Previous Issue: 16 March 2011 Next Planned Update: TBD
Revised paragraphs are indicated in the right margin Page 1 of
92
Primary contact: Soliman Nour Eldin, Mahmoud Bahy Mahmoud on
+966-3-8809449
CopyrightSaudi Aramco 2013. All rights reserved.
Best Practice SABP-A-012 21 July 2013
New Projects Energy Efficiency Optimization Review
Methodology
Document Responsibility: P&CSD/Energy Systems Division
New Projects Energy Efficiency Optimization Review
Methodology
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 2 of 92
Table of Contents
Page
1 Introduction 3
1.1 Definition 4
1.2 Purpose and Scope 4
1.3 Intended Users 4
2 New Projects Energy Assessment 4
2.1 Project Phases 4
2.2 Energy Efficiency Optimization Tasks Description 5
2.3 Solution Approach 5
3 Energy Assessment Methodology 6
3.1 Energy Assessment Procedures during Project Study Phase
6
3.2 Energy Assessment Procedures during Project Proposal Phase
24
3.3 Quick Guidelines for Efficient Energy System Design 31
4A Appendices for Short-cut Assessment Tools 35
4A.1 Steam and Power Model 35
4A.2 Pinch Method for utilities Targeting and Selection 36
4A.3 Cogeneration Targeting and Drivers Selection 54
4A.4 Cooling Water and Refrigeration System Targeting 72
4A.5 Tri-generation 90
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 3 of 92
1 Introduction
Energy conservation in Saudi Aramco became everyones business.
It is mandatory for each existing process facility to find cost
effective solutions to save energy and achieve
more with less in their facilities. It is also equally important
for each new project to be
designed and operated in an energy-conscious manner.
A vital contribution towards the success of the company wide
energy conservation
policy comes through documenting the company best practices in
methodology; tools
and applications in the field of energy efficiency optimization.
Besides, capturing the
knowledge of the in-house expertise in such field and
distributing such knowledge
among our facilities and engineering services departments.
Hence, a consistent effort
has been exerted in Saudi Aramco to produce Best Practices to
help our engineers
achieve their energy efficiency optimization mission through the
design and building of
energy conscious facilities following the same new paradigm
implemented in the
existing facilities.
This particular Best Practice document introduces a brief
methodology for grassroots
projects energy assessment, associated with short-cut tools that
can help satisfy the
above mission.
The first and most important thing to learn and apply from this
quick review
methodology for energy efficiency optimization in grassroots
project is that;
Our Big Picture Includes Process and Utility Plants
It is important during the early phase of any project that we
see its big picture.
In this document when we talk about project phases we mean only
the following three
phases; project studies phase, design basis scoping paper
preparation, and project
proposal phases.
We need to make sure that the system-approach that take into
consideration the
process(es), hot and electricity utilities, and the cooling and
refrigeration utilities needs
is utilized. This approach has to prevail on the current
state-of-art sequential sub-
system by sub-system approach during the project study
phase.
Removing some degrees of freedom from our options subjectively
shall be avoided as
much as possible. During feasibility study phase, it is
absolutely necessary to
investigate different combined process and utilities system
schemes.
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 4 of 92
1.1 Definition
The term Energy Assessment refers to the methodology of
collecting and analyzing available energy utilities related process
data without losing the
context of the whole process needs in order to establish the big
picture of the energy requirements for a particular facility and
identify component-based-
energy efficiency optimization opportunities from the operating
cost point of
view and capital cost of energy and process sub-systems point of
view too.
Striking the right balance between such costs will define the
close-to-optimum
solution of the energy problem in the design of any new plant.
In grassroots
projects available data are mostly uncertain, time is critical
and there are infinite
combinations of options. Therefore, the energy assessment
process of any new
project has to be conceptual, fast but rigorous-oriented with
the right level of
details at each phase of the project.
1.2 Purpose and Scope
The purpose of this best practice document is to describe a
methodology for the
quick review of new projects from energy efficiency optimization
point of view.
Besides, introducing short cut tools by which quick assessment
for energy
efficiency improvement can be conducted. Its scope include quick
energy
assessment methodology in a step-by-step manner, simple models
for data
representation, and short cut tools for evaluating process
schemes for energy
efficiency optimization.
1.3 Intended Users
This Best Practice manual is intended for use by project and
process engineers
in Saudi Aramco, who are responsible for process &facilities
planning, process
engineering and energy systems engineering. This particular
document will
enable them to conduct quick review of new projects from energy
efficiency
optimization point of view to make sure that they are planning
for and designing
of new energy-conscious facilities in Saudi Aramco.
2 New Projects Energy Assessment
2.1 Project Phases
In Saudi Aramco our projects have four main phases. These phases
are the
project study phase, design basis scoping paper phase, project
proposal phase
and finally expenditure request approval and completion
phase.
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 5 of 92
During each of these phases it is important to develop the
appropriate level of
details in our modeling and assessment techniques to be able to
render at the end
of all project phases a facility which is going to be optimal.
This process shall
proceeds in a way that does not hinder next phase decisions from
being optimal
too. It is the same philosophy used in dynamic programming
approach where
while the flow of information details goes from left to right on
the time and
information maturity scales of new projects, the optimization
process starts from
right to left.
2.2 Energy Efficiency Optimization Tasks Description
Energy Efficiency Optimization objective aims to specifying the
near-optimal
design that minimizes the new plants energy consumption at
minimum deficiency in energy supply of the utility systems to the
plants process at minimum capital cost. Following that, the task
will be to list all possible design
options/actions/modifications necessary to achieve the
specified/desired process
target(s). This includes identification of all related
engineering activities in a
minimum possible time using uncertain plant data and without any
interruption
to the overall project schedule. Currently, the scope of the
energy efficiency
optimization of new projects assessment include the power,
heating and cooling
systems that are mandatory to satisfy certain process demands
along the life of
the project.
2.3 Solution Approach
Nowadays in Aramco for the sake of simplicity and timely
results,
decomposition and heuristic techniques are adapted in lieu of
the time-
consuming but more beneficial Mathematical
Programming/Optimization
Techniques.
The evolutionary approach can be adapted versus the more time
consuming
revolutionary approach. The old projects data base shall be
fully utilized to
facilitate the energy review process and result in merits.
The plants energy utility needs shall be defined with reasonable
level of flexibility and the energy utility system; electricity,
fuel, steam and other
energy-related utilities shall be defined one by one to find the
near- optimal
consumption of such utilities that guarantee minimum deficiency
in the utility
supply to plant processes subject to controlled minimum capital
cost.
The company reliability figures shall prevail at least for the
time being.
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 6 of 92
On the macro level the energy system components are generation,
distribution
and utilization. The objective will be to minimize waste in
energy fresh
resources and capital in these three components. This can be
done via the
continuous upgrade of the efficiency of energy system components
in
generation, distribution and utilization. However, the
utilization component has
a unique feature, where its boundaries are not completely
dictated by the
process. Therefore, the room of improvement in this component
can have
tangible impact on the process capital cost in addition to
energy utility system
cost.
3 Energy Assessment Methodology
3.1 Energy Assessment Procedures during Project Study Phase
Preliminary review of similar old process designs, system
drawings and data analysis
Understand the Big Picture of the old plant and the new
plant-wide operations
Understand process energy needs and utility systems preference
of both the old and the new plants
Understand the interaction between the process and hot utility
system
Understand the interaction between the process and the cold
utility system
Establish your desired objectives Targeting for the new project
(power, steam, fuel, water)
Identify All Opportunities for energy savings in the old
project/existing facility
Define Obvious Quick-hit savings (e.g. better plot plan,
considering cogeneration scheme,etc.)
