01 02 C D E F G RB4 RB4 RB4 RB4 RB2 RB2 RB4 RB2 RB3 RB2 RB3 RB2 RC1 RC1 RB2 RB3 FC1 FC1 RB5 RB5 RC1 RC1 RC1 RC1 RC1 RC1 RC1 RC1 RC1 FC1 FC1 FC1 RB5 FC1 END COLUMN TO BE CONCRETE ENCASED AND SUPPORT FUTURE FLOOR SLABS RB4 RB4 RB4 RB1 RB1 RB2 RB2 RB2 RB4 RB4 EXISTING HERITAGE FACADE S.03 S701 EXISTING HERITAGE FACADE S.01 S701 S.02 S701 RC1 01 02 C D E F G TPF1 TPF1 TPF1 TPF1 TPF1 TPF1 TPF2 TPF2 TPF2 TPF2 TPF2 TPF2 RC1 FC1 FC1 FC1 FC1 FC1 FC1 S.03 S701 EXISTING HERITAGE FACADE S.01 S701 S.02 S701 EQ. EQ. RC1 RC1 RC1 RC1 RC1 RC1 RC1 RC1 RC1 01 LEVEL 02 LEVEL 03 LEVEL 04 LEVEL 01 TPF1 TPF2 RB5 FB1 FB1 FB1 RB5 RB2 RB2 RB1 RB1 RB1 RB1 RB2 RB2 RB1 RB2 RB2 RB1 FC1 4B6 4B5 INISTU NEW JERSEY BARRIERS TO ACT AS KENTLEDGE TO FRAME (MIN 10m³ CONCRETE PER SUPPORT) ALLOW FOR STEEL COLUMN TO BE CAST INTO FUTURE NEW FOUNDATIONS COLUMN CONNECTED TO LEVEL 4 ROOF TERRACE STRUCTURE IN FUTURE EXISTING FACADE RC1 RC1 RC1 RC1 CONTRACTOR TO LOCATE BASE OF EXISTING FOOTING. 3 TILTMETERS (AUTOMATED) 3 SURVEY POINTS (3D) 2 S703 APPROX. 2500 R.L 48.53 R.L 46.05 R.L 51.54 R.L 54.66 4B4 GROUND LEVEL 02 C D E F LEVEL 03 LEVEL 04 LEVEL 01 RB2 RB2 RB2 RB2 RB2 RB2 RB2 RB2 RB2 RB2 RB2 RB2 RB4 RB4 TPF1 TPF1 TPF1 TPF1 TPF1 TPF1 RB2 RB2 RB6 RB6 RB6 RB1 RB1 RB1 RB1 RB1 RB1 RC1 RC1 RC1 RC1 RC1 RC1 RB1 RB1 RB2 RB2 RB1 RB1 RB2 RB3 RB3 RC1 RC1 RC1 RC1 RC1 RC1 RB4 RB4 RB1 RB1 RB1 RB1 RB1 RB1 RB2 RB2 RB2 RB3 RB3 RB6 RB6 RB6 RB6 RB6 RB6 RB6 C D E F RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 FC1 FC1 FC1 FC1 FC1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 RB5 RB5 RB5 RB5 RB5 RB5 RB5 RB5 RB5 RB5 4B4 4B4 4B4 4B4 4B4 4B4 4B8 4B8 4B6 FC1 COLUMNS TO BE FULL HEIGHT CONTINUOUS STEEL MEMBERS. INSTALLTION THROUGH POCKETS CUT IN EXISTING STRUCTURE PRIOR TO FULL DEMOLITION. PROPPING WILL BE REQUIRED TO EXISTING BEAMS TO CREATE POCKETS. ALTERNATIVELY 2 No. 360UB56 BATTENED COLUMNS COULD BE USED EITHER SIDE OF EXISTING BEAM FB1 BEAMS CRANKED AROUND CORNER REFER PLAN FB1 FB1 FB1 01 02 C D E F G RB2 RB2 RC1 RC1 FC1 FC1 RC1 RC1 RC1 RC1 RC1 RC1 RC1 RC1 FC1 FC1 FC1 FC1 RB2 RB2 FB1 FB1 FB1 FB1 FB1 FB1 FB1 FB1 RB2 RB2 S.03 S701 EXISTING HERITAGE FACADE S.01 S701 S.02 S701 RB1 RB1 RB1 