RUPRATIONAL UNIFIED PROCESS

Behnam Akbari

06 Oct 2014

1

Page 2: Rup

Topics

What is RUP?

RUP Overview.

RUP phases & Disciplines.

RUP good practice.

2

Page 3: Rup

What is the Rational Unified Process?

3

Page 4: Rup

What is the Rational Unified Process?

The Rational Unified Process® or RUP® is a software engineering process developed by Rational Software, IBM

It provides a disciplined approach to assigning tasks and responsibilities within a development organization.

Its goal is to ensure the production of high-quality software that meets the needs of its end-users, within a predictable schedule and budget.

It is a guide for how to effectively use the Unified Modeling Language(UML).

The Rational Unified Process is a configurable process. No single process is suitable for all software development.

The Unified Process fits small development teams as well as large development organizations.

4

Page 5: Rup

RUP Overview:

described from 2 perspectives

A dynamic perspective that shows

phases over time;

A static perspective that shows

process activities;

5

Page 6: Rup

RUP Overview:

The first dimension represents time and shows the lifecycle aspects of the process as it unfolds.

– it is enacted, and it is expressed in terms of phases, iterations, and milestones.

The second dimension represents the static aspect of the process.

– how it is described in terms of process components, disciplines, activities,workflows, artifacts, and roles.

The graph shows how the emphasis varies over time.

– For example, in early iterations, spend

more time on requirements, and in later

iterations, spend more time on

implementation.

6

Page 7: Rup

RUP Phases:

TheRational Unified Process divides one development cycle in four consecutive phases. The software lifecycle is broken into cycles, each cycle working on a new generation of the product.

• Inception phase

• Elaboration phase

• Construction phase

• Transition phase

Each phase is concluded with a well-defined milestone ,a point in time at which certain critical decisions must be made, and therefore key goals must have been achieved

7

Page 8: Rup

Inception Phase:

During the inception phase, you establish the business case for the system and delimit the project scope. To accomplish this you must identify all external entities with which the system will interact (actors) and define the nature of this interaction at a high-level. This involves identifying all use cases.

Milestone:

• Stakeholder concurrence on scope definition and cost/schedule estimates.

• Requirements understanding as evidenced by the fidelity of the primary use cases.

• Credibility of the cost/schedule estimates, priorities, risks, and development process.

• Depth and breadth of any architectural prototype that was developed.

• Actual expenditures versus planned expenditures.

The project may be cancelled or considerably re-thought if it fails to pass this milestone.

8

Page 9: Rup

Elaboration Phase:

Elaboration is the second of the four phases in the RUP approach. The goal of the

Elaboration phase is to define and baseline the architecture of the system in order to provide

a stable basis for the bulk of the design and implementation effort in the Construction

phase. The architecture evolves out of a consideration of the most significant requirements

(those that have a great impact on the architecture of the system) and an assessment of risks.

?

Is vision Stable? Is architecture stable? Does executable show true risk management? Is next phase (Construction) plane is accurate? Does current vision could be achieved? Is the actual resource expenditure versus planned expenditure

acceptable?

9

Page 10: Rup

Construction Phase:

During the construction phase, all remaining components and

application features are developed and integrated into the

product, and all features are thoroughly tested.

System design, programming and testing.

The Construction phase ends with an important project milestone,

which is used to determine whether the product is ready to be

deployed into a beta test environment by answering (among others) the following questions

• Is this product release stable and mature enough to be deployed in the user

community?

• Are all stakeholders ready for the transition into the user community?

• Are the actual resource expenditures versus planned expenditures still

acceptable?

10

Page 11: Rup

Transition Phase:

The transition phase is entered when a baseline is mature enough to be

deployed in the end-user domain.

Once the product has been given to the end user, issues usually arise that

require you to develop new releases, correct some problems, or finish the

features that were postponed.

• “beta testing” to validate the new system against user expectations

• conversion of operational databases

• training of users and maintainers

• roll-out the product to the marketing, distribution, and sales teams

11

Page 12: Rup

Iterations:

Each phase in the Rational Unified Process can be further broken

down into iterations. An iteration is a complete development loop

resulting in a release (internal or external) of an executable product,

a subset of the final product under development, which grows

incrementally from iteration to iteration to become the final system.

• Risks are mitigated earlier

• Change is more manageable

• The project team can learn along the way

• Better overall quality

12

Page 13: Rup

Static Aspect of RUP:

Static dimension of RUP consist of Some Roles ,Activities , Artifacts

and workflows.

Workflow is a way to describe meaningful sequences of activities that

produce some valuable result and to show interactions between

roles.Roles in RUP are assigned to Workers , and preparing an artifact

assign to Roles . Activities shows how a Role will do an assignment.

Static Elements

• Worker (Who)

• Activity (How)

• Artifact (What)

• Workflows or Disciplines (when)

13

Page 14: Rup

Worker,Activity ,Artifact: 14

Page 15: Rup

workflows in the RUP:

Business modelling: The business processes are modelled using

business use cases.

Requirements :Actors who interact with the system are identified

and use cases are developed to model the system requirements.

Analysis and design: A design model is created and documented using architectural models, component models, object models and

sequence models.

Implementation: The components in the system are implemented

and structured into implementation sub-systems. Automatic code generation from design models helps accelerate this process.

Testing: Testing is an iterative process that is carried out in

conjunction with implementation. System testing follows the

completion of the implementation.

15

Page 16: Rup

workflows in the RUP:

Deployment:A product release is created, distributed to users and

installed in their workplace.

Configuration and change management:This supporting workflow managed changes to the system

Project management:This supporting workflow manages the system

development

Environment:This workflow is concerned with making appropriate

software tools available to the software development team.

16

Page 17: Rup

RUP Good Practice:

Develop software iteratively

Plan increments based on customer priorities and deliver highest priority

increments first.

Manage requirements

Explicitly document customer requirements and keep track of changes to

these requirements.

Use component-based architectures

Organize the system architecture as a set of reusable components.

Visually model software

Use graphical UML models to present static and dynamic views of the

software.

17

Page 18: Rup

RUP Good Practice:

Verify software quality

Ensure that the software meet’s organizational quality standards.

Control changes to software

Manage software changes using a change management system and

configuration management tools.

18

Page 19: Rup