This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Montage Handbuch Huawei - Vodafone
BEP 2.0 Project Huawei RTN 900 Series (hybrid type)
Issue Entwurf
Date 07.12.2010
BOM
Huawei Technologies Co., Ltd. provides customers with comprehensive technical support and service. Please contact our local office or company headquarters.
No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co., Ltd.
Trademarks and Permissions
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective holders.
Notice
The information in this document is subject to change without notice. Every effort has been made in the preparation of this document to ensure accuracy of the contents, but all statements, information, and recommendations in this document do not constitute the warranty of any kind, express or implied.
Abbildung 50 Vulkanisierendes Band .......................................................................................................................52
Abbildung 64 Andrew Standard single pol. ...............................................................................................................67
Abbildung 65 Standard dual pol antenna ...................................................................................................................68
Abbildung 66 Kompaktes Antennensystem für XMC-ODU .....................................................................................68
Abbildung 67 Erdung einer Antenne .........................................................................................................................73
Abbildung 68 Huawei Richtfunk in einem Ericsson Cabinet ....................................................................................77
Abbildung 69 Beispiel Siemens + Delta Outdoor Cabinet ........................................................................................78
Abbildung 78 PIX-WRAP Adern mit Vorrat aufgelegt .............................................................................................79
Abbildung 79 Beispiel PIX+ in einem Delta outdoor Cabinet ..................................................................................79
Abbildung 80 PBR- und UBR-Anschlüsse ................................................................................................................80
Abbildung 81 PDR- und UDR-Anschlüsse ...............................................................................................................80
Tabellenverzeichnis
Tabelle 1 Indoor information report ..........................................................................................................................14
Tabelle 2 Indoor Kabel Information ..........................................................................................................................15
Tabelle 3 Outdoor Information ..................................................................................................................................16
Tabelle 4 Outdoor Kabel Information ........................................................................................................................16
Tabelle 5 Stromaufnahme der einzelnen Karten ........................................................................................................21
Tabelle 6 Sicherungskapazität für RTN equipment ...................................................................................................22
Tabelle 7 Abmessungen und Gewicht einer HP ODU ...............................................................................................23
Tabelle 8 Beschreibung der Schnittstellen .................................................................................................................24
Tabelle 9 Eigenschaften eines ODU-Adapters ..........................................................................................................26
Tabelle 10 Beschreibung des Anschlussglasches eines Hybrid-Kopplers .................................................................26
Tabelle 11 Schnittstellenbeschreibung einer XMC-ODU ..........................................................................................30
Tabelle 12 Beschreibung der Interfaces XMC-ODU .................................................................................................32
Tabelle 13 Anforderungen an Interfaces ....................................................................................................................36
Tabelle 23 Pin assignment of the MDI interface .......................................................................................................51
Tabelle 24 Pin assignment of the MDI-X interface ...................................................................................................51
Tabelle 25 Pin assignment of the straight through cable ...........................................................................................51
Tabelle 26 Pin assignment of the crossover cable .....................................................................................................52
Tabelle 28 Performance of a flexible waveguide .......................................................................................................57
Tabelle 30 Description of the ODU label ..................................................................................................................64
2.2.1 Platzbedarf in einem Systemtechnikschrank bei der Installation ........................................ 19
2.2.2 Platzbedarf bei IDU-Wandmontage .................................................................................... 20
2.3 DC Stromversorgung ..............................................................................................................................21
3 Montage eines Outdoor Units ............................................................................................................... 23
3.1 HP ODU Schnittstellen ...........................................................................................................................23
3.1.1 Abmessungen und Gewicht eines HP ODUs ...................................................................... 23
3.1.2 Beschreibung des “R” Interfaces eines HP ODUs .............................................................. 24
3.1.3 HP ODU Adapter ................................................................................................................ 25
3.1.4 HP ODU Koppler ................................................................................................................ 26
3.1.5 HP ODU Installation Mode ................................................................................................. 27
Dieses Handbuch wurde für das Vodafone BEP 2.0 Projekt erstellt. Das Installationshandbuch richtet sich an die Service Partner von Huawei. Dieses beschreibt verbindlich jegliche Richtfunkinstallation in den Vodafone Regionen: Nord, Nord-Ost, Ost und Süd. Zum Installationshandbuch ist das Vodafone Abnahme-Handbuch “FAcc RTN900” und der dazugehörige Appendix der jeweiligen Region anzuwenden.
Die Anmeldung muss nach Vodafone-Prozeduren erfolgen.
Fragen, Hinweise und Ergänzungen zum Handbuch richten Sie an:
Für jeden Richtfunkaufbau ist eine Standortbegehung notwendig. Als Ergebnis soll ein Site-Survey-Report vollständig ausgefüllt werden. Das SSR gilt als komplette Informationsquelle, welche alle Informationen für die Montageplanung eines Huawei Richtfunkssystems beinhaltet.
