Top Banner
29

Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

May 15, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000
Page 2: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000
Page 3: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308

(404) 631-1000 Main Office

December 4, 2019

Citizen’s Review Panel (CRP) Members

Mr. Bill Slaughter, Chairman

Southern Georgia Special District

RE: Transportation Investment Act (TIA) of 2010

Dear Citizen’s Review Panel Members:

The Georgia Department of Transportation presents the attached update through calendar year

2019 on the Transportation Investment Act of 2010 for the Southern Georgia Special District.

Also attached is a summary for the completed projects in the region within the last year. This

summary can be utilized in the determination of benefits by the CRP for completed projects.

The Transportation Investment Act of 2010 legislation requires submittal of an annual report by

the CRP to the legislators by December 15th each year.

As of this letter, five TIA projects have been completed in Southern Georgia, 11 are currently

under construction, and 68 are in preconstruction. The latest revenue collections for Southern

Georgia are 14.1 % higher than originally anticipated.

We are closely coordinating with all local governments to ensure successful delivery of the

program. The Department remains committed to the people of Southern Georgia for showing

our state how to take an active role in its transportation future.

This update is provided to you for your information. Please let me know if you need further

information regarding the TIA 2010 Program.

Sincerely,

Kenneth Franks

State TIA Administrator

Enclosure: Annual Report and CRP Meeting Minutes

cc: Diana Pope, Georgia State Finance and Investment Commission

Lisa Cribb, ATTN: Corey Hull, Southern Georgia Regional Commission

kfranks
KC
Page 4: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

Southern GeorgiaAnnual Project Status Report

Status on November 15, 2019

Band Project ID County Sponsor GDOT ID Description Project Phase

Project Let By

01 SGRC-001 Atkinson Pearson PI-0016170 US 441 Sidewalk Improvements Design Local Let

01 SGRC-003 Atkinson Atkinson County PI-0016172 Springhead Road Widen and Resurface Phase 1 Design TIA Let

01 SGRC-004 Atkinson Atkinson County PI-0016173 Springhead Road Widen and Resurface Phase 2 Design TIA Let

01 SGRC-005 Atkinson Atkinson County PI-0016174 Springhead Road Widen and Resurface Phase 3 Design TIA Let

01 SGRC-006 Atkinson Willacoochee PI-0016175 Bostwick Street Paving Design Local Let

01 SGRC-007 Atkinson Willacoochee PI-0016176 McCranie Ave Paving Design Local Let

01 SGRC-008 Atkinson Willacoochee PI-0016177 Florida Road Paving Design Local Let

01 SGRC-009 Atkinson Willacoochee PI-0016178 School Road Paving Design Local Let

01 SGRC-010 Bacon Alma PI-0016179 Industrial Park Roads Resurfacing Bundle Bidding TIA Let

01 SGRC-011 Bacon Alma PI-0016180 Douglas Street Resurfacing Bidding TIA Let

01 SGRC-022 Ben Hill Fitzgerald PI-0016191 Appomattox Road Resurfacing Construction TIA Let

01 SGRC-023 Ben Hill Fitzgerald PI-0016192 Evergreen Road Resurfacing - Fitzgerald Inactive TIA Let

01 SGRC-024 Berrien Berrien County PI-0016193 West Lenox Road Widen and Resurface Construction Local Let

01 SGRC-025 Berrien Berrien County PI-0016194 Lenox-Alapaha Highway Widen and Resurface Inactive TIA Let

01 SGRC-026 Berrien Berrien County PI-0016195 Coy Hancock Road Resurfacing Inactive TIA Let

01 SGRC-027 Berrien Berrien County PI-0016196 Garner Road Widen and Resurface Construction Local Let

01 SGRC-029 Brantley Nahunta PI-0016197 Roberson Street Widen and Resurface Complete Local Let

01 SGRC-031 Brantley Nahunta PI-0016199 Velie Street Paving Design Local Let

01 SGRC-032 Brantley Nahunta PI-0016200 Cannon Street Resurfacing Complete Local Let

01 SGRC-034 Brooks Brooks County PI-0016202 Webster Road Sidewalks and Drainage Improvements Inactive TIA Let

01 SGRC-035 Brooks Quitman PI-0016203 Barwick Road Sidewalks and Drainage Improvements Inactive TIA Let

01 SGRC-036 Brooks Quitman PI-0016204N. Highland Street Sidewalks and Drainage Improvements

Inactive TIA Let

01 SGRC-037 Brooks Quitman PI-0016205 N. MLK Street Sidewalks Inactive TIA Let

01 SGRC-038 Brooks Quitman PI-0016206 S. Court Street Sidewalk Inactive TIA Let

01 SGRC-039 Charlton Charlton County PI-0016207 River Road Resurfacing Design Local Let

01 SGRC-041 Charlton Folkston PI-0016208 Tower Street Resurfacing and Drainage Improvements Design Local Let

01 SGRC-042 Charlton Folkston PI-0016209 Tower Street Paving and Drainage Improvements Design Local Let

01 SGRC-043 Charlton Folkston PI-0016210 Homeland Park Road Bridge Replacement Construction Local Let

01 SGRC-044 Charlton Homeland PI-0016211 Bowery Lane Widening and Resurfacing Inactive TIA Let

01 SGRC-045 Charlton Homeland PI-0016212 Broadway Resurfacing Inactive TIA Let

01 SGRC-046 Charlton Homeland PI-0016213 Paxton Road Resurfacing Inactive TIA Let

01 SGRC-047 Clinch Argyle PI-0016214 Oak Lane Resurfacing Design Local Let

01 SGRC-050 Clinch Clinch County PI-0016216Frank Sessoms Memorial Hwy/Cogdell Hwy Resurfacing

Complete TIA Let

- 1 -

Page 5: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

Southern GeorgiaAnnual Project Status Report

Status on November 15, 2019

Band Project ID County Sponsor GDOT ID Description Project Phase

Project Let By

01 SGRC-051 Clinch Clinch County PI-0016217 Cogdell Hwy/Sandy Bottom Road Resurfacing Complete TIA Let

01 SGRC-052 Clinch Dupont PI-0016218 Lightsey Street Resurfacing Planning TIA Let

01 SGRC-053 Clinch Dupont PI-0016219 Mill Street Resurfacing Planning TIA Let

01 SGRC-054 Clinch Homerville PI-0016220 Peach Street Resurfacing Design Local Let

01 SGRC-055 Clinch Homerville PI-0016221 Elna Street Resurfacing Design Local Let

01 SGRC-056 Clinch Homerville PI-0016222 Wheeler Street Resurfacing Design Local Let

01 SGRC-057 Clinch Homerville PI-0016223 Beacon Light Replacement at Homerville Airport Planning Local Let

01 SGRC-058 Clinch Homerville PI-0016224 Virginia Avenue Resurfacing Design Local Let

01 SGRC-059 Clinch Homerville PI-0016225 Wiregrass Street Resurfacing Design Local Let

01 SGRC-060 Clinch Homerville PI-0016226 Magnolia Street Resurfacing Design Local Let

01 SGRC-061 Clinch Homerville PI-0016227 Orange Street Resurfacing Design Local Let

01 SGRC-062 Clinch Homerville PI-0016228 Dovie Lane/Wiregrass Street Ext. Resurfacing Design Local Let

01 SGRC-063 Clinch Homerville PI-0016229 Reddick Street Resurfacing Design Local Let

01 SGRC-064 Clinch Homerville PI-0016230 Brown Street Resurfacing Design Local Let

01 SGRC-065 Clinch Homerville PI-0016231 Tomlinson Street Resurfacing Design Local Let

