lading

Required to have specific information including the type of material last transported and ID number referencing supplier’s test results.

Page 21: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

SamplingSampling

Page 22: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Samples for EvaluationSamples for Evaluation

SupplierSupplier’’s process control sampless process control samplesQualification samplesQualification samplesRandom split samplesRandom split samplesRetained samples Retained samples –– kept by supplier a kept by supplier a minimum of 60 daysminimum of 60 daysInvestigative samplesInvestigative samples

Page 23: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Investigative SamplesInvestigative Samples

At refinery or asphalt terminal At refinery or asphalt terminal –– taken by taken by supplier, witnessed by IDOT during supplier, witnessed by IDOT during unannounced inspectionsunannounced inspections

At jobsite At jobsite –– as part of QC/QA for as part of QC/QA for Bituminous Concrete Mixtures ProgramBituminous Concrete Mixtures Program2 samples per month per grade2 samples per month per gradeWitnessed by IDOTWitnessed by IDOT

Page 24: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Jobsite SamplesJobsite Samples

Can be taken anywhere, anytime.

Must be witnessed to ensure sample security and integrity.

Page 25: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

AASHTO / ASTMAASHTO / ASTM

‘SamplingSampling is equally as important as is equally as important as the testing, and the sampler shall the testing, and the sampler shall use every precaution to obtain use every precaution to obtain samples that will show the nature samples that will show the nature and condition of the materials which and condition of the materials which they representthey represent’’

Page 26: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Proper SamplingProper Sampling

Container 1 quart friction-top cannew, clean and dry

Representative Sample - Prior to Sampling draw and discard a minimum 1 gallon of material

Seal sample container immediately

Page 27: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Proper Sampling (cont.)Proper Sampling (cont.)Label Container Properly (not lid)

Label Paperwork Thoroughly and Accurately

Sampled FromBill of Lading NumberDate

Submit samples in a reasonable time frame For more Information on Proper Sampling

AASHTO T 40 Sampling Bituminous Materials

Page 28: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Failing TestsFailing Tests

Page 29: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Samples in Chart Form

Samples Tested in Asphalt LabSamples Tested in Asphalt Lab

Page 30: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Binder Samples Tested in 2005Binder Samples Tested in 2005

Page 31: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

FailuresFailures

Look at trendsResample if possibleCheck for contaminationWe don’t mill up pavement based on one low DSR test resultSample at asphalt terminal - More emphasis on samples from the binder supplier’s tanks

Page 32: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Failures

0

1

2

3

4

5

6

2000 2001 2002 2003 2004 2005

% F

ailu

res

Page 33: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

HMA Plant SampleHMA Plant Sample

Binder Producer SampleBinder Producer Sample

Page 34: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Gas ChromatographGas Chromatograph

Used to detect contamination with solvents, diesel or fuel oil

Page 35: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified
Page 36: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Neat Binder Neat Binder

No contaminationNo contamination

0.000

0.005

0.010

0.015

0.020

0.025

0.030

0.035

Intensity

2 4 6 8 10 12 14 Time (minutes)

Gas Chromatograph

Page 37: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

0.000

0.005

0.010

0.015

0.020

0.025

0.030

0.035

Contaminated Binder

But with what?

Intensity

2 4 6 8 10 12 14 Time (minutes)

Gas Chromatograph

Page 38: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

0.05

0.10

0.15

0.20

0.25

0.30

0.35

0.40

0.45

0.50

I

tensity

2 4 6 8 10 12 14 Time (minutes)

Diesel fuel

Gas Chromatograph

n

Page 39: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

-0.08

-0.06

-0.04

-0.02

0.00

0.02

0.04

2 4 6 8 10 12 14 Time (minutes)

Neat

Contaminated

Diesel

Gas Chromatograph

Page 40: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Factors Affecting Field Factors Affecting Field SamplesSamples

Borderline original resultsContamination with binder in haul tank from last cartageContamination with binder in HMA mix plant storage tankContaminated in asphalt lines Fuel oil for flushing (be aware of line sags)

Page 41: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

IDOT Special Provision for IDOT Special Provision for SUPERPAVE MixesSUPERPAVE Mixes

Requires:“Polymer modified asphalt binder shall be placed in an empty tank and shall not be blended with other asphalt binders.”

Page 42: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

2005 Material Failures2005 Material Failures

Sand Mix jobs requiring small quantities of Polymer Modified PG 76-28 transported in small loads4 samples taken over a period of 10 days failed Original DSRSuspect contamination with previous load carried in transport truck or residual in plant tank

Page 43: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Last Load Carried

0

5

10

15

20

25

30

35

40

45

PG neat PG polymer PG 76-28 PG 64-22 PG 58-22

# of

Loa

ds

Page 44: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

ActionsActions

Suggested that to minimize possible Suggested that to minimize possible contamination during small jobs, it may contamination during small jobs, it may be a good idea to keep the materials in be a good idea to keep the materials in the tanker and directly feed the HMA the tanker and directly feed the HMA plant.plant.

Page 45: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Sampling IssuesSampling Issues

Sample ProperlySample ProperlyMake sure representativeMake sure representativeLabel, store properlyLabel, store properlySend to lab in a timely mannerSend to lab in a timely manner

Page 46: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Material Handling IssuesMaterial Handling Issues

Borderline original resultsBorderline original results““cleanclean”” transport trucktransport truck““cleanclean”” receiving tankreceiving tankBe aware of possible contaminationBe aware of possible contamination

Page 47: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

SummarySummary

Want to make sure taxpayer is getting Want to make sure taxpayer is getting what is specified what is specified ““on the roadon the road””

Binder sampling is throughout pipelineBinder sampling is throughout pipeline

Testing properly and accurately on Testing properly and accurately on samplesample

Page 48: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Summary (cont.)Summary (cont.)

What does sample represent?In Illinois, binder producer has responsibility of material until pumped off truckMarginally produced material is at risk of failurePossible HMA plant shut down

Page 49: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified
Page 50: Sampling and Material Quality Issues - Purdue Universityncaupg/Activities/2006/Presentations... · 2005 Material Failures {Sand Mix jobs requiring small quantities of Polymer Modified

Abraham Lincoln Museum and Library

Springfield, Illinois