Item Result Remarks
IDU installation mode Die IDU wird standartmäßig in einem 19” Einbaurahmen installiert. Dafür stehen z.B. in einem Technikraum ein oder mehrere MW-Systemschänke zur Verfügung. Grundsätzlich soll die IDU in einem Systemschrank im unteren Einbauplatz eingebaut werden. Sollte im Systemschrank nicht genügend Platz für die IDU vorhanden sein, dann soll ein Zusatzsystemschrank installiert werden.
Zusatzleistungen wie z.B. Installation von zusätzlichen Systemschränken muss unbedingt mit dem regional zuständigen Bauleiter von Vodafone abgestimmt werden.
DDF Panel E1, RJ45, Coax, Wrap etc.
Grundsätzlich sollten alle vorhandenen Schnittstellen bis zum DDF aufgelegt werden. Alle notwendigen Übergabepunkte sind im Verteilerplan angegeben
Nach der Begehung muss dokumentiert werden, ob ein DDF Panel zu bestellen ist, , oder ob ein
Weitere Informationen, siehe Kapitel 4.4 DDF-Verteiler
ODF Panel type Bei der BTB sollen ODF Typen und deren Kuppler dokumentiert werden. Die Portbelegung wird vom Vodafone Netzplaner vorgegeben.
RG8 couple Panel Bei der Begehung soll die RG8 Kabelzuführung genau dokumentiert werden. Es wird auf folgendes geachtet: Roxtecs, Winkelverbindungsblech, Steckertyp, Verbinungsverkuppler, Jumper-Kabel (N-type beidseitig, gerade, Langloch, Winkelstecker usw.) RG8-Distribution panel sollen bei der Richtfunkinstallation vorhanden sein.
Cabinet Neuer Systemschrank erforderlich?
Muss ein neuer Systemschrank eingebaut werden, dann muss es mit Vodafone abgestimmt werden. Es muss ein freier Rackplatz vorhanden sein. Die erforderlichen Abmessungen sollen beim Site Survey dokumentiert werden.
Typ, Abmessungen, Racklayout
Der Typ und das Racklayout werden von Vodafone vorgegeben.
Power type Bei der Begehung sollen die Leistung der -48V Stromanlage und DC-Leitungsschutzschalter überprüft werden. Sollten für den Richtfunk Sicherungsautomaten vorhanden sein, sind diese mit einem Label zu versehen.. Haben die Sicherungen nicht die richtige Kapazität, sind sie auszutauschen.
Whether to purchase the PDU Es ist darauf zu achten, dass die Sicherungsautomaten für 6A bzw, 10A ausgelegt sind. Sind keine ausreichenden Sicherungen vorhanden, müssen diese nachbestellt und durch eine Elektrofachkraft installiert werden. min.6A RTN910 laut VFD2 Spezifikation
Ethernet cable RJ45, CAT5+, CAT6 Total number of RJ-45 connectors:
Total length of Ethernet cables:
External clock/time cable Es ist zu überprüfen, ob am Standort externer Takt einzuspeissen ist. Im gegebenen Fall, Kabelweg und –länge aufnehmen. 2Mbit/2Mhz
Tabelle 2 Indoor Kabel Information
Item Description Remarks
Turm Ist ein Hubsteiger oder einen Kran notwendig?
Typ des Steigschutzes Dokumentieren Sie den Typ des Steigschutzes und prüfen Sie ob der Zugang zum Steigschutz gewährleistet ist.
Überprüfen, ob die zugewiesenen Aufstellplätze ausreichen
Bei Unstimmigkeiten, den Zuständigen Bauleiter verständigen.
Halterung Antenne Benötigt man einen zusätzlichen Ausleger oder ein Tragrohr?
Länge und Durchmesser, sowie Traglast des Auslegers bestimmen
Art der ODU-Installation Direkte oder abgesetzte Montage
Überprüfen ob der geplante Antennenstellplatz frei ist.
Sollte die vorhandene Antenne nicht getauscht werden, dann müssen unbedingt die Spezifikationen der Antenne dokumentiert werden
Frequenzbereich, Anschlussflansch, Band und Typ der Antenne.
Tabelle 3 Outdoor Information
Cable Name Total Length Remarks
IF Kabel Gesamtlänge des RG8 Kabels darf 300m nicht überschreiten
IF Kabel ground kits Pieces: RG8 Kabel wird vor der ODU, vor der Einführung ins Cabinet und alle 20m geerdet
IF Kabel Schellen Pieces: Bei vorhandenen Kabelwegen auf 2-fach oder 3-fach Schellung tauschen, bei Neubau ist der Abstand der Schellen wie folgt: horizontal – 50cm und vertikal – 1m
Das Equipment ist in der Originalverpackung zur Station zu transportieren, auch wenn ein Prestaging durchgeführt wurde. Dies ist notwendig um Beschädigungen während des Transports zu vermeiden.