01 SGRC-066 Clinch Homerville PI-0016232 Old Pearson Road Resurfacing Design Local Let

01 SGRC-067 Clinch Homerville PI-0016233 Battle Street Resurfacing Design Local Let

01 SGRC-070 Clinch Homerville PI-0016234 Gaskins Street Resurfacing Design Local Let

01 SGRC-073 Coffee Coffee County PI-0016236 Harvey Vickers Road Widening and Resurface Design TIA Let

01 SGRC-074 Coffee Coffee County PI-0016237 Rebecca S Waldron Road Widen and Resurface Construction TIA Let

01 SGRC-075 Coffee Coffee County PI-0016238 Wendell Sears Road Widen and Resurface Construction TIA Let

01 SGRC-076 Coffee Coffee County PI-0016239 Wray Road Widen and Resurface Design TIA Let

01 SGRC-079 Coffee Coffee County PI-0016242 Sinkhole Road Widen and Resurface Construction TIA Let

01 SGRC-080 Coffee Coffee County PI-0016243Warren Carter Road/Hillcrest Road Widen and Resurface

Design TIA Let

01 SGRC-090 Coffee Douglas PI-0016252 N. Liberty Street Resurfacing Design TIA Let

01 SGRC-072 Coffee GDOT PI-421345-SR 32 from west of CR 296 east to the West City Limits of Douglas

DesignGDOT - OPD Let

01 SGRC-091 Cook Adel PI-0016253 Alabama Road Truck Route Improvements Planning TIA Let

01 SGRC-093 Cook Adel PI-0016255 Turn Lanes at New Recreation Facility on SR 37 Inactive TIA Let

01 SGRC-094 Cook Cook County PI-0016256 Antioch Road Resurfacing Design TIA Let

01 SGRC-096 Cook Lenox PI-0016258 Taylor Street Paving Design Local Let

01 SGRC-097 Cook Lenox PI-0016259 E. Revels Street Paving Design Local Let

01 SGRC-098 Cook Sparks PI-0016260 Lovett Street Sidewalks and Resurfacing Design Local Let

01 SGRC-099 Cook Sparks PI-0016261 Elm Street Sidewalks and Resurfacing Design Local Let

- 2 -

Page 6: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

Southern GeorgiaAnnual Project Status Report

Status on November 15, 2019

Band Project ID County Sponsor GDOT ID Description Project Phase

Project Let By

01 SGRC-100 Echols Echols County PI-0016262 John Hampton Road Paving Design Local Let

01 SGRC-101 Irwin Irwin County PI-0016263 Osierfield Drive Widen and Resurface Construction TIA Let

01 SGRC-102 Irwin Irwin County PI-0016264 Evergreen Road Widen and Resurface Construction TIA Let

01 SGRC-103 Irwin Ocilla PI-0016265 Cherry Street Resurfacing and Drainage Improvements Inactive TIA Let

01 SGRC-104 Irwin Ocilla PI-0016266 Fifth Street Ext. Paving Inactive TIA Let

01 SGRC-105 Lanier Lanier County PI-0016267 River Road Widen and Resurface Complete TIA Let

01 SGRC-106 Lanier Lanier County PI-0016268 Boyette Road Widen and Resurface Inactive TIA Let

01 SGRC-107 Lanier Lanier County PI-0016269 Giddens Road/Royals Road Resurface Inactive TIA Let

01 SGRC-109 Lowndes GDOT PI-0010297 I-75 @ SR 31 - Phase II (Exit 11) DesignGDOT - OPD Let

01 SGRC-113 Lowndes Lowndes County PI-0016274Clyattstone Road/Simpson Lane Paving and Drainage Improvements

Design Local Let

01 SGRC-115 Lowndes Lowndes County PI-0016276Hightower Road/Cooper Road NE Paving and Drainage Improvements

Design Local Let

01 SGRC-116 Lowndes Lowndes County PI-0016277 Hickory Grove Road Bridge Replacement Construction Local Let

01 SGRC-123 Lowndes Valdosta PI-0016284New Air Traffic Control Tower at Valdosta Regional Airport

Design Local Let

01 SGRC-130 Pierce Patterson PI-0016291 City of Patterson Resurfacing Bundle Phase 1 Design TIA Let

01 SGRC-131 Pierce Blackshear PI-0016292 City of Blackshear Session Hill Resurfacing Bundle Planning TIA Let

01 SGRC-133 Pierce Pierce County PI-0016294 Ware Street Widen and Resurface Construction TIA Let

01 SGRC-134 Pierce Pierce County PI-0016295 St. Johns Church Road Widen and Resurface Planning TIA Let

01 SGRC-142 Tift Tifton PI-0016302 8th Street Widening for Turn Lane Inactive TIA Let

01 SGRC-143 Tift Tifton PI-0016303 2nd Street Resurfacing Planning TIA Let

01 SGRC-148 Turner Ashburn PI-0016308City of Ashburn Resurfacing Bundle and Sidewalk Improvements

Design Local Let

01 SGRC-149 Turner Turner County PI-0016309 Hobby Road Paving Inactive TIA Let

01 SGRC-153 Ware Waycross PI-0016312 Albany Avenue Widen and Resurfacing Planning Local Let

02 SGRC-002 Atkinson Atkinson County PI-0016171 Cogdell Road Widen and Resurface Inactive TIA Let

02 SGRC-012 Bacon Bacon County PI-0016181Johnson Lake Road Widening and Safety Improvements

Inactive TIA Let

02 SGRC-013 Bacon Bacon County PI-0016182 SR 32 Passing Lanes Between Alma to DouglasProcure Design

TIA Let

02 SGRC-017 Ben Hill Ben Hill County PI-0016186Bethlehem Church Road Bridge at House Creek Bridge Replacement

Inactive TIA Let

02 SGRC-018 Ben Hill Ben Hill County PI-0016187Bethlehem Church Road Bridge at Otter Creek Bridge Replacement

Inactive TIA Let

02 SGRC-019 Ben Hill Ben Hill County PI-0016188Peachtree Road Corridor Realigning, Widening, and Intersection Improvements

Procure Design

TIA Let

02 SGRC-020 Ben Hill Ben Hill County PI-0016189 Evergreen Road Resurfacing - Ben Hill Inactive TIA Let

02 SGRC-021 Ben Hill Fitzgerald PI-0016190Fitzgerald Perimeter Roads Improvements (Widen, Resurface, C/G)

Inactive TIA Let

02 SGRC-033 Brooks Brooks County PI-0016201DeVane Road Bridge Replacement, Widen and Resurface

Procure Design

TIA Let

02 SGRC-040 Charlton GDOT PI-0000821 SR 40 from SR40 Conn to 0.36 mi east of May Bluff Rd DesignGDOT - OPD Let

02 SGRC-049 Clinch GDOT PI-422390-SR 89/US441 from Orange St in Homerville to CR 101/Cowart Rd

Design TIA Let

- 3 -

Page 7: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

Southern GeorgiaAnnual Project Status Report

Status on November 15, 2019

Band Project ID County Sponsor GDOT ID Description Project Phase

Project Let By

02 SGRC-071 Coffee Coffee County PI-0016235 Bud Hutcheson Road Paving Inactive TIA Let

02 SGRC-078 Coffee Coffee County PI-0016241Hwy 149/Youngie Fussell Road/Bridgetown Road Widen and Resurface

Inactive TIA Let

02 SGRC-092 Cook Adel PI-0016254 Tillman Road Bypass Phase 3 Improvements Inactive TIA Let

02 SGRC-095 Cook Cook County PI-0016257 Valdel Road Resurfacing Inactive TIA Let

02 SGRC-110 Lowndes Lowndes County PI-0016271 Old 41 N. Widening Inactive TIA Let

02 SGRC-124 Lowndes Valdosta PI-0016285 Old Clyattville Road Widening - Valdosta Inactive TIA Let

02 SGRC-126 Lowndes Valdosta PI-0016287S Patterson Street at Griffin Avenue Intersection and Drainage Improvements

Inactive TIA Let

02 SGRC-127 Lowndes Valdosta PI-0016288St Augustine Road at Gornto Road Intersection and Drainage Improvements

Procure Design

TIA Let

02 SGRC-129 Lowndes Valdosta PI-0016290Baytree Road at Gornto Road Intersection and Signal Improvements

Inactive TIA Let

02 SGRC-132 Pierce Pierce County PI-0016293Pierce County Horseshoe Road/Fletcher Road Area Resurfacing Bundle

Inactive TIA Let

02 SGRC-136 Pierce Pierce County PI-0016297US 84 Intersection and Signal Improvements from County Farm Road to New School Road

