Top Banner
M A R C I A G I B S 0 N S A M P L E W O R K E: [email protected] P: 281.785.1848 262 W STATE ST #3207 BATON ROUGE, LA 70802
11

Samplework_past&present

Mar 15, 2016

Download

Documents

Marcia Gibson

A work sample from my undergraduate, graduate, including processes of current project.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Samplework_past&present

M A R C I A G I B S 0 N S A M P L E W O R K

E: [email protected]: 281.785.1848

262 W STATE ST #3207BATON ROUGE, LA 70802

Page 2: Samplework_past&present
Page 3: Samplework_past&present

Marcia Christine Gibson262 W State St. #3207 Baton Rouge, LA 70802 281.785.1848 [email protected]

Architecture Internship available June 17th

Graduate Assistantship Louisiana State University

Chickasaw Scholarship FoundationReceived 12 consectutive times for 3.0 and higher

AIA Henry Adams Award: awarded to the second highest graduating student in the Graduate School of Architecture

Graduate Research Assistant | LSU | Baton Rouge, LA | August 2011-Present+Spring ‘12: Working currently with Professor Meredith Sattler. Focusing on an academic analysis of the Louisiana Master Plan 2012. +Fall ‘12: Worked with Professor Meredith Sattler + Spring ‘12: Worked with Professor Frank Melendez + Fall ‘11: Worked with Professor Meredith Sattler

Summer Intern Architect | Chenevert | Baton Rouge, LA | May 2012-August 2012+ Worked on various aspects of design from 3d modeling, CD drawings, ASI’s, programming requirements in Excel, and putting together schematic design binders. Participated in some site visits and building surveying. +Primarily worked in AutoCad, Sketchup, Excel, & Photoshop.

Summer Intern Architect | Architexas | Dallas, TX | June 2011- August 2011+ Worked on various aspects of �ve di�erent projects including: a church, petroleum building, two courthouses, and convention center. +Surveying work for a restoration of a 1920’s church. +Primarily worked in AutoCad & Photoshop.

Server | Abuelos Mexican Embassy | College Station, TX | April 2008 - May 2011+ During school I worked part time as a server. My responsibilities included customer service, making transactions, and handling money. +Employee trainer and awarded employee of the month

Program Assistant | CS Conf. Center | College Station, TX | Jan. 2008 - May 2008+ Responsible for answering phone calls and arranging events at the confer-ence center for di�erent local organizations, private meetings, and parties.

LOUISIANA STATE UNIVERSITY | August 2011 - PresentCollege of Architecture Masters Degree Candidate - expected graduation date: May 2013

TEXAS A&M UNIVERSITY | August 2007 - May 2011Bachelors of Environmental DesignMinor in Business Administration

2d drafting : Rhinoceros 4.0 + AutoCAD Visualization: Adobe Photoshop + Illustrator Publishing: InDesign Building Information Modeling: Revit3d Representation: Rhinoceros 4.0, Sketch-Up Rendering: Rhino Vray, Kerkythea Microsoft O�ce: Word, Powerpoint, Excel

a c comp l i s hmen t s

ob j e c t i v e

wo r ke xpe r i e n ce

edu c a t i o n

s k i l l s

Page 4: Samplework_past&present

G L I E S D R E C K R E S I D E N Z MASTER PLAN COMMUNITY

TIME: FALL 2012 PROGRAM: 2,000 UNIT RESIDENCE

NORTH-SOUTH SECTION

ZINC PANEL DETAIL SITE PLAN AERIAL

Page 5: Samplework_past&present

M A R C I A G I B S O N [email protected]

(281) 785-1848262 W STATE ST BATON ROUGE LA 70802

FLOOR PLAN

FLOOR PLAN: DETAIL

G L I E S D R E C K R E S I D E N Z MASTER PLAN COMMUNITY

TIME: FALL 2012 PROGRAM: 2,000 UNIT RESIDENCE

NORTH-SOUTH SECTION

ZINC PANEL DETAIL SITE PLAN AERIAL

Page 6: Samplework_past&present

Janet Craig Dracaena Deremensisheight 1ft. diameter 15 in.