Es ist zu überprüfen, ob das Material komplett geliefert wurde. Hierfür muss das Material mit den Angaben vom Lieferschein (Delivery Note) verglichen werden. Sollte etwas fehlen, ist zeitnah der Cargo Problem Report auszufüllen und an den Huawei Support Engineer zu senden.
Siehe dazu das Dokument “Huawei’s Cargo Problem Report”.
1.4.2 Entsorgung
Nach Abschluss der Arbeiten ist der Technikraum sauber zu verlassen. Verpackungs- und Restmaterial ist vom Standort zu entfernen und fachgerecht zu entsorgen.
Die IDU der RTN 900 Serie besteht aus mehreren Baugruppen, die im IDU Rahmen eingebaut sind. Der IDU Rahmen ist eine (RTN 910) bzw. zwei (RTN 950) Höheneinheiten hoch.
Die IDU kann in einem Systemtechnikschrank, an der Wand oder auf einer ebenen Fläche installiert werden.
Innerhalb des Systemtechnikschrankes sind alle erforderlichen Konstruktionen, die für die Befestigung der einzelnen Einbaugeräte erforderlich sind, einzubauen. Soweit als möglich ist genormtes bzw. standardisiertes Material zu verwenden.
Abmasse der IDU
442 mm x 220 mm x 44 mm (Breite x Tiefe x Höhe) RTN910 1HE 442 mm x 220 mm x 88 mm (Breite x Tiefe x Höhe) RTN950 2HE
IDU 910 und 950 werden standardmässig mit zwei Einbauwinkeln für 19” Systemtechnik oder ETSI-Systemschrank ausgeliefert und montiert.
Abbildung 3 RTN950 Montage in einem 19" Systemtechnikschrank
Die Position der IDU’s ist dem Racklayout zu entnehmen.
RTN910 und RTN950 besitzen einen Lüfter, der für eine Querdurchströmung mit Frischluft sorgt. Aus klimatischen Gründen wäre es sinnvoll zusätzlich 1HE zwischen der Technik freizulassen, ist aber nicht zwingend erforderlich.
2.2.1 Platzbedarf in einem Systemtechnikschrank bei der Installation
Abbildung 4 IDU Platzbedarf im Systemtechnikschrank
Für die richtige Belüftung des RTN in Abb.4 sollte der erforderliche Freiraum von, 25mm rechts und links, und 66.5mm im Frontbereich eingehalten werden. Die entsprechende Kabelverlegung soll so realisiert werden, dass der Luftstrom unbehindert zirkulieren kann.
2.2.2 Platzbedarf bei IDU-Wandmontage
Abbildung 5 IDU Platzbedarf bei Wandmontage
Anmerkung: Es soll ein Freiraum von 50mm von oben und unten für die Luftdurchströmung freigehalten werden. Für die Verkabelung benötigt man 800mm, um den den einwandfreien Zugang zu ermöglichen.
Alle Sicherungsautomaten, welche im laufenden Betrieb ausgetauscht werden müssen, um eine Anpassung an den Bedarf des RTN950 sicherzustellen, müssen durch Fachpersonal getauscht werden.
IDU Type Rated Voltage Voltage Range Number of Input Power Supplies
Recommended Fuse Capacity
RTN 910 IDU -48 V -38.4 V to -60 V 2 6A*
RTN 950 IDU -48 V -38.4 V to -60 V 2 10A*
Tabelle 6 Sicherungskapazität für RTN equipment
*) Für den RTN910 sind 6A Sicherungen für alle Konfigurationen ausreichend. Für den
RTN950 sind 10A ausreichend, solange nicht mehr als 4 ODU’s verwendet werden. Ab 5 ODU’s werden 20A empfohlen.
Hintergrund:
Vodafone HQ sieht nicht vor, dass ein RTN950 mit mehr als 4 ODU konfiguriert wird.
2.3.3 AC/DC Konverter
Eaton für indoor Variante: siehe Eaton Installation Guide
Eaton für outdoor Variante: siehe Eaton Installation Guide
2.3.4 PDU Stromunterverteiler
Die Montage einer Spannungsunterverteilung muss von einer, durch Vodafone zertifizierten Elektro-Fachkraft durchgeführt werden.
2.3.5 Gesicherte Stromzuführung
RTN910 besitzt nur eine PIU-Karte mit zwei Stromanschlüssen.
RTN950 hat zwei PIU-Karten mit jeweils einem Stromanschluss.
Es ist darauf zu achten, dass die ODU’s entsprechend des Abrufs and der korrekten Seite des Links verbaut werden. Oberband und Unterband dürfen nicht vertauscht werden.
Die ODU muß in einer Position montiert werden, die einen sicheren Zugang für Wartungs- und Instandsetzungsarbeiten ermöglicht. Die vier Klammern müssen vollständig und sicher einrasten. Die ODU ist so zu montieren, dass der Anschluss für das ZF-Kabel nicht nach oben zeigt. Sollten Änderungen zum Antennenaufstellplan vorgenommen werden, dann sind diese mit dem zuständigen Vodafonplaner abzustimmen.