Procure Design

TIA Let

02 SGRC-137 Tift Tift County PI-0016298 Upper Ty Ty Road Bridge Replacement over Little River Planning TIA Let

02 SGRC-139 Tift Tift County PI-0016299 Scooterville Road Bridge Replacement over Little Creek Planning TIA Let

02 SGRC-140 Tift Tift County PI-0016300Omega-Eldorado Road Bridge Replacement over Arnold Creek

Planning TIA Let

02 SGRC-141 Tift Tift County PI-0016301Omega-Eldorado Road Bridge Replacement over Little River

Planning TIA Let

02 SGRC-145 Tift Tift County PI-0016305 Taxiway Improvements at Henry Tift Myers Airport Inactive TIA Let

02 SGRC-146 Tift Tifton PI-001630612th Street at Prince Avenue Intersection Improvements

Inactive TIA Let

02 SGRC-150 Turner Turner County PI-0016310 Glynn Cook Road Paving Inactive TIA Let

02 SGRC-151 Turner Turner County PI-0016311 Reid Road Paving Inactive TIA Let

02 SGRC-152 Ware GDOT PI-0013605 US 84 Bridge over Satilla River DesignGDOT - OPD Let

02 SGRC-154 Ware Waycross PI-0016313 Knight Avenue Resurfacing Inactive TIA Let

03 SGRC-014 Bacon Bacon County PI-0016183 Corinth Church Road Resurfacing Inactive TIA Let

03 SGRC-015 Bacon Bacon County PI-0016184 Ten Mile Church Road Resurfacing Inactive TIA Let

03 SGRC-016 Bacon Bacon County PI-0016185 Cumberland Road Resurfacing Inactive TIA Let

03 SGRC-028 Brantley GDOT PI-0015536SR520/US82 @Satilla River Overflow 14 mi east of Hoboken

DesignGDOT - OPD Let

03 SGRC-030 Brantley Nahunta PI-0016198 Cherry Street Resurfacing Inactive TIA Let

03 SGRC-048 Clinch Clinch County PI-0016215Homerville Bypass Resurfacing, Bridge Replacement and Other Improvements

Inactive TIA Let

03 SGRC-077 Coffee Coffee County PI-0016240 SR 158 Passing Lanes in Coffee County Inactive TIA Let

03 SGRC-081 Coffee Douglas PI-0016244 McDonald Road Sidewalk and Drainage Improvements Inactive TIA Let

03 SGRC-082 Coffee Douglas PI-0016245S. Gaskin Avenue Sidewalk and Drainage Improvements

Inactive TIA Let

03 SGRC-083 Coffee Douglas PI-0016246Chester Avenue Sidewalk and Drainage (Culvert) Improvements

Inactive TIA Let

03 SGRC-084 Coffee Douglas PI-0016247West Green Hwy (SR 135/US 221) Sidewalk Improvements

Inactive TIA Let

03 SGRC-086 Coffee Douglas PI-0016248 Lupo Lane Sidewalk and Drainage Improvements Inactive TIA Let

- 4 -

Page 8: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

Southern GeorgiaAnnual Project Status Report

Status on November 15, 2019

Band Project ID County Sponsor GDOT ID Description Project Phase

Project Let By

03 SGRC-087 Coffee Douglas PI-0016249 Baker Hwy, East (SR 158) Sidewalk Improvements Inactive TIA Let

03 SGRC-088 Coffee Douglas PI-0016250 West Walker Street Sidewalk Improvements Inactive TIA Let

03 SGRC-089 Coffee Douglas PI-0016251 Road Improvements at Douglas Municipal Airport Inactive TIA Let

03 SGRC-108 Lowndes Lowndes County PI-0016270 Old Clyattville Road Widening - Lowndes Inactive TIA Let

03 SGRC-111 Lowndes Lowndes County PI-0016272 Shiloh Road Resurfacing and Bridge Replacement Inactive TIA Let

03 SGRC-112 Lowndes Lowndes County PI-0016273 Orr Road Extension Inactive TIA Let

03 SGRC-114 Lowndes Lowndes County PI-0016275 Briggston Road Paving and Drainage Improvements Inactive TIA Let

03 SGRC-117 Lowndes Lowndes County PI-0016278Kinderlou Clyattville Road Paving and Drainage Improvements

Inactive TIA Let

03 SGRC-118 Lowndes Lowndes County PI-0016279 Coleman Road NW Paving and Drainage Improvements Inactive TIA Let

03 SGRC-119 Lowndes Lowndes County PI-0016280 Twin Lakes Road Paving and Drainage Improvements Inactive TIA Let

03 SGRC-120 Lowndes Lowndes County PI-0016281 Hall Road Paving, Drainage and Other Improvements Inactive TIA Let

03 SGRC-121 Lowndes Valdosta PI-0016282 Country Club Drive Widening Inactive TIA Let

03 SGRC-122 Lowndes Valdosta PI-0016283 St. Augustine Road RR Grade Separation Inactive TIA Let

03 SGRC-125 Lowndes Valdosta PI-0016286St Augustine Road at Norman Drive Intersection, Drainage and Signal Improvements

Procure Design

TIA Let

03 SGRC-128 Lowndes Valdosta PI-0016289 Forrest Street Widening Inactive TIA Let

03 SGRC-135 Pierce Pierce County PI-0016296 Golf Course Road Alignment, Drainage and Resurfacing Inactive TIA Let

03 SGRC-138 Tift GDOT PI-0010318 I-75 @ CR421/Chula Brookfield Rd - Phase II (Exit 69) Inactive TIA Let

03 SGRC-144 Tift Tifton PI-0016304 McCormick Drive Widening and Realignment Inactive TIA Let

03 SGRC-147 Tift Tifton PI-0016307 18th Street Ditch Bridge Replacements (5 Culverts) Inactive TIA Let

Multiple Regional PI-A000835 Program Administration

11/18/2019 9:32:27 AM

- 5 -

Page 9: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

Sout

hern

Geo

rgia

Ann

ual R

epor

t -

TIA

Fun

ds O

nly

Rep

ort

cove

rs:

Dec

embe

r 1,

201

8 -

Nov

embe

r 15

, 201

9

Pro

ject

ID

Cou

nty

Ban

dG

DO

T ID

Des

crip

tion

Ori

gina

l Es

tim

ated

Cos

tC

urr

ent

Esti

mat

ed C

ost

Pri

or Y

ears

Cur

rent

Yea

rC

orre

ctiv

e A

ctio

n

Req

uire

d?C

omm

ents

SGRC

-001

Atki

nson

01PI

-001

6170

US

441

Side

wal

k Im

prov

emen

ts$1

,188

,000

$1,1

88,0

00$0

$0N

oN

/A

SGRC

-003

Atki

nson

01PI

-001

6172

Sprin

ghea

d Ro

ad W

iden

and

Res

urfa

ce

Phas

e 1

$1,0

85,0

00$1

,085

,000

$0$0

No

N/A

SGRC

-004

Atki

nson

01PI

-001

6173

Sprin

ghea

d Ro

ad W

iden

and

Res

urfa

ce

Phas

e 2

$1,2

53,0

00$1

,253

,000

$0$0

No

N/A

SGRC

-005

Atki

nson

01PI

-001

6174

Sprin

ghea

d Ro

ad W

iden

and

Res

urfa

ce

Phas

e 3

$885

,000

$885

,000

$0$0

No

N/A

SGRC

-006

Atki

nson

01PI

-001

6175

Bost

wic

k St

reet

Pav

ing

$103

,000

$103

,000

$0$0

No

N/A

SGRC

-007

Atki

nson

01PI

-001

6176

McC

rani

e Av

e Pa

ving

$77,

000

$77,

000

$0$0

No

N/A

SGRC

-008

Atki

nson

01PI

-001

6177

Flor

ida

Roa

d Pa

ving

$200

,000

$200

,000

$0$0

No

N/A

SGRC

-009

Atki

nson

01PI

-001

6178

Scho

ol R

oad

Pavi

ng$7

2,00

0$7

2,00

0$0

$0N

oN

/A

SGRC

-010

Baco

n01

PI-0

0161

79In

dust

rial P

ark

Roa

ds R

esur

faci

ng B

undl

e$7

22,0

00$7

22,0

00$0

$0N

oN

/A

SGRC

-011

Baco

n01

PI-0

0161

80D

ougl

as S

tree

t Res

urfa

cing

$292

,800

$292

,800

$0$0

No

N/A

SGRC

-022

Ben

Hill

01PI

-001

6191

Appo

mat

tox

Roa

d Res

urfa

cing

$415

,400

$415

,400

$0$0

No

N/A

SGRC

-023

Ben

Hill

01PI

-001

6192

Ever

gree

n Roa

d Res

urfa

cing

- F

itzge

rald

$523

,500

$523

,500

$0$0

No

N/A

SGRC

-024

Berr

ien

01PI

-001

6193

Wes

t Le

nox

Roa

d W

iden

and

Res

urfa

ce$1

,645

,000

$1,6

45,0

00$0

$31,

960

No

N/A

SGRC

-025

Berr

ien

01PI

-001

6194

Leno

x-Al

apah

a H

ighw

ay W

iden

and

Re

surf

ace

$1,6

10,0

00$1

,610

,000

$0$0

No

N/A

SGRC

-026

Berr

ien

01PI

-001

6195

Coy

Han

cock

Roa

d Res

urfa

cing

$686

,300

$686

,300

$0$0

No

N/A

SGRC

-027

Berr

ien

01PI

-001

6196

Gar

ner

Roa

d W

iden

and

Res

urfa

ce$2

,513

,000

$2,5

13,0

00$0

$48,

142

No

N/A

SGRC

-029

Bran

tley

01PI

-001

6197

Rob

erso

n St

reet

Wid

en a

nd R

esur

face

$87,

900

$87,

900

$0$0

No

N/A

SGRC

-031

Bran

tley

01PI

-001

6199

Velie

Str

eet

Pavi

ng$2

00,0

00$2

00,0

00$0

$0N

oN

/A

SGRC

-032

Bran

tley

01PI

-001

6200

Cann

on S

tree

t Res

urfa

cing

$52,

000

$52,

000

$0$0

No

N/A

SGRC

-034

Broo

ks01

PI-0

0162

02W

ebst

er R

oad

Side

wal

ks a

nd D

rain

age

Impr

ovem

ents

$2,2

81,9

00$2

,281

,900

$0$0

No

N/A

SGRC

-035

Broo

ks01

PI-0

0162

03Ba

rwic

k Ro

ad S

idew

alks

and

Dra

inag

e Im

prov

emen

ts$3

99,8

00$3

99,8

00$0

$0N

oN

/A

SGRC

-036

Broo

ks01

PI-0

0162

04N

. Hig

hlan

d St

reet

Sid

ewal

ks a

nd

Dra

inag

e Im

prov

emen

ts$6

44,5

00$6

44,5

00$0

$0N

oN

/A

SGRC

-037

Broo

ks01

PI-0

0162

05N

. MLK

Str

eet

Side

wal

ks$1

,040

,000

$1,0

40,0

00$0

$0N

oN

/A

SGRC

-038

Broo

ks01

PI-0

0162

06S.

Cou

rt S

tree

t Si

dew

alk

$556

,400

$556

,400

$0$0

No

N/A

- 1 -

Page 10: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

Sout

hern

Geo

rgia

Ann

ual R

epor

t -

TIA

Fun

ds O

nly

Rep

ort

cove

rs:

Dec

embe

r 1,

201

8 -

Nov

embe

r 15

, 201

9

Pro

ject

ID

Cou

nty

Ban

dG

DO

T ID

Des

crip

tion

Ori

gina

l Es

tim

ated

Cos

tC

urr

ent

Esti

mat

ed C

ost

Pri

or Y

ears

Cur

rent

Yea

rC

orre

ctiv

e A

ctio

n

Req

uire

d?C

omm

ents

SGRC-

039

Char

lton

01PI

-001

6207

Riv

er R

oad

Res

urfa

cing

$1,9

47,2

00$1

,947

,200

$0$0

No

N/A

SGRC

-041

Char

lton

01PI

-001

6208

Tow

er S

tree

t Re

surf

acin

g an

d D

rain

age

Impr

ovem

ents

$250

,000

$250

,000

$0$0

No

N/A

SGRC

-042

Char

lton

01PI

-001

6209

Tow

er S

tree

t Pa

ving

and

Dra

inag

e Im

prov

emen

ts$2

73,4

67$2

73,4

67$0

$0N

oN

/A

SGRC

-043

Char

lton

01PI

-001

6210

Hom

elan

d Pa

rk R

oad

Brid

ge R

epla

cem

ent

$500

,000

$500

,000

$0$0

No

N/A

SGRC

-044

Char

lton

01PI

-001

6211

Bow

ery

Lane

Wid

enin

g an

d Res

urfa

cing

$150

,000

$150

,000

$0$0

No

N/A

SGRC

-045

Char

lton

01PI

-001

6212

Broa

dway

Res

urfa

cing

$161

,000

$161

,000

$0$0

No

N/A

SGRC

-046

Char

lton

01PI

-001

6213

Paxt

on R

oad

Res

urfa

cing

$120

,600

$120

,600

$0$0

No

N/A

SGRC

-047

Clin

ch01

PI-0

0162

14O

ak L

ane

Res

urfa

cing

$300

,000

$300

,000

$0$0

No

N/A

SGRC

-050

Clin

ch01

PI-0

0162

16Fr

ank

Sess

oms

Mem

oria

l Hw

y/Co

gdel

l H

wy

Resu

rfac

ing

$2,1

61,0

00$1

,854

,133

$0$1

,442

,615

No

N/A

SGRC

-051

Clin

ch01

PI-0

0162

17Co

gdel

l Hw

y/Sa

ndy

Bott

om R

oad

Resu

rfac

ing

$319

,100

$395

,439

$0$3

82,3

11Ye

sPr

ojec

t ex

ceed

ed o

rigin

al e

stim

ated

cos

t. G

DO

T m

anag

ed c

osts

to

keep

ove

rrun

s at

a m

inim

um.

