Run 16 RHIC Machine/Experiments Meeting 31 July 2016 • Summary Slides 1
Run 16 RHIC Machine/Experiments Meeting31 July 2016
• Summary Slides
1
Run 16 as run
2
19 January, Begin cool-down to 4.5K 22 January, Cool-down to 6K in Blue 24 January, Blue and Yellow at 4.5 deg K 02 February, Beam in Blue and Yellow at injection 07 February, Begin √s = 200 GeV/n AuAu physics 18 March, Physics program interrupted to troubleshoot then replace Blue Sector 10
dipole 19 Quench Protection Diode. 07 April, resume √s = 200 GeV/n AuAu physics. 09 May, end √s = 200 GeV/n AuAu physics run begin setup for √s = 200 GeV/n dAu
physics. 12 May, Begin √s = 200 GeV/n dAu physics 20 May, end √s = 200 GeV/n dAu physics run begin setup for √s = 62.6 GeV/n dAu
physics. 21 May, Begin √s = 62.6 GeV/n dAu physics 27 May, end √s = 62.6 GeV/n dAu physics run begin setup for √s = 19.6 GeV/n dAu
physics. 28 May, Begin √s = 19.6 GeV/n dAu physics. 08 June, end √s = 19.6 GeV/n dAu physics run begin setup for √s = 38 GeV/n dAu
physics. 10 June, Begin √s = 38 GeV/n dAu physics. 17 June, end √s = 38 GeV/n dAu physics run begin setup for √s = 200 GeV/n AuAu
physics. 17 June, resume √s = 200 GeV/n dAu physics. 27 June, end √s = 200 GeV/n dAu physics run. End Run 16. 28 June, begin Cryo warm up. 01 July, cryo warm up completed.
3
From Ingrassia, http://www.cadops.bnl.gov/AGS/Operations/Run16/
Through final fill 20207, 27 June 2016 max/min projections from Fischer et.al. “RHIC Collider Projections (FY2014-FY2018)”, 4 June 2013
4
5
0
50
100
150
200
250
0 1 2 3 4 5 6 7 8 9
Inte
grat
ed L
umin
osity
[nb^
-1]
Weeks in Physics
Run16 vs Run08 Delivered Luminosity d x Au √s = 200 GeV
Run16 integrated lumi STAR (0.44 ba. Lumi On/Off)Run16 integrated lumi PHENIX (0.50 ba Lumi On/Off)Run08 integrated lumi PHENIX (0.57 ba Physics On/Off)
6
7
8
Through Final Store 20207 26 June 2016
9
Through Final Store 20207 26 June 2016
10
11
0
100
200
300
400
500
600
700
800
2/1
2/8
2/15
2/22
2/29
3/7
3/14
3/21
3/28
4/4
4/11
4/18
4/25
5/2
5/9
5/16
5/23
5/30
6/6
6/13
6/20
6/27
7/4Lu
min
osity
per
day
[µb
-1]
Date in Run16
Run16 Luminosity Delivered to Phenix by day 100x100 GeV AuAu
12
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
0 5 10 15 20 25
Del
iver
ed Lu
min
osity
by
Wee
k [n
b-1]
Weeks in Physics
Run16 Integrated lumi delivered to PHENIX by week 100x100 GeV AuAu
23 January 2016, Blue and Yellow at 4.5 deg K
13
Who’s Who for 2016
14
Power Consumption
15
16
17
18
19