SAFETY AUDIT PROJECT REPORT Turan Guneş highway AZDEEN NAJAH 090502004
46

Safety audit project report turan gunes copy

Jan 06, 2017

Download

Engineering

Azdeen Najah
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Safety audit project report turan gunes   copy

SAFETY AUDIT PROJECT REPORT

Turan Guneş highway

AZDEEN NAJAH090502004

Page 2: Safety audit project report turan gunes   copy

Road Function:

PREREQUISITES:Road Function .Traffic Situation .Road Standards .The Surroundings .

Page 3: Safety audit project report turan gunes   copy

Turan Guneş Highway Map :

Page 4: Safety audit project report turan gunes   copy

Starting of Safety Audit (00+000.000)

Page 5: Safety audit project report turan gunes   copy

Ending of Safety Audit (05+000.000)

Page 6: Safety audit project report turan gunes   copy

End of Turan Guneş highway

Konya

Road

Page 7: Safety audit project report turan gunes   copy

Type of Hazards :

Page 8: Safety audit project report turan gunes   copy

1- Improper of Pedestrian Crossing.

Roadway that come from Or-An (04+580.000)

Page 9: Safety audit project report turan gunes   copy

1- Improper of Pedestrian Crossing.Roadway that come from Or-An (04+570.000)

Page 10: Safety audit project report turan gunes   copy

2- Unmarked Pedestrian Crossing MarksRoadway that go to Or-An (01+900.000)

Page 11: Safety audit project report turan gunes   copy

2- Unmarked Pedestrian Crossing MarksRoadway that come from Or-An (00+200.000)

Page 12: Safety audit project report turan gunes   copy

3- Improper curbs ramp at Pedestrian Crossing places

Roadway that go to Or-An (00+050.000)

Page 13: Safety audit project report turan gunes   copy

3- Improper curbs ramp at Pedestrian Crossing places

IDEAL CURB RAMP

Page 14: Safety audit project report turan gunes   copy

4- Improper Pedestrian over-passRoadway that go to Or-An (00+500.000)

Page 15: Safety audit project report turan gunes   copy

4- Improper Pedestrian over-pass Ideal over-pass

Page 16: Safety audit project report turan gunes   copy

5- Dangerous Obstacles, buildings, walls and etc. on side-walk close to asphalt pavement boards

Roadway that go to Or-An (00+420.000)

Page 17: Safety audit project report turan gunes   copy

5- Dangerous Obstacles, buildings, walls and etc. on side-walk close to asphalt pavement boards

Roadway that go to Or-An (00+550.000)

Page 18: Safety audit project report turan gunes   copy

5- Dangerous Obstacles, buildings, walls and etc. on side-walk close to asphalt pavement boardsRoadway that come from Or-An (00+200.000)

Page 19: Safety audit project report turan gunes   copy

5- Dangerous Obstacles, buildings, walls and etc. on side-walk close to asphalt pavement boardsRoadway that come from Or-An (00+180.000)

Page 20: Safety audit project report turan gunes   copy

6- Improper sport Track & Gym sets locationRoadway that come from Or-An (00+050.000)

Page 21: Safety audit project report turan gunes   copy

6- Improper sport Track & Gym sets locationRoadway that come from Or-An (00+200.000)

Page 22: Safety audit project report turan gunes   copy

7- Dangerous electrical poles, steel columns and fences at road median

Roadway that go to Or-An (00+500.000)

Page 23: Safety audit project report turan gunes   copy

7- Dangerous electrical poles, steel columns and fences at road median

Roadway that go to Or-An (00+520.000)

Page 24: Safety audit project report turan gunes   copy

8- Improper temporary rain water pipe connection

Roadway that come from Or-An (04+580.000)

Page 25: Safety audit project report turan gunes   copy

9- Improper connectionRoadway that go to Or-An

(00+200.000)

Page 26: Safety audit project report turan gunes   copy

9- Improper connectionRoadway that go to Or-An

(00+400.000)

Page 27: Safety audit project report turan gunes   copy

9- Improper connectionRoadway that go to Or-An

(01+100.000)

Page 28: Safety audit project report turan gunes   copy

9- Improper connectionRoadway that go to Or-An

(01+400.000)

Page 29: Safety audit project report turan gunes   copy

9- Improper connectionRoadway that go to Or-An

(01+750.000)

Page 30: Safety audit project report turan gunes   copy

9- Improper connectionRoadway that go to Or-An

(04+600.000)

Page 31: Safety audit project report turan gunes   copy

9- Improper connectionRoadway that come from Or-An

(04+600.000)

Page 32: Safety audit project report turan gunes   copy

10- Improper connection to markets, petrol station or other commercial

activities Roadway that go to Or-An

(00+200.000)

Page 33: Safety audit project report turan gunes   copy

10- Improper connection to markets, petrol station or other commercial

activities Roadway that come from Or-An

(04+550.000)

Page 34: Safety audit project report turan gunes   copy

10- Improper connection to markets, petrol station or other commercial

activities Roadway that go to Or-An

(03+200.000)

Page 35: Safety audit project report turan gunes   copy

11- Improper roundabout or intersection design according to

existing traffic situation Roadway that go to Or-An

(00+000.000)

Page 36: Safety audit project report turan gunes   copy

12- Improper Bus stops Roadway that go to Or-An

(00+530.000)

Page 37: Safety audit project report turan gunes   copy

13- Improper vehicle parking at two lanes of road

Roadway that go to Or-An (00+530.000)

Page 38: Safety audit project report turan gunes   copy

14- Improper car parking on side-walk

Roadway that go to Or-An

03+900.00 03+700.00

Page 39: Safety audit project report turan gunes   copy

15- Hidden traffic signs Roadway that come from Or-An

00+100.000 00+200.00000+000.000

Page 40: Safety audit project report turan gunes   copy

16- Dangerous big advertisement boards

Roadway that come from Or-An & go to Or-An

To Or-An 01+000.000 To Or-An 01+420.000

To Or-An 01+390.000From Or-An 03+200.000

Page 41: Safety audit project report turan gunes   copy

17- Missed or removed guardrailRoadway that come from Or-An &

go to Or-An

To Or-An 00+050.000 To Or-An 01+000.000

From Or-An 03+200.000To Or-An 01+000.000

Page 42: Safety audit project report turan gunes   copy

18- Un-safe existing guardrailRoadway that go to Or-An

02+300.000 02+375.00002+450.000

Ideal Guardrail

Page 43: Safety audit project report turan gunes   copy

19- Uncontrolled vertical & horizontal curves

Roadway that from Or-An & to Or-AnFrom Or-An 03+450.000From Or-An 02+750.000

To Or-An 03+850.000Horizontal Curve Vertical Curve

Horizontal + Vertical Curve

Page 44: Safety audit project report turan gunes   copy

20- Missed connection triangular side-walk/curbs

Roadway that come from Or-An (02+650.000)

Page 45: Safety audit project report turan gunes   copy

21- Improper closed connectionRoadway that come from Or-An

(04+550.000)

Page 46: Safety audit project report turan gunes   copy

End of Presentation