SGRC

-052

Clin

ch01

PI-0

0162

18Li

ghts

ey S

tree

t Res

urfa

cing

$53,

700

$53,

700

$0$0

No

N/A

SGRC

-053

Clin

ch01

PI-0

0162

19M

ill S

tree

t Re

surf

acin

g$6

5,40

0$6

5,40

0$0

$0N

oN

/A

SGRC

-054

Clin

ch01

PI-0

0162

20Pe

ach

Stre

et R

esur

faci

ng$2

0,54

1$2

0,54

1$0

$0N

oN

/A

SGRC

-055

Clin

ch01

PI-0

0162

21El

na S

tree

t Res

urfa

cing

$94,

900

$94,

900

$0$0

No

N/A

SGRC

-056

Clin

ch01

PI-0

0162

22W

heel

er S

tree

t Res

urfa

cing

$21,

000

$21,

000

$0$0

No

N/A

SGRC

-057

Clin

ch01

PI-0

0162

23Be

acon

Lig

ht R

epla

cem

ent

at H

omer

ville

Ai

rpor

t$1

8,00

0$1

8,00

0$0

$0N

oN

/A

SGRC

-058

Clin

ch01

PI-0

0162

24Vi

rgin

ia A

venu

e Res

urfa

cing

$70,

600

$70,

600

$0$0

No

N/A

SGRC

-059

Clin

ch01

PI-0

0162

25W

iregr

ass

Stre

et R

esur

faci

ng$6

0,00

0$6

0,00

0$0

$0N

oN

/A

SGRC

-060

Clin

ch01

PI-0

0162

26M

agno

lia S

tree

t Res

urfa

cing

$58,

800

$58,

800

$0$0

No

N/A

SGRC

-061

Clin

ch01

PI-0

0162

27O

rang

e St

reet

Res

urfa

cing

$19,

257

$19,

257

$0$0

No

N/A

SGRC

-062

Clin

ch01

PI-0

0162

28D

ovie

Lan

e/W

iregr

ass

Stre

et E

xt.

Resu

rfac

ing

$32,

700

$32,

700

$0$0

No

N/A

SGRC

-063

Clin

ch01

PI-0

0162

29Red

dick

Str

eet

Res

urfa

cing

$100

,900

$100

,900

$0$0

No

N/A

SGRC

-064

Clin

ch01

PI-0

0162

30Br

own

Stre

et R

esur

faci

ng$6

8,90

0$6

8,90

0$0

$0N

oN

/A

SGRC

-065

Clin

ch01

PI-0

0162

31To

mlin

son

Stre

et R

esur

faci

ng$5

7,70

0$5

7,70

0$0

$0N

oN

/A

- 2 -

Page 11: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

Sout

hern

Geo

rgia

Ann

ual R

epor

t -

TIA

Fun

ds O

nly

Rep

ort

cove

rs:

Dec

embe

r 1,

201

8 -

Nov

embe

r 15

, 201

9

Pro

ject

ID

Cou

nty

Ban

dG

DO

T ID

Des

crip

tion

Ori

gina

l Es

tim

ated

Cos

tC

urr

ent

Esti

mat

ed C

ost

Pri

or Y

ears

Cur

rent

Yea

rC

orre

ctiv

e A

ctio

n

Req

uire

d?C

omm

ents

SGRC

-066

Clin

ch01

PI-0

0162

32O

ld P

ears

on R

oad

Res

urfa

cing

$76,

000

$76,

000

$0$0

No

N/A

SGRC

-067

Clin

ch01

PI-0

0162

33Ba

ttle

Str

eet

Res

urfa

cing

$18,

100

$18,

100

$0$0

No

N/A

SGRC

-070

Clin

ch01

PI-0

0162

34G

aski

ns S

tree

t Res

urfa

cing

$18,

100

$18,

100

$0$0

No

N/A

SGRC

-073

Coffe

e01

PI-0

0162

36H

arve

y Vi

cker

s Ro

ad W

iden

ing

and

Resu

rfac

e$9

00,0

00$9

00,0

00$0

$0N

oN

/A

SGRC

-074

Coffe

e01

PI-0

0162

37Re

becc

a S

Wal

dron

Roa

d W

iden

and

Re

surf

ace

$1,6

87,0

00$1

,550

,446

$0$0

No

N/A

SGRC

-075

Coffe

e01

PI-0

0162

38W

ende

ll Se

ars

Roa

d W

iden

and

Res

urfa

ce$3

50,0

00$3

50,0

00$0

$0N

oN

/A

SGRC

-076

Coffe

e01

PI-0

0162

39W

ray

Roa

d W

iden

and

Res

urfa

ce$6

15,3

13$6

15,3

13$0

$0N

oN

/A

SGRC

-079

Coffe

e01

PI-0

0162

42Si

nkho

le R

oad

Wid

en a

nd R

esur

face

$1,4

56,0

00$1

,248

,570

$0$0

No

N/A

SGRC

-080

Coffe

e01

PI-0

0162

43W

arre

n Ca

rter

Roa

d/H

illcr

est

Road

Wid

en

and

Resu

rfac

e$9

50,0

00$9

50,0

00$0

$0N

oN

/A

SGRC

-090

Coffe

e01

PI-0

0162

52N

. Lib

erty

Str

eet

Res

urfa

cing

$231

,500

$231

,500

$0$0

No

N/A

SGRC

-072

Coffe

e01

PI-4

2134

5-SR

32

from

wes

t of

CR

296

east

to

the

Wes

t Ci

ty L

imits

of D

ougl

as$9

,780

,000

$25,

556,

464

$0$3

2,28

5N

oBl

ende

d Pr

ojec

t -

Tota

l Pro

ject

Cos

t $3

5,40

7,29

2.

TIA

and

HB1

70 fu

nds

adju

sted

to

acco

mm

odat

e ba

nd c

hang

e re

ques

t.SG

RC-0

91Co

ok01

PI-0

0162

53Al

abam

a Roa

d Tr

uck

Rou

te I

mpr

ovem

ents

$3,3

12,0

00$3

,312

,000

$0$0

No

N/A

SGRC

-093

Cook

01PI

-001

6255

Turn

Lan

es a

t N

ew R

ecre

atio

n Fa

cilit

y on

SR

37

$250

,000

$250

,000

$0$0

No

Blen

ded

Proj

ect

(Sta

te F

unds

) -

Tota

l Pro

ject

Cos

t $5

00,0

00SG

RC-0

94Co

ok01

PI-0

0162

56An

tioch

Roa

d Res

urfa

cing

$1,9

49,3

00$1

,949

,300

$0$0

No

N/A

SGRC

-096

Cook

01PI

-001

6258

Tayl

or S

tree

t Pa

ving

$276

,900

$276

,900

$0$0

No

N/A

SGRC

-097

Cook

01PI

-001

6259

E. R

evel

s St

reet

Pav

ing

$450

,000

$450

,000

$0$0

No

N/A

SGRC

-098

Cook

01PI

-001

6260

Love

tt S

tree

t Si

dew

alks

and

Res

urfa

cing

$588

,000

$588

,000

$0$0

No

N/A

SGRC

-099

Cook

01PI

-001

6261

Elm

Str

eet

Side

wal

ks a

nd R

esur

faci

ng$7

15,0

00$7

15,0

00$0

$0N

oN

/A

SGRC

-100

Echo

ls01

PI-0

0162

62Jo

hn H

ampt

on R

oad

Pavi

ng$4

00,0

00$4

00,0

00$0

$0N

oN

/A

SGRC

-101

Irw

in01

PI-0

0162

63O

sier

field

Driv

e W

iden

and

Res

urfa

ce$1

,967

,000

$1,6

66,8

57$0

$0N

oN

/A

SGRC

-102

Irw

in01

PI-0

0162

64Ev

ergr

een

Roa

d W

iden

and

Res

urfa

ce$1

,596

,000

$1,2

87,1

90$0

$0N

oN

/A

SGRC

-103

Irw

in01

PI-0

0162

65Ch

erry

Str

eet

Resu

rfac

ing

and

Dra

inag

e Im

prov

emen

ts$5

00,0

00$5

00,0

00$0

$0N

oN

/A

SGRC

-104

Irw

in01

PI-0

0162

66Fi

fth

Stre

et E

xt. P

avin

g$5

00,0

00$5

00,0

00$0

$0N

oN

/A

- 3 -

Page 12: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

Sout

hern

Geo

rgia

Ann

ual R

epor

t -

TIA

Fun

ds O

nly

Rep

ort

cove

rs:

Dec

embe

r 1,

201

8 -

Nov

embe

r 15

, 201

9

Pro

ject

ID

Cou

nty

Ban

dG

DO

T ID

Des

crip

tion

Ori

gina

l Es

tim

ated

Cos

tC

urr

ent

Esti

mat

ed C

ost

Pri

or Y

ears

Cur

rent

Yea

rC

orre

ctiv

e A

ctio

n

Req

uire

d?C

omm

ents

SGRC-

105

Lani

er01

PI-0

0162

67Riv

er R

oad

Wid

en a

nd R

esur

face

$3,2

50,0

00$1

,943

,410

$0$1

,155

,898

No

N/A

SGRC

-106

Lani

er01

PI-0

0162

68Bo

yett

e Roa

d W

iden

and

Res

urfa

ce$1

,700

,000

$1,7

00,0

00$0

$0N

oN

/A

SGRC

-107

Lani

er01

PI-0

0162

69G

idde

ns R

oad/

Roya

ls R

oad

Res

urfa

ce$7

70,0

00$7

70,0

00$0

$0N

oN

/A

SGRC

-109

Low

ndes

01PI

-001

0297

I-75

@ S

R 31

- P

hase

II

(Exi

t 11

)$1

9,44

5,00

0$1

9,44

5,00

0$0

$0N

oBl

ende

d Pr

ojec

t -

Tota

l Pro

ject

Cos

t $2

1,44

5,00

0

SGRC

-113

Low

ndes

01PI

-001

6274

Clya

ttst

one

Road

/Sim

pson

Lan

e Pa

ving

an

d D

rain

age

Impr

ovem

ents

$2,3

00,0

00$2

,300

,000

$0$7

2,15

0N

oN

/A

SGRC

-115

Low

ndes

01PI

-001

6276

Hig

htow

er R

oad/

Coop

er R

oad

NE

Pavi

ng

and

Dra

inag

e Im

prov

emen

ts$3

,750

,000

$3,7

50,0

00$0

$48,

846

No

N/A

SGRC

-116

Low

ndes

01PI

-001

6277

Hic

kory

Gro

ve R

oad

Brid

ge R

epla

cem

ent

$2,7

00,0

00$2

,700

,000

$0$1

75,7

27N

oN

/A

SGRC

-123

Low

ndes

01PI

-001

6284

New

Air

Traf

fic C

ontr

ol T

ower

at

Vald

osta

Re

gion

al A

irpor

t$2

,705

,000

$2,7

05,0

00$0

$0N

oN

/A

SGRC

-130

Pier

ce01

PI-0

0162

91Ci

ty o

f Pat

ters

on R

esur

faci

ng B

undl

e Ph

ase

1$2

,750

,000

$2,7

50,0

00$0

$0N

oN

/A

SGRC

-131

Pier

ce01

PI-0

0162

92Ci

ty o

f Bla

cksh

ear

Sess

ion

Hill

Res

urfa

cing

Bu

ndle

$1,5

00,3

24$1

,500

,324

$0$0

No

N/A

SGRC

-133

Pier

ce01

PI-0

0162

94W

are

Stre

et W

iden

and

Res

urfa

ce$2

,600

,000

$2,1

91,6

10$0

$14,

456

No

N/A

SGRC

-134

Pier

ce01

PI-0

0162

95St

. Joh

ns C

hurc

h Ro

ad W

iden

and

Re

surf

ace

$2,4

40,3

00$2

,440

,300

$0$0

No

N/A

SGRC

-142

Tift

01PI

-001

6302

8th

Stre

et W

iden

ing

for

Turn

Lan

e$9

41,6

00$9

41,6

00$0

$0N

oN

/A

SGRC

-143

Tift

01PI

-001

6303

2nd

Stre

et R

esur

faci

ng$1

,081

,600

$1,0

81,6

00$0

$0N

oN

/A

SGRC

-148

Turn

er01

PI-0

0163

08Ci

ty o

f Ash

burn

Res

urfa

cing

Bun

dle

and

Side

wal

k Im

prov

emen

ts$1

,000

,000

$1,0

00,0

00$0

$0N

oN

/A

SGRC

-149

Turn

er01

PI-0

0163

09H

obby

Roa

d Pa

ving

$1,4

00,0

00$1

,400

,000

$0$0

No

N/A

SGRC

-153

War

e01

PI-0

0163

12Al

bany

Ave

nue

Wid

en a

nd R

esur

faci

ng$1

,600

,000

$1,6

00,0

00$0

$0N

oN

/A

SGRC

-002

Atki

nson

02PI

-001

6171

Cogd

ell R

oad

Wid

en a

nd R

esur

face

$2,3

59,0

00$2

,359

,000

$0$0

No

N/A

SGRC

-012

Baco

n02

PI-0

0161

81Jo

hnso

n La

ke R

oad

Wid

enin

g an

d Sa

fety

Im

prov

emen

ts$3

,000

,000

$3,0

00,0

00$0

$0N

oN

/A

SGRC

-013

Baco

n02

PI-0

0161

82SR

32

Pass

ing

Lane

s Be

twee

n Al

ma

to

Dou

glas

$536

,000

$536

,000

$0$0

No

Blen

ded

Proj

ect

(Sta

te F

unds

) -

Tota

l Pro

ject

Cos

t $4

,536

,000

SGRC

-017

Ben

Hill

02PI

-001

6186

Beth

lehe

m C

hurc

h Ro

ad B

ridge

at

Hou

se

Cree

k Br

idge

Rep

lace

men

t$1

,500

,000

$1,5

00,0

00$0

$0N

oN

/A

SGRC

-018

Ben

Hill

02PI

-001

6187

Beth

lehe

m C

hurc

h Ro

ad B

ridge

at

Ott

er

Cree

k Br

idge

Rep

lace

men

t$1

,000

,000

$1,0

00,0

00$0

$0N

oN

/A

SGRC

-019

Ben

Hill

02PI

-001

6188

Peac

htre

e Ro

ad C

orrid

or R

ealig

ning

, W

iden

ing,

and

Int

erse

ctio

n Im

prov

emen

ts$9

13,2

00$9

13,2

00$0

$0N

oBl

ende

d Pr

ojec

t (S

tate

Fun

ds)

- To

tal P

roje

ct C

ost

$5,9

13,2

00

- 4 -

Page 13: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

Sout

hern

Geo

rgia

Ann

ual R

epor

t -

TIA

Fun

ds O

nly

Rep

ort

cove

rs:

Dec

embe

r 1,

201

8 -

Nov

embe

r 15

, 201

9

Pro

ject

ID

Cou

nty

Ban

dG

DO

T ID

Des

crip

tion

Ori

gina

l Es

tim

ated

Cos

tC

urr

ent

Esti

mat

ed C

ost

Pri

or Y

ears

Cur

rent

Yea

rC

orre

ctiv

e A

ctio

n

Req

uire

d?C

omm

ents

SGRC-

020

Ben

Hill

02PI

-001

6189

Ever

gree

n Roa

d Res

urfa

cing

- B

en H

ill$6

88,3

00$6

88,3

00$0

$0N

oN

/A

SGRC

-021

Ben

Hill

02PI

-001

6190

Fitz

gera

ld P

erim

eter

Roa

ds I

mpr

ovem

ents

(W

iden

, Res

urfa

ce, C

/G)

$5,1

65,1

92$5

,165

,192

$0$0

No

N/A

SGRC

-033

Broo

ks02

PI-0

0162

01D

eVan

e Ro

ad B

ridge

Rep

lace

men

t, W

iden

an

d Re

surf

ace

$4,0

00,0

00$4

,000

,000

$0$0

No

N/A

SGRC

-040

Char

lton

02PI

-000

0821

SR 4

0 fr

om S

R40

Conn

to

0.36

mi e

ast

of

May

Blu

ff Rd

$2,6

35,0

00$1

,651

,000

$0$0

No

Blen

ded

Proj

ect

- To

tal P

roje

ct C

ost

$8,6

35,0

00.

TIA

and

HB1

70 fu

nds

adju

sted

to

acco

mm

odat

e ba

nd c

hang

e re

ques

t fo

r PI

-421

345-

.

SGRC

-049

Clin

ch02

PI-4

2239

0-SR

89/

US4

41 fr

om O

rang

e St

in

Hom

ervi

lle t

o CR

101

/Cow

art

Rd$6

,625

,000

$1,6

25,0

00$0

$0N

oBl

ende

d Pr

ojec

t -

Tota

l Pro

ject

Cos

t $2

6,62

5,00

0.

TIA

and

HB1

70 fu

nds

adju

sted

to

acco

mm

odat

e ba

nd c

hang

e re

ques

t fo

r PI

-421

345-

.

SGRC

-071

Coffe

e02

PI-0

0162

35Bu

d H

utch

eson

Roa

d Pa

ving

$2,7

98,0

00$2

,798

,000

$0$0

No

N/A

SGRC

-078

Coffe

e02

PI-0

0162

41H

wy

149/

Youn

gie

Fuss

ell

Road

/Brid

geto

wn

Road

Wid

en a

nd

$850

,000

$850

,000

$0$0

No

Blen

ded

Proj

ect

(Sta

te F

unds

) -

Tota

l Pro

ject

Cos

t $3

,850

,000

SGRC

-092

Cook

02PI

-001

6254

Tillm

an R

oad

Bypa

ss P

hase

3

Impr

ovem

ents

$4,9

00,0

00$4

,900

,000

$0$0

No

N/A

SGRC

-095

Cook

02PI

-001

6257

Vald

el R

oad

Res

urfa

cing

$2,0

07,5

00$2

,007

,500

$0$0

No

N/A

SGRC

-110

Low

ndes

02PI

-001

6271

Old

41

N. W

iden

ing

$6,5

16,8

00$6

,516

,800

$0$0

No

N/A

SGRC

-124

Low

ndes

02PI

-001

6285

Old

Cly

attv

ille

Roa

d W

iden

ing

- Va

ldos

ta$6

,217

,514

$6,2

17,5

14$0

$0N

oN

/A

SGRC

-126

Low

ndes

02PI

-001

6287

S Pa

tter

son

Stre

et a

t G

riffin

Ave

nue

Inte

rsec

tion

and

Dra

inag

e Im

prov

emen

ts$1

,258

,000

$1,2

58,0

00$0

$0N

oN

/A

SGRC

-127

Low

ndes

02PI

-001

6288

St A

ugus

tine

Road

at

Gor

nto

Road

In

ters

ectio

n an

d D

rain

age

Impr

ovem

ents

$2,5

10,1

00$2

,510

,100

$0$0

No

N/A

SGRC

-129

Low

ndes

02PI

-001

6290

Bayt

ree

Road

at

Gor

nto

Road

Int

erse

ctio

n an

d Si

gnal

Im

prov

emen

ts$2

,734

,000

$2,7

34,0

00$0

$0N

oN

/A

SGRC

-132

Pier

ce02

PI-0

0162

93Pi

erce

Cou

nty

Hor

sesh

oe R

oad/

Flet

cher

Ro

ad A

rea

Resu

rfac

ing

Bund

le$6

81,8

90$6

81,8

90$0

$0N

oBl

ende

d Pr

ojec

t (S

tate

Fun

ds)