Prepare do and do not do list for the new project during the
study phase
Challenge every process step in the old design to generate new
process alternatives for the sake of a lower energy systems capital
and operating costs
From the available data, establish at least two or more process
design schemes
Propose scope for the second level of the review process that
includes more definitive assessment with some economic analysis
including the simulation
of the defined process schemes.
Propose plant-wide energy-utility strategy
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 7 of 92
Discuss your findings with the project study team
There are three essential tasks that need to be conducted during
the review of the
old project schemes in order to draw useful conclusions for the
new project
process and utility design
(A) Data analysis, Models building and establishing Targets
(B) Insights, Opportunities and Estimated savings potential
(C) Screen and Formulate Improvement Strategy
These tasks can be explained in details as follows:
1. Site survey through templates, checklists and interviewing of
process owners/proponents to gather the right amount of data that
enable the energy
team build the plants big picture and understand the goals and
the constraints of the facility
2. Define the criteria for focusing on potential areas of
interest (when to be rigorous and get to the second level of
details)
3. Develop site energy/utility nominal design/normal operation
models with the appropriate level of details in a high level
generic path diagrams for, power, fuel, H2, steam, water, nitrogen
and air. Preliminary purpose of
these models will be to understand what is going on in the
energy utility
system, locate the energy consumption elephants (ECEs) in both
process and utility plants and generate insights for energy saving
opportunities
4. Add more depth in the level of details of the energy utility
model for each ECE and/or other criterion of focus
5. Define the effect of disturbances and uncertainty on the
energy utility system models
a. Sources of disturbances
b. Site energy utility balance under disturbances
c. Nominal and dynamic targeting of energy utility systems
d. Check that the big picture depicted for the process and the
utility plants is correct with enough degree of confidence before
you proceed
6. Target (order of magnitude targeting)
a. _ Identify main processing issues that affect utility
utilization
b. _ Link utility-utility interactions
c. _ Integrate and qualitatively optimize site utilities
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 8 of 92
7. Integrate core processes among themselves and with
utilities
8. Develop a comprehensive initiatives list via identifying and
estimating energy utility savings opportunities
9. Develop word strategies for realizing savings for the new
facility goals, analysis of the results and the mapping of the
opportunities onto the new
facility strategy
Power and Heat Supply Decision
The following example addresses the problem of using
cogeneration or not using
cogeneration to satisfy the process heat and power supply to the
process. The example
below is an actual study conducted by one of our external
consults. It shows that for
process heating and power supply requirements, it is important
to consider as much as
possible number of options and economically screen them before
you decide where to
go for this issue.
Option 1 Base Case
Steam raised in boilers at 150 psig, power purchased from SEC
and all equipment on
electric drives.
Initial steam demand estimate is given below.
Summer
Year Water
Cut
Desalter
Heater
Stabiliser
Reboiler
Stripping
Steam
Other
Users
% MMBTU/h MMBTU/h MMBTU/h Mlb/h Mlb/h Mlb/h Mlb/h MMBTU/h
2011 1 14 167 181 198 30 95 323 295.2
2015 11.1 39 169 208 227 30 95 352 321.7
2022 30 126 173 299 327 30 95 452 413.1
2030 51 153 173 326 357 30 95 482 440.5
Total Steam DemandSummer Duty
Winter
Year Water
Cut
Desalter
Heater
Stabiliser
Reboiler
Stripping
Steam
Other
Users
% MMBTU/h MMBTU/h MMBTU/h Mlb/h Mlb/h Mlb/h Mlb/h MMBTU/h
2011 1 113 178 291 318 30 95 443 404.9
2015 11.1 210 185 395 432 30 95 557 509.1
2022 30 531 197 728 796 30 95 921 841.8
2030 51 600 201 801 876 30 95 1001 914.9
Winter Duty Total Steam Demand
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 9 of 92
Estimated Power Demands
Wat
er C
ut1%
1%6%
9%11
%14
%17
%19
%22
%24
%27
%30
%32
%35
%38
%40
%43
%46
%48
%51
%
Year
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Powe
r req
uire
men
tAq
uife
r WIP
sM
W75
7575
7575
7575
7593
9393
9393
9393
9393
9393
93
Form
atio
n W
IPs
MW
99
99
933
3333
3333
3333
3333
3333
5050
5050
ESPs
MW
67
912
1417
2125
2933
3844
4955
6269
7683
9199
Oth
er G
OSP
MW
4646
4646
4646
4646
4646
4646
4646
4646
4646
4646
Utili
ties
MW
55
55
55
55
55
55
55
55
55
55
Tota
l Pow
erM
W13
914
014
314
514
717
517
818
220
521
021
522
022
623
223
824
526
927
628
429
2
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 10 of 92
The steam demand ranges from 323 Mlb/h for summer 2011 to 1001
Mlb/h for Winter
2030.
Minimum criteria to be used for phased installation of equipment
is 7-10 years, however
from the above table it can be seen that >50% of final
capacity is required by 2015.
Therefore, 100% capacity installation is required from 2010.
4 x 50% units will be installed each with capacity of 500 Mlb/h,
giving N+2 intallation
in year 2030. It is assumed that one boiler will be down for
maintenance at any one
time and that the steam load will be shared equally between the
remaining boilers.
Refer to tables below showing steam demand and boiler
turndown.
During summers the required steam demand can be met by a single
boiler. However it is
assumed that the load is shared by two boilers to allow speedy
ramp-up should one
boiler trip. It is possible to share this load over 3 boilers
but the boilers would be
operating at close to 20% turndown.
Summer
2011 2015 2022 2030
Total Steam demand Mlb/h 323 352 452 482
Running boilers (N+1) 2 2 2 2
Production per boiler Mlb/h 161.5 176.0 226.0 241.0
Turndown % 32% 35% 45% 48%
Winter
2011 2015 2022 2030
Total Steam demand Mlb/h 443 557 921 1001
Production per boiler 2 3 3 3
Production per boiler Mlb/h 221.5 185.7 307.0 333.7
Turndown % 44% 37% 61% 67%
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 11 of 92
Operational cost factors will be based on power import and fuel
consumption as shown
in the following table:
Operation Cost Factors 2011 2015 2022 2030
Power Import, Summer MW 139 147 220 292
Power Import, Winter MW 139 147 220 292
Fuel, Summer MMBTU/h 410 447 574 613
Fuel, Winter MMBTU/h 563 708 1,170 1,272
Option 1a Steam Generation at 750psig
This option looks at raising steam at 750 psig (52 bara) and
letting down through steam
turbine drivers for the compressors.
The GOSP gas compressors power demands are constant throughout
the life of the plant; therefore 100% steam capacity would be
required from 2010.
Compressor Description Power per item MW
Total operating power
K-100A/B Atmospheric Compressor 12,500 12,500
K-101/2 A-C HP compressor 9,960 19,920
K-103 A/B Propane Compressor 3,159 3,159
It is estimated that 35 MW of power is available from 454 t/h
(1001 Mlb/h) steam
through 750 100 psig pass-out turbines. This matches the
operating duty for all the running gas compressors.
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 12 of 92
Stand-by machines will be electric motors.
750 psig
1001000 lb/h
4 ST Drivers for Compressors
2 x 10 MW
35 MW 1 x 12.5 MW
1 x 3.2 MW
100 psig
60 psig
Condensate
BOILERS
Condensing
turbine
Excess steam in the summers and during the early years can be
used to generate
electricity via a condensing steam turbine generator and hence
reduce the amount of
purchased power required further. Refer to tables below:
Summer
2011 2015 2022 2030
Steam Produced Mlb/h 1001 1001 1001 1001
Steam for Process Heating Mlb/h 323 352 452 482
Excess Steam Mlb/h 678 649 549 519
Power produced hp 24726 23668 20021 18927
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 13 of 92
Winter
2011 2015 2022 2030
Steam Produced Mlb/h 1001 1001 1001 1001
Steam for Process Heating Mlb/h 443 557 921 1001
Excess Steam Mlb/h 558 444 80 0
Power produced hp 20350 16192 2918 0
Operational cost factors will be based on power import and fuel
consumption as shown
in the following table.