3.1 HP ODU Schnittstellen
3.1.1 Abmessungen und Gewicht eines HP ODUs
Im BEP Projekt werden ausschließlich High Power ODU`s verwendet
Abbildung 6 ODU Interfaces (7-38 GHz)
Item Performance
Dimensions 280 mm x 92 mm x 280 mm (width x depth x height)
Antenna interface Connects the antenna or the hybrid coupler. 1.025" dia (7 GHz frequency band)
153IEC-R140 (15 GHz frequency band)
153IEC-R220 (18/23/26 GHz frequency band)
153IEC-R320 (32 GHz frequency band)
0.219" dia (38 GHz frequency band)
IF interface Connects the IF cable. Type-N (female)
RSSI interface Connects the multimeter during the RSSI test. BNC (female)
Grounding bolt Connects the protection ground cable. 5 mm bolt
Tabelle 8 Beschreibung der Schnittstellen
3.1.2 Beschreibung des “R” Interfaces einer HP ODU
Die HF-Anschlüsse einer HP-ODU und die entsprechenden Anschlüsse einer Richtfunkantenne oder eines Kopplers sind als “R”-Anschluss definiert.
Abbildung 7 HP-ODU Radio-Anschluss
“R”-Anschlüsse können ausschliesslich mit “R”-Anschlüssen verbunden werden. Das bedeutet, dass es nicht möglich ist, einen “R”-Anschluss auf einen Standard Flange (“H”-Anschluss) zu montieren.
Abbildung 8 “R”-Anschluss einer Richtfunkantenne
Der “R”-Anschluss ist hervorgehoben (“male”) und kann nicht an einem Standard Flange fixiert werden.
hybrid coupler 153IEC-R140 (15 GHz frequency band)
153IEC-R220 (18/23/26 GHz frequency band)
153IEC-R320 (32 GHz frequency band)
0.219" dia (38 GHz frequency band)
At the side of the flexible waveguide
154IEC-UBR84 (7 GHz frequency band)
154IEC-UBR140 (15 GHz frequency band)
154IEC-UBR220 (18/23/26 GHz frequency band)
154IEC-UBR320 (32/38 GHz frequency band)
Tabelle 9 Eigenschaften eines ODU-Adapters
3.1.4 HP ODU Koppler
Abbildung 12 Schnittstellen eines Hybrid-Kopplers
Interface Mark Function Type of Connector
Antenna interface - Connects to the antenna. 1.025" dia (7/8 GHz frequency band) 153IEC-R120 (11/13 GHz frequency band) 153IEC-R140 (15 GHz frequency band) 153IEC-R220 (18/23/26 GHz frequency band)
Primary branch interface MAIN Connects to the active ODU.
153IEC-R320 (32 GHz frequency band)
Secondary branch interface STD BY
Connects to the standby ODU.
0.219" dia (38 GHz frequency band)
Tabelle 10 Beschreibung Anschlussflansch eines Hybrid-Koppler
1. Der Flanch an der Antennenseite ist “female”. Bei abgesetzter Montage benötigt man einen ODU-Adapter sowie Hohlleiter. Es ist darauf zu achten, das ein PBR-PBR Hohleiter verwendet wird, da die ODU und die Antenne über UBR Anschlüsse verfügen.
2. Der Koppler wird mit den Befestigungs Klips und den Schrauben befestigt..
3. ODU-seitig ist der Anschluss “male” und nur für Kompaktmontage geeignet.
3.1.5 HP ODU Installation Mode
“Direkte Montage” einer HP ODU auf einer single polarisierten
Antenne
Abbildung 14 Female "R"-Anschlussflansch
Abbildung 15 Fixierung einer ODU mit Hilfe von Befestigungs Klips
1 Hook The hook is used together with the hook trough to facilitate the installation of the ODU.
2 Polarization direction identifier
H: Horizontal polarization
V: Vertical polarization
3 Cooling fins The 45° slant angle of the cooling fins ensures the ventilation of the ODU in horizontal-polarized and vertical-polarized conditions to facilitate heat dissipation.
4 Handle The handle is used to facilitate the holding and installation of the ODU.
5 RSSI interface
Siehe Tabelle Interface-Beschreibung XMC-ODU 6 IF interface
7 Grounding screw
8 Cut corner horizontal and vertical conditions, cables are inclined from the cut corner to enhance waterproof reliability.
Tabelle 11 Schnittstellenbeschreibung einer XMC-ODU
ODUs sind in der Regel mit leitfähigen Verschraubungen an geerdeten Halterungen montiert. Trotzdem ist eine separate Erdung am Erdungspunkt des Gerätes erforderlich.
Der Anschlussflansch einer XMC-ODU ist “male” und besteht aus einem Standard Flansch mit 4 Fixierungslöchern.