- To

tal P

roje

ct C

ost

$1,6

81,8

90SG

RC-1

36Pi

erce

02PI

-001

6297

US

84 I

nter

sect

ion

and

Sign

al

Impr

ovem

ents

from

Cou

nty

Farm

Roa

d to

$3

,500

,000

$3,5

00,0

00$0

$3,2

09N

oBl

ende

d Pr

ojec

t (S

tate

Fun

ds)

- To

tal P

roje

ct C

ost

$8,5

00,0

00SG

RC-1

37Ti

ft02

PI-0

0162

98U

pper

Ty

Ty R

oad

Brid

ge R

epla

cem

ent

over

Litt

le R

iver

$2,7

10,0

00$2

,710

,000

$0$0

No

N/A

SGRC

-139

Tift

02PI

-001

6299

Scoo

terv

ille

Road

Brid

ge R

epla

cem

ent

over

Litt

le C

reek

$1,4

10,0

00$1

,410

,000

$0$0

No

N/A

SGRC

-140

Tift

02PI

-001

6300

Om

ega-

Eldo

rado

Roa

d Br

idge

Re

plac

emen

t ov

er A

rnol

d Cr

eek

$1,9

11,0

00$1

,911

,000

$0$0

No

N/A

SGRC

-141

Tift

02PI

-001

6301

Om

ega-

Eldo

rado

Roa

d Br

idge

Re

plac

emen

t ov

er L

ittle

Riv

er$2

,582

,250

$2,5

82,2

50$0

$0N

oN

/A

SGRC

-145

Tift

02PI

-001

6305

Taxi

way

Im

prov

emen

ts a

t H

enry

Tift

M

yers

Airp

ort

$5,6

00,0

00$5

,600

,000

$0$0

No

N/A

SGRC

-146

Tift

02PI

-001

6306

12th

Str

eet

at P

rince

Ave

nue

Inte

rsec

tion

Impr

ovem

ents

$2,2

85,5

00$2

,285

,500

$0$0

No

N/A

- 5 -

Page 14: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

Sout

hern

Geo

rgia

Ann

ual R

epor

t -

TIA

Fun

ds O

nly

Rep

ort

cove

rs:

Dec

embe

r 1,

201

8 -

Nov

embe

r 15

, 201

9

Pro

ject

ID

Cou

nty

Ban

dG

DO

T ID

Des

crip

tion

Ori

gina

l Es

tim

ated

Cos

tC

urr

ent

Esti

mat

ed C

ost

Pri

or Y

ears

Cur

rent

Yea

rC

orre

ctiv

e A

ctio

n

Req

uire

d?C

omm

ents

SGRC-

150

Turn

er02

PI-0

0163

10G

lynn

Coo

k Roa

d Pa

ving

$620

,000

$620

,000

$0$0

No

N/A

SGRC

-151

Turn

er02

PI-0

0163

11Rei

d Roa

d Pa

ving

$2,4

00,0

00$2

,400

,000

$0$0

No

N/A

SGRC

-152

War

e02

PI-0

0136

05U

S 84

Brid

ge o

ver

Satil

la R

iver

$3,6

50,0

00$3

,650

,000

$0$0

No

Blen

ded

Proj

ect

- To

tal P

roje

ct C

ost

$8,6

50,0

00

SGRC

-154

War

e02

PI-0

0163

13Kn

ight

Ave

nue

Res

urfa

cing

$650

,000

$650

,000

$0$0

No

N/A

SGRC

-014

Baco

n03

PI-0

0161

83Co

rinth

Chu

rch

Roa

d Res

urfa

cing

$620

,100

$620

,100

$0$0

No

N/A

SGRC

-015

Baco

n03

PI-0

0161

84Te

n M

ile C

hurc

h Roa

d Res

urfa

cing

$534

,000

$534

,000

$0$0

No

N/A

SGRC

-016

Baco

n03

PI-0

0161

85Cu

mbe

rland

Roa

d Res

urfa

cing

$389

,687

$389

,687

$0$0

No

N/A

SGRC

-028

Bran

tley

03PI

-001

5536

SR52

0/U

S82

@Sa

tilla

Riv

er O

verf

low

14

mi e

ast

of H

obok

en$9

00,0

00$2

00,0

00$0

$0N

oBl

ende

d Pr

ojec

t -

Tota

l Pro

ject

Cos

t $5

,900

,000

. TI

A an

d H

B170

fund

s ad

just

ed t

o ac

com

mod

ate

band

cha

nge

requ

est

for

PI-4

2134

5-.

SGRC

-030

Bran

tley

03PI

-001

6198

Cher

ry S

tree

t Res

urfa

cing

$367

,317

$367

,317

$0$0

No

N/A

SGRC

-048

Clin

ch03

PI-0

0162

15H

omer

ville

Byp

ass

Res

urfa

cing

, Brid

ge

Repl

acem

ent

and

Oth

er I

mpr

ovem

ents

$3,0

00,0

00$3

,000

,000

$0$0

No

N/A

SGRC

-077

Coffe

e03

PI-0

0162

40SR

158

Pas

sing

Lan

es in

Cof

fee

Coun

ty$3

,428

,000

$1,4

28,0

00$0

$0N

oBl

ende

d Pr

ojec

t (S

tate

Fun

ds)

- To

tal P

roje

ct C

ost

$8,4

28,0

00.

TIA

and

HB1

70 fu

nds

adju

sted

to

acco

mm

odat

e ba

nd c

hang

e re

ques

t fo

r PI

-421

345-

.

SGRC

-081

Coffe

e03

PI-0

0162

44M

cDon

ald

Road

Sid

ewal

k an

d D

rain

age

Impr

ovem

ents

$1,3

41,8

00$1

,341

,800

$0$0

No

N/A

SGRC

-082

Coffe

e03

PI-0

0162

45S.

Gas

kin

Aven

ue S

idew

alk

and

Dra

inag

e Im

prov

emen

ts$6

57,1

00$6

57,1

00$0

$0N

oN

/A

SGRC

-083

Coffe

e03

PI-0

0162

46Ch

este

r Av

enue

Sid

ewal

k an

d D

rain

age

(Cul

vert

) Im

prov

emen

ts$2

,846

,200

$2,8

46,2

00$0

$0N

oN

/A

SGRC

-084

Coffe

e03

PI-0

0162

47W

est

Gre

en H

wy

(SR

135/

US

221)

Si

dew

alk

Impr

ovem

ents

$560

,200

$560

,200

$0$0

No

N/A

SGRC

-086

Coffe

e03

PI-0

0162

48Lu

po L

ane

Side

wal

k an

d D

rain

age

Impr

ovem

ents

$674

,400

$674

,400

$0$0

No

N/A

SGRC

-087

Coffe

e03

PI-0

0162

49Ba

ker

Hw

y, E

ast

(SR

158)

Sid

ewal

k Im

prov

emen

ts$6

94,6

00$6

94,6

00$0

$0N

oN

/A

SGRC

-088

Coffe

e03

PI-0

0162

50W

est

Wal

ker

Stre

et S

idew

alk

Impr

ovem

ents

$433

,900

$433

,900

$0$0

No

N/A

SGRC

-089

Coffe

e03

PI-0

0162

51Ro

ad I

mpr

ovem

ents

at

Dou

glas

Mun

icip

al

Airp

ort

$150

,000

$150

,000

$0$0

No

N/A

SGRC

-108

Low

ndes

03PI

-001

6270

Old

Cly

attv

ille

Road

Wid

enin

g -

Low

ndes

$21,

200,

000

$21,

200,

000

$0$0

No

N/A

SGRC

-111

Low

ndes

03PI

-001

6272

Shilo

h Ro

ad R

esur

faci

ng a

nd B

ridge

Re

plac

emen

t$5

,600

,000

$5,6

00,0

00$0

$0N

oN

/A

SGRC

-112

Low

ndes

03PI

-001

6273

Orr

Roa

d Ex

tens

ion

$1,1

75,0

00$1

,175

,000

$0$0

No

N/A

- 6 -

Page 15: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

Sout

hern

Geo

rgia

Ann

ual R

epor

t -

TIA

Fun

ds O

nly

Rep

ort

cove

rs:

Dec

embe

r 1,

201

8 -

Nov

embe

r 15

, 201

9

Pro

ject

ID

Cou

nty

Ban

dG

DO

T ID

Des

crip

tion

Ori

gina

l Es

tim

ated

Cos

tC

urr

ent

Esti

mat

ed C

ost

Pri

or Y

ears

Cur

rent

Yea

rC

orre

ctiv

e A

ctio

n

Req

uire

d?C

omm

ents

SGRC-

114

Low

ndes

03PI

-001

6275

Brig

gsto

n Ro

ad P

avin

g an

d D

rain

age

Impr

ovem

ents

$2,5

25,0

00$2

,525

,000

$0$0

No

N/A

SGRC

-117

Low

ndes

03PI

-001

6278

Kind

erlo

u Cl

yatt

ville

Roa

d Pa

ving

and

D

rain

age

Impr

ovem

ents

$3,4

50,0

00$3

,450

,000

$0$0

No

N/A

SGRC

-118

Low

ndes

03PI

-001

6279

Cole

man

Roa

d N

W P

avin

g an

d D

rain

age

Impr

ovem

ents

$2,3

00,0

00$2

,300

,000

$0$0

No

N/A

SGRC

-119

Low

ndes

03PI

-001

6280

Twin

Lak

es R

oad

Pavi

ng a

nd D

rain

age

Impr

ovem

ents

$2,1

00,0

00$2

,100

,000

$0$0

No

N/A

SGRC

-120

Low

ndes

03PI

-001

6281

Hal

l Roa

d Pa

ving

, Dra

inag

e an

d O

ther

Im

prov

emen

ts$3

,700

,000

$3,7

00,0

00$0

$0N

oN

/A

SGRC

-121

Low

ndes

03PI

-001

6282

Coun

try

Club

Driv

e W

iden

ing

$800

,800

$800

,800

$0$0

No

Blen

ded

Proj

ect

(Sta

te F

unds

) -

Tota

l Pro

ject

Cos

t $8

,800

,800

SGRC

-122

Low

ndes

03PI

-001

6283

St. A

ugus

tine

Roa

d RR G

rade

Sep

arat

ion

$8,9

00,0

00$3

,162

,536

$0$0

No

Blen

ded

Proj

ect

(Sta

te F

unds

) -

Tota

l Pro

ject

Cos

t $1

8,90

0,00

0. T

IA a

nd H

B170

fund

s ad

just

ed t

o ac

com

mod

ate

band

cha

nge

requ

est

for

PI-4

2134

5-.

SGRC

-125

Low

ndes

03PI

-001

6286

St A

ugus

tine

Road

at

Nor

man

Driv

e In

ters

ectio

n, D

rain

age

and

Sign

al

$3,9

88,7

00$3

,988

,700

$0$0

No

N/A

SGRC

-128

Low

ndes

03PI

-001

6289

Forr

est

Stre

et W

iden

ing

$20,

301,

700

$20,

301,

700

$0$0

No

N/A

SGRC

-135

Pier

ce03

PI-0

0162

96G

olf

Cour

se R

oad

Alig

nmen

t, D

rain

age

and

Resu

rfac

ing

$3,4

08,0

00$3

,408

,000

$0$0

No

N/A

SGRC

-138

Tift

03PI

-001

0318

I-75

@ C

R421

/Chu

la B

rook

field

Rd

- Ph

ase

II (

Exit

69)

$3,1

55,0

00$1

,800

,000

$0$0

No

Blen

ded

Proj

ect

(Sta

te F

unds

) -

Tota

l Pro

ject

Cos

t $2

0,90

5,00

0. T

IA a

nd H

B170

fund

s ad

just

ed t

o ac

com

mod

ate

band

cha

nge

requ

est

for

PI-4

2134

5-.

SGRC

-144

Tift

03PI

-001

6304

McC

orm

ick

Driv

e W

iden

ing

and

Real

ignm

ent

$3,5

00,0

00$3

,500

,000

$0$0

No

N/A

SGRC

-147

Tift

03PI

-001

6307

18th

Str

eet

Ditc

h Br

idge

Rep

lace

men

ts (

5 Cu

lver

ts)

$1,8

69,4

00$1

,869

,400

$0$0

No

N/A

Reg

iona

lM

ultip

lePI

-A00

0835

Prog

ram

Adm

inis

trat

ion

$18,

491,

374

$18,

491,

374

$0$3

32,8

11N

oN

/A

$315

,254

,826

$312

,356

,381

$0$3

,740

,411

2:17

:22

PMTo

tal

Nov

18,

201

9

- 7 -

Page 16: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

Completed Project Report

Southern Georgia Region Project: Roberson Street Widening and Resurfacing County: Brantley Project ID: SGRC-029 GDOT ID: PI-0016197 Project Description This project resurfaced and widened Roberson Street from Canon Street to Nahunta City Limits. Project Benefit The project has benefited the public by potentially enhancing safety. Schedule Information NTP Date: 10.07.2019 Completion Date: 10.22.2019 Budget / Cost Information Original Budget: $87,900 Projected Final Cost: $87,900 Project Delivery Local Let Locally Managed Construction Project Photos Before After

Page 17: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

Completed Project Report

Southern Georgia Region Project: Cannon Street Resurfacing County: Brantley Project ID: SGRC-032 GDOT ID: PI-0016200 Project Description This project resurfaced and widened Cannon Street from School Street to Charlton Street. Project Benefit The project has benefited the public by potentially enhancing safety. Schedule Information NTP Date: 10.07.2019 Completion Date: 10.22.2019 Budget / Cost Information Original Budget: $52,000 Projected Final Cost: $52,000 Project Delivery Local Let Locally Managed Construction Project Photos Before After

Page 18: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

Completed Project Report

Southern Georgia Region Project: Frank Sessoms Highway Resurfacing County: Clinch Project ID: SGRC-050 GDOT ID: PI-0016216 Project Description This project leveled and resurfaced Frank Sessoms Memorial Highway (aka Cogdell Highway) beginning at US 84 and ending at SR 122. Project Benefit The project has benefited the public by potentially enhancing safety. Schedule Information NTP Date: 07.18.2019 Completion Date: 10.02.2019 Budget / Cost Information Original Budget: $2,161,000 Projected Final Cost: $1,854,133 Project Delivery GDOT Let GDOT Managed Construction Project Photos Before After

Page 19: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

Completed Project Report

Southern Georgia Region Project: Cogdell Highway Resurfacing County: Clinch Project ID: SGRC-051 GDOT ID: PI-0016217 Project Description This project leveled and resurfaced Cogdell Highway/Sandy Bottom Road from SR 122 to the Atkinson County Line. Project Benefit The project has benefited the public by potentially enhancing safety. Schedule Information NTP Date: 07.18.2019 Completion Date: 10.02.2019 Budget / Cost Information Original Budget: $319,100 Projected Final Cost: $395,439 Project Delivery GDOT Let GDOT Managed Construction Project Photos Before After

Page 20: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

Completed Project Report

Southern Georgia Region Project: River Road Widening and Resurfacing County: Lanier Project ID: SGRC-105 GDOT ID: PI-0016267 Project Description This project widened and resurfaced River Road from SR 37 to SR 64. Project Benefit The project has benefited the public by potentially enhancing safety. Schedule Information NTP Date: 08.12.2019 Completion Date: 11.12.2019 Budget / Cost Information Original Budget: $3,250,000 Projected Final Cost: $1,943,410 Project Delivery GDOT Let GDOT Managed Construction Project Photos Before After

Page 21: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

MinutesTIA Citizens Review Panel

March 26, 20192:00 PM

Members Present OrganizationBill Slaughter Lowndes CountyWalter Hudson Irwin CountyRobert Griner Berrien CountyD.W. Harper Irwin CountyPatrick Jones Ware County

Others PresentKenneth Franks TIA GDOTEric Wilkinson TIA GDOTBrent Moseley TIA GDOTWilliam Eastin GDOTCorey Hull SGRCAugust Huckleberry SGRCRandy Lane City of AdelPete Pyrzenski City of TiftonJohn Shepherd Jr. City of TiftonScott Moye Ware CountyDan Bodycomb GDOTGene Thomas City of Waycross

Page 22: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

CRP Item #1 - Call to Order

Mr. Slaughter called the meeting to order at 2:00 pm.

CRP Item #2 - Introductions/Roll Call

Mr. Slaughter asked those present to introduce themselves and state their affiliation with the committee.

CRP Item #3 – Approval of Minutes

Mr. Slaughter gave the committee time to review the minutes. Mr. Jones made a motion to approve the minutes. Mr. Harper made a motion in the second. The vote was unanimous; the motion carried.

CRP Item #4 – Public Comment

Mr. Slaughter opened the floor for public comments. Mr. Slaughter asked Mr. Franks if there was there anything we need to consider for public comment such as time. Mr. Franks stated that he has never had an issue where rules needed to be put in place. Mr. Slaughter stated that we usually cut it off at 5 minutes.

CRP Item #5 – Election of Chair and Vice-Chair

Mr. Franks explained to the committee that in order to execute band changes, they have to consider the financial standing. Mr. Franks stated that he has calculated loose numbers to help with the band change requests; for the first 4 years, I have $7 million in administration and $10 million for band 2 and 3 startup and 93 million for the projects on TIA investment list. That leaves us with 38 million. I took the initial projection and docked it by 10% that would leave us with 23 million. I have since then gotten a new projection and we are looking to have 48 million for band one projects. We are currently 10% over our current projected amounts but looking at the band change holistically, I used all the same assumptions and applied all the band change requests. The first would be Adel request, which would be moving one project from Band 1 to 2 and two projects from Band 2 to Band 1. The state route turning lane project is broke in half due to the 112 million that was brought in from GDOT. The planning office was okay with advancing 250,000 dollars into Band 1. TIA office is in favor of this request. The Waycross request, I am inclined to agree with that request. Lowndes County request, we are in favor of that request. Tifton request, we are in favor of that request. Mr. Franks continued, the Coffee County request is a little bit more complex. It has 9.8 million in TIA funds and 15 million in state funds. We approached the planning office to request advancing funds but it was denied. The TIA office has some flexibility where we can do a budget change and advance the project into Band 1 but it will increase and change the TIA projects budgets. One thing that I am uncomfortable about is that the revenue has been great but bringing in 25 million into Band 1 might put band 1 project in a deficit. We are in favor of it because it was a previously programmed project that was going to let in 2020 or 2021 so the citizens were expecting the delivery of this project, but I would like to delay the approval of this project until the risk team can come in and vet the project. My recommendation is that agenda items A, B, D, E, all be

Page 23: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

approved and Agenda item C, be placed on hold for approval until the next meeting. Mr. Griner made a motion to approve the Adel band change request. Mr. Jones seconded the motion. The vote was unanimous; the motion carried. Mr. Hudson made a motion to approve the Waycross band change request. Mr. Harper seconded the motion. The vote was unanimous; the motion carried. Mr. Griner made a motion to table the Coffee County band change request until next meeting. Mr. Harper seconded the motion. The vote was unanimous; the motion carried. Mr. Jones made a motion to approve the Lowndes County band change request. Mr. Hudson seconded the motion. The vote was unanimous; the motion carried. Mr. Hudson made a motion to approve the Tifton band change request. Mr. Griner seconded the motion. The vote was unanimous; the motion carried.

CRP Item # 6 – TIA Update

Mr. Franks gave a brief update on the projects. We are currently in Band one and we will have those projects all in construction by 2022. Also, if you would like to see what is going on in other regions please visit our website. The approved investment list has a total of 480 million and currently there are 84 projects in Band one, which has changed at this meeting and I will update that number by next meeting. Once the Southern Georgia region is added to the website, the projects, construction and cost will be updated once a month and you can keep up with whatis going on via our website. Mr. Moseley gave the update of the projects that will be let in the Southern Georgia region this calendar year. He stated that Pierce County would be the 1st

project to be let next month. Clinch County has two projects, Lanier has one, Coffee County has three and Irwin County has two, Fitzgerald has one, City of Alma has two next month. Cook County has one scheduled in December. Berrien County has agreed to let theirs on their own. We are waiting on the TIA agreement from them. Lowndes County has returned their agreements and they will administer their project. Asked if the bike lane can be considered in this project. Mr. Franks stated that with the current year layout he is looking to be aggressive early on especially if the trend continues.

CRP Item # 7 – Privilege of the Floor

There were no comments.

CRP Item # 8 – Next Meeting Date, Place, Time

Mr. Slaughter stated that the meeting will be held on August 6, 2019 @ 2:30 p.m.

Page 24: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

MinutesTIA Citizens Review Panel

August 6, 20192:00 PM

Members Present OrganizationBill Slaughter Lowndes CountyWalter Hudson Irwin CountyRobert Griner Berrien CountyD.W. Harper Irwin CountyPatrick Jones Ware County

Others PresentKenneth Franks TIA GDOTBrent Moseley TIA GDOTDan Bodycomb TIA GDOTRick Toole Alfred Benesch & Co. Eric Hammarlund Alfred Benesch & Co.Janet Studstill The Berrien PressCorey Hull SGRCAmy Martin SGRC

Page 25: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

CRP Item #1 - Call to Order

Mr. Slaughter called the meeting to order at 2:00 pm.

CRP Item #2 - Introductions/Roll Call

Mr. Slaughter asked those present to introduce themselves and state their affiliation with the committee.

CRP Item #3 – Approval of Minutes

Mr. Slaughter gave the committee time to review the minutes. Mr. Harper made a motion to approve the minutes. Mr. Jones made a motion in the second. The vote was unanimous; the motion carried.

CRP Item #4 – Public Comment

Mr. Slaughter opened the floor for public comments. There were no comments.

CRP Item #5 – New Business

A. Coffee County Band Change Request

Mr. Slaughter explained that the information for this band change request was in the agenda packet and that the request was previously tabled at the last meeting. Mr. Slaughter asked Mr. Franks to give an update concerning the project as it relates to available TIA funds to move it forward. Mr. Franks stated that the TIA office ran financial analysis to determine if this was possible. We looked at all band one projects holistically and performed a cost-spending program for the first four years and it is well within our capabilities to advance this project into band one. Mr. Slaughter asked if anyone had questions. There were no questions. Mr. Griner made a motion to approve the Coffee County Band Change Request. Mr. Hudson seconded the motion. The vote was unanimous; the motion passed.

CRP Item # 6 – TIA Update

Mr. Franks gave a brief update on TIA in other regions. Mr. Franks gave a brief update on TIA in the Southern Georgia Region. Mr. Franks handed out a list of all the projects throughout the region that included the current band, project stage, and estimated let date among other information. Mr. Franks explained that the other regions that are looking to have a TIA referendum have begun developing projects to submit. Mr. Slaughter asked how far out are the other regions before TIA ends. Mr. Franks responded that they are in Band 2 and they are 3 years out from TIA ending. They have begun the process early because the law states that if the resolution goes to ballot and fails then there is a 2 year wait to put it on the ballot again, so if it fails they can put it back on the ballot in 2022. Mr. Franks stated that the total thus far in collections is a little over $40 million dollars in collections. Currently, the projections have the Southern GA. Region at 13% over, based on this TIA is projected to end 18 months early; however, these projections tend to change, the trend is good now but we are only in year one and

Page 26: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

want to be aware that these amounts can change. Mr. Franks stated that on the handout GDOT will remain as letting the project until the project is approved for local let. We bring the project sheet because we want to be transparent with all the taxpayers in the region by showing where we are spending the money at and the progress. There will be TIA budgetary changes on projects with blended funds where TIA funds will increase and State funds will decrease and be expanded into other projects. Mr. Bodycomb explained that 17 projects will be let in CY19. Four of the projects will be local let and 13 GDOT let. The bids for the projects were really good and were below the projected budget for the project. Mr. Slaughter asked what happens if there is additional funding after all TIA projects are completed. Mr. Franks responded that the funds were be disbursed to the region via the discretionary funding formula. Mr. Bodycomb showed a snapshot of the upcoming 10 projects in the SGR. He continued, the I-75 and SR 31 (Exit 11) project is behind and has been pushed back to October/November 2020 due to geotechnical issues. Mr. Bodycomb gave a brief description of the rest of the projects and explained how the agreements for local let projects are executed and the current status of the projects. Mr. Bodycomb notified the panel that Pierce County will have a ribbon cutting on Friday, September 13, 2019 for their project. Mr. Franks stated that the TIA office is happy with the progress thus far and with the current forecast we will start advancing and pushing out projects faster. We want to be efficient as we can and process projects as quickly as we can to beat inflation.

CRP Item # 7 – Privilege of the Floor

There were no comments.

CRP Item # 8 – Next Meeting Date, Place, Time

Mr. Slaughter asked the panel when would they like for the next meeting to take place. Mr. Franks stated that there is an end of year report that needs to be done. The committee agreed that the next meeting will be held on November 19th @ 2:00 p.m. at the same location.

Page 27: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

MinutesTIA Citizens Review Panel

November 11, 20192:00 PM

Members Present OrganizationBill Slaughter Lowndes CountyWalter Hudson Irwin CountyRobert Griner Berrien CountyD.W. Harper Irwin County

Others PresentKenneth Franks TIA GDOTBrent Moseley TIA GDOTDan Bodycomb TIA GDOTWilliam Eastin TIA GDOTCorey Hull SGRCAmy Martin SGRC

Page 28: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

CRP Item #1 - Call to Order

Mr. Slaughter called the meeting to order at 2:01 pm.

CRP Item #2 - Introductions/Roll Call

Mr. Slaughter asked those present to introduce themselves and state their affiliation with the committee.

CRP Item #3 – Approval of Minutes

Mr. Slaughter gave the committee time to review the minutes. Mr. Hudson made a motion to approve the minutes. Mr. Griner made a motion in the second. The vote was unanimous; the motion carried.

CRP Item #4 – Public Comment

Mr. Slaughter opened the floor for public comments. There were no comments.

CRP Item #5 – New Business

Mr. Slaughter opened the floor for any new business. There were no new business items to discuss.

CRP Item # 6 – TIA Update

Mr. Franks stated that he would like to give a brief update on TIA in the other regions in Georgia. Mr. Franks explained that the other regions that are looking to have a TIA referendum have begun developing projects to submit. He continued that Central Valley Regional Commission and the Heart of Georgia Regional Commission have started the process for the TIA referendum to be included in the March Ballot; River Valley Regional Commission has selected the TIA Executive Committee and are aiming for a 2022 referendum on the ballot. Mr. Franks explained how the Southern Georgia Region compared to other regions in various areas and continued a brief update on TIA in the Southern Georgia Region. Mr. Franks handed out a list of all the projects throughout the region that included the current band, project stage, and estimated let date, and the amount of revenue that has been applied to various projects. He stated that 11 projects have been let and 5 have been completed. Mr. Moseley then gave a more detailed review of the projects. He stated that the bids for the projects are continuing to fall below the projected budget for the project. Mr. Moseley continued that the projects are being spreadthroughout the region and that both the GDOT and local let projects are moving according to their timelines and there has been no major issues. Mr. Franks and Mr. Moseley both stated that the TIA office is happy with the progress thus far. Mr. Franks explained the basis of the end of year report to the CRP committee. Mr. Franks provided the committee with a draft of the report and asked that any comments be sent to him. He continued that the report needs to be posted on the Department of Revenue website before December 15, 2019.

Page 29: Russell R. McMurry, P.E., Commissioner SG CRP Report.pdf · Russell R. McMurry, P.E., Commissioner One Georgia Center 600 West Peachtree Street, NW Atlanta, GA 30308 (404) 631-1000

CRP Item # 7 – Privilege of the Floor

There were no comments.

CRP Item # 8 – Next Meeting Date, Place, Time

Mr. Slaughter asked the panel when would they like for the next meeting to take place. The committee agreed that the next meeting will be held on March 10th @ 2:00 p.m. at the same location. Mr. Slaughter opened the floor for adjournment. Mr. Griner made a motion to adjourn;Mr. Hudson made a motion in the second. The meeting was adjourned.