RB1 RB1 RB1 RC1 RC1 01 02 C D E F G 4B5 4B5 4B5 4B5 4B5 4B5 UNDER FC1 UNDER FC1 UNDER FC1 UNDER FC1 4B4 4B4 4B4 4B4 4B4 4B6 4B4 4B5 4B5 4B5 4B5 4B5 4B5 4B5 4B5 4B5 4B5 4C1 4C1 4B8 4B8 S.03 S701 S.04 S703 S.01 S701 S.02 S701 UNDER 3C1 UNDER FC1 NOTE: FACADE RETENTION PLANS SHOW STRUCTURE TO COMPLETED NEW BUILDING BEHIND. NOTE: BUILDER TO CONFIRM ALL LEVELS ON SITE PRIOR TO ANY STEELWORK FABRICATION 82 Smith Street Darwin 0800 t +61 8 8980 5900 f +61 8 8981 4010 [email protected]ABN 89 050 214 894 WORK IN PROGRESS PRELIMINARY NOT TO BE USED FOR CONSTRUCTION 0 2000 10000 4000 6000 8000 Scales at A0 Date Drawing Title Sheet No. Job No. Drawn Checked Rev. Approved Client Project A0 Description Rev. Date By Description Rev. Date By Description Rev. Date By SCALE INDICATED FOR REFERENCE ONLY. DO NOT SCALE DRAWING. FACULTY OF ARCHITECTURE BUILDING AND PLANNING UNIVERSITY OF MELBOURNE PARKVILLE CAMPUS 09ME0504 2 As indicated 15/06/2012 3:55:00 PM HERITAGE FACADE RETENTION DETAILS - SHEET 1 S701 B.P D.I 04/16/12 B.R DISCLAIMER:- COPYRIGHT OF THIS DRAWING IS VESTED IN IRWINCONSULT PTY LTD AND THIS DRAWING/FILE IS NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, IN ANY FORM, WITHOUT THE PRIOR WRITTEN APPROVAL OF IRWINCONSULT PTY LTD. THE RECIPIENT IS RESPONSIBLE FOR ENSURING THAT THEY REVIEW THE STATUS OF THIS DRAWING, AND ARE IN RECEIPT OF THE CURRENT REVISION PRIOR TO USE. EXCEPT WHERE FIGURED DIMENSIONS HAVE BEEN PROVIDED, IRWINCONSULT IS NOT RESPONSIBLE FOR DIMENSIONING AND SETTING OUT. THIS DRAWING HAS NOT BEEN PRODUCED TO A LEVEL OF DIMENSIONAL ACCURACY SUITABLE FOR FABRICATION. THE CONTRACTOR IS RESPONSIBLE FOR PRODUCTION OF FABRICATION / SHOP DRAWINGS WHERE THESE ARE REQUIRED. THIS DRAWING HAS BEEN PRODUCED FOR THE NAMED CLIENT FOR USE ON THIS PROJECT ONLY AND IS NOT TO BE USED FOR ANY OTHER PURPOSE. Rev Description By Date 1 PRELIMINARY ISSUE BP 04.06.12 2 50% C.D ISSUE BP 15.06.12 SCALE: 3D ISOMETRIC SCALE: 1 : 100 FACADE RETENTION PLAN - RL 46.050 SCALE: 1 : 100 FACADE RETENTION - GROUND FLOOR TEMPORARY FACADE RETENTION STEELWORK SCHEDULE MARK SIZE REMARKS RB1 RB2 RB3 RB4 150PFC TEMPORARY STEEL BEAM RB5 200UC46 TEMPORARY STEEL BEAM