S E S S E S S I O N S I O N 4 4 Republic of Poland Republic of Poland Rural Development Rural Development Operational Programme Operational Programme 2007-2013” 2007-2013” Implementing Issues Implementing Issues Future of Rural Areas in Europe. Kraków, 30th November– 1st December 2005 Ministry of Agriculture and Rural Development
38

S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

Dec 16, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

S E SS E S S I O N S I O N 4 4

Republic of PolandRepublic of Poland„„Rural DevelopmentRural Development

Operational ProgrammeOperational Programme 2007-2013” 2007-2013”

Implementing IssuesImplementing Issues

Future of Rural Areas in Europe. Kraków, 30th November– 1st December 2005

Ministry of Agriculture and Rural Development

Page 2: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

Essential documents: Council Regulation (EC) No 1290/2005

of 21 June 2005 on financing of the common agricultural policy

Council Regulation (EC) No 1698/2005of 20 September 2005 on support for rural development by the European Agricultural Fund for Rural Development (EAFRD)

Drafts Implementing Regulation regarding Council Regulation

No 1698/2005 (under preparation by EC) European Commission Guidelines concerning monitoring

and evaluation (consultations - EC and Member States)

Page 3: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

POLISH ASSUMPTIONFOR YEARS 2007-2013

One programme for the whole country

„„Rural DevelopmentRural DevelopmentOperational Programme 2007-2013”Operational Programme 2007-2013”

Preparation of assumptions and rules of the programme implementation based on partnership

Use of working elements of existing programmes: RDP 2004-2006, SOP 2004-2006

Continuation of good solutions, changing elements making difficulties in programmes’ realisation

Strengthening of cooperation and exchange of information

Page 4: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

INSTITUTIONSINSTITUTIONS

Page 5: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

INSTITUTIONS 2007-2013 (1)

Required authorities shall be established(Council Regulation (EC) No 1698/2005, article 74)

Managing Authority…….Ministry of Agriculture and Rural Development (MARD) – Department of Rural Development

Paying Agency…………..Agency for Restructuring and Modernisation of Agriculture (ARMA)

Certification Body…….Ministry of Finance (MF) - Bureau for International Treasury Relations

probably also:

Coordinating Body…….MARD – Department of Finance (DF)• OP RDP’s Paying Agency• Paying Agency managing part of CAP measures (Agriculture Market

Agency – AMA)

Page 6: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

INSTITUTIONS 2007-2013 (2)

Regulations 1290/2005 and 1698/2005 define institutions’ responsibilities for implementation of tasks as regards the Programme

The realisation of most of the tasks may be delegated to other bodies – retaining the responsibility for the realisation

The execution of payment of the Community funds cannot be delegated – it’s the only competence of the Paying Agency

Fundamental change comparing to RDP 2004-2006 – the responsibility for the projects’ choice (beneficiaries): up to date……………………. Paying Agency 2007-2013……..……..……… Managing Authority

(possibility of delegation eg. to the Paying Agency)

Page 7: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

MANAGING AUTHORITY 2007-2013 (1)

Legal base:Legal base: Regulation 1698/2005, art. 75

Poland (project):Poland (project): Ministry of Agriculture and Rural Development

Department of Rural Development Responsible for:Responsible for:

Managing the programme Implementing the programme in an efficient, effective and

correct way

Page 8: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

MANAGING AUTHORITY 2007-2013 (2)

In particular responsible for ensuring that:In particular responsible for ensuring that: Projects’ selection for funding is done in accordance with criteria of the

Programme and the Paying Agency receives all necessary information, in particular on the procedures operated and any controls carried out in relation to operations selected for funding before payments are authorised

Information about the Program (promotion) is done according to the Community requirements and the beneficiaries and other institutions concerned are well informed about their obligations as regards the support given and fulfill accountancy requirements

The computerised system of recording and maintaining the statistical information suitable for the monitoring and evaluation is in place.