Operation Cost Factors 2011 2015 2022 2030
Power Import, Summer MW 85 94 170 243
Power Import, Winter MW 88 100 183 257
Fuel, Summer MMBTU/h 1,279 1,279 1,279 1,279
Fuel, Winter MMBTU/h 1,279 1,279 1,279 1,279
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 14 of 92
Option 2 PWIPs with individual CGTs & WHRUs
Base Case :
Power Water Injection Pumps (PWIP) are electric motor driven and
installed in 2
phases. Each PWIP is limited to 400MBPOD or a motor size of
approx 25,000 hp with
4 PWIPs installed in Phase 1 and a 5th
installed in 2019.
This option considers same capacity and phasing of PWIPs as base
case, however each
PWIP is connected to a combustion gas turbine (CGT) with a waste
heat recovery unit
generating low-pressure steam. Refer to sketch below:
CGT
GE Frame 5 WIP
Fuel & Air
25,000 hp
WHRU
From other
WHRUs
138.9 Mlb/hTo Users
Base load
from Boilers
300 Mlb/h
All other drivers are electric motor with power purchased from
SEC.
Back-up steam production by 3 x 50 % boilers is required in case
WHRUs fail, i.e., 3 x 500.5 Mlb/h boilers (3 x 227 t/h) (number of
back-up boiler tbc)
Assume that back-up boilers are operating at 30% turndown. In
the summers & early
years it is assumed only one back-up boiler is running at
turndown, in order to minimize
heat bypassed to GT/WHRU exhaust.
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 15 of 92
Each PWIP is coupled to a GE Frame 5 CGT complete with a WHRU,
which can
produce up to 139 Mlb/h steam.
In 2018 at end of Phase 1 total steam that can be generated by
WHRUs is 556 Mlb/h.
With back-up boilers operating at 30% turndown there is excess
heat from the WHRUs
which is discharged to the GT exhaust.
In 2030 when 5 PWIPs are installed total steam production from
WHRUs will be 695
Mlb/h. 306 Mlb/h steam made up from boilers.
Summer Winter
2015 2030 2015 2030
No PWIPs 4 5 No PWIPs 4 5
Power Produced hp 100000 125000 Power Produced hp 100000
125000
Steam from WHRUs Mlb/h 556 695 Steam from WHRUs Mlb/h 556
695
Steam from Boilers Mlb/h 150 150 Steam from Boilers Mlb/h 150
305
Process Steam req'd Mlb/h 395 482 Process Steam req'd Mlb/h 705
1001
Installation requirements:
2010-2018 4 x Frame 5 GE CGTs direct drivers for PWIPs complete
with WHRU
[555.6 Mlb/h steam + 100,000 hp (74MW) Power]
3 x 500 Mlb/h back-up boilers
2018-2030 1 additional Frame 5 GE CGT complete with WHRU
[694.5 Mlb/h steam + 125,000 hp (93MW) Power]
Other considerations:
In years 2010 to 2015 there will be excess heat available from
WHRU. This can be
used to raise excess LP steam that can be used for BFW preheat
or Crude preheating or
by-passing the WHRU to stack.
Operational cost factors will be based on power import and fuel
consumption as shown
in the following table (excess heat loss via GT Stack is also
included):
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 16 of 92
Operation Cost Factors 2011 2015 2022 2030
Power Import, Summer MW 64 72 126 198
Power Import, Winter MW 64 72 126 198
Fuel, Summer MMBTU/h 1,222 1,222 1,480 1,480
Fuel, Winter MMBTU/h 1,222 1,222 1,575 1,677
Excess Heat from GT Exhaust, Summer MMBTU/h 389 360 399 369
Excess Heat from GT Exhaust, Winter MMBTU/h 267 151 -1 -1
Option 2a PWIPs with individual CGTs & WHRUs
This option is same as Option 2 except 4 off larger PWIPs (and
associated GT Direct
Drives) are installed in year 2010. The best GT match is Siemens
SGT-700 for the new PWIPs duty. The Siemens GT operates at higher
power output and lower steam production.
Refer to sketch below:
CGT
SGT-700 WIP
Fuel & Air
30,345 hp
WHRU
From other
WHRUs
115 Mlb/hTo Users
Base load
from Boilers
541 Mlb/h
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 17 of 92
All other drivers are electric motor with power purchased from
SEC.
Back-up steam production by 3 x 50% boilers is required in case
WHRUs fail, i.e., 3 x 500.5 Mlb/h boilers (3 x 227 t/h) (number of
back-up boiler tbc)
Assume that back-up boilers are operating at 30% turndown. In
the Summers & early
years it is assumed only one back-up boiler is running at
turndown, in order to minimise
heat bypassed to GT/WHRU exhaust.
Each PWIP is coupled to a Siemens GT-700 complete with a WHRU,
which can produce up to 115 Mlb/h steam.
In 2018 at end of Phase 1 total steam that can be generated by
WHRUs is 460 Mlb/h.
With back-up boilers operating at 30% turndown there is excess
steam or heat lost with
by-pass of WRHU to the stack.
Summer Winter
2018 2030 2018 2030
No PWIPs 4 4 No PWIPs 4 4
Power Produced hp 121380 121380 Power Produced hp 121380
121380
Steam from WHRUs Mlb/h 460 460 Steam from WHRUs Mlb/h 460
460
Steam from Boilers Mlb/h 150 150 Steam from Boilers Mlb/h 250
541
Process Steam req'd Mlb/h 395 482 Process Steam req'd Mlb/h 705
1001
excess/ (make-up) Mlb/h 215 128 excess/ (make-up) Mlb/h 5 0
Installation requirements:
2010-2030 4 x Siemens GT-700 complete with WHRU
[460 Mlb/h steam + 123,000 hp (92 MW) Power]
3 x 500.5 Mlb/h back-up boilers
Other considerations:
In years 2010 to 2015 there will be excess heat available from
WHRU. This can be
used to raise excess LP steam that can be used for BFW preheat
or Crude preheating or
wasted via GT stacks.
Towards 2030 and in winter, two back-up boilers are required to
operate @ 54%. This
is due to the lower steam production from the Siemens GT-700,
the closest GT size to the PWIPs power rating.
Operational cost factors will be based on power import and fuel
consumption as shown
in the following table (excess heat loss via GT Stack is also
included).
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 18 of 92
Operation Cost Factors 2011 2015 2022 2030
Power Import, Summer MW 45 53 126 198
Power Import, Winter MW 45 53 126 198
Fuel, Summer MMBTU/h 1,135 1,135 1,135 1,135
Fuel, Winter MMBTU/h 1,135 1,135 1,530 1,632
Excess Heat from GT Exhaust, Summer MMBTU/h 293 264 162 132
Excess Heat from GT Exhaust, Winter MMBTU/h 171 55 1 1
Option 3 Cogeneration sized for heat match
One back-up boiler will be running at 30% turndown. Base heat
load provided by
WHRUs of the GTGs and all the drivers including PWIPs are
electric motor.
Central Cogen sized for process heat match remaining power
purchased from SEC.
2 x 50% back-up boilers.
2030 steam demand requires 3 x GE Frame 6 CGT.
350 Mlb/h
CGT
GE Frame 6 GEN
Fuel & Air
72,415 hp
WHRU
From other
WHRUs
335.1 Mlb/h To Users
From Boilers
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 19 of 92
Total Power generated in 2030 (2 GTGs) is 108 MW.