RB6 150x150x12 EA TEMPORARY STEEL BEAM TEMPORARY FACADE RETENTION STEEL COLUMN SCHEDULE MARK SIZE REMARKS RC1 200UC46 TEMPORARY RETENTION STEEL COLUMN PERMANENT FACADE RETENTION STEELWORK SCHEDULE MARK SIZE REMARKS FB1 250x250x6.0 SHS PERMANENT FLOOR BEAM PERMANENT FACADE STEEL COLUMN SCHEDULE MARK SIZE REMARKS FC1 460UB82 STEEL COLUMN TEMPORARY FACADE RETENTION PAD FOOTING SCHEDULE MARK DIMENSIONS REMARKS TPF1 1250x1250x1200D TEMPORARY PAD FOOTING TPF2 900x900x1200D TEMPORARY PAD FOOTING SECTION SCALE - 1 : 50 S.03 SECTION SCALE - 1 : 100 S.01 FRONT ELEVATION SECTION SCALE - 1 : 100 S.02 REAR ELEVATION (FACADE RETENTION PLAN - RL 54.660 SIMILAR) SCALE: 1 : 100 FACADE RETENTION PLAN - RL 48.530 SCALE: 1 : 100 FACADE RETENTION PLAN - LEVEL 4 (FACADE RETENTION PLAN - RL 51.540 SIMILAR)
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
01 02
C
D
E
F
G
RB4
RB4
RB4RB4
RB2
RB2
RB4
RB2
RB3
RB2
RB3
RB2
RC1
RC1
RB2
RB3
FC1
FC1
RB5
RB5
RC1
RC1
RC1
RC1
RC1
RC1
RC1
RC1
RC1
FC1
FC1
FC1
RB5
FC1
END COLUMN TO BE CONCRETE ENCASEDAND SUPPORT FUTURE FLOOR SLABS
RB4
RB4
RB4
RB1RB1
RB2
RB2
RB2
RB4RB4
EXISTING HERITAGEFACADE
S.03S701
EXISTING HERITAGEFACADE
S.01S701
S.02S701
RC1
01 02
C
D
E
F
G
TPF1
TPF1
TPF1
TPF1
TPF1
TPF1
TPF2
TPF2
TPF2
TPF2
TPF2
TPF2
RC1
FC1
FC1
FC1
FC1
FC1
FC1
S.03S701
EXISTING HERITAGEFACADE
S.01S701
S.02S701
EQ.
EQ.
RC1
RC1
RC1RC1
RC1
RC1
RC1
RC1
RC1
01
LEVEL 02
LEVEL 03
LEVEL 04
LEVEL 01
TPF1 TPF2
RB5
FB1
FB1
FB1
RB5RB2
RB2
RB1RB1
RB1RB1
RB2
RB2 RB1
RB2
RB2
RB1
FC1
4B64B5
INISTU NEW JERSEY BARRIERSTO ACT AS KENTLEDGE TO FRAME(MIN 10m³ CONCRETE PER SUPPORT)
ALLOW FOR STEEL COLUMN TOBE CAST INTO FUTURE NEWFOUNDATIONS
COLUMN CONNECTED TOLEVEL 4 ROOF TERRACESTRUCTURE IN FUTURE
EXISTING FACADE
RC1
RC1
RC1
RC1
CONTRACTOR TO LOCATE BASEOF EXISTING FOOTING.
3 TILTMETERS(AUTOMATED)
3 SURVEY POINTS(3D)
2S703
APPROX.2500
R.L 48.53
R.L 46.05
R.L 51.54
R.L 54.66
4B4
GROUND
LEVEL 02
C D E F
LEVEL 03
LEVEL 04
LEVEL 01
RB2RB2
RB2RB2
RB2RB2
RB2RB2
RB2RB2
RB2RB2
RB4RB4
TPF1 TPF1 TPF1 TPF1 TPF1 TPF1
RB2
RB2
RB6
RB6
RB6
RB1RB1
RB1RB1
RB1RB1
RC1
RC1
RC1
RC1
RC1
RC1
RB1
RB1
RB2RB2
RB1
RB1
RB2 RB3RB3
RC1
RC1
RC1
RC1
RC1
RC1
RB4RB4
RB1RB1
RB1RB1
RB1RB1
