    RULES ENABLING THE NET-

    METERING PROGRAM FORRENEWABLE ENERGY

  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    3/25

    Outline

    1. Introduction

    2. Legal Basis

    3. Scope, Applicability & Qualification

    4. Interconnection Set-Up

    5. Pricing Methodology

    6. Net-Metering Charge

    7. Billing Charge

    8. Net-Metering Interconnection Standards

    9. Net-Metering Agreement template

    2

  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    4/25

    Introduction

    Resolution No. 9, Series of 2013 - A ResolutionAdopting the Rules Enabling the Net-MeteringProgram for Renewable Energy

    Components:Rules Enabling the Net-Metering Program (Annex A)

    Net-Metering Interconnection Standards (Annex A-1)Net-Metering Agreement Template (Annex A-2)

    Approved on May 27, 2013

    Effectivity on July 24, 2013

    3

  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    5/25

    Legal Basis

    Section 10 of R.A. 9513 and Section 7 of its IRRprovides that the ERC, in consultation with

    NREB, shall establish the net-meteringinterconnection standards and pricingmethodology.

    4

  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    6/25

    Scope, Applicability & Qualification

    Applicable to on-grid systems.Only for installation of < 100kW.

    For eligible RE Technologies such as wind, solar,biomass or biogas or other RE systems capable of

    being installed in the QEs premises. End-user should be in good credit standing in thepayment of electric bills to the DU.The RE System must be compliant with thestandards set in the PEC, PDC, DSOAR and the Net-Metering Interconnection Standards.

  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    7/25

    Interconnection Set-Up

    Either 2 uni-directional meters or one bi-directional meter. Third meter may also be

    installed to measure total RE generation.6

    Import Meter(delivered energy)

    Export Meter(received energy)

    REC Meter

    http://www.google.com.ph/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=SShkYLkC7lp7EM&tbnid=pd1qbJuMvJXpqM:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.philippinestodayus.com%2Fnews%2Fbusiness%2Fmeralco-nets-p7-8-b-in-first-half%2F&ei=EjgtUvqdGKm0iQfRtICYAg&bvm=bv.51773540,d.aGc&psig=AFQjCNEaXT_HXPAwlmTCv2LwM-u5DTwSuw&ust=1378780827672559http://www.google.com.ph/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=nbkfNeCJTiAtJM&tbnid=GeVYyMlx9JR9yM:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.webdesign.org%2Fphotoshop%2Fdrawing-techniques%2Fhow-to-draw-the-cartoon-sun-exclusive-tutorial.16991.html&ei=zzEtUuPdGOmOigem3YGoCQ&bvm=bv.51773540,d.aGc&psig=AFQjCNGaqMMP4rXJGFZ1BQ013XdcXWiLtg&ust=1378779958032261
  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    8/25

    Pricing Methodology

    Interim pricing for export energy is the DUsmonthly charge based on its blendedgeneration cost.

    This cost shall be automatically included inthe DUs total generation cost to be

    recovered from all its customers.

    7

  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    9/25

    Pricing Methodology

    8

    P5.6580

    Generation Transmission Distribution End-User

    P5.6580 P1.1839

    SL: P0.4723

    DSM: P1.9112

    Subs: P0.1093

    Tax: P0.9046UC: P0.1188 P11.1106/kWh+ =+

    http://www.google.com.ph/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=nbkfNeCJTiAtJM&tbnid=GeVYyMlx9JR9yM:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.webdesign.org%2Fphotoshop%2Fdrawing-techniques%2Fhow-to-draw-the-cartoon-sun-exclusive-tutorial.16991.html&ei=zzEtUuPdGOmOigem3YGoCQ&bvm=bv.51773540,d.aGc&psig=AFQjCNGaqMMP4rXJGFZ1BQ013XdcXWiLtg&ust=1378779958032261
  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    10/25

    Net-Metering Charge

    Net-metering charge is equivalent toPhP/customer/month supply and metering rates;plus the ERC-approved PhP/kWh metering ratebased on export energy.

    DUs may file for a different net-metering charge, ifnecessary.

  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    11/25

    Billing Charge

    Billing Charge:PhP for import energy

    Less: PhP export energy

    PhP credited in previous monthTOTAL

    If positive: QE shall pay this amount to DUIf negative: DU shall credit this amount to QEs next bill

  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    12/25

    Net-Metering Interconnection

    Standards

    Annex A-1

    11

  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    13/25

    Interconnection Standards

    General Guidelines

    Application for Interconnection

    System Parameters

    System ProtectionOperations & Maintenance

    Metering

    Testing & Commissioning

  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    14/25

    General GuidelinesDesign, installation, operations and maintenance shall be

    in consultation with the DU, since all specifications shallbe of DUs standards. System requirements shall be met at the ConnectionPoint.