Therefore, purchase power required is 183MW.
Installation.
2010- 2018 2 x GE Frame 6 CGTs complete with WHRU (only 1
operating to
reduce heat waste via GT stacks) with 2 x 500.5 Mlb/h back-up
boilers
[670 Mlb/h Steam + (54MW) Power]
~93 MW Purchase Power required in 2018
1 more GE Frame 6 CGT complete with WHRU (with 2 operating)
[670 Mlb/h Steam + (108MW) Power]
~183 MW purchase Power required
Operational cost factors will be based on power import and fuel
consumption as shown
in the following table (excess heat loss via GT Stack is also
included):
Operation Cost Factors 2011 2015 2022 2030
Power Import, Summer MW 84 93 111 183
Power Import, Winter MW 84 93 111 183
Fuel, Summer MMBTU/h 789 789 1,388 1,388
Fuel, Winter MMBTU/h 789 885 1,515 1,642
Excess Heat from GT Exhaust, Sum MMBTU/h 330 271 561 516
Excess Heat from GT Exhaust, Winter MMBTU/h 86 7 -1 30
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 20 of 92
Option 4 Cogen sized for PWIP Steam Turbine Drivers
PWIPs driven by steam turbine, all other drivers electric
motor.
Central Cogen raising enough steam to drive PWIPs
Back-up by 2 x 100% boilers & SEC
Assume PWIP size & phasing as per option 2.
125,000 hp
177,415 hp
CGT
GE Frame 7 GEN
Fuel & Air
171,250 hp
WHRU
2336.8 Mlb/h
From other
WHRUs
584.2 Mlb/h
750 psig
WIPs
To process
heating
1001 Mlb/h
150 psig
Condensing
turbine
2921 Mlb/h
150 psig
1920 Mlb/h
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 21 of 92
In 2018, PWIP power requirement is 100,000 hp. This requires
approx 2337 Mlb/h
steam from 750 175 psig pass out turbine. Power required for
remaining drives is approx 155,560 hp (116 MW).
In 2030 PWIP power requirement is 125,000 hp. This requires
approx 2921 Mlb/h
steam from 750 175 psig pass out turbine. Power required for
remaining drives is approx 274,910 hp (205 MW).
However, process heat requirement in 2030 is only 1001 Mlb/h (60
psig), therefore,
excess steam is routed to condensing turbine to generate more
power.
In 2030 5 x GE Frame 7 CGTs are required to raise steam for PWIP
steam turbine
drives, which will generate 856,250 hp. An additional 177,415 hp
is generated by the
condensing steam turbine giving total available power generated
= 1,033,665 hp.
This is well in excess of the required 274,910 hp.
Installation:
2010- 2018 4 x GE Frame F CGTs complete with WHRU
[2337 Mlb/h Steam + 685,000 hp (511 MW) Power]
2 x 1001 Mlb/h back-up boilers
1 x 174,333 hp (130 MW) condensing turbine
1 additional GE Frame 7 CGT complete with WHRU
[2921 Mlb/h Steam + 1,033,665 hp (769 MW) Power]
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 22 of 92
Option 5 Cogeneration sized to match total power demand
No base load boilers required, as the GT system has a N+2 supply
arrangement.
In this option all drivers are electric motor and all power is
produced by central CGTs
with no back up from SEC. Therefore, N+2 CGTs are required.
Steam is raised at 750 psig in WHRU and passed through a steam
turbine. 150 psig
steam is extracted for process heating demand.
Total power requirement in 2030 is ~300 MW or 402,310 hp
CGT
GE Frame 7 GEN
Fuel & Air
88,370 hp
WHRU
From other
WHRUs
302.5 Mlb/h
750 psig
To process
heating
1001 Mlb/h
150 psig
87,165 hp
To
condenser
907.5 Mlb/h
1210.0 Mlb/h
209.0 Mlb/h
GTs running at 100% rate, the actual maximum power or heat
demand is supplied with
around 90% turndown on the GT and associated steam turbine
generator.
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 23 of 92
Installation:
2010 - 2018 5 x GE Frame 7 CGTs complete with WHRU (3 operating,
two standby),
[907 Mlb/h Steam + 265,000 hp (198 MW) Power]
1 x 87,165 hp (65MW) condensing turbine
(based on maximum of 1210 Mlb/h of steam)
2018 - 2030 1 additional GE Frame 7 CGT complete with WHRU
[1210 Mlb/h Steam + 440,645 hp (328MW) Power]
In summer, the plant power demand will dictate the turndown
ratio of the operating GT
machines, and in all cases, there will be excess heat. In winter
2015 & 2022, the heating
requirement will dictate the GT turndown rates.
Operational cost factors will be based on power import and fuel
consumption as shown
in the following table (excess heat loss via GT Stack is also
included).
Operation Cost Factors 2011 2015 2022 2030
Power Import, Summer MW 0 0 0 0
Power Import, Winter MW 0 -21 -31 0
Fuel, Summer MMBTU/h 1,118 1,186 1,962 2,603
Fuel, Winter MMBTU/h 1,118 1,355 2,240 2,603
Excess Heat from STG condenser, Summer MMBTU/h 455 427 410
142
Excess Heat from STG condenser, Winter MMBTU/h 455 356 294
142
Excess power in 2015 & 2022, can be reduced by the
installation of after burner to
divert energy from power to heat.
The heat loss is via condenser not GTG stacks.
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 24 of 92
3.2 Energy Assessment Procedures during Project Proposal
Phase
The following are the procedures which normally render an
acceptable energy
efficient process design in a project proposal phase:
1- Data extraction for the study to be done for each stream that
needs to be
heated or vaporized and any stream that needs to be cooled or
condensed
in the base design case. As if each stream will be handled
through utilities. (No integration in the base case design).
2- Targets for energy utility to be calculated for the process
with integration
and without integration.
3- The grand composite curve for the base case design shall be
utilized to
help show the right/optimal level of utility mix. for heating
and cooling
utilities.
4- The same graph (GCC) needs also to be utilized to show the
potential
cogeneration opportunities and best drivers for the process, if
any.
5- List of possible design and operational modifications to be
investigated to
explore its impact on the utility consumption and other process
units.
6- These steps should be done for at least 6 DTmin., before
selecting the right
one. Of-course, in such cases a preliminary evaluation of the
HENs capital
cost will be needed, or whatever targeting method you use, to
reach the
close-to-optimum DTmin. (These calculations can be done easily
using
state-of-the art software(s) like SPRINT, currently available at
Saudi
Aramco ESU)
7- Preliminary HEN synthesis developed will render several
process
initiatives for improving the design from energy efficiency
point of view
compared with the base case design.
8- The process scheme produced may have some environmental,
safety and
control/operability constraints that may justify forbidding
streams
matching and warrant the removal of some streams from the
heat
integration schemes or even removing all of them from
integration
scheme; it does not matter as long as the design is pursued
systematically
and the techno-economical justifications are detailed and
documented.
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 25 of 92
9- One-by-one, of problem stream(s) shall be taken out from the
integrated process scheme and its energy impact in Dollars is
defined. In the same time an engineered solution for solving this
problem/ constraint, safety;
control/operability or other problem, shall be suggested and its
impact
shall also be roughly quantified/estimated in Dollars if
possible and
documented.
10- Trade-off between the energy saving impact $ and for
instance the control/operability impact $ shall be calculated,
documented and shown in
the energy assessment study.
11-Other subjective decisions need to be mentioned and
documented clearly
with enough techno-economical support as much as possible to
support the
decisions of accepting or rejecting process initiatives for the
sake of energy
efficiency optimization.