RB2RB2 RB2 RB3RB3
RB6
RB6
RB6
RB6
RB6
RB6
RB6
CDEF
RB1RB1
RB1RB1
RB1
RB1RB1
RB1RB1
RB1
RB1
RB1
FC1
FC1
FC1
FC1
FC1
FB1FB1FB1FB1 FB1 FB1FB1FB1
FB1FB1
FB1FB1
FB1FB1FB1FB1
FB1FB1FB1
FB1 FB1 FB1
RB5 RB5 RB5RB5 RB5
RB5 RB5 RB5RB5 RB5
4B4 4B4 4B4 4B4 4B4 4B4 4B84B8 4B6
FC1 COLUMNS TO BE FULL HEIGHT CONTINUOUS STEEL MEMBERS.INSTALLTION THROUGH POCKETS CUT IN EXISTING STRUCTUREPRIOR TO FULL DEMOLITION. PROPPING WILL BE REQUIRED TOEXISTING BEAMS TO CREATE POCKETS. ALTERNATIVELY 2 No.360UB56 BATTENED COLUMNS COULD BE USED EITHER SIDE OFEXISTING BEAM
FB1 BEAMS CRANKED AROUND CORNERREFER PLAN
FB1FB1
FB1
01 02
C
D
E
F
G
RB2
RB2
RC1
RC1
FC1
FC1
RC1
RC1
RC1
RC1
RC1
RC1
RC1
RC1
FC1
FC1
FC1
FC1
RB2
RB2
FB1
FB1
FB1
FB1
FB1
FB1
FB1
FB1
RB2
RB2S.03S701
EXISTING HERITAGEFACADE
S.01S701
S.02S701
RB1
RB1
RB1
RB1
RB1
RB1
RC1RC1
01 02
C
D
E
F
G
4B5
4B5
4B5
4B5
4B5
4B5
UNDERFC1
UNDERFC1
UNDERFC1
UNDERFC1
4B4
4B4
4B4
4B4
4B4
4B6
4B4
4B5
4B5
4B5 4B
5
4B5
4B5
4B5
4B5
4B5
4B5
4C1
4C1
4B8
4B8
S.03S701
S.04S703
S.01S701
S.02S701
UNDER3C
1
UNDERFC1
NOTE:FACADE RETENTION PLANS SHOWSTRUCTURE TO COMPLETED NEWBUILDING BEHIND.
NOTE:BUILDER TO CONFIRM ALL LEVELSON SITE PRIOR TO ANY STEELWORKFABRICATION
82 Smith Street Darwin 0800t +61 8 8980 5900 f +61 8 8981 4010
SCALE INDICATED FOR REFERENCE ONLY. DO NOT SCALE DRAWING.
FACULTY OF ARCHITECTUREBUILDING AND PLANNING
UNIVERSITY OF MELBOURNEPARKVILLE CAMPUS
09ME0504 2As indicated
15/06/2012 3:55:00 PM
HERITAGE FACADE RETENTION DETAILS -SHEET 1
S701
B.P D.I04/16/12 B.R
DISCLAIMER:-
COPYRIGHT OF THIS DRAWING IS VESTED IN IRWINCONSULT PTY LTD AND THIS DRAWING/FILE IS NOT TO BE REPRODUCED OR COPIEDIN WHOLE OR IN PART, IN ANY FORM, WITHOUT THE PRIOR WRITTEN APPROVAL OF IRWINCONSULT PTY LTD.
THE RECIPIENT IS RESPONSIBLE FOR ENSURING THAT THEY REVIEW THE STATUS OF THIS DRAWING, AND ARE IN RECEIPT OF THECURRENT REVISION PRIOR TO USE.
EXCEPT WHERE FIGURED DIMENSIONS HAVE BEEN PROVIDED, IRWINCONSULT IS NOT RESPONSIBLE FOR DIMENSIONING AND SETTINGOUT. THIS DRAWING HAS NOT BEEN PRODUCED TO A LEVEL OF DIMENSIONAL ACCURACY SUITABLE FOR FABRICATION. THECONTRACTOR IS RESPONSIBLE FOR PRODUCTION OF FABRICATION / SHOP DRAWINGS WHERE THESE ARE REQUIRED.