Abbildung 23 RF Interface einer Antennas für XMC-ODU
Der Anschlussflansch einer Antenne für XMC-ODUs ist “female” und besteht aus einem Standard Flansch.
Abbildung 24 RF Interface eines Kopplers
Der Anschlussflansch eines Kopplers ist “male” und besteht aus einem Standard Flansch mit 4 Fixierungslöchern. Die XMC-ODU-Seite hat einen “female” Anschluß.
Antenna interface The antenna interface is a waveguide interface that is connected to an antenna, a hybrid coupler, a compatible adapter, or a flexible waveguide.
153IEC-R84, can be interconnected with the PBR84 (7 GHz) 153IEC-R140, can be interconnected with the PBR140 (15 GHz) 153IEC-R220, can be interconnected with the PBR220 (23 GHz)
IF interface The IF interface is connected to the IDU through an IF cable.
Type-N (female)
RSSI interface Connects the multimeter during the RSSI test.
BNC (female)
Grounding screw Connects the protection ground cable.
M5 screw
Tabelle 12 Beschreibung der Interfaces XMC-ODU
Bei Nichtübereinstimmung der Interfaces zwischen Antenne, ODU-Adapter und flexiblem Hohlleiter besteht auch die Möglichkeit des Einsatzes eines „Flange Converters“. Die entsprechenden Spezifikationen können bei Bedarf von Huawei angefordert werden.
Die Anforderungen für den Betrieb der ODU sind wie folgt definiert:
• Umgebungstemperatur: -35oC to +55oC
• Relative Feuchtigkeit: 15% to 100%
• Relative Temperaturänderung: ≤ 0.5oC/min
• Regenrate: ≤ 6 mm/min
• Atmosphärischer Druck: 70 kPa to 106 kPa
• Sonnenstrahlung: ≤ 1120 W/m3
• Windgeschwindigkeit: ≤ 50 m/s
Im Allgemeinen sind keine zusätzlichen Maßnahmen notwendig um die Betriebsbedingungen der ODU-Einheit sicherzustellen. In speziellen Fällen können bestimmte Maßnahmen, wie z.B. die Installation eines Sonnenschutzes, durchgeführt werden.
Es gelten alle Installationsvorschriften aus dem Vodafone Handbuch „ Leistungsbeschreibung Elektrotechnik und Blitzschutz für GU-Pauschalvergabe an
VFD2 Standorten 09-03-25“.
Die Kabeleinführung in Outdoor Cabinets erfolgt hauptsächlich von unten. Kabeleinführungen müssen eventuell mit PG-Verschraubungen ausgeführt werden.
Generell sind im Verteiler entsprechende Zugentlastungen vorzusehen.
Jedes Kabel ist mit einer gut lesbaren, maschinell erstellten und dauerhaften Beschriftung zu versehen.
ZF- und Stromversorgungskabel sollen sauber zur Seite abgeführt werden.
4.1.2 Stromkabel
Das Stromversorgungskabel verbindet die PIU-Karte einer IDU mit einem Sicherungsautomaten, welcher die Spannung von -48V leitet und überwacht.
Bei der Montage sind beidseitig passende Kabelstifte zu verwenden. Die Verlegung erfolgt ausschließlich auf der linken Seite.
Es werden nur Kabel mit einem PVC Aussenmantel verwendet!
Abbildung 33 Beispiel eines 2-adrigen Stromkabels mit Außenmantel.
Die Farbe des Aussenmantels ist nicht spezifiziert, aber es ist darauf zu achten, dass an allen Standorten ähnliche Kabelfarben verwendet werden. Somit ist ein standardisiertes Layout der Standorte gewährleistet.Von seiten Huawei werden 2,5mm² für den RTN910, 6mm² für den RTN950 empfohlen und bereitgestellt.
Installationshinweise: entsprechenden Kabelschuh verwenden. Das Schuhloch muss mit Erdungsklemmenloch übereinstimmen.
Item Wire Related Parameter Terminal Related Parameter
Protection grounding cable
Electronic/Electric wire, 450 V/750 V, H07Z, K, 6 mm2, yellow green, fire resistant cable with low smoke and no halogen
General terminal, OT, 6 mm2, M6, tin plating, pre-insulated ring terminal, 12-10AWG, yellow
Tabelle 15 Spezifikation Erdungskabel
4.1.4 RG8 Jumper Kabel von Huawei
IF-Jumper verbindet die IDU (IF Board) über ein RG8-Abfangs-Panel (CCP) mit dem RG8-Kabel. Das Jumperkabel wird von Huawei geliefert (Bomcode:99042MWD, RF Cable, 2m, TNC50AM-III,RG-223/U,N50SF,N-Type Connector)
Generell werden RG8 Jumperkabel über ein Blechpanel mit dem Feederkabel verbunden. Diese Installationsweise verhindert jeglichen Einfluss von aussen auf die sensible Technik im Systemschrank.