In general, there are very important constraints in form of
early decisions taken
at early stages of the project life that confine the scope of
work in any energy
efficiency optimization study. It will not be practical, logical
and even
beneficial to continue arguing about the logic or correctness of
past decisions
because the review process shall move on fast but with enough
rigors and
without losing the essence of why we are doing energy studies
for new designs.
In order to get the best out of any energy study, we suggest
that you explore few
important modifications that would have the most impact on the
base case
design from energy efficiency point of view and also help save
significant
capital cost.
The following example is an actual one about an oil and gas
separation project
where the base case design has been studied from energy
efficiency optimization
point of view by an outside consultant/engineering company and
has been
reviewed with the comments below.
The proposed comments are a result of small effort spent on an
energy study
review with the available information at that stage bearing in
mind that only
major things shall be reported back for consideration. Changes
have to be
practical and do not have any major change on the project
schedule. However, it
may help correct some of the quit clear points in the base case
design.
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 26 of 92
The first most important item which is fundamental and does not
even need
investigation is the unnecessary recycle of the NGL stabilizer
over head gas
stream back to the process. This recycle in base case design is
not technically
useful. Such type of recycles has to be eliminated as long as
these recycle
streams have no separation sink. These recycle streams normally,
do not only
affects the size of all equipment, piping,etc., down the stream
it joins resulting in huge capital waste but also has no production
benefit from NGL separation
point of view. It also affects energy utilities such as the
refrigeration package
capital and operating cost. In any case recycle streams without
separation or
conversion sink should not be recycled back to the process.
Deleting NGL Stabilizer OVHD Recycle Example:
The two graphs below show the place of the recycle that need to
be demolished
and an idea that need to be investigated with others by the
process designers to
explore the extra capital cost used due to the recycle and to
enhance if possible
the amount of NGL that can be recovered. Here below some ideas
that can be
explored along the major change of using de-ethanizer instead of
NGL stripper,
for instance.
260 Psig445 Psig
425 Psig
TEG unit
NGL Stripper
HP gas from inlet manifold
Dried HP gas to export
Condensate Feed Drum
GOSP condensate from
condensate inlet manifold
440 Psig
Should not be recycled
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 27 of 92
260 Psig445 Psig
425 Psig
TEG unit
NGL Stripper
HP gas from inlet manifold
Dried HP gas to export
Condensate Feed Drum
GOSP condensate from
condensate inlet manifold
440 Psig
Should not be recycled
Sales Gas
NGL
Condenser
This condenser could use the process stream that have a
temperature of
50 F and the rest can come from the refrigeration package
260 Psig
445 Psig
425 Psig
TEG unit
NGL StripperAn idea to avoid recycle and possible
Increase in NGL recovery
HP gas from inlet manifold
Dried HP gas to export
Condensate Feed Drum
GOSP condensate from
condensate inlet manifold
440 Psig
330 Psig
NGL
sales Gas
sales Gas
-New HP flash drum or small stripper with 20% of the feed load
to
recover more NGL
-Smaller existing Stripper using less steam &redesigned to
allow more NGL recovery instead of the heavy components loss in the
top
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 28 of 92
Heat Integration between Compressors and Crude Stabilization
process
Example:
The graph below suggests that integration between the discharge
of compressors
and the crude stabilization process can be done through several
options upon the
implementation of pinch techniques. One option is possible
through a hot water
system. This integration option can result in huge steam saving
and savings in
the fin-fans electric power loads as well as a reduction in
capital. The scheme
below can have different options based upon the location of the
pump-
around/inter-heater and the water return temperature. Note that
we are only
giving here a configuration while several configurations can
also be produced
and explored. The savings here in capital and operating cost is
quite clear and
there is no operability problem but simulation and more in-depth
review of the
process will be warranted.
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 29 of 92
Steam System Optimization Example:
The graph below shows that electricity can be generated from the
proposed
utility system design to minimize the power purchased from the
grid.
In the current base case design, only 4 MW could be generated
from the current
situation using BPST generator.
Khurais Project
Combined Heat & Power System
*- One working to
support the 573 Klb/hr
process by 168 Klb/hr 133 psig
*- One on standby 428 Deg. F
*- One shutoff 573 Klb/hr
168 Klb/hr 4 MW
95 psig
365 Deg. F
716.17 Klb/hr 24.83 Klb/hr
1.65 Klb/hr
40 psig
320 Deg. F
24.5 Klb/hr
High Pressure
Low Pressure
Mid Pressure
HRSG
4GT
3 Boilers
at 50% load
Process LP Steam
Demand
Process MP Steam
Demand
BPST
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 30 of 92
The proposed scheme below shows that via increasing the HRSG
pressure and
temperature, it is possible to produce about 20 MW power of
electricity.
Khurais Project
Combined Heat & Power System
*- One working to
support the 573 Klb/hr
process by 168 Klb/hr 625 psig
*- One on standby 700 Deg. F
*- One shutoff 573 Klb/hr
168 Klb/hr 20 MW
95 psig
365 Deg. F
716.17 Klb/hr 24.83 Klb/hr
1.65 Klb/hr
40 psig
320 Deg. F
24.5 Klb/hr
High Pressure
Low Pressure
Mid Pressure
HRSG
4GT
3 Boilers
at 50% load
Process LP Steam
Demand
Process MP Steam
Demand
BPST
The HRSG HP Steam can be utilized to drive a steam turbine
generator for
power recovery. The steam balance and the steam property will
not be affected.
In general it is recommended to produce the steam at the highest
possible
pressure to generate more power. The optimum steam pressure can
be decided
by the designer.
Heat Integration of NGL Separation Section Example:
The graph below suggests that simple pinch calculation might
also be useful in
exploring the best way to match the shown hot and cold streams
in order to
further minimize the utility consumption. The result may exhibit
no need to
modify the existing design especially after the consideration of
modifying the
NGL recovery and stopping the recycle, however it may worth its
exploration.
It is important also to consider both the NGL cold section and
the refrigeration
system simultaneously to minimize capital and compressor
work-shaft.
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 31 of 92
260 Psig445 Psig
425 Psig
TEG unit
NGL Stabilizer
HP gas from inlet manifold
Dried HP gas to export
Condensate Feed Drum
GOSP condensate from
condensate inlet manifold
440 Psig
Cold streams to be heated
Hot streams to be cooled
It is important to note that the above mentioned suggestions and
others in line
with it can saves energy utility in form of steam consumption,
electricity
consumption and increase the in-situ generation of electricity
to reduce the
purchased power.
It may also result in an increases the NGL recovery and reduces
the overall
process plant and utility plant capital cost due to the
elimination of boilers, fin
fan coolers and the reduction of the capital cost. These
benefits need to be
verified by process designers via simulation and economic
analysis.