THIS DRAWING HAS BEEN PRODUCED FOR THE NAMED CLIENT FOR USE ON THIS PROJECT ONLY AND IS NOT TO BE USED FOR ANYOTHER PURPOSE.Rev Description By Date
1 PRELIMINARY ISSUE BP 04.06.122 50% C.D ISSUE BP 15.06.12
ASSUMED SEQUENCE FOR SUPPORT OF EXISTING J.R. FACADE1. REMOVE WINDOWS & DOORS AND STORE APPROPRIATELY. DECOMMISSION LIFT OF
EXISTING FACADE.2. CAST FOOTINGS FOR EXTERNAL TEMPORARY STEEL FRAME. COORDINATE WITH SERVICES
DIVERSIONS IN FRONT OF JR FAÇADE.3. PROP INTERNAL CONCRETE BEAMS SPANNING ONTO FAÇADE. BREAK OUT LOCAL POCKETS IN
FLOORS WHERE PERMANENT STEEL COLUMNS ARE TO BE INSTALLED.4. INSTALL NEW STEEL COLUMNS (DROPPED IN FROM THE ROOF) AND FIX BACK TO THE EXISTING
JR FACADE AS PER DETAILS.5. INSTALL HORIZONTAL STEEL ELEMENTS AND FIX BACK TO THE EXISTING JR FACADE AS PER DETAILS.6. CONSTRUCT EXTERNAL HOARDING FRAME.7. INSTALL KENTLEDGE BARRIERS TO FRONT OF RETENTION STEELWORK.8. INSTALL TEMPORARY HORIZONTAL RB5’S AND CONNECT TO PERMANENT STEEL COLUMNS FIXED TO
EXISTING JR FACADE.9. EXISTING SLABS TO BE CAREFULLY SAW-CUT WHERE THEY ARE SUPPORTED ON THE JR FAÇADE.10. BALANCE OF DEMOLITION CAN OCCUR.11. ONCE THE LEVEL 4 STEEL IS COMPLETE, THE LEVEL 4 SLAB IS POURED AND THE MAIN STRUCTURE IS
SUITABLY BRACED AND CONNECTED TO THE STEELWORK TO THE REAR OF THE JR FAÇADE THE TEMPORARYSTEEL CAN BE REMOVED.
DESIGN RESPONSIBILITY1. THESE DRAWINGS INDICATE DESIGN INTENT FOR THE TEMPORARY WORKSTO RESTRAIN THE JOSEPH REED FAÇADE. THE CONTRACTOR IS RESPONSIBLEFOR THE DETAILED DESIGN OF THE TEMPORARY WORKS AND IS TO SUBMITDETAILED DRAWINGS AND COMPUTATIONS FOR CHECKING.
2. THE ELEMENTS IDENTIFIED AS PERMANENT ON THESE DRAWINGS ARE THEDESIGN RESPONSIBILITY OF IRWINCONSULT IN THE PERMANENT CONDITION.THE CONTRACTOR IS TO ENSURE THAT THESE ELEMENTS ARE CHECKED FORTHE FORCES APPLIED IN THE TEMPORARY CONDITION, OR SUPPLY THESEFORCES TO IRWINCONSULT FOR CHECKING.
3. THE EXISTING CONDITIONS SHOWN ON THESE DRAWINGS ARE BASED ONBEST AVAILABLE INFORMATION. THE CONTRACTOR MUST VERIFY THISINFORMATION BY SITE SURVEY WITH PARTICULAR ATTENTION TO:3.1. EXISTING FOUNDATIONS – THE DEPTH OF THE EXISTING FOUNDATIONS ISNOT KNOWN. THE CONTRACTOR IS TO EXCAVATE A TRIAL PIT TO VERIFY THEDEPTH PRIOR TO COMMENCING DETAILED DESIGN.3.2. WALL PLUMB – THE CONTRACTOR IS TO VERIFY BY SURVEY THEPLUMBNESS / VERTICALITY OF THE EXISTING WALL PRIOR TO COMMENCINGDETAILED DESIGN WORK.3.3. EXISTING WALL STRUCTURE – THE INTERNAL MAKE UP OF THE WALL ISCURRENTLY UNKNOWN. WHILE THE FRONT COMPRISES 19TH CENTURYSTONEWORK, AND THE REAR COMPRISES 1930S BRICKWORK, THE INTERIOR ISNOT KNOWN. THE CONTRACTOR IS TO OPEN AN EXPLORATORY HOLE IN THEREAR OF THE WALL TO VERIFY THE INTERNAL MAKE-UP OF THE WALL, AND THECONDITION OF ANY TIES FOUND THEREIN.