Bei der Netzplanung wird festgelegt welche Eigenschaften die optische STM-1 Schnittstelle haben soll. Folgende Tabelle gibt den Netzplanern eine Übersicht über die möglichen Schnittstellenkonfigurationen.
Im Beispiel, soll der Eingangspegel des Empfängers mit einem festen Dämfungsglied so eingestellt werden, dass der optische Pegel bei -17...-19 dBm liegt.
Das E1 Trunk-Kabel ist einseitig vorkonfektioniert (Anea 96). Das andere Ende ist offen. Die Adern des E1-Trunk-Kabels sind aus starrem Kupferdraht gefertigt. Der Durchmesser einer Einzelader beträgt 0.5mm
Item Description
Connector X Cable connector- Anea 96
Cable type Communication cable-120 ohms; 0.5 mm-24AWG
Abbildung 44 Front panel CSHC; rot markiert E1 interface
The performance of the E1 interface is compliant with ITU-T G.703/G.823.
E1 Verkabelung zum DDF
Das E1 Trunk Kabel wird genutzt um die einzelnen E1 Ports vom E1 Board der IDU zum DDF zu verkabeln.
Jedes E1 Trunk Kabel kann bis zu 16 Mal E1 übertragen. Der Wellenwiderstand des Kabels ist 120 Ohm.
Der Kupferleiter besteht aus massivem Draht und kann sowohl auf LSA+ als auch PIX-Wrap-Kontake aufgelegt werden.
Beschriftung erfolgt nach Vorgaben des FACC Handbuchs von Vodafone. Um nähere Information zu erhalten, siehe Kapitel “Beschriftungsanforderungen durch Vodafone”.
Cable Diagram
Abbildung 45 E1 Trunk Kabel mit einem Anea 96 - Stecker (female)
Bei Outdoor Cabinets ist der Einsatz eines RJ45 Patchfeldes vorgesehen. Es wird ein Verteilerfeld von ADC-Krone Cat5eingesetzt.. Das Panel sollte mindestens 16 Ports haben und maximmal eine HE hoch sein. Katalognummer: 66901402-16/32 (16 Port-Panel, 32 Port Panel)
Abbildung 46 16, 24, 32 Modulare Verteilerfelder für Cat 5
Bei der Ericsson Outdoor BTS, muss ein Adapter (SubD9 auf RJ45 über starres Ethernet Kabel, 50cm) gefertigt werden. Folgende Pin-Belegung muss beachtet werden.
Abbildung 47 Ericsson Octopus Kabel Cable Pin-Belegung
Notiz: Zwischen Sub-D 9Pol Stecker gibt es einen Tx/Rx-Konverter. Dieser wird nach dem Technik-Swap zwar nicht mehr verwendet, soll aber trotzdem im Cabinet hinterlegt werden.
DDF Verteilungsfelder
Bei Vodafone werden für elektrische E1 folgende Verteilerbezeichnungen verwendet:
DF001 & DF101 sind E1-Verteiler
z.Bsp.DF001 DC101 PIX-Shelf mit 56 Karten
DF001 DD101 PIX+ Verteiler mit 64 Karten
Die Verteiler-Belegung ist vom regionalen VFD2 Planer im Verteilerplan vorgegeben.
Abbildung 48 Wrap PIX-PLUS Verteiler von ADC-Krone
PIX-Plus Verteiler wird im unteren Bereich aufgewrappt! Der obere Bereich ist ausschließlich für Rangierungen vorbehalten.
Abbildung 50 Ethernet optical Front panel of the CSHC
Board Feature Code
Module Type BOM Code of the Module
01 1000BASE-SX (Multi-mode, 0.5 km) 34060286
02 1000BASE-LX (Single-mode, 10 km) 34060473
03 10/100/1000BASE-T(X) (100m) 34100052
Tabelle 22 BOM Board feature code of the EM6F
Die Ethernetports können mit SFP Modulen ausgestattet werden. Dafür stehen GE multimode optisch (850nm SX) , singlemode optisch (1310nm LX) und RJ45 elektrisch SFPs zur Verfügung.
Elektrische Schnittstelle (GE elektrisch / FE 10/100)
Das Netzwerkkabel verbinden 2 Ethernet-Geräte. Beide Anschlüsse sind mit einem RJ-45 Stecker terminiert.
Bei der Installation müssen die herstellerspezifischen Biegeradien eingehalten werden.
Bei Vodafone werden nur flexible Hohlleiter eingesetzt mit einer max. Länge von 0,9m. Es wird empfohlen PBR-PBR Waveguides einzusetzen, da die Andrewantenne und der ODU Adapter ein UBR Interface hat, und somit auf ein Druckfenster verzichtet werden kann.
Sollte PBR auf PBR Interface treffen, sollten Adapterbleche oder Druckfenster eingesetzt werden.
