Salvatore Chiarelli Director Of Physical Plant UVM 284 East Avenue, Burlington VT 05405 (802)656-1072 (802)656-1075 fax [email protected] http://www.uvm.edu/~uvmppd Contact Information
Jan 03, 2016
Salvatore ChiarelliDirector Of Physical Plant UVM
284 East Avenue, Burlington VT 05405(802)656-1072 (802)656-1075 fax
[email protected]://www.uvm.edu/~uvmppd
Contact Information
What I Expect To Share With You Today
• Some general information about the Physical Plant• Issues of mutual interest.
OUR MISSION• To maintain facilities, perform related services and
provide responsible stewardship of the University of Vermont’s physical assets in support of the
University’s mission.
Items of Interest From SGA
Anti-Idling Policy, if there is not one, plans to create
Plans to reduce the Carbon Foot Print
Relationship with the wood chip burning facility that is down near the intervale
Great Staff In PPDThey Do All The Work And Deserve All The Credit
Physical Plant Department 2009About 190 Employees
• Heat/Chilled Plant• HVAC• CPR Shop• Custodial• Plumbing• Electric Shop• Asbestos/Lead
• Recycling/Solid Waste• Administration• Service Operations• Material Management• Grounds• Energy Management• Zone Maintenance
Shops
Some Responsibilitiesof Physical Plant
(What do we get involved in)*basically, everything
HVAC Repair Practices
Electrical Issues
Innovation And Technology
Grounds Work
At Times Taking On Other Roles
“Disclaimer”None Of The Previous Pictures
Were Taken At UVM
They Were Actually Taken At Dartmouth
Energy Management
• Pro-active• Working with departments• Eco-Reps Program• $1 Million/year energy loan• More proactive in repairs• Working with utilities• Real time metering• Get message out to students/faculty/staff• Rebates equate to about 10% of each dollar invested• Condensate return 90%
Energy Management Continued
• Steam trap maintenance• Central Steam system• Back up fuel is .25% Sulfur (voluntarily)• Central chilled water plant• LEED Certifications• Preventive Measures (maintenance, inspection)• Control systems 70,000 points on campus• Many lighting upgrades• High efficiency motors• Delta V Boiler Controls• Steam lines• Davis Center Dashboard• Camus Growth 15%, reduction in steam demand by approximately 10%• Enernoc• Many others
The University of Vermont CampusElectrical Consumption (FY '75 - FY '07)
8
10
12
14
16
18
20
'75 '76 '77 '78 '79 '80 '81 '82 '83 '84 '85 '86 '87 '88 '89 '90 '91 '92 '93 '94 '95 '96 '97 '98 '99 '00 '01 '02 '03 '04 '05 '06 '07
FISCAL YEAR (FY)
CO
NS
UM
PT
ION
(kW
h /
Sq
. F
t.)
8
10
12
14
16
18
20
CO
NS
UM
PT
ION
(kWh
/ Sq
. Ft.)
No Energy Conservation With Energy Conservation
Trend (With E.C.) Trend (No E.C.)
Utilities Master Planning
Plant Controls System – Delta VPlant Controls System – Delta V
Central Chilled Water Plant
Utility Tracking
Load Shed/Response
Life Safety Systems
Sprinkler Valves
Blue Lights
Elevator Phones
Exterior Doors
General Safety In Rooms
Emergency Blue Lights
Questions