1. A SYSTEM IS TO BE ESTABLISHED TO ENSURE THAT THE POSITION ANDPLUMB OF THE FAÇADE CAN BE MONITORED THROUGHOUT THE DEMOLITIONAND CONSTRUCTION.
2. DURATION OF MONITORING:THE MONITORING SYSTEM IS TO BE INSTALLED AND FUNCTIONAL AT LEAST 2WEEKS BEFORE COMMENCEMENT OF DEMOLITION. TWO WEEKS WORTH OFBASELINE READINGS ARE TO BE TAKEN TO ACT AS THE BASIS FOR FUTURECOMPARISON. MONITORING IS TO CONTINUE THROUGHOUT THE DEMOLITIONAND CONSTRUCTION PERIODS UNTIL THE PERMANENT SUPPORT TO THEFAÇADE HAS BEEN ESTABLISHED AND THE TEMPORARY SUPPORTREMOVED.
3. MONITORING FREQUENCY:THE INTERVALS BETWEEN MONITORING ARE TO REMAIN UNCHANGED FORTHE TIME BETWEEN COMMENCEMENT OF DEMOLITION TO THE COMPLETIONOF BASEMENT AND GROUND FLOOR SLAB. THE MONITORING INTERVALS CANTHEN BE RELAXED FOR THE BALANCE OF THE MONITORING PERIOD.
4. MONITORING PLAN:THE CONTRACTOR IS TO SUBMIT A PLAN FOR MONITORING THAT INCLUDES:4.1.PHYSICAL SURVEY OF FIXED TARGETS, INCLUDING THE PROPOSEDPOSITIONS OF FIXED SURVEY TARGETS AND FIXED POSITIONS FROM WHICHTHESE CAN BE CLEARLY SIGHTED AT ALL STAGES DURING CONSTRUCTION.THE PROPOSED INTERVAL OF SURVEY OF THE FIXED POINTS IS TO BEOUTLINED.4.2.AUTOMATED MONITORING OF THE PLUM / VERTICALITY OF THE WALLUSING TILTMETERS OR SIMILAR LINKED TO A LOGGING / RECORDING SYSTEMTHAT WILL RAISE AN ALARM SHOULD THE WALL MOVE BEYOND THEALLOWABLE MOVEMENTS OUTLINED BELOW.
5. HANDOVER ON COMPLETION:THE CONTRACTOR IS TO INCLUDE PROVSION FOR THE SURVEY ANDMONITORING SYSTEM TO BE TAKEN OVER BY THE MAIN CONTRACTOR ONCOMPLETION OF THE ENABLING WORKS CONTRACT.
SURVEY AND MONITORING
1. THE ULTIMATE MAXIMUM ALLOWABLE OUT-OF-PLUMB OF THE WALLIS TO BE CALCULATED AS BEING THE OUT-OF-PLUMB AT WHICH THEHORIZONTAL LOAD IS GREATER THAN THE MAXIMUM DESIGN LOADCALCULATED IN ACCORDANCE WITH THE DESIGN CRITERIA BELOW.
2. THE MONITORING PLAN IS TO ADOPT A LIMIT OF 80% OF THEABOVE OUT-OF-PLUMB. THE REULTS OF THE SURVEY ANDTILTMETERS ARE TO BE COMPARED WITH THIS LIMIT AND THEFOLLOWING ACTIONS TAKEN:GREEN – MOVEMENT OF UP TO 50% OF THE CALCULATED LIMIT –· NO ACTION REQUIRED.AMBER – MOVEMENT BETWEEN 50% AND 75% OF THE CALCULATEDLIMIT –· INFORM PROJECT SUPERVISOR, ARCHITECT AND STRUCTURALENGINEER.· INVESTIGATE CAUSE OF MOVEMENT.· PREPARE PLAN FOR REMEDIAL ACTION TO BE TAKEN IFMOVEMENT EXCEEDS RED LIMIT.RED – MOVEMENT OF 75% OF THE LIMIT –· STOP ALL WORK DESTABILISING WALL.· IMPLEMENT REMEDIAL ACTION PLAN.· INFORM PROJECT SUPERVISOR, ARCHITECT, AND STRUCTURALENGINEER.