Programme evaluations are conducted within the time limits laid down in Regulation 1698/2005 and conform to the common monitoring and evaluation framework

Page 9: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

MANAGING AUTHORITY 2007-2013 (3)

The list of tasks contains also:The list of tasks contains also: Drawing up the annual progress report and, after approval by the

Monitoring Committee, submitting it to the Commission. Leading the Monitoring Committee and sending it the documents

needed to monitor implementation of the programme in the light of its specific objectives.

Submitting evaluations undertaken to the relevant national authorities and the Commission.

In case of delegation of part of tasksthe Managing Authority retains full responsibility for the

efficiency and correctness of management and implementation of those tasks

Page 10: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

THE PAYING AGENCY 2007-2013 (1)

Legal base:Legal base: Regulation 1290/2005, art. 6

Poland (project):Poland (project): Agency for Restructuring and the Modernisation of Agriculture

Responsible for:Responsible for: Paying and declaring the amounts from the Community budget to

the Commission Carrying out the checks (internal and on-the-spot) Submission of annual accounts Detecting the irregularities and recovering the amounts unduly

paid Statements of assurance

Page 11: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

CERTIFICATION BODY 2007-2013

Legal base:Legal base: Regulation 1290/2005, art. 7

Poland (project):Poland (project): The Ministry of Finance

Bureau for International Treasury Relations

Responsible for:Responsible for: Certification the truthfulness, completeness and accuracy of the

accounts of the accredited paying agency, taking account of the management and control systems set up.

Page 12: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

COORDINATING BODY 2007-2013

Legal base:Legal base: Regulation 1290/2005, art. 6, par. 3

Poland:Poland: The Ministry of Agriculture and Rural Development

Department of Finance Responsible for:Responsible for:

Collecting the information to be made available to the Commission and handling it over to the Commision

Promotion of the harmonious application of Community rules

The Coordinating Body will be the subject to specific accreditation by the Member State as regards the

processing of the financial information

Page 13: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

COOPERATING INSTITUTIONS 2007-2013

Supporting and Confirming InstitutionsSupporting and Confirming Institutions(as for measures under RDP 2004-2006)Institutions which take part in the process of preparation of Institutions which take part in the process of preparation of applications, with advising functions and confirming fulfilment of applications, with advising functions and confirming fulfilment of the criteria during the realisation of particular activitythe criteria during the realisation of particular activity

Implementation Organisations Implementation Organisations (as for measures under SOP 2004-2006)Responsible for the implementation of particular activitiesResponsible for the implementation of particular activities

Page 14: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

PLANNEDPLANNEDIMPLEMENTATION IMPLEMENTATION

STRUCTURESTRUCTURERDOP 2007-2013RDOP 2007-2013

Page 15: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

GENERAL IMPLEMENTATION SCHEME

European

Commission

Managing Authority (MARD)

Certifying Body(MF)

Implementing Body’s delegated tasks

Applicant/Beneficiary

Paying Agency(ARMA)

Refund, audit, control

Programme management, implementation supervising, audit, control, monitoring, evaluation, leading of Monitoring Committee, information

Certification of Paying Agency’s accounts

Programme implementation, applications’ treatment, monitoring, information, support granting

Application submission, implementation of the scheme, support receiving

Programme implementation, applications’ treatment, monitoring, information, support granting, payments, controls

Page 16: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

Programme implementationProgramme implementation

Main implementation components:- cooperation (partnership)- management, control (check), information- monitoring, evaluation, reporting- technical assistance and networks

Institutions involved in implementation have to manage support given in favour of rural development in an efficient way and to monitor its use

Page 17: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

Partnership (1)

Support for rural development implemented using partnership rules (close consultations)

Main partners at EU level: European Union Poland

Main partners at the state level: The competent regional, local authorities and other

public authorities The economic and social partners Others: non-governmental organisations,

environment protection organisations and bodies responsible for promoting equality

Page 18: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

Partnership (2)

Designation of suitable partners to create broad and effective cooperation

Cooperation includes: Preparation and monitoring of the National Strategy Plan Preparation, implementation, monitoring and evaluation

of the programme Public consultation at the stage of preparation RDOP 2007-

2013 (published on www.minrol.gov.pl) and National Strategy Plan

Implementation of Rural Development Operational Plan 2007-2013 in partnership with the social partners