    The DU shall only allow interconnection of RE facilitieswith up to 100kW capacity per QE account.The DU shall conduct inspections and shall remove thegeneration from DU system at any time due tomaintenance, test, repair and emergency conditions.QE to be liable for any damages of the DU should the QEexecute changes to the RE facilities without first informingthe DUs.

    http://www.google.com.ph/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=Car-v5sfHJVxnM&tbnid=37DT73Uilpzu4M:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.famu.edu%2Fcesta%2Fmain%2Findex.cfm%2Fnaval-sciences%2Fwelcome-aboard%2Fnew-student-forms%2F&ei=_i2cUvjVLu2NiAeiq4CYBg&bvm=bv.57155469,d.aGc&psig=AFQjCNHVNGSiW_53gUqrhJIxkT3j6C_UCg&ust=1386053494143966http://www.google.com.ph/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=Car-v5sfHJVxnM&tbnid=37DT73Uilpzu4M:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.famu.edu%2Fcesta%2Fmain%2Findex.cfm%2Fnaval-sciences%2Fwelcome-aboard%2Fnew-student-forms%2F&ei=_i2cUvjVLu2NiAeiq4CYBg&bvm=bv.57155469,d.aGc&psig=AFQjCNHVNGSiW_53gUqrhJIxkT3j6C_UCg&ust=1386053494143966
  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    15/25

    Application for Intercon nection

    QE and DUto enter

    into a Net-Metering

    Agreement.

    QE to

    senda letter requesting DU forinterconnection.

    DU toprovide

    informationto QE.

    QE to complete

    and file anapplication.

    DU toacknowledgewithin 10business daysfrom receipt.

    DU to determinewhether DISand/orDAS isnecessary.

    If yes:DU shall

    provideresults of study.

    DU, withQE toconducton-siteinspection.

    Pro forma agreements Application form

    Description of proposed connection Relevant Standard Planning Data Other data required by DU Completion date