ALLOWABLE MOVEMENTS
1. LOADSTHE TEMPORARY RETENTION IS TO BE DESIGNED FOR THE GREATER OF:· THE HORIZONTAL LOADS RESULTING FROM THE EXISTING OUT-OF-PLUMB,PLUS· THE EXISTING OUT-OF-BALANCE MOMENT RESULTING FROM THEDISTRIBUTION OF MASS OF THE WALL PLUS· WIND AND EARTHQUAKE LOADS AS DEFINED BY THE RELEVENT PARTS OFAS1170 OR· 1.5% OF THE VERTICAL DEAD LOAD AT EACH LEVEL TAKEN AS ACTINGHORIZONTALLY.
THE WINDOWS WILL BE REMOVED DURING CONSTRUCTION, HOWEVER, THEDESIGN IS TO ASSUME A SOLID FAÇADE AND NOT REDUCE WIND LOADS TOACCOUNT FOR THE REDUCED AREA WITHOUT WINDOWS.THE EARTHQUAKE LOADS SHOULD ASSUME THE MASS OF TWO WORKINGPLATFORMS FOR THE STONE MASON LOCATED AT RLS 54.66 AND 46.05 APPROX.
1. DEFLECTIONS:1.1.THE COMBINATION OF OUT-OF-PLUMB PLUS MAXIMUM DEFLECTION IS NEVERTO RESULT IN A SCENARIO WHERE THE RESULTING HORIZONTAL LOAD EXCEEDSTHE DESIGN HORIZONTAL LOAD AS OUTLINED ABOVE.1.2.THE DEFLECTION IS NEVER TO EXCEED HEIGHT/250.
2. THE SUBMITTED COMPUTATIONS ARE TO INCLUDE A CLEAR RESPONSE TOTHE ABOVE CRITERIA, TAKING INTO ACCOUNT THE RESULTS OF THE PLUMBNESS/ VERTICALITY SURVEY.
DESIGN CRITERIA
82 Smith Street Darwin 0800t +61 8 8980 5900 f +61 8 8981 4010
SCALE INDICATED FOR REFERENCE ONLY. DO NOT SCALE DRAWING.
FACULTY OF ARCHITECTUREBUILDING AND PLANNING
UNIVERSITY OF MELBOURNEPARKVILLE CAMPUS
09ME0504 2As indicated
15/06/2012 3:55:02 PM
HERITAGE FACADE RETENTION DETAILS -SHEET 2
S702
B.P D.I04/16/12 B.R
DISCLAIMER:-
COPYRIGHT OF THIS DRAWING IS VESTED IN IRWINCONSULT PTY LTD AND THIS DRAWING/FILE IS NOT TO BE REPRODUCED OR COPIEDIN WHOLE OR IN PART, IN ANY FORM, WITHOUT THE PRIOR WRITTEN APPROVAL OF IRWINCONSULT PTY LTD.
THE RECIPIENT IS RESPONSIBLE FOR ENSURING THAT THEY REVIEW THE STATUS OF THIS DRAWING, AND ARE IN RECEIPT OF THECURRENT REVISION PRIOR TO USE.
EXCEPT WHERE FIGURED DIMENSIONS HAVE BEEN PROVIDED, IRWINCONSULT IS NOT RESPONSIBLE FOR DIMENSIONING AND SETTINGOUT. THIS DRAWING HAS NOT BEEN PRODUCED TO A LEVEL OF DIMENSIONAL ACCURACY SUITABLE FOR FABRICATION. THECONTRACTOR IS RESPONSIBLE FOR PRODUCTION OF FABRICATION / SHOP DRAWINGS WHERE THESE ARE REQUIRED.