Andrewantenne und ODU sind bis zu einen Druck von 0,5psa druckdicht, d.h. bei einem belüfteten Hohlleiter sind keine Druckfenster erforderlich.
Interface At the side of the ODU adapter 154IEC-PBR84 (7 GHz frequency band)
154IEC-PBR140 (15 GHz frequency band)
154IEC-PBR220 (18/23/26 GHz frequency band)
At the side of the antenna adapter 154IEC-PBR320 (32/38 GHz frequency band)
Maximum twist degree (the whole flexible waveguide, unifirmly twisting)
249°(7 GHz frequency band)
405°(15 GHz frequency band)
465°(18/23/26/32/38 GHz frequency band)
Minimum E-bend radius 76 mm (7 GHz frequency band)
52 mm (15 GHz frequency band)
38 mm (18/23/26/32/38 GHz frequency band)
Minimum H-bend radius 152 mm (7 GHz frequency band)
102 mm (15 GHz frequency band)
76 mm (18/23/26/32/38 GHz frequency band)
Tabelle 28 Performance of a flexible waveguide
4.3 Sicherung und Stromversorgung
4.3.1 Stromsicherung
Die Stromsicherung soll entsprechend der Vorgaben des Netzbetreibers erfolgen.
4.4 DDF Verteiler
Folgende Verteiler sind zugelassen:
- RJ45-Coupler-Panel, Cat6, Kabel beidseitig RJ45
- HK Cat5a 32 Port RJ45 Panel (temp. für Outdoor – Schränke), einseitig offene Kabelenden für E1-Verschaltungen (16 und 24-Port – Varianten sind ebenfalls verfügbar)
- KM8, Cat6, 32 Port RJ45 Panel, einseitig offene Kabelenden für LAN bis GigabitEthernet
Indicates the transmit frequency range (MHz) of the ODU.
(2): T/R spacing Indicates the T/R spacing (MHz) of the ODU.
Some ODUs support two T/R spacings, refer to Technical Specifications for detail.
(3): Tx high/low station
Hi: Tx high station
Lo: Tx low station
Serial number of the ODU (S/N) - Identifies the ODU uniquely.
Bar code area - Indicates the bar code of the serial number of the ODU.
Tabelle 30 Description of the ODU label
4.6.6 Stromversorgung
Die Gerätsabsicherung erfolgt über einen von der Versorgungsspannung getrennten Sicherungsabgangverteiler mit min.6A bzw. 10A Leitungsschutzschlatern (C-Charakteristik).
Die Sicherungsautomaten werden mit der Netzelementekennung für PIU A und PIU-B gekennzeichnet.
Die optischen Fasern sind beidseitig 5cm nach dem Stecker mit dem Prinzip „Standort nach Ziel“ zu kennzeichnen. LWL werden beidseitig mit einem Label versehen (empfohlen Label IDXpert Artnr.800743 Band:XSL96-427)), die Beschriftung erfolgt nach folgenden Konzept
In BEP2.0 werden ausschliesslich Antennen vom Hersteller “ANDREW” verwendet. Hierzu werden die verschieden Anschlüsse näher betrachtet und erklärt.
4.7.1 Standard Flange
Das folgende Bild zeigt eine Standard Flange ANDREW Antennenausführung. Das Standard Flange ist ein “H” Interface und darauf passen Hohlleiter zur festen Montage.
Die obere Ausführung zeigt, das das „Kundenspezifische“ Flange entfernt wurde und mit der „Standard transition“ von Andrew ausgerüstet wurde, im BEP2.0 Projekt werden die „kompakten“ Antennen mit kundenspezifischen Transition für HP-ODU ausgeliefert.
Die „Standard transition Umbau-Kits“ haben folgende Artikelbezeichnungen:
VTRANS-15-2-KIT ...für 15GHz
VTRANS-18-2-KIT ...für 18GHz
VTRANS-23-2-KIT ...für 23GHz
VTRANS-26-2-KIT ...für 26GHz
Laut ANDREW Communications gibt es für die Frequenzen 32 und 38 keine Umbau-Kits.
Es muss dazu erwähnt werden, dass der Umbau nur bei grossen Antennen einen Vorteil bringt, bei kleinen Frequenzen erst ab 6GHz.
Die Wiederverwendung von Antennen wird von Huawei nicht empfohlen, weil die Prozedur im Labor nicht getestet wurde und stellt eine Gefahr für die einwandfreie Operation nach dem Swap dar.
Das nächste Bild zeigt wie man mit Hilfe von OMT aus einer Standard Flange Interface von einer single Pole Antenne, eine dual Pole Antenne realisiert.
Zum Umbau auf die „Standard Dual Antenne“ müssen bei der kundenspezifischen single Antenne für die HP ODU folgende Schritte durchgeführt werden:
1. Die HP-ODU-Halterungssystem entfernen
2. Radio Transition entfernen
3. Mit Umbau-Kit auf die Standard Transition ändern
4. OMT montieren
Das Resultat ist die obere Abbildung „Dual Pol non-integrated antenna with OMT“.