Page 19: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

Partnership (3)

National Rural NetworkIncludes all organisations and administration structures engaged in rural development (funding from technical assistance at the programme level)

Tasks: Dissemination and exchange of good rural

development practice Exchange of knowledge and experience Preparation of training programmes for Leader

groups Cooperation with Leader groups

Page 20: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

Monitoring Committee

Established up to 3 months after programme’s approval 1 Programme = 1 Committee Chairman – representative of authorities of Member State

or Managing Authority Activities based on cooperation with partners Assembling representatives of appropriate local authorities

and other public organisations, economic and social partners, representatives of other organisations, including NGOs

Representative of EC may be the advisory member.

Page 21: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

Monitoring Committee - tasks

Provide appropriate programme implementation by:

Consultations regarding criteria of projects’ selection for implementation

Periodical evaluations of the progress of programme targets’ implementation

Analysis and approval of the annual reports on implementation before submitting to the Commission

Proposing to the Managing Authority to make reviews/amendments of the programme

Analysis and approval of any proposals of amendments concerning the programme requiring Commission decision

Page 22: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

FINANCIAL MANAGEMENT

1 Fund (agricultural, not structural) and 1 financial management system for rural development – multiannual programming

Financial rules the same as for Structural Funds Multiannual legal commitments (decisions, agreements) but

financial commitments divided into annual instalments Commitments and payments, N+2 rule

(such as PROW 2004-2006 and SOP 2004-2006)

Paying Agency accredited by MS(such as PROW 2004-2006)

Clearance of accounts(such as PROW 2004-2006)

Annual decisions on clearance of accounts

Page 23: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

Financial Operations

Automatic annual commitments

Payment on account (7% = 2 X 3.5%) – after the programme adopting

Intermediate payments (4 per year)

N+2 – automatic decommitments (if any)

Page 24: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

DECLARATIONS OF EXPENDITURE

The Paying Agency declares 4 times per year the expenditure incurred between: 1 January and 31 March - by 30 April 1 April and 30 June - by 31 July 1 July and 15 October - by 15 November 16 October and 31 December - by 31 January

The Commission shall make intermediate payments within 45 days of registering a declaration of expenditure

The Commission shall develop an IT financial system interfaced with the MS for submission of declarations and calculation of payments

Page 25: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

The annual and final accounts By 10 February of the year N+1 the Paying Agency submits the

annual accounts of year N (EAGGF financial year, ie. 16 October of year N-1 to 15 October of year N).

Commission decision on annual clearance of accounts– prior to 30 April N+1

Annual clearance of accounts based on the annual accounts of the year N submitted by the paying agency.

Amounts to be recovered - shall be deducted from subsequent payment for the Paying Agency

Amounts to be paid - shall be added to subsequent payment for the Paying Agency

Closure of the programme – based on the last annual report and the clearance of accounts of the last year of programme implementation.

Page 26: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

Controls/checks

Beneficiaries are the subject of the checks carried out by the Paying Agency Possibility of delegation of this function to the external bodies

Paying Agency checked by: Managing Authority – responsible for the implementation of

the Program EC auditors – correctness of the expenditures

Insititutions with delegated functions controled by the delegating institutions Particular role of the internal audit units

Page 27: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

Information

Publication of the National Strategy Plan, Rural Development Operational Program with the information about the Community contribution

At the program level the Managing Aurthority shall inform about: The possibilities offered by the programme and the

rules for gaining access to programme funding The Community contribution The role played by the Community in the programmes

and the results thereof

Page 28: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

MONITORING Monitoring – more strategic than now Aggregation of results and influence at the UE level Use of monitoring as a support for evaluation of priorities’

achievement (Community and country level) Indicators of existing situation, results and impact of the programme. Limited number of common indicators at the Community-Axis-

Measure level Limited number of additional indicators specific for the programme Indicators should be better defined at the beginning of programming

period – baseline evaluation, monitoring basis. Requirements concerning monitoring (consolidated document –

common monitoring and evaluation framework) discussed by EC and Member States

Page 29: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

EVALUATION

Rising of „on-going” evaluation significance. Key elements of evaluation system:

ex-ante evaluation on-going evaluation (annual report) mid-term evaluation ex-post evaluation

Evaluation conducted by external evaluators

Page 30: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

REPORTINGReporting based on common guidelines: Annual report at the programme level

(connected with annual accounting). National reports summarising progress in implementation of the

National Strategy: 2010-2012-2014 Commission report presented to the Council and Parliament

summarising progress in implementation of Community Strategy: 2011-2013-2015.