THIS DRAWING HAS BEEN PRODUCED FOR THE NAMED CLIENT FOR USE ON THIS PROJECT ONLY AND IS NOT TO BE USED FOR ANYOTHER PURPOSE.Rev Description By Date
1 PRELIMINARY ISSUE BP 04.06.122 50% C.D ISSUE BP 15.06.12
SCALE: 1 : 100ENABLING WORKS - STAGE 1
SCALE: 1 : 100ENABLING WORKS - STAGE 3
SCALE: 1 : 100ENABLING WORKS - STAGE 4
SCALE: 1 : 100COMPLETION OF ENABLING WORKS
SCALE: 1 : 100FINAL CONDITION
CONSTRUCTION PROCEDURE FOR SUPPORT OF EXISTINGJ.R FACADE DURING ENABLING WORKS
BUILD UP SCREED/FINISHES,FALLS & TANKING TO ARCH'SDETAILS
20 CAP PL.6CFW4M20 BOLTS
10 STIFFENER PL.6CFW
10 THK. PLATEWITH 50mm VERTICAL SLOTTED HOLES6CFW TO FC116Ø THREADED RODDRILL & EPOXY INTO JR FACADE BRICKWORKWITH CHEMSET INJECTION 101(OR APPROVED EQUIVALENT)IN STRICT ACCORDANCE WITH MANUF. SPEC.300 MIN. EDGE DISTANCETYPICAL TO FC1 AT 1200 CTS.
ALL STEELWORK TO FIT AGAINST BACK OFJR FACADE. CHASE INTO RENDER. (TYP.)
FOOTING OF JR FACADECONTRACTOR TO CONFIRMDEPTH OF FOOTINGS
FC1 TO EXTEND INTO NEW CONC. FOOTINGWELD 150x10 EA TO EACH FACE OF FC1AND CAST IN CONCRETE POUR
10 CLEAT PL.6CFW2M20 BOLTS
10 THK. PLATEWITH 50mm VERTICAL SLOTTED HOLES6CFW TO FC116Ø THREADED RODDRILL & EPOXY INTO JR FACADE BRICKWORKWITH CHEMSET INJECTION 101(OR APPROVED EQUIVALENT)IN STRICT ACCORDANCE WITH MANUF. SPEC.300 MIN. EDGE DISTANCETYPICAL TO FB1 AT 1200 CTS.
JR FACADE
300200 MIN.
250
4B4
4B6 10 STIFFENER PL.6CFW
20 PL.6CFW4M20 BOLTS
10 STIFFENER PL.EACH FACE6CFW
82 Smith Street Darwin 0800t +61 8 8980 5900 f +61 8 8981 4010
SCALE INDICATED FOR REFERENCE ONLY. DO NOT SCALE DRAWING.
FACULTY OF ARCHITECTUREBUILDING AND PLANNING
UNIVERSITY OF MELBOURNEPARKVILLE CAMPUS
09ME0504 2 1 : 10
15/06/2012 3:55:03 PM
HERITAGE FACADE RETENTION DETAILS -SHEET 3
S703
B.P D.I05/29/12 B.R
DISCLAIMER:-
COPYRIGHT OF THIS DRAWING IS VESTED IN IRWINCONSULT PTY LTD AND THIS DRAWING/FILE IS NOT TO BE REPRODUCED OR COPIEDIN WHOLE OR IN PART, IN ANY FORM, WITHOUT THE PRIOR WRITTEN APPROVAL OF IRWINCONSULT PTY LTD.
THE RECIPIENT IS RESPONSIBLE FOR ENSURING THAT THEY REVIEW THE STATUS OF THIS DRAWING, AND ARE IN RECEIPT OF THECURRENT REVISION PRIOR TO USE.
EXCEPT WHERE FIGURED DIMENSIONS HAVE BEEN PROVIDED, IRWINCONSULT IS NOT RESPONSIBLE FOR DIMENSIONING AND SETTINGOUT. THIS DRAWING HAS NOT BEEN PRODUCED TO A LEVEL OF DIMENSIONAL ACCURACY SUITABLE FOR FABRICATION. THECONTRACTOR IS RESPONSIBLE FOR PRODUCTION OF FABRICATION / SHOP DRAWINGS WHERE THESE ARE REQUIRED.
THIS DRAWING HAS BEEN PRODUCED FOR THE NAMED CLIENT FOR USE ON THIS PROJECT ONLY AND IS NOT TO BE USED FOR ANYOTHER PURPOSE.Rev Description By Date
1 PRELIMINARY ISSUE BP 04.06.122 50% C.D ISSUE BP 15.06.12