Abbildung 72 Kompaktes Antennensystem für XMC-ODU
Notiz: 1. Andrew Standart Antenna, 2. XMC-ODU Halterung, 3. XMC-ODU Transition mit Standard „H“ Interface, 4. XMC-ODU
Produktbeschreibungen und Installationanleitungen können bei Huawei angefordert werden. In folgender Tabelle finden Sie die Übersicht über vohandene Antennentypen.
Die Installation der Antennen soll nach allgemeinen Hersteller- und Vodafone-Vorschriften durchgeführt werden.
Bei der Bestückung sind die Paired Slots der IFU zu beachten, Slot 1+2, Slot 3+5, Slot 4+6 (Protection SD, FD) Bei HSB können die IFU Packs beliebig eingebaut werden (empfohlen linke Seite zwecks Verkabelung) Es wird empfohlen die SL1D,EM6F und die SP3D auf die Slots 2/4/6 zu bestücken um die Verkabelung nach rechts abführen zu können Die Verkabelung von Power erfolgt auf der linken Seite Die Verkabelung der IF-Boards erfolgt bei Slot 1/3/5 auf der linken Seite, bei Slot 2/4/6 auf der rechten Seite.
* Alle Schnittstellen der Geräte werden auf Verteiler aufgelegt. Dazu gehören:
G E1 Trunk Kabel, offenes Ende oder 16 x Sub d9 Stecker als Octopus Adapter
Huawei (HQ)
H RG8 Jumper Kabel, N-Typ Huawei
I RG8 Grounding Climp Service Partner(local)
J RG8 Kabel Service Partner(local)
K ODU-Erdungskabel Huawei
L Flexibler Hohlleiter Service Partner(local)
M Antenne-Erdungskabel Huawei
Tabelle 32 Kabelübersicht
Allgemein: Alle DDFs, Sicherungen sollen von Vodafone // Service Partner beschafft werden.
5.3 Outdoor Standorte
5.3.1 Ericsson – ohne LTE!
Wenn es von Vodafone erwünscht ist, dann wäre es möglich einen einfachen Link komplett in einem bestehendem Ericsson outdoor cabinet parallel aufzubauen.
Abbildung 75 Huawei Richtfunk in einem Ericsson Cabinet
Für die obere Konfiguration braucht man zusätzliches Installationsmaterial:
1. Glassicherungen, 6A oder 10A
2. Für die Fuse Panel ein Stromstecker von Fa. Stuttman
3. 16 x E1 Trunk Kabel mit Sub d9 Steckern
5.3.2 Siemens
Die Stromversorgung des Siemens Systemschrankes hat nicht genügend Kapazität für die RTN910 oder RTN950 Richtfunk-Geräte. Daher wird bei so einem Standort das HUAWEI Richtfunkgerät in einem zusätzlichem Delta Outdoor Kabinett installiert.
Erweiterungsmöglichkeiten sind zu berücksichtigen! Siehe dazu nächste Abbildung!
Abbildung 76 Beispiel Siemens + Delta Outdoor Cabinet
5.3.3 Pix Verteiler
Die DDF-Verteiler werden immer beschriftet. Die Überlänge is möglichst kurz zu halten, damit die Kabelwege nicht zu voll werden. Pix+ Verteiler wird immer im unteren Bereich aufwrap. E1 Ports werden 1:1 aufgelegt und nicht TX/RX gedreht.
Abbildung 78 Beispiel PIX+ in einem Delta outdoor Cabinet
5.3.4 Anschluss-Flange
Alle flexiblen Hohlleiter verfügen einseitig über einen druckdichten PDR-Anschluss oder PBR (Anschluss mit Fräsung für die Aufnahme eines Gummi-Dichtungsringes). Die andere Seite besteht aus einer nicht druckdichten Variante UDR, bzw. UBR (glatter
Anschluss ohne Fräsung). Es sollten flexible Waveguides der Ausführung PBR-PBR verwendet erden, da die Andrewantenne und die ODU ein UBR Interface hat.
Abbildung 79 PBR- und UBR-Anschlüsse
Abbildung 80 PDR- und UDR-Anschlüsse
Bei der Montage eines Hohlleiters ist grundsätzlich darauf zu achten, dass PBR/PDR auf UBR/UDR trifft. Zwei PBR/PDR Anschlüssen dürfen nie direkt aufeinander treffen, da sonst ein Gummiring auf dem anderen Gummiring liegen würde. Bei einem PBR/PDR Anschluss ist immer darauf zu achten, dass der passende Gummiring eingelegt wird.
Gummiringe sind grundsätzlich mit einer dünnen Schicht Silikon zu versehen (Vaseline/Silikon zur Vermeidung von Material – Versprödung). Bei sämtlichen Verbindungen von Hohlleitern ist auf die Wasserdichtigkeit zu achten.