3.3 Quick Guidelines for Efficient Energy System Design
Consider the process and hot utility system simultaneously and
optimize the
CHP system
Strongly consider the use of Cogeneration if your power-to-heat
ratio is
rendering high cogeneration efficiency with respect to central
power
generation plants efficiency
Do not allow the carrying through of the undesired species with
main
streams, (gas, water or other species) especially if heating or
cooling is
required along its path
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 32 of 92
Later in the project phase watch for robust condensate recovery
system
Do not forget Piping insulation for long distance pipelines
Consider having flexible operation of main equipment to allow
for its load
management
Optimize air compressors design
Consider the use of Economizers and Pre-heater in the
boilers
Consider the use of turbo-expander instead of JT valves and to
drive gas
compressors
Watch for power generation from high pressure liquids
Re-consider the use of gas turbines versus the more efficient
steam turbines
Increase boiler steam pressure and temperature to the extent
that matches
process needs unless electricity generation is the controlling
factor
Use auxiliary turbines to minimize steam let downs
Use steam in the process optimally to save capital cost
Consider using air pre-heaters for combustion air
Use ASD on BFW pumps
Integrate the flue gases in with the rest of the process using
grand composite
curve developed by pinch technology (see later section)
Recover valuable gases from fuel gases and fully utilize the
streams pressure
Minimize the H2 wheel in your plant
Cool down the inlet temperature to compressors
Reduce cooling medium return temperature in refrigeration
cycles
Consider heat rejection of the refrigeration system in process
cold or even
hot section, to the ambient and to another refrigerant
Use highest efficiency turbines in your CHP system (thermo-flow
software
can help in such selection)
Utilize motors instead of turbine drivers if it is more
economical since they
are more efficient
Optimize steam use in strippers
Minimize live steam utilization
Consider Mechanical energy integration
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 33 of 92
Reduce natural gas consumption by understanding fuel gas sinks
and
constraints
Reduce fuel gas use via considering energy integration
Keep H2 separate from fuel gas system, also measure the
composition of
off-gas streams and recover C2 and C3+
Avoid unnecessary processing of off-gas
Avoid unnecessary processing of wastes and inert
Minimize the unnecessary production of off-gas
Avoid unnecessary recycles
Adjust operating pressures and optimize process interaction
Optimize your piping system to minimize excessive pressure
drops
Re-use lowest quality water
Maximize use of stripped sour water and Minimize generation of
wastewater
Eliminate direct water injection for cooling purposes
Eliminate live steam used for re-boiling and stripping where it
is only used
for BTU value
Minimize or eliminate live steam consumption in sour water
strippers by
replacing it with re-boilers
Boiler blow-down could be considered for cooling tower
make-up
Extract the low pressure steam from the boiler blow-down
Use process water effluent as a source on the next lower water
quality level
In general eliminate live steam usage since it becomes water and
follows an
energy path through the plant consuming more energy to process
it
Should live steam becomes necessary optimize the amount used
through
optimal pressure conditions
Use lowest quality water possible for desalter operation
Minimize water used in desalting and/or carried through to
desalting
Automate desalter operation, avoid water slipping through with
crude during
desalting/maximize the separation of free water upstream of the
crude
desalting (each Ib of water will require roughly Ib steam for
processing)
Minimize the water-wheel in the plant
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 34 of 92
Maximize utilization of treated oily-water from the waste-water
treatment
plant
Consider adjustable speed motors/devices for pumps, compressors,
.etc
Increase waste heat steam generation
Insulate condensate return lines, valves, flanges,etc.
Cooling- tower blow-down should not be treated but segregated to
sewer
Boiler blow-down should not be sent to wastewater treatment but
segregate
to sewer
In your plot-plan make sure that energy exporters are close to
energy
importers
Avoid non-isothermal mixing of streams
Use cooling water instead of air, if possible, to cool down
compressors
discharge
Illustrative Examples for Quick Energy Efficiency Optimization
in New Design
Compression Energy % Savings Due to Decrease in compressors
Inlet temperature
% Energy saving in a compressor energy consumption = {1-
(Tnew/Told)} * 100
Tnew is the new inlet temperature
Told is the old inlet temperature
Back pressure turbines energy available for integration
Thermal energy available for Integration (Q) = Outlet steam
flow* (Vapor enthalpy-
liquid enthalpy)
Outlet steam flow= Inlet steam flow (1- actual wetting
factor)
Actual wetting factor can be assumed between (8 to 15) %
% Energy saving in heat pumps/refrigeration cycles due to
decrease in reject
temperature
W2/W1 = (T reject 2 Tc)/ (T reject 1 Tc)
Treject is the temperature at which heat is rejected to the
cooling medium (water)
Tc is the temperature at which heat is taken into the
refrigeration) cycle
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 35 of 92
4A Appendices for Short-Cut Assessment Tools
4A.1 Steam and Power Model
The basic Steam Mass Balance does not require high accuracy as
long as the
developed model still makes sound engineering sense. (i.e.,
output is much
higher than input)
Common engineering sense shall be used to estimate what the
unknowns. For
example condensate return, blow-down and flares can be defined
after getting
good idea about main consumers.
chemicals
Proc. #1
Proc. #1
Proc. #1
Proc. #2
Proc. #3
Proc. #4
BFW
Raw water
Make-up Treatment Plant
MP Process
Condensate
LP Process
Condensate
HP Process
Condensate
Process Condensate
Est. 50 % Returned
HP Boiler
MP Boiler
HP
MP
LP
Vent
Effluent
Deaerator
98 t/h
68 t/h
0.0 t/h
21 t/h 0.0 t/h
68 t/h
30 t/h
0.0 t/h
8 t/h
30 t/h
0.0 t/h
Vent
1 t/h
2 t/h
1 t/h
18 t/h
7 t/h 4 t/h
27 t/h 9 t/h
38 t/h
(42+5) t/h
98+5 t/h
5 t/h
0.0 t/h
0.0 t/h
0.0 t/h
6.28 MW
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 36 of 92
4A.2 Pinch Technology for Utilities Targeting and Selection
The purpose of this section is not to conduct a pinch study but
to get some
energy targets regarding the utilities consumption for a desired
plant area.
This can be done essentially via three methods, graphical,
algebraic and using
mathematical programming/optimization. In this document the only
one method
is going to be explained. In Saudi Aramco we have some
software(s) that can be
used to conduct in depth analysis.
Targeting Using Graphical Method:
Any heat exchanger can be represented as a hot stream that is
cooled down by
another cold stream and/or cold utility and a cold stream that
is heated up by a
hot stream and/or hot utility with a specified minimum
temperature approach
between the hot and the cold called Tmin.
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 37 of 92
The process exhibited below in the graph shows the situation
when the two
streams do not have a chance of overlap that produce heat
integration between
the hot and the cold.
PROCESSH CFeed Product
0
20
40
60
80
100
120
0 10 20 30 40 50 60 H
T HOT UTILITY
COLD UTILITY
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 38 of 92
Moving the cold stream to the left on the enthalpy axis without
changing its
supply and target temperatures till we have small vertical
distance between the
hot stream and the cold stream we obtain some overlap between
the two streams
that result in heat integration between the hot and the cold and
less hot and cold
utilities. As been depicted in the graph below with shrinkage in
the hot and cold
lines span.
PROCESSH CFeed Product
0
20
40
60
80
100
120
0 10 20 30 40 50 60 H
T HOT UTILITY
COLD UTILITY
HEAT
RECOVERY
Pinch(MAT)
PROCESSH CFeed Product
0
20
40
60
80
100
120
0 10 20 30 40 50 60 H
T HOT UTILITY
COLD UTILITY
HEAT
RECOVERY
Pinch(MAT)
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 39 of 92
For demonstration, all hot streams will be represented in the
process by one long
hot stream to be called the hot composite curve. Same thing be
done for all cold streams in the process.
The next step will be drawing the two composite curves/lines on
the same page
in Temperature (T)-Enthalpy diagram with two conditions:
1- The cold composite curve should be completely below the hot
composite
curve, and
2- The vertical distance between the two lines/curves in terms
of temperature
should be greater than or equal to a selected minimum
approach
temperature called global Tmin
The resulting graph is depicted below and known as thermal pinch
diagram.
Net Heat Sink
Above the Pinch
Net Heat Source
Below the Pinch
Opportunity for
heat recovery
Net Heat Sink
Above the Pinch
Net Heat Source
Below the Pinch
Opportunity for
heat recovery
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 40 of 92
Grand Composite Curve (G.C.C)Should Be Drawn To Scale
T* (K)
Enthalpy ( kW)
700 1400 2100 2800200
300
400
500
600
Total hot utility required is equal to 2620 kW
Hu1
Hu2
Hu3
Multiple utility targeting/selection using Grand Composite Curve
(GCC)
Upon maximizing heat recovery in the heat exchanger network,
those heating
duties and cooling duties not serviced by heat recovery must be
provided by
external utilities.