„On-going” evaluation: ex-anteon-going (annual reports)mid-term (2010)ex-post (2014)

Page 31: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

POLANDASSUMPTIONS AND STATE OF ART

Coordination of RDOP preparation – MARD, Department of Rural Development

Establishing of working groups: on programming measures within RDOP 2007-2013 on rules of implementation of RDOP 2007-2013

Working groups’ tasks – establishing of rules: Implementing measures and criteria for granting support Programm’s managing Programm’s implementing Financial aspect of programm’s implementation Monitoring and evaluation Use of IT tools

Preparation of rules and setting up the National Network – 2006

Page 32: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

ISSUES TO BE CONSIDEREDISSUES TO BE CONSIDERED

OVERLAPING PERIODOVERLAPING PERIOD

Page 33: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

EFFECTIVE IMPLEMENTATION - CONDITIONS

Clearly specified, legal based roles, tasks and responsibilities of all institutions involved in implementation

Importance of wide and active partnership on all stages of programming and implementation, strong and effective coordination of partners’ cooperation

Setting up of National Network – effective cooperation, rise of involvement of partners in implementation of the programme

Preparation and implementation of monitoring and evaluation system at each level

Clear, reliable and prompt information for potential beneficiaries, friendly and transparent system (applications, instructions, rules of projects choice, lists of contact persons…)

Applicants support (consulting, loans…)

Page 34: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

OVERLAPING PERIOD2007-2008

New Managing Authority for RDOP? New Paying Agency for RDOP? Separated IT systems – Paying Agency, Managing Authority,

regional partners… Monitoring of multiannual commitments of RDP 2004-2006

for 2007-2013 In the same time - implementation and management of

several programmes by the same institutions, necessary division of tasks

Financial management – different systems simultaneously…

Page 35: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

Paying Agency AccreditationRDP 2004-2006

Poland –accreditation of ARMA in stages: As regards the realisation of particular tasks e.g. –

financial procedures As regards realisation of particular measures of RDP As regards realisation of succesive stages of realisation of

the measures – e.g. receiving and registering of the applications

Consequences: Long-term process of full accreditation (about 2 years) Delay in implementation of some measures of RDP High costs of external audits carried out.

Page 36: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

Paying Agency AccreditationRDOP 2007-2013

Aims: Changing the model of accreditation – give it to the

Insitution (ARMA) for the implementation and realisation of tasks.

Taking into account the „up to date” state of the current accreditation and experience gained during the implementation of SOP 2004-2006

Significantly shorten the accreditation process as regards RDOP

Page 37: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

IT TOOLS

Providing complete, reliable, detailed data Providing of comparison of monitoring and

financial data Availability of historic data Availability for current monitoring of

Programme’s implementation. Basic tool of management of the Programme Possibility of simulating and forecasting in long

time period

Page 38: S E S S I O N 4 Republic of Poland „ Rural Development Operational Programme 2007-2013” Implementing Issues Future of Rural Areas in Europe. Kraków, 30th.

SUMMARY

In Poland - implementation of RDOP 2007-2013 similar to the RDP 2004-2006

Possible use of experience gained (with necessary modifications), not necessary to prepare everything new

In relation to the present state of art increase of responsibility of Managing Authority – necessity for strengthening of resources

Increase of importance of good cooperation between partners Required better coordination of activities concerning the Programme

implemented by all institutions, Monitoring Committee, beneficiaries Special importance of precise financial management Priority – IT system for monitoring and evaluation