Top Banner
Safe lockage with new control system Last year work began on connecting locks and movable bridges along the Trollhätte Canal to a new control and monitoring system in the then newly opened canal centre. This autumn the last of the six locks and three movable bridges will become part of the system. The old control pulpits with push-buttons and lamps were replaced by a modern, computer-based control system with graphical interfaces. Aside from a better working environment with an improved overview there is also the ability to control equipment remotely from several places. - The new system enablesusto remotely control all ofthelocksandmovablebridgesfrom thenew canal centre, saysBörjeJarl, ProjectManager at theSwedish MaritimeAdministration.Thenew controlsystem with its graphical interface also provides a better overview and simplifies control maneuvers. © Infracontrol AB 2010 September 2010 Photo: Rasmus G Höglund
2

Safe lockage with new control system - infracontrol.com · Safe lockage with new control system Last year work began on connecting locks and movable bridges along the Trollhätte

Jun 26, 2018

Download

Documents

dokhue
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Safe lockage with new control system - infracontrol.com · Safe lockage with new control system Last year work began on connecting locks and movable bridges along the Trollhätte

Safelockagewithnewcontrolsystem

Lastyearworkbeganonconnecting locksandmovablebridgesalongtheTrollhätteCanaltoanewcontrol andmonitoring systeminthe thennewlyopened canalcentre.Thisautumnthelastofthesixlocksand threemovablebridgeswillbecomepartofthesystem.Theoldcontrolpulpitswithpush-buttons and lampswerereplacedbyamodern,computer-based controlsystemwithgraphicalinterfaces.Asidefromabetterworkingenvironmentwithanimprovedoverviewthereisalsotheabilitytocontrolequipment remotelyfromseveralplaces.

-Thenewsystemenablesustoremotelycontrolallofthelocksandmovablebridgesfromthenewcanalcentre,saysBörjeJarl,ProjectManagerattheSwedishMaritimeAdministration.Thenewcontrolsystemwithitsgraphicalinterfacealsoprovidesabetteroverviewandsimplifiescontrolmaneuvers.

©InfracontrolAB2010

September 2010

Photo:RasmusGHöglund

Page 2: Safe lockage with new control system - infracontrol.com · Safe lockage with new control system Last year work began on connecting locks and movable bridges along the Trollhätte

Address Flöjelbergsgatan1c,SE-43135Mölndal,SwedenTelephone+46313332700www.infracontrol.com

Modern remotecontrol solution

TrollhätteCanalisaround50mileslong,ofwhichsixmilesareman-madewhiletherestcomprisesanaturalnavigablechannelintheGötaRiver.Heightdifferencestotaling145feetareovercomebysixlocks;oneatLillaEdet,fourinTrollhättanandoneatBrinkebergskulleinVänersborg.Therearebothfixedandmovablebridgesacrossthenavigablechannelforroadandrailtraffic.Thechainoflocksispassedbyaround10freightersperdayyear round,andbyanadditional4,000leisurecraftduringthesummermonths.

Untilnow,lockoperationswerecontrolledbymeansofconventionalpush-buttonpulpitswithchange-overswitchesandlamps,onepulpitperstation,butnowoperationshavetakenstepstowardamodernsolutionthatprovidesseveraladvantages:

-Thenewsystemenablesustoremotelycontrolallofthelocksandmovablebridgesfromthenewcanalcentre,saysBörjeJarl,ProjectManagerattheSwedishMaritimeAdministration.Thenewcontrolsystemwithitsgraphicalinterfacealsoprovidesabetteroverviewandsimplifiescontrolmaneuvers.

Manysystemsworkingtogether

There areanumberofdifferenttechnicalcomponentsystemsthatmustworktogetherforlockagetoworkproperly.Apartfromthelockgatesthemselvesthereisasystemofvalveportsthatareusedtofillandemptythelocks.Therearealsoboomsandsignalsforpedestriansandcanaltrafficandsupplysystemssuchashydraulicequipment.Thereisalsoasystemofbubblecurtainsusedtopreventiceformationclosetothegatesduringwinter.

InordertocontrolthelocksremotelyitisnecessarytoseewhatistakingplaceonsitesoanewTVmonitoringsystemhasbeeninstalledtoprovideoperatorsfullcontrol.TheTVmonitoringsystemisconnectedtotheoperatingsystemsothattherightcameraisalwaysconnectedwhenthevariousmaneuverfunctionsareactivated.

-Wehavelongexperienceofthistypeofoperatingsystem,saysNinniErixal,ProjectManageratInfracontrol.Itallstartedbackin1994whenweinstalledthesystemfortheGötaRiverBridgeinGothenburg.It'sgreattoseehowwell-designedsystemsreallymakelifeeasierforusers.

About Infracontrol

Infracontrolwasfoundedin1993asanindependentsystemintegrator,specialisingininfrastructureIT.Sincethen,andincollaborationwithourcustomers,wehavecreatedanever-moreIntelligentInfrastructurethatmakeslifeeasierforusall.Ourcustomersareprimarilypublicprocurersforthestateandmunicipalities.

Wehelpsocietyfunctionbetterbymeansofmoreuser-friendly,usefulandsmarterITsolutions.Wemakesuretechnologyisheretohelppeopleandnotviceversa– asissooftenthecase–throughourspecialfocusonusefulnessandutility.Theresultisuser-friendlysupportsystemsthatleadtoincreasedsafety,reducedenergy consumption,improvedworkingenvironmentandbetterutilisationofinvestments.

©InfracontrolA

B2010

September 2010

Safe lockagewithnewcontrolsystem