Warneki Dracaena Deremensisheight 1ft. diameter 15 in.

Spider Plant Algaonema Modestumheight 2ft. diameter 27 in.

18330 mg

trichloroethelene 3686.20 mg

benzene6938.6 mg

formaldehyde

13760 mg

trichloroethelene

39,107 mg

benzene

10,378 mg

r

formaldehyde

Total Microgram

s Rem

oved Per Plant

CLEAN

P L A N T I N G P U R I F I C A T I O N HABITAT FOR HUMANITY

TIME: SPRING 2012 PROGRAM: 1200 SF FAMILY UNIT

ENHANCING AIR QUALITY

VOC’S, TOXINS, & HEALTH

Page 7: Samplework_past&present

Floor Plan

SitePlan 1:120

GSRI Ave.

Jade

Ave

.

M A R C I A G I B S O N [email protected]

(281) 785-1848262 W STATE ST BATON ROUGE LA 70802

1. GREEN SPACE

2. GREEN SPACE + TRANSLUCENCY

3. GREEN SPACE + TRANSLUCENCY + OUTDOOR

4. GREEN SPACE + TRANSLUCENCY + FRONT & BACK PORCHES

5. WHOLE GREEN HOUSE

Page 8: Samplework_past&present

F I R E S T A T I O N # 6CIVIC & COMMUNITY

TIME: FALL 2010 PROGRAM: FIRE STATION & COMMUNITY CENTER

A

B

RAIN WATER COLLECTION

CIRCULATION

HVAC DISTRIBUTATION

West Central East Auditorium

LEVEL 1

SITE PLAN

M A R C I A G I B S O N [email protected]

(281) 785-1848262 W STATE ST BATON ROUGE LA 70802

1.Coping2.

3.

4.

5.

6.

7.

8.

9.

101112

InsulationAlucoBond XPS Extruded (R 5.0/1”)

Metal Cladding

Y Flange

Plaster CeilingLow E GlassFacade Panel Connection

Protection BoardBentonite

Sealant

10

12

9.

1.

2.

3.

4.

5.

6.

7.

8.

1.

2.

4.

5.

6.

7.

8.

1. Coping2.

3.

4.

5.

6.

7.

8

.

InsulationAlucoBond XPS Extruded (R 5.0/1”)

Metal Cladding

Y Flange

Plaster CeilingLow E Glass

1.

3.2.

4.

5.

6.

7.

8.

EAST-WEST SECTION

AUDITORIUM WALL SECTION

Page 9: Samplework_past&present

M A R C I A G I B S O N [email protected]

(281) 785-1848262 W STATE ST BATON ROUGE LA 70802

1.Coping2.

3.

4.

5.

6.

7.

8.

9.

101112

InsulationAlucoBond XPS Extruded (R 5.0/1”)

Metal Cladding

Y Flange

Plaster CeilingLow E GlassFacade Panel Connection

Protection BoardBentonite

Sealant

10

12

9.

1.

2.

3.

4.

5.

6.

7.

8.

1.

2.

4.

5.

6.

7.

8.

1. Coping2.

3.

4.

5.

6.

7.

8

.

InsulationAlucoBond XPS Extruded (R 5.0/1”)

Metal Cladding

Y Flange

Plaster CeilingLow E Glass

1.

3.2.

4.

5.

6.

7.

8.

EAST-WEST SECTION

AUDITORIUM WALL SECTION

Page 10: Samplework_past&present

E M B A T T L E M E N T PRESERVATION AS PROVOCATION

TIME: SPRING 2013 (IN PROGRESS)PROGRAM: PAVILION, LODGING, BELVEDERE

WELCOME PAVILION ELEVATION

ISLAND MODEL SITE MODEL

EAST-WEST ELEVATION

BELVEDERE COLLAGE INSPIRATION

Page 11: Samplework_past&present

M A R C I A G I B S O N [email protected]

(281) 785-1848262 W STATE ST BATON ROUGE LA 70802

WELCOME PAVILION COLLAGE INSPIRATION

MIDTERM DETAIL MODEL OF A LODGING ROOM

SYSTEMS MOVING THROUGH A ROOM

LODGING BUILDING SECTION