The most common utility is steam. It is usually available at
several levels.
High temperature heating duties require furnace flue gas or a
hot oil circuit.
Cold utilities might be refrigeration, cooling water, air
cooling, furnace air
preheating, boiler feed water preheating, or even steam
generation at higher
temperatures.
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 41 of 92
Although the composite curves can be used to set energy targets,
they are not a
suitable tool for the selection of utilities. The grand
composite curve drawn
above is a more appropriate tool for understanding the interface
between the
process and the utility system. It is also as will be shown in
later chapters a very
useful tool in studying of the interaction between
heat-integrated reactors,
separators and the rest of the process.
The GCC is obtained via drawing the problem table cascade as we
shown
earlier.
The graph shown above is a typical GCC. It shows the heat flow
through the
process against temperature. It should be noted that the
temperature plotted here
is the shifted temperature T* and not the actual temperature.
Hot streams are
represented by Tmin/2 colder and the cold streams Tmin/2 hotter
tan they are in the streams problem definition. This method means
that an allowance of
Tmin is already built into the graph between the hot and the
cold for both process and utility streams. The point of zero heat
flow in the GCC is the pinch point. The open jaws at the top and
the bottom represent QHmin and QCmin respectively.
The grand composite curve (GCC) provides convenient tool for
setting the
targets for the multiple utility levels of heating utilities as
illustrated above.
The graphs below further illustrate such capability for both
heating and cooling
utilities.
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 42 of 92
The above figure (a) shows a situation where HP steam is used
for heating and
refrigeration is used for cooling the process. In order to
reduce utilities cost,
intermediate utilities MP steam and cooling water (CW) are
introduced.
The second graph (b) shows the targets for all the utilities.
The target for the
MP steam is set via simply drawing a horizontal line at the MP
steam
temperature level starting from the vertical axis until it
touches the GCC.
The remaining heat duty required is then satisfied by the HP
steam. This
maximizes the MP steam consumption prior to the remaining
heating duty be
fulfilled by the HP steam and therefore minimizes the total
utilities cost.
Similar logic is followed below the pinch to maximize the use of
the cooling
water prior the use of the refrigeration.
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 43 of 92
The points where the MP steam and CW levels touch the GCC are
called utility
pinches since these are caused by utility levels. The graph (C)
below shows a
different possibility of utility levels where furnace heating is
used instead of HP
steam. Considering that furnace heating is more expensive than
MP steam, the
use of the MP steam is first maximized. In the temperature range
above the MP
steam level, the heating duty has to be supplied by the furnace
flue gas. The flue
gas flowrate is set as shown in graph via drawing a sloping line
starting from the
MP steam to theoretical flame temperature Ttft.
If the process pinch temperature is above the flue gas corrosion
temperature, the
heat available from the flue gas between the MP steam and pinch
temperature
can be used for process heating. This will reduce the MP steam
consumption.
In summary the GCC is one of the basic tools used in pinch
technology for the
selection of appropriate utility levels and for targeting for a
given set of multiple
utility levels. The targeting involves setting appropriate loads
for the various
utility levels by maximizing cheaper utility loads and
minimizing the loads on
expensive utilities.
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 44 of 92
MP
CW
Refrigeration
T*
H
T-tft(C)
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 45 of 92
Normally, Plants Operations have choices of many hot and cold
utilities and the graph below shows some of available options.
Generally, it is recommended to
use hot utilities at the lowest possible temperature while
generating it at the
highest possible temperature. And for the cold utilities it is
recommended to use
it at the highest possible temperature and generate at the
lowest possible
temperature. These recommendations are best addressed
systematically using
the grand composite curve.
ProcessHeat
Pump
Boiler House
And Power Plant
Hot Oil
Circuit
Furnace
Fuel
Cooling
Towers
Refrigeration
Steam
Turbines
Gas
Turbines
Air preheat
W
W
W
W
BFW
preheat
Hot and cold utilities
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 46 of 92
The graph below shows that utility pinches are formed according
to the number
of utilities used. Each time a utility is used a utility pinch
is created. It also shows that the GCC right noses sometimes known
as pockets are areas of heat integration/energy recovery. In other
words it does not need any external
utilities. These right noses/pockets are caused by;
- Region of net heat availability above the pinch
- Region of net heat requirement below the pinch
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 47 of 92
GCC curve can be used by engineers to select the best match
between utility
profile and process needs profile. For instance, the steam
system shown below
needs to be integrated with the process demands profile to
minimize low
pressure steam flaring and high or medium pressures steam let
downs. Besides
it helps selecting steam header pressure levels and loads.
chemicals
Proc. #1
Proc. #1
Proc. #1
Proc. #2
Proc. #3
Proc. #4
BFW
Raw water
Make-up Treatment Plant
MP Process
Condensate
LP Process
Condensate
HP Process
Condensate
Process Condensate
HP Boiler
MP Boiler
HP
MP
LP
Vent
Effluent
Deaerator
Vent
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 48 of 92
T
H
CW
BFW
LP
HP
MP
Superimposed Utility Profile with Process Profile
Nominal Case Supply-Demand Matching Problem
Process GCC
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 49 of 92
The superimposed steam system on the process grand composite
curve shows
that while process heating needs can be achieved electricity can
also be
generated to satisfy process demands and/or export the surplus
to the grid.
The graph below shows how we can use the GCC not only to select
utility type,
load but also to define the steam headers minimum
pressure/temperature to
minimize driving force and save energy.
T
H
CW
BFW
LP
MP
HP
Qh
Qc
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 50 of 92
Grand Composite Curve can also be utilized to select the load
and return
temperature of hot oil circuits. The graph below shows that
while in many cases
the process pinch can be our limiting point in defining the load
(slop of the hot
oil line) and the return temperature of the heating oil. In some
other cases the
topology of the GCC is the limiting point not the process pinch.
This is also
shown in the second graph below. This practical guide to select
the load and the
target temperature of the hot oil circuits is also applicable to
furnaces as will be
shown later in this chapter.
CW
Refrigeration
T*
H
Process
Pinch
Hot Oil
T return
T supply
Process Pinch temperature is the Limiting temperature for the
Hot oil return temperature
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 51 of 92
CW
Refrigeration
T*
H
Process
Pinch
Hot Oil
T return
T supply
Process Pinch temperature is not the Limiting temperature for
the Hot oil return temperature
But the topology of the GCC curve
CP-min
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 52 of 92
Grand composite curve (GCC) can also be used to select the
process
refrigeration levels and the synthesis of the multiple-cycles
refrigeration systems
as we did in the steam system. The schematic graph below shows a
simplified
refrigeration system.
Schematic Diagram for multi-level Refrigeration System
Work
Process
0C
CW
Process
-35C
Process
-65C
25C
-5C
-40C
-70C
Compressor
Condenser
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 53 of 92
The GCC as we mentioned before can be used to place the
refrigeration levels as
we did with steam levels. The graph below shows how we can do
that.
T
H
Tcw
We can place the refrigeration levels like steam levels.
Maximizing the highest temperature load to minimize the lower
temperature loads
- 5 C
- 40 C
- 70 C
When a hot utility needs to be at a high temperature and/or
provide high heat
fluxes, radiant heat transfer is used from combustion of fuel in
furnace. Furnace
designs vary according to the function of the furnace, heating
duty and type of
fuel, and method of introducing combustion air.