    Technic al requi rementsSpecifi cationsListing of certifi ed equipment

    Application fee information

    Applicable rate schedulesMetering requirements

    http://www.google.com.ph/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=Car-v5sfHJVxnM&tbnid=37DT73Uilpzu4M:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.famu.edu%2Fcesta%2Fmain%2Findex.cfm%2Fnaval-sciences%2Fwelcome-aboard%2Fnew-student-forms%2F&ei=_i2cUvjVLu2NiAeiq4CYBg&bvm=bv.57155469,d.aGc&psig=AFQjCNHVNGSiW_53gUqrhJIxkT3j6C_UCg&ust=1386053494143966http://www.google.com.ph/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=Car-v5sfHJVxnM&tbnid=37DT73Uilpzu4M:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.famu.edu%2Fcesta%2Fmain%2Findex.cfm%2Fnaval-sciences%2Fwelcome-aboard%2Fnew-student-forms%2F&ei=_i2cUvjVLu2NiAeiq4CYBg&bvm=bv.57155469,d.aGc&psig=AFQjCNHVNGSiW_53gUqrhJIxkT3j6C_UCg&ust=1386053494143966http://www.google.com.ph/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=Car-v5sfHJVxnM&tbnid=37DT73Uilpzu4M:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.famu.edu%2Fcesta%2Fmain%2Findex.cfm%2Fnaval-sciences%2Fwelcome-aboard%2Fnew-student-forms%2F&ei=_i2cUvjVLu2NiAeiq4CYBg&bvm=bv.57155469,d.aGc&psig=AFQjCNHVNGSiW_53gUqrhJIxkT3j6C_UCg&ust=1386053494143966http://www.google.com.ph/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=6wBTJmtdMb_jxM&tbnid=bCGlh8W0hs6L3M:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.123rf.com%2Fphoto_9735904_girl-send-a-letter--illustration-isolated-on-white-background.html&ei=0CycUtHdD6P_iAfUj4GICA&bvm=bv.57155469,d.aGc&psig=AFQjCNEgHWu7yXswr7HukuHehaIutmu4BA&ust=1386053169772043http://www.google.com.ph/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=Car-v5sfHJVxnM&tbnid=37DT73Uilpzu4M:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.famu.edu%2Fcesta%2Fmain%2Findex.cfm%2Fnaval-sciences%2Fwelcome-aboard%2Fnew-student-forms%2F&ei=_i2cUvjVLu2NiAeiq4CYBg&bvm=bv.57155469,d.aGc&psig=AFQjCNHVNGSiW_53gUqrhJIxkT3j6C_UCg&ust=1386053494143966http://www.google.com.ph/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=Car-v5sfHJVxnM&tbnid=37DT73Uilpzu4M:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.famu.edu%2Fcesta%2Fmain%2Findex.cfm%2Fnaval-sciences%2Fwelcome-aboard%2Fnew-student-forms%2F&ei=_i2cUvjVLu2NiAeiq4CYBg&bvm=bv.57155469,d.aGc&psig=AFQjCNHVNGSiW_53gUqrhJIxkT3j6C_UCg&ust=1386053494143966http://www.google.com.ph/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=qGNjcoBkZLYuwM&tbnid=zKx-6suwWysj3M:&ved=0CAUQjRw&url=http%3A%2F%2Fdominicanewsonline.com%2Fnews%2Fhomepage%2Fnews%2Fbusiness%2Fgovernment-cdf-sign-18-4-million-loan-agreement%2F&ei=NyWcUtbhIYeFiAfz_4DICA&bvm=bv.57155469,d.aGc&psig=AFQjCNE0KEUAB4nrlvAaSKN_lsFWKKrydg&ust=1386050883671685http://www.google.com.ph/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=qGNjcoBkZLYuwM&tbnid=zKx-6suwWysj3M:&ved=0CAUQjRw&url=http%3A%2F%2Fdominicanewsonline.com%2Fnews%2Fhomepage%2Fnews%2Fbusiness%2Fgovernment-cdf-sign-18-4-million-loan-agreement%2F&ei=NyWcUtbhIYeFiAfz_4DICA&bvm=bv.57155469,d.aGc&psig=AFQjCNE0KEUAB4nrlvAaSKN_lsFWKKrydg&ust=1386050883671685http://www.google.com.ph/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=qGNjcoBkZLYuwM&tbnid=zKx-6suwWysj3M:&ved=0CAUQjRw&url=http%3A%2F%2Fdominicanewsonline.com%2Fnews%2Fhomepage%2Fnews%2Fbusiness%2Fgovernment-cdf-sign-18-4-million-loan-agreement%2F&ei=NyWcUtbhIYeFiAfz_4DICA&bvm=bv.57155469,d.aGc&psig=AFQjCNE0KEUAB4nrlvAaSKN_lsFWKKrydg&ust=1386050883671685http://www.google.com.ph/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=Car-v5sfHJVxnM&tbnid=37DT73Uilpzu4M:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.famu.edu%2Fcesta%2Fmain%2Findex.cfm%2Fnaval-sciences%2Fwelcome-aboard%2Fnew-student-forms%2F&ei=_i2cUvjVLu2NiAeiq4CYBg&bvm=bv.57155469,d.aGc&psig=AFQjCNHVNGSiW_53gUqrhJIxkT3j6C_UCg&ust=1386053494143966http://www.google.com.ph/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=yZbHRJ1VUgrAjM&tbnid=m52wH-zO1PwSsM:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.picstopin.com%2F1141%2Fbiotech-sample-cover-letter-by-carlos%2Fhttp%3A%257C%257Ci44*tinypic*com%257C27xgznl*jpg%2F&ei=mC2cUoObK4LziAfgrYC4CA&bvm=bv.57155469,d.aGc&psig=AFQjCNFkmA8pt5GJc4wyXYctDezcnbgVoQ&ust=1386053380152087http://www.google.com.ph/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=6wBTJmtdMb_jxM&tbnid=bCGlh8W0hs6L3M:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.123rf.com%2Fphoto_9735904_girl-send-a-letter--illustration-isolated-on-white-background.html&ei=0CycUtHdD6P_iAfUj4GICA&bvm=bv.57155469,d.aGc&psig=AFQjCNEgHWu7yXswr7HukuHehaIutmu4BA&ust=1386053169772043http://www.google.com.ph/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=qGNjcoBkZLYuwM&tbnid=zKx-6suwWysj3M:&ved=0CAUQjRw&url=http%3A%2F%2Fdominicanewsonline.com%2Fnews%2Fhomepage%2Fnews%2Fbusiness%2Fgovernment-cdf-sign-18-4-million-loan-agreement%2F&ei=NyWcUtbhIYeFiAfz_4DICA&bvm=bv.57155469,d.aGc&psig=AFQjCNE0KEUAB4nrlvAaSKN_lsFWKKrydg&ust=1386050883671685http://www.google.com.ph/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=Car-v5sfHJVxnM&tbnid=37DT73Uilpzu4M:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.famu.edu%2Fcesta%2Fmain%2Findex.cfm%2Fnaval-sciences%2Fwelcome-aboard%2Fnew-student-forms%2F&ei=_i2cUvjVLu2NiAeiq4CYBg&bvm=bv.57155469,d.aGc&psig=AFQjCNHVNGSiW_53gUqrhJIxkT3j6C_UCg&ust=1386053494143966http://www.google.com.ph/url?sa=i&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&docid=Car-v5sfHJVxnM&tbnid=37DT73Uilpzu4M:&ved=0CAUQjRw&url=http%3A%2F%2Fwww.famu.edu%2Fcesta%2Fmain%2Findex.cfm%2Fnaval-sciences%2Fwelcome-aboard%2Fnew-student-forms%2F&ei=_i2cUvjVLu2NiAeiq4CYBg&bvm=bv.57155469,d.aGc&psig=AFQjCNHVNGSiW_53gUqrhJIxkT3j6C_UCg&ust=1386053494143966
  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    16/25

