Page 1 of 2 SA Metropolitan Fire Service 99 Wakefield Street, Adelaide, SA, 5000 GPO Box 98, Adelaide SA 5001 Tel: 8204 3611 Fax: 8204 3781 Email: [email protected] Flow Test Request Conditions for MFS Flow Test: • Once this request has been received, the MFS Water Officer will contact you to make an appointment. • Prior to a commissioning/extension test, this Department requires a copy of the ‘Fire Service Installation Report and Plumbing Certificate of Compliance’ as witnessed by the Office of the Technical Regulator (OTR) and sent by the OTR to this department. • The flow test request, block plans and all documents from the OTR must be received at least 3 working days prior to the test date to confirm your booking. • Due to MFS work, health & safety policies, the MFS will not proceed with the hydraulic test if, upon inspection the site is deemed to be a construction site (i.e. building not completed, contractors are required to wear PPE, scaffolding/temporary fencing present, unsealed roadways/carparks) unless there are exceptional circumstances confirmed and agreed to prior. • If it is determined, that the site is unfit for testing, the test will be cancelled and will need to be rescheduled by the contractor in liaison with the MFS Water Officer. Premises: Premises Address: Management/Contractors Details Company: Contact Person: Phone: Address: Email: TEST REQUIRED Hose Reels Unassisted Hydrants (no booster on site) Boosted Hydrants Unassisted Combination Hydrant Sprinkler Boosted Combination Hydrant Sprinkler Boosted and Pumped Hydrant Boosted and Pumped Combination Hydrant Sprinkler TYPE OF TEST REQUIRED Commissioning Extension 5 Year Inspection Other (specify) DATE AND TIME OPTIONS (PREFERRED – SUBJECT TO AVAILABILITY) Office Use MFS Shift Preference Date Time 1 2