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 54 of 92
4A.3 Cogeneration Targeting and Drivers Selection
Steam and power balances provide the link between the process
utility
requirements and the utility supply. They determine the basis
for cogen or no cogen decision, import power requirements or power
export potential, boiler sizes, fuel consumption, steam-turbines
flows, boiler feed-water requirements,
steam flows in various parts of the process,etc.
An easy way to explore the site power and steam optimal
generation and
utilization is through what is called site hot and cold
composite curve. It is
important to emphasize on that we recommend, on the contrary of
most
literatures, that you include other process steam demands in the
balance
calculation in order to depict more accurate picture.
Constructing the site- source and sink composite curves
The first step in constructing the site source-sink composite
diagram is to draw
the site-source composite curve and the site-sink composite
curve via looking at
each process grand composite curve and extract the source(s) and
sink(s)
streams while ignoring the pockets, areas of process heat
integration, as shown
in graphs below. Source streams are the ones that have negative
slopes, while
the sink streams are the streams that are having positive
slopes.
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 55 of 92
Process
(A) GCC
Process
(B) GCC
T*
H
T*
H
Process A heat
sink profile
Process A
heat source profile
Process B heat
sink profile
Process B heat
source profile
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 56 of 92
Now let us use a simple example to show that site composite
curves can be
drawn the same we do for drawing single process composite
curves.
Data for Constructing Composite Curves
Stream Type Supply Temp
(C) Target Temp.
(C) FCp (kW/ C)
Source/Hot 170 70 10
Source/Hot 120 30 20
Sink/Cold 50 90 40
Sink/Cold 20 110 18
For the simple example shown in the table above, first step will
be tabulating the
site sources and sinks as shown. The second step in developing
the site-
composite curves now is the development of the two tables below.
These two
tables, list all the source and sink streams temperatures of
each process (A,
B,.N), extracted from its grand composite Curves like the ones
shown above, in an ascending order with the cumulative enthalpy
(result of adding the
enthalpy of all source streams or sink streams laying together
in a certain
temperature interval) corresponding to the lowest hot
temperature and lowest
cold temperature respectively equal to zero.
In every temperature interval the cumulative source/hot load is
calculated using
the following formula:
H= FCp * (Tsupply Ttarget)
In every temperature interval the cumulative sink/cold load is
calculated using
the following formula:
H= FCp * (Ttarget Tsupply)
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 57 of 92
Source streams temperature list Cumulative Enthalpy (H)
T0=30 H0=0.0
T1=70 H1=800
T2=120 H2=2300
T3=170 H3=2800
Sink streams temperature list Cumulative Enthalpy (H)
T0=20 H0=0.0
T1=50 H1=540
T2=90 H2=2860
T3=110 H3=3220
Temperature (T) - Enthalpy (H) Diagram
T
H
30
20
Site-source composite curve
Site-sink composite curve
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 58 of 92
The site-sink/cold composite curve shall lie completely below or
to the left of
the site-source/hot composite curve and this can be done via
dragging the site-
sink/cold composite curve to the right on the enthalpy axis (H).
This process
shall stop at a vertical distance between the cold and the hot
composite curve for
a temperature equal to reasonable minimum temperature
approach.
Temperature (T) - Enthalpy (H) Diagram
T
H
30
20
Site-source composite curve
Site-sink composite curve
Site-Minimum Heating Utility
Site-Minimum Cooling Utility
Qh =480 kW
Qc=60 kW
Minimum Temperature Approach
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 59 of 92
It is important to note that the construction of the grand
composite curve of each
process relies on a built-in Tmin between the hot composite and
the cold composite curves. It is a Tmin/2 (half Tmin) lower shift
in the actual hot streams temperatures and Tmin/2 upper shift in
the actual cold streams temperatures. Since the heating and/or
cooling utilities are going to be used as
buffer for the purpose of integration among different processes
it is important to
have another shift in hot and cold streams temperatures, which
is complete
Tmin instead of half Tmin. If these curves are drawn without
considering hot utility/steam as a buffer the graphs will look like
the composite curves shown
above. However, in order to better show site-steam generation
capability from
the site-source composite curve and its demand based upon the
site-sink
composite curve we need to plot the two composites curves as
shown below.
Total Site Profiles
T
H
Site Source Profile
Site Sink Profile
Hot streams to be cooled/
steam generation/supply
Cold streams to be heated/
steam Demand
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 60 of 92
The site composite curves drawn this way can be utilized to
select the required
utility mix and its temperature range. The site composite curve
shown above to
the left defines for the site, the overall cooling requirements
from both enthalpy
and temperatures points of view. The utility selection shall
start from the top-to-bottom with the intention of maximizing steam
generation. As depicted in the graph, the highest temperature
cooling utility in the shown case is medium
pressure steam generation using process high temperature source
stream(s).
Again, it is beneficiary for the site to maximize the use of
such cooling utility
(high pressure steam generation). The second highest temperature
cooling
utility is the generation of low pressure steam. This cooling
utility has to be
maximized too. The residual heat that needs to be rejected to
the environment
can be then handled using air or water cooling systems. The site
sink composite
curve to the right shows the site needs for heating utilities.
The process of
selecting the heating utilities on that side is a bottom-to-top
marsh. We start at the lowest possible temperature heating utility
and we maximize it. In our
case here it is a low pressure steam utility. The next
lowest-heating utility is a
medium pressure steam, and also it has to be maximized. The rest
of the heating
utility demands can now be handled using high pressure
steam.
Targeting for steam Generation/Supply and Demand
T
H
Site Source Profile
Site Sink Profile
LP
MP
HP
CW
LP
MP
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 61 of 92
Studying the process heating and cooling demands should not be
done in
isolation of the process needs for electricity. The interaction
between the
process units, hot utility and cold utility systems is extremely
important.
Sometimes it is not very clear to the straight forward old
perceived intuitions.
Accurate process steam demands and generation capabilities are
essential for
proper targeting of the site cogeneration design.
After recovering heat between process steam generation and
process steam
usage, the balance of the heating demand and other process steam
users will be
satisfied by fuel fired in the utility boilers to generate the
required steam
demands. Normally, very high pressure steam will be produced to
produce
power and use the exhausted steam in satisfying the process
demand.
The shaded area, in the left graph below, is a region where
higher pressure steam
is expanded through steam turbine to lower pressure steam to
produce power.
This shaded region can be used roughly to compare between the
amounts of
power that can be produced from a site at different scenarios.
The site steam
headers might also have a pinch where above it there is a steam
supply
deficiency and below it there is a surplus of heat/steam supply
and the site needs
to reject it to the environment. This is normally rejected to
water or air coolers.
In order to maximize the true cogeneration of power and steam
from the site,
low pressure steam generated is expanded to vacuum pressure
steam, which is
ultimately condensed using cooling water.
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 62 of 92
While this graphical procedure can render some insights we
recommend that
you use algebraic method to with simple equations for steam
turbine to estimate
the exact amount of power that can be co-generated with steam
need to satisfy
the process demand. Schematic representation of the method is
shown to the
right of the graph below.
Steam generated
by the process
Steam Consumed
by the processLP
MP
HP
Fuel
VHP
VP
CW
E1
E2
VPE3
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 63 of 92
Back to the graphical method that can give very useful insights,
the graph below
can be used to as we said before in getting an idea about
amounts of power that
can be produced from a site in different scenarios.
Fuel
VHP
VP
H
T
-
Document Responsibility: P&CSD/Energy Systems Division
SABP-A-012
Issue Date: 21 July 2013
Next Planned Update: TBD New Projects Energy Efficiency
Optimization Review Methodology
Page 64 of 92
In steam turbine situation, the larger the flow of steam through
the turbine, the
greater is the amount of power that will be produced and the
larger the pressure
difference and hence the larger the saturation temperature
difference across the
turbine, the greater the potential for power generation. Such
po