Top Banner
ALBUQUERQUE RAPID TRANSIT CONNECTING PEOPLE, CREATING PLACE, DRIVING OPPORTUNITY David Leard, AICP Rail~Volution October 2015
21

RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP

Mar 21, 2017

Download

Art & Photos

Rail~Volution
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP

ALBUQUERQUE RAPID TRANSIT

CONNECTING PEOPLE, CREATING PLACE, DRIVING OPPORTUNITY David Leard, AICP Rail~Volution October 2015

 

Page 2: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP

Agenda

•  Why

•  What

•  Keys to Success

Page 3: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP

Albuquerque

Population 879,401

Employment

388.981

Page 4: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP

Why

Page 5: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP

Why

Page 6: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP

Why

Page 7: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP

Why

Page 8: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP

What is ART

•  8.75 Miles •  Median of Route 66

•  90% Exclusive Guideway

•  Reducing General Purpose Lanes (50%)

•  20 Stations

•  18 Vehicles

•  Pedestrian, Landscaping and Bike Lanes

•  Gold Standard?

Page 9: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP
Page 10: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP
Page 11: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP
Page 12: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP
Page 13: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP
Page 14: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP
Page 15: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP
Page 16: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP
Page 17: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP
Page 18: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP

Budget

Transit  Elements Capital  Cost Capital  Cost  Estimate  (2015) $119.3  MGuideway $12.2  M Capital  Cost  Estimate  (2015) $126.1  MStations $8.0  MDemolition $2.4  MUtilities $7.1  MHazardous  Materials $0.3  MSidewalks/Landscaping $3.0  MRoadway $3.9  MGeneral  Constrcution  Costs   $5.0  MTraffic  Signals $6.6  M StreetscapeCommunications $4.4  M Enhancement  Elements Capital  CostFare  Collection $1.1  M Sidewalks/landscaping $8.5  MVehicles $18.0  M Roadway $5.0  MRight-­‐of-­‐Way $2.0  M Traffic  Signals $3.5  MProfessional  Services $16.2  M General  Constrcution  Costs   $1.8  MUnallocated  Contingency $4.6  M Professional  Services $5.6  MSubtotal  -­‐  Transit $94.8  M Subtotal  -­‐  Enhancements $24.4  M

Page 19: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP

Schedule

Page 20: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP

Keys To Success

•  Champion

•  Active Listening

•  Flexibility

•  Opportunity

Page 21: RV 2015: Sustainable Corridors: Broad and Specific Looks by David Leard, AICP

“a subway with a view”

ALBUQUERQUE RAPID TRANSIT

Learn more at BRTABQ.COM