    System Parameters

    Voltage Level - should be the same level as the DU with

    automatic method of disconnecting.Frequency 60 Hz with automatic method of disconnecting.Power Quality

    Limitation of DC injection not to inject current greater than0.5% of the full load rated output current at connection

    point.

    Flicker severity not to exceed 1.0 unit for ST and 0.8 units for LT.

    Harmonics within limits in Sec. 3.2.4 of PDCPower Factor not less than 85% lagging measured at theConnection Point.

  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    17/25

    System Protection

    Synchronization QE to provide synchronizing devices withtypical limits in the NM Standards.Islanding QE system should detect islanding and disconnectwithin 2 seconds from formation.

    Integration with DUs Distribution System Grounding shall begrounded in accordance to PEC.Protective Control Devices

    Disconnect device visible for use by the DU within 10 feet from connection point.

    Protective relays protective relays provided in NMStandards

    Reclosing immediate disconnection from the DU systemwhen the system is down.

  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    18/25

    Operations & Maintenance

    Facility should operate in parallel with theDU.

    QE must inform the DU if it is going tosynchronize.

    If the DU system is down, the facility shouldautomatically disconnect.

    QE to provide DU with contact numbers.

    QE shall maintain the facility in a safemanner as approved by the DU.

  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    19/25

    Metering

    MSP shall own and shall be responsible forthe operations and maintenance of themeter in accordance with Sec. 2.11 ofDSOAR.

    QE to provide space for the meteringfacilities.

    Metering facilities shall be installed in anaccessible and visible area for reading andtesting of both QE and DU.

  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    20/25

    Commissioning Test shall

    include the following:Verification andinspectionsProduction Test

    Response toabnormal voltageResponse toabnormal frequencySynchronization

    Unintentional islandingfunctionality testCease-to-energizefunctionality test

    Testing and Commissioning

    Commissioning test shallbe conducted after theinterconnection systemis installed.

    DU has the right towitness the testing andcommissioning.

    RE facility shall be

    equipped with whateverequipment is required toperform the test.

  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    21/25

    Net-Metering Agreement

    Annex A-2

    20

  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    22/25

    Net-Metering Agreement

    Parties: DU and Qualified End-user

    Mirrors the provision in the Rules Enabling the Net-Metering Program (i.e. Compliance Standards,Interconnection Set-Up, DU Inspection, MeterReadings, Pricing and Other Charges).

    To be submitted to ERC, DOE & NREB within 5 days

    from execution.

    Deemed approved and effective upon submission toERC.

  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    23/25

    ISSUES

    Annex A-2

    22

  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    24/25

    ISSUES

    1. DUs are not precluded under the Rules from paying our in

    cash its accumulated peso credit at the end of eachcalendar year.

    2. That QE is an entity distinct from that of an SGF and IPP,thus:

    It is not covered by the imposition of the universalcharge required of SGF.

    Shall apply for COC as QE.

    3. Customer who intends to install beyond 100kW: Must comply with the PDC and DU Standards Must apply for COC as SGF Must enter into PSA with a DU for ERCs approval

  • 8/12/2019 Rules Enabling TheNet-Metering Program For Renewable Energy

    25/25

    THANK YOU

    24

    www.erc.gov.ph

    http://www.erc.gov.ph/http://www